Hebbronville Texas Directional Boring: Delmita Soil, Highway 16 and Noriacitas Creek

Quick Answer: Hebbronville is an unincorporated community in Jim Hogg County, so Galbraith Street is not city owned; we do directional boring, also called horizontal directional drilling (HDD), for crossings of Texas State Highway 16. Our Yukon, Oklahoma main office is 635 road miles from Hebbronville, where CPKC (Kansas City Southern) track is another crossing to plan around. The USDA soil survey maps Delmita fine sandy loam across 43 percent of the area and cemented material at about 40 inches in 77 percent, which can affect reaming and bore depth.

Family Business Since 1965 Boring Since 1982 24 Hour Phone No Utility Strike in 25 Years

Hebbronville bores at a glance

  • County seat of Jim Hogg County, Texas. Population 4,101 (2020 Census count).
  • Road distance from our Yukon, Oklahoma main office: 635 miles, about 12.7 hours of driving.
  • Ground: Delmita soil is mapped on 47 percent of the area, with cemented material about 40 inches down.
  • Rock: no bedrock is mapped in the top 60 inches.
  • Highways inside the boundary: Texas State Highway 16, Texas State Highway 359, FM 1017 and Texas State Highway 285. State permit office: TxDOT Pharr District.
  • Railroad track inside the boundary: CPKC (Kansas City Southern), with 13 mapped street and rail crossings.
  • Named streams inside the boundary: Noriacitas Creek and Mesquite Creek.
  • Texas811: locate request at least two working days before a bore and no more than 14 days ahead.
  • Range: 3/4 inch service lines to 48 inch casing, 10 feet to 5,000 feet.
  • Phone answered 24 hours a day: (405) 409-7423

Who does directional boring under Texas State Highway 16 in Hebbronville?

Hebbronville is an unincorporated community and the county seat, so its streets are not controlled by a city government. The Census Bureau counted 4,101 people here in 2020; it does not publish yearly estimates for unincorporated places. We install water, sewer, gas, electric conduit and fiber lines, including along Smith Avenue or beneath Texas State Highway 16 where a route needs a crossing.

Our main office is in Yukon, Oklahoma, and Hebbronville work is done with our own crews and from satellite yards run by partner drilling contractors Trinity has personally vetted. We handle jobs from 3/4 inch service lines to 48 inch casing, from short connections near Galbraith Street to longer crossings. For directional boring in Hebbronville, our family business started in 1965, and we have done this work since 1982.

Aerial view of a bore pit with drill rig and conduit alongside a directional drill rig and conduit on a concrete lot
Our crew at a bore pit beside the directional drill on a conduit job, seen from above. Photos on this page are from our jobs in Oklahoma and Texas.

How does Delmita soil affect a Hebbronville bore?

The USDA soil survey maps Delmita soil across 47 percent of Hebbronville, with Delmita fine sandy loam mapped across 43 percent. Surface texture is mostly fine sandy loam, with fine sand and loamy fine sand also mapped. At about 40 inches, cemented material is mapped across 77 percent of the area; sandy clay loam is mapped across 22 percent, and average clay content at that depth is 25 percent. In Hebbronville, we distinguish mapped soil patterns from test borings when planning a crossing. The mix means the route and actual ground conditions matter when choosing reaming steps.

USDA soil survey, inside the Hebbronville mapped community boundaryWhat is mapped
Soil series mappedDelmita 47 percent, Cuevitas 17 percent, Randado 13 percent, Nueces 13 percent and Brennan 6 percent
Texture at the surfacefine sandy loam 80 percent, fine sand 13 percent and loamy fine sand 7 percent
Texture about 40 inches downcemented material 77 percent and sandy clay loam 22 percent
Engineering class about 40 inches downclayey sand (SC) 22 percent
Average clay content about 40 inches down25 percent
Bedrock mapped within 60 inchesNone mapped
Seasonal water table within 60 inches0 percent of the area
Flood prone soils0 percent of the area
High corrosion risk for uncoated steel0 percent of the area

In Hebbronville, we do not see bedrock mapped in the top five feet, though deeper rock remains possible. Seasonal water tables and flood prone soils are not mapped in the USDA survey, which informs pit planning but does not replace checking the site. The survey does not mark areas of high steel corrosion risk. The geologic map shows Holocene sand sheet, about 0.5 to 5 m thick, and Pliocene sedimentary deposits; loose sand can need support to keep a bore open.

What does it take to bore cemented material in Hebbronville?

The USDA soil survey maps cemented material at about 40 inches across much of Hebbronville. We use the planned depth and site checks to choose the approach, rather than treating the mapped layer as a test result.

  1. On a route through Delmita fine sandy loam, we use staged reaming and have the pipe ready before the final pass so loose ground has less time to fall in.
  2. Where cemented material is mapped near 40 inches, we check the planned depth and ground conditions before selecting the tooling and pace for a bore.
  3. Before drilling near Galbraith Street, we hydrovac expose each marked utility on the route because locate paint shows position, not burial depth.
  4. At Noriacitas Creek, we track the drill head from the surface and log depth and pitch so the crossing profile stays under review.
Open bore pit in red Oklahoma dirt with white PVC conduit stub ups and an orange safety barrier
An open bore pit in red Oklahoma dirt with PVC conduit stubbed up and a safety barrier around it.

Where does a line have to go under Noriacitas Creek in Hebbronville?

Texas State Highway 16, Texas State Highway 359, FM 1017 and Texas State Highway 285 run inside the mapped Hebbronville community boundary. Galbraith Street is the longest named street at 2.17 miles; Smith Avenue runs 1.96 miles, and Lucille Street runs 1.52 miles. Oak Avenue is also a long route through the community. A bore beneath pavement avoids cutting across the surface, while the highway owner’s requirements set the crossing plan and cover.

CrossingTypeMapped extentWho has a say
Texas State Highway 16State highway7.1 roadway miles insideState highway office
Texas State Highway 359State highway4.2 roadway miles insideState highway office
FM 1017State highway1 roadway miles insideState highway office
Texas State Highway 285State highway1 roadway miles insideState highway office
CPKC (Kansas City Southern)Railroad2.95 track miles insideThe railroad
Noriacitas CreekStream2.88 channel miles insideChecked for Corps of Engineers jurisdiction
Mesquite CreekStream0.91 channel miles insideChecked for Corps of Engineers jurisdiction
Swipe the table sideways to see every column.

CPKC (Kansas City Southern) owns 2.95 track miles inside Hebbronville on its Laredo Subdivision, so a route beneath the line needs railroad coordination. Public records map 13 street and rail crossings. Noriacitas Creek runs 2.88 channel miles inside the community, and Mesquite Creek runs 0.91 miles; 12 street crossings of named streams are mapped. No lakes or ponds are mapped within one mile, but a creek route still needs site and jurisdiction checks.

Who approves a bore in Hebbronville and Jim Hogg County?

Hebbronville has no city government, so a street permit is not issued by a city department; the responsible county or state authority depends on the route. Work in the right of way of Texas State Highway 16 or another state highway needs a TxDOT utility permit. The TxDOT Pharr District reviews it, and the utility that owns the line files through RULIS; we prepare the bore plan and profile for that application. A crossing under CPKC (Kansas City Southern) also needs an agreement with the railroad. Noriacitas Creek is checked for federal jurisdiction during planning.

Read the rules for yourself: Texas Utilities Code Chapter 251 on notice to Texas811, the Texas811 questions and answers page, the TxDOT Utility Accommodation Rules, 43 TAC 21.40 and TxDOT utility permits in RULIS.

Who owns the lines in Hebbronville and Jim Hogg County?

The water provider for a specific Hebbronville address must be confirmed with the county or local water district before a bore is planned; available records do not identify a provider for the community. AEP Texas Central and Medina Electric Cooperative report electric service in Jim Hogg County, but that does not establish which serves a particular address. Before an electric conduit route near Smith Avenue is planned, we confirm the line owner for that location.

Line ownerWhat it isSourceSize
AEP Texas Central and Medina Electric CooperativeElectric utilities reporting service in Jim Hogg CountyEIA Form 861Confirm the line owner by address
Swipe the table sideways to see every column.

The American Community Survey 2019 to 2023 estimates give Hebbronville a median housing year of 1975: 24 percent of units were built before 1960, 62 percent from 1960 to 1999, and 14 percent in 2000 or later. That age range can mean either replacing buried lines or adding a service near Oak Avenue. We hydrovac expose marked utilities along the planned path before drilling near them; paint shows position, not depth.

Hydrovac truck and boring equipment staged beside an airport taxiway for utility daylighting in Oklahoma City
Our hydrovac truck and boring equipment beside an airport taxiway in Oklahoma City, set up to expose a utility crossing.

Do you cover South Fork Estates and Hebbronville?

Hebbronville is the county seat of Jim Hogg County, covers 6.48 square miles and sits at 596 feet in elevation. ZIP code 78361 serves the community. Las Lomitas is 1.7 miles northeast; South Fork Estates is 4.5 miles southwest, and Thompsonville is 7.6 miles southwest. From our Yukon, Oklahoma main office, Hebbronville is 635 road miles away, a 12.7 hour drive for planning. Those distances matter when planning equipment and crew mobilization for a route near Texas State Highway 16.

Places near Hebbronville

What would we bore near Galbraith Street in Hebbronville?

  • Highway crossing: A bore beneath Texas State Highway 16 avoids cutting the pavement, with cover and route requirements set through the TxDOT permit.
  • Water service: A service near Smith Avenue needs the address specific water provider confirmed before we plan a connection or crossing.
  • Fiber conduit: A conduit route along Galbraith Street can use a bore to pass beneath pavement without opening a long surface trench.
  • Creek crossing: A route beneath Noriacitas Creek needs depth planning and a check for federal jurisdiction during the crossing review.
  • Rail crossing: A bore beneath the CPKC (Kansas City Southern) Laredo Subdivision needs an agreement with the track owner.
  • Electric conduit: Before planning near Oak Avenue, we identify which Jim Hogg County electric provider owns the line at that address.

More on each kind of work: water line boring, electric line boring, fiber optic boring, road, railroad and creek crossings and municipal boring.

What drives the price of a Hebbronville bore near CPKC (Kansas City Southern)?

For a route near Galbraith Street, start with its address or map pin. Tell us what goes underground, such as a water line or fiber conduit, then give the pipe or conduit size and footage. A sketch or plans help show whether the route crosses Texas State Highway 16, Noriacitas Creek or a CPKC track.

A short service route along Smith Avenue with clear access is simpler to plan than a long crossing beneath Texas State Highway 16 or CPKC (Kansas City Southern). Price depends on length, pipe size, soil conditions, utilities to expose, pavement, creek crossings, pits and backfill. Delmita soil and cemented material can affect the drilling plan; the 635 road miles from Yukon also affect mobilization. For high profile or emergency boring work in Hebbronville, we plan for added demands.

Questions people ask about boring in Hebbronville

Does Trinity take directional boring jobs in Hebbronville and Jim Hogg County?

Yes. We take directional boring work in Hebbronville, and Trinity stays responsible for the job from the first call through the bore log. The work is staffed with our own crews or crews from partner drilling contractors we have vetted. For a route under Texas State Highway 16, the utility owner still handles its permit application.

How old are buried lines near Smith Avenue in Hebbronville?

Public records do not give the age of individual buried lines. The American Community Survey 2019 to 2023 estimates put the median housing year at 1975, with 24 percent of units built before 1960. A replacement bore near Smith Avenue may need to connect to older infrastructure, so marked lines are exposed before drilling nearby.

What ground will a bore pass through in Hebbronville’s Delmita soil?

The USDA soil survey maps Delmita soil across 47 percent of Hebbronville, mostly as fine sandy loam at the surface. At about 40 inches, cemented material is mapped across 77 percent of the area, with sandy clay loam also present. Those map patterns help with planning, but they are not a substitute for checking the route.

Could a directional bore in Hebbronville hit deeper rock, since bedrock is not mapped in the top five feet?

Bedrock is not mapped in Hebbronville’s top five feet, but that does not rule out deeper rock. The geologic map shows Holocene sand sheet and Pliocene sedimentary deposits. A route near Noriacitas Creek still needs site specific depth planning because mapped geology describes broad units, not conditions at every bore location.

For a crossing beneath Texas State Highway 16 in Hebbronville, who approves the bore?

TxDOT reviews a utility permit for work in the Texas State Highway 16 right of way through its Pharr District. The utility that owns the line submits the application in RULIS, and we prepare the bore plan and profile for it. A crossing under Galbraith Street instead follows the authority responsible for that county road.

What does a bore under CPKC (Kansas City Southern) in Hebbronville need?

A crossing under the CPKC (Kansas City Southern) Laredo Subdivision needs an agreement from the railroad that owns the track. The agreement sets crossing conditions such as casing, depth and flagging. Public records map 2.95 track miles inside Hebbronville, so the proposed alignment needs to be checked against the track location.

What bore sizes and lengths can Trinity handle near Oak Avenue in Hebbronville?

We handle lines from 3/4 inch service size up to 48 inch casing, with bore lengths from 10 feet to 5,000 feet. A service near Oak Avenue and a longer crossing of Texas State Highway 16 can call for different equipment and planning. The route, pipe size and ground conditions help determine the setup.

How much 811 notice is needed for a bore near Galbraith Street in Hebbronville?

Texas811 requires a locate request at least 48 hours before excavation, excluding Saturdays, Sundays and legal holidays, and no earlier than 14 days before it. If our Hebbronville start moves more than 14 days past the original notice, we make a new request. Marks near Galbraith Street that wear off or move must be refreshed through Texas811 before work continues.

What affects the cost of directional boring near Texas State Highway 16 in Hebbronville?

Length, pipe or conduit size, soil, utility crossings, pavement, pits and creek crossings all affect the job scope. Cemented material mapped beneath parts of Hebbronville may change the drilling plan, while a Texas State Highway 16 crossing adds permit and route considerations. Mobilization also reflects the 635 road miles from our Yukon office.

Where the Hebbronville facts on this page come from

Darren Rice in a safety vest at the bore pit beside the Trinity Boring Solutions Ditch Witch directional drill, with drill rods racked, on the airfield at Will Rogers World Airport in Oklahoma City

About Trinity Boring Solutions

Trinity Boring Solutions is a family business in Yukon, Oklahoma, founded by Dean Rice in 1965 and owned today by Darren Rice, who started its directional boring side in 1982. The company bores across Oklahoma and Texas. No bore is too big or too small: 4 foot sidewalk sleeves to roughly 4,100 feet under the Arkansas River in Tulsa. Reach us at (405) 409-7423.

Get a Quote for a Bore in Hebbronville

Send the address, what is going in, the size and the footage.

Trinity Boring Solutions
9102 NW Expressway, Yukon, OK 73099
(405) 409-7423 | darren@trinityboringsolutions.com

Trinity Boring Solutions | 24/7 Available ☎ Call (405) 409-7423 Free Quote

Free Bore Planner

Plan Your Bore in Hebbronville, Texas

Type the address of your job in Hebbronville. The Bore Planner opens an aerial map at that spot. Drop one pin where the bore starts and one where it ends, tell us what is going in and send the scope to our crew.

Talk to the crew that does the work

Fastest way to a number is a phone call. Tell us where the crossing is and what is going in the ground, and you will get a straight answer on the same call. Bores from 10 feet to 5,000 feet, 3/4 inch service line through 48 inch casing, anywhere in Oklahoma and Texas. We run 24/7 for main breaks and emergency repairs.

Call (405) 409-7423

Answered by a person, not a call center.

Would rather not call? Send the details and we will come back with a written quote.

Quick Quote In Page

County and State Pages for Hebbronville

Same county: Guerra. All counties: Texas county list.