Mineola Texas Directional Boring: Gladewater Clay, US 69 and Union Pacific Track
Quick Answer: Can we get your line beneath US 69, the Union Pacific track or Sabine River without cutting the surface? Yes, our directional boring, also called horizontal directional drilling (HDD), can put a line below those Mineola crossings. Mineola is 285 road miles from our Yukon, Oklahoma main office, so distance matters for a route near Broad Street. Gladewater clay covers 37 percent of the mapped area, and sticky cuttings can call for staged reaming and careful fluid control. We install water, sewer, gas, electric conduit and fiber in Mineola, where the City of Mineola owns the public water system.
Mineola bores at a glance
- Incorporated city in Wood County, Texas. Population 5,380 (Census Bureau 2024 estimate).
- Road distance from our Yukon, Oklahoma main office: 285 miles, about 5.8 hours of driving.
- Ground: Gladewater soil is mapped on 37 percent of the area, with clay about 40 inches down.
- Rock: bedrock is mapped within 60 inches on 15 percent of the area.
- Highways inside the boundary: US 69, US 80, Loop 564, FM 1254 and Texas State Highway 37. State permit office: TxDOT Tyler District.
- Railroad track inside the boundary: Union Pacific, with 4 mapped street and rail crossings.
- Named streams inside the boundary: Sabine River, Lechner Creek, Benham Creek and Smith Creek.
- Public water: City of Mineola, groundwater wells.
- Texas811: locate request at least two working days before a bore and no more than 14 days ahead.
- Range: 3/4 inch service lines to 48 inch casing, 10 feet to 5,000 feet.
- Phone answered 24 hours a day: (405) 409-7423
Who can I call for Mineola directional boring near Union Pacific track?
Trinity Boring Solutions takes directional boring and horizontal directional drilling (HDD) work in Mineola, Wood County, including routes beneath US 69. Can we get your line beneath a road, track or creek without cutting the surface? We plan bores for water, sewer, gas, electric conduit and fiber, such as a service route crossing Broad Street. The Census Bureau Vintage 2024 estimate puts Mineola’s population at 5,380.
Our main office is in Yukon, Oklahoma, and Mineola work is done with our own crews and from satellite yards run by partner drilling contractors Trinity has personally vetted. Our family business started in 1965, and we have done directional boring since 1982, experience we apply when planning work near US 69 in Mineola. For a Mineola crossing, we handle lines from 3/4 inch service lines up to 48 inch casing, with bore lengths from 10 feet to 5,000 feet.

What is Mineola ground like to bore in Gladewater soil?
Mineola ground varies across mapped Gladewater clay and sandy loam, so a bore route can change character from one block to the next. The USDA soil survey maps Gladewater clay, 0 to 1 percent slopes, frequently flooded, across 37 percent of the area. At 40 inches below the surface, clay is mapped across 73 percent, while sandy clay loam accounts for 14 percent. We use Mineola’s mapped clay patterns to plan bore routes, but treat them as soil maps, not test borings. In sticky clay, cuttings can cling to a reamer and swelling ground can grip pipe, so the drilling plan matters.
| USDA soil survey, inside the Mineola city limits | What is mapped |
|---|---|
| Soil series mapped | Gladewater 37 percent, Freestone 21 percent, Woodtell 17 percent, Wolfpen 13 percent and Manco 6 percent |
| Texture at the surface | clay 37 percent, fine sandy loam 23 percent and loam 22 percent |
| Texture about 40 inches down | clay 73 percent, sandy clay loam 14 percent and clay loam 9 percent |
| Engineering class about 40 inches down | fat clay (CH) 74 percent, clayey sand (SC) 14 percent and lean clay (CL) 7 percent |
| Average clay content about 40 inches down | 49 percent |
| Bedrock mapped within 60 inches | 15 percent of the area (0 percent hard rock, 15 percent weathered rock) |
| Seasonal water table within 60 inches | 78 percent of the area |
| Flood prone soils | 43 percent of the area |
| High corrosion risk for uncoated steel | 81 percent of the area |
The soil survey maps weathered bedrock within 60 inches across 15 percent of Mineola, with typical bedrock depth at 57 inches; expect some routes to slow as they meet firmer material. A seasonal water table is mapped within 60 inches across 78 percent, and flood prone soils across 43 percent, so pits near Sabine River or Lechner Creek may need water management and a channel aware depth plan. High steel corrosion risk covers 81 percent. The geologic map includes Queen City Sand of Lutetian age, with sand and claystone, so ground conditions can vary along a bore.
How do we plan a bore through Mineola clay?
For Mineola’s mapped Gladewater clay, we manage sticky cuttings and watch fluid returns rather than pushing the reamer too fast. The route under US 69 also calls for checking the marked utilities before drilling near them.
- In Mineola’s Gladewater clay, we keep fluid thinner and ream in stages so sticky cuttings do not build up on the reamer.
- Where seasonal water is mapped near Sabine River, we use compact pits and pump as needed to manage water at the bore ends.
- Before a bore near Broad Street reaches a marked utility, we hydrovac expose it because surface paint shows position, not depth.
- On a route crossing US 69, a walkover locator follows the drill head while we log depth and pitch as the bore advances.

Where might a Mineola line have to go under US 69?
Mineola’s routes may meet US 69, US 80, Loop 564, FM 1254, Texas State Highway 37, FM 49 or FM 1801. A line under US 69 or US 80 can be bored so the pavement stays intact. Broad Street is the longest named street in the city at 5.06 miles, followed by Pacific Street at 2.79 miles and Newsom Street at 1.94 miles. Those streets can mean more than one driveway or buried line to account for along a longer route.
| Crossing | Type | Mapped extent | Who has a say |
|---|---|---|---|
| US 69 | US highway | 6.1 roadway miles inside | State highway office |
| US 80 | US highway | 5.1 roadway miles inside | State highway office |
| Loop 564 | State highway | 4.2 roadway miles inside | State highway office |
| FM 1254 | State highway | 1.7 roadway miles inside | State highway office |
| Texas State Highway 37 | State highway | 1.2 roadway miles inside | State highway office |
| FM 49 | State highway | 0.9 roadway miles inside | State highway office |
| FM 1801 | State highway | 0.6 roadway miles inside | State highway office |
| Union Pacific | Railroad | 2.94 track miles inside | The railroad |
| Sabine River | Stream | 19.21 channel miles inside | Checked for Corps of Engineers jurisdiction |
| Lechner Creek | Stream | 2.48 channel miles inside | Checked for Corps of Engineers jurisdiction |
| Benham Creek | Stream | 2.08 channel miles inside | Checked for Corps of Engineers jurisdiction |
| Smith Creek | Stream | 1.45 channel miles inside | Checked for Corps of Engineers jurisdiction |
| Dodson Creek | Stream | 0.97 channel miles inside | Checked for Corps of Engineers jurisdiction |
| Winding Creek | Stream nearby | Along the boundary | Checked for Corps of Engineers jurisdiction |
Union Pacific has 2.94 track miles inside Mineola, on the Union Pacific Mineola Subdivision, and the mapped street and rail crossing count is 4. A rail route needs the track owner’s crossing agreement, which sets the crossing conditions. The Sabine River runs 19.21 channel miles in the city; Lechner Creek and Benham Creek are also mapped. Public mapping shows 16 street crossings of named streams, so a crossing plan near a creek or Spring Lake needs attention to water and access.
Who signs off on Mineola bores in Wood County?
Mineola is incorporated, so its city streets belong to the city; for a route on US 69, US 80 or another state highway right of way, the line owner, not the driller, applies for the TxDOT utility permit through RULIS. The TxDOT Tyler District reviews Wood County applications. We prepare the bore plan and profile for the owner’s filing. TxDOT cover rules call for at least 60 inches for electric and communication lines crossing a highway, and 60 inches for water crossings; the permit can set another depth. The Union Pacific track needs a crossing agreement, and a Sabine River or creek crossing is checked for Corps jurisdiction during planning.
Read the rules for yourself: Texas Utilities Code Chapter 251 on notice to Texas811, the Texas811 questions and answers page, the TxDOT Utility Accommodation Rules, 43 TAC 21.40 and TxDOT utility permits in RULIS.
Which utilities serve Mineola near the City of Mineola water system?
The City of Mineola public water system uses groundwater wells and reports 2,578 service connections serving 4,515 people. For a route near that system, we identify the line owner before planning a water bore. Wood County electric service is reported by Oncor Electric Delivery Company, Southwestern Electric Power, Farmers Electric Cooperative, Upshur Rural Electric Cooperative and Wood County Electric Cooperative. Those countywide reports do not identify the provider at every Mineola address, so the owner is confirmed before an electric conduit route is planned.
| Line owner | What it is | Source | Size |
|---|---|---|---|
| City of Mineola | Public water system | Groundwater wells | 2,578 connections, 4,515 people served |
| Oncor Electric Delivery Company, Southwestern Electric Power, Farmers Electric Cooperative, Upshur Rural Electric Cooperative and Wood County Electric Cooperative | Electric utilities reporting service in Wood County | EIA Form 861 | Confirm the line owner by address |
The American Community Survey 2019 to 2023 five year estimates put Mineola’s median housing year at 1978: 19 percent of units were built before 1960, 73 percent from 1960 to 1999 and 8 percent in 2000 or later. That mix can mean a project is replacing older service or connecting newer construction along Newsom Street. We hydrovac expose marked utilities before drilling near them, including lines near the City of Mineola water system and the confirmed electric owner.

How far is Mineola from Hideaway and our Yukon yard?
Mineola is an incorporated city in Wood County, at an elevation of 394 feet and covering 10.31 square miles. ZIP code 75773 serves Mineola, helping us identify the city when preparing underground work plans. Hideaway is 11.0 miles south, Lindale is 11.8 miles south, and Quitman, the Wood County seat, is 10.0 miles north. Tyler is 25.3 miles southeast. Mineola is 285 road miles and a 5.8 hour drive from our Yukon, Oklahoma main office, a distance that can affect mobilization for a route near Broad Street.
Places near Mineola
- Directional boring in Quitman: 10 miles north
- Directional boring in Hideaway: 11 miles south
- Directional boring in Lindale: 11.8 miles south
- Directional boring in Van: 12.8 miles southwest
- Directional boring in Alba: 12.8 miles northwest
- Directional boring in Tyler: 25.3 miles southeast
Which Mineola jobs call for a bore near Broad Street?
- Highway crossing: A route beneath US 69 keeps the existing pavement uncut and needs a plan for the road right of way.
- Water service: A line near the City of Mineola water system can connect service while avoiding the marked water lines.
- Fiber route: A conduit crossing Broad Street can carry fiber beneath pavement, driveways and existing buried utilities.
- Creek crossing: A bore near Lechner Creek can pass below the channel, with water jurisdiction checked during planning.
- Rail crossing: A line beneath Union Pacific track needs the railroad owner’s crossing agreement before the bore is planned.
- Drainage route: Around Sabine River, flood prone soils and the mapped seasonal water table shape pit placement and bore depth.
More on each kind of work: water line boring, electric line boring, fiber optic boring, road, railroad and creek crossings and municipal boring.
What should I send for a Mineola quote near the Sabine River?
For a Mineola quote, start with the address or map pin, such as a point on Broad Street or near the Sabine River. Tell us what will go underground, whether it is water, sewer, gas, electric conduit or fiber, then give the pipe or conduit size and footage. A sketch or plans help us see the route and its crossings.
The price follows the actual route and conditions, not just the footage. Gladewater clay can affect reaming and fluid handling, while a crossing under US 69 or the Union Pacific track adds coordination and exposure work. We also account for pipe size, soil and rock, pavement, how many utilities need exposing, creek crossings, pits and excavator time. Mineola’s 285 road miles from Yukon can affect mobilization, and high profile or emergency work can change the scope.
Questions people ask about boring in Mineola
Does Trinity take directional boring jobs in Mineola and Wood County?
Yes, Trinity takes directional boring and horizontal directional drilling (HDD) work in Mineola and across Texas. Mineola projects are done by our own crews or from satellite yards run by partner drilling contractors we have vetted. You deal with Trinity through planning and the bore log, whether the route is under US 69 or across a local street.
Who must approve our bore under US 69 in Mineola?
TxDOT reviews a utility permit for work in the US 69 right of way through its Tyler District. The line owner files the application in RULIS, and we provide the bore plan and profile for that filing. The route and required cover are set through the permit process for the Mineola crossing.
What does a Mineola bore beneath Union Pacific track require?
A bore beneath Union Pacific track in Mineola requires a crossing agreement from the railroad that owns the track. The agreement sets conditions such as casing, depth and flagging. The city has 2.94 track miles, so the planned route needs to identify where it meets the railroad before drilling is scheduled.
Can you bore a line under Sabine River in Mineola?
A line can be planned beneath Sabine River, which runs 19.21 channel miles within Mineola. The route needs to account for flood prone soils and the channel, and the crossing is checked for U.S. Army Corps of Engineers jurisdiction during planning. Site conditions determine the bore path and pit locations.
Who runs Mineola’s public water system, and does it draw from groundwater wells?
We plan underground work with Mineola’s groundwater wells in mind because the City of Mineola owns its public water system, supplied by those wells. The system reports 2,578 service connections serving 4,515 people. For a bore near that water network, the planned route needs to account for marked lines and confirm the owner of each utility along the way.
Which electric company serves a Mineola address in Wood County?
Several providers report electric service in Wood County: Oncor Electric Delivery Company, Southwestern Electric Power, Farmers Electric Cooperative, Upshur Rural Electric Cooperative and Wood County Electric Cooperative. Those reports do not establish which company serves a particular Mineola address. Confirm the line owner before planning an electric conduit bore.
Can I reach Trinity after hours for an urgent bore on Newsom Street in Mineola?
Yes, a person answers Trinity’s phone 24 hours a day at (405) 409-7423. For an urgent job near Newsom Street, we can discuss the location, the line and the crossing conditions before planning a response. Trinity also provides 24 hour emergency response.
How early should I call 811 for a bore near Broad Street in Mineola?
For a bore near Broad Street, Texas law requires a Texas811 locate request at least 48 hours before excavation, excluding Saturdays, Sundays and legal holidays, and no earlier than 14 days before work. If the start slips more than 14 days past the notice, make a new request. In Mineola, we refresh marks that wear off or move through Texas811 before resuming work, keeping the bore route aligned with current markings.
What affects the cost of directional boring under US 69 in Mineola?
The cost of a Mineola bore under US 69 depends on the work involved: length, pipe or conduit size, soil and rock, pavement, utility crossings and potholing, pits, and excavator time. Gladewater clay can affect drilling, and mobilization reflects the distance from Yukon. A creek or railroad crossing can also change the planning and work required.
Where the Mineola facts on this page come from
- USDA Natural Resources Conservation Service, Soil Data Access: soil survey map units inside Mineola
- U.S. Census Bureau, TIGER/Line 2024: Mineola boundary, roads, rail lines and streams
- U.S. Census Bureau, Vintage 2024 population estimates: Mineola
- U.S. Census Bureau, American Community Survey 2019 to 2023: Mineola housing units and year built
- Macrostrat geologic map compilation: map units under Mineola
- U.S. EPA Safe Drinking Water Information System: public water systems serving Mineola
- U.S. Department of Transportation, North American Rail Network: track owners in Wood County
- U.S. Energy Information Administration, Form EIA 861: electric utilities serving Wood County
- U.S. Geological Survey, Elevation Point Query Service: Mineola elevation
- OpenStreetMap road network through the OSRM router: road miles from Yukon, Oklahoma to Mineola
- Texas Utilities Code Chapter 251, Underground Facility Damage Prevention and Safety
- TxDOT Utility Accommodation Rules, 43 Tex. Admin. Code 21.40: underground utilities
- Texas Department of Transportation: Right of Way Utility and Leasing Information System (RULIS) utility permits
Get a Quote for a Bore in Mineola
Send the address, what is going in, the size and the footage.
Trinity Boring Solutions
9102 NW Expressway, Yukon, OK 73099
(405) 409-7423 | darren@trinityboringsolutions.com
Free Bore Planner
Plan Your Bore in Mineola, Texas
Type the address of your job in Mineola. The Bore Planner opens an aerial map at that spot. Drop one pin where the bore starts and one where it ends, tell us what is going in and send the scope to our crew.
Talk to the crew that does the work
Fastest way to a number is a phone call. Tell us where the crossing is and what is going in the ground, and you will get a straight answer on the same call. Bores from 10 feet to 5,000 feet, 3/4 inch service line through 48 inch casing, anywhere in Oklahoma and Texas. We run 24/7 for main breaks and emergency repairs.
Answered by a person, not a call center.
Would rather not call? Send the details and we will come back with a written quote.