Holly Lake Ranch Texas Directional Boring: Darco Fine Sand, FM 49 and Big Sandy Creek

Quick Answer: At Big Sandy Creek and FM 49, Trinity Boring Solutions takes directional boring work, also called horizontal directional drilling (HDD), in Holly Lake Ranch, Texas. FM 2869 is another state road a bore may need to pass beneath. The Yukon main office is 304 road miles from Holly Trail, a distance that affects crew mobilization. Darco fine sand is widely mapped, so the bore plan must account for sand that can fall in behind the drill.

Family Business Since 1965 Boring Since 1982 24 Hour Phone No Utility Strike in 25 Years

Holly Lake Ranch bores at a glance

  • Unincorporated community in Wood County, Texas. Population 2,951 (2020 Census count).
  • Road distance from our Yukon, Oklahoma main office: 304 miles, about 6.2 hours of driving.
  • Ground: Darco soil is mapped on 35 percent of the area, with fine sand about 40 inches down.
  • Rock: bedrock is mapped within 60 inches on 7 percent of the area.
  • Highways inside the boundary: FM 49 and FM 2869. State permit office: TxDOT Tyler District.
  • Railroad track inside the boundary: none mapped.
  • Named streams inside the boundary: Big Sandy Creek, Greenbriar Creek, Holly Creek and Boggy Creek.
  • Texas811: locate request at least two working days before a bore and no more than 14 days ahead.
  • Range: 3/4 inch service lines to 48 inch casing, 10 feet to 5,000 feet.
  • Phone answered 24 hours a day: (405) 409-7423

Who does directional boring in Holly Lake Ranch near Big Sandy Creek?

Trinity Boring Solutions takes directional boring work in Holly Lake Ranch, where the USDA soil survey maps fine sand across much of the top five feet and clay loam in other areas. The Census Bureau counted 2,951 people here in the 2020 Census. Our crews can place water, sewer, gas, electric conduit and fiber beneath streets such as Holly Trail or around Big Sandy Creek.

Our main office is in Yukon, Oklahoma, and Holly Lake Ranch work is done with our own crews and from satellite yards run by partner drilling contractors Trinity has personally vetted. We began directional boring in 1982. Four decades of boring matter in a place where Darco fine sand and creek crossings call for a plan that keeps the hole stable and tracks the drill carefully.

Aerial view of a Trinity Boring Solutions directional drill set up for a gas line bore at a commercial site
Our directional drill set up for a gas line bore at a commercial site, seen from above. Photos on this page are from our jobs in Oklahoma and Texas.

What kind of ground does Holly Lake Ranch have around Darco soil?

Holly Lake Ranch has sandy mapped soils, with Darco listed as the leading soil series at 35 percent of the community. The USDA soil survey maps surface fine sand across 35 percent and loamy fine sand across 23 percent. At about 40 inches below the surface, 63 percent of the mapped area is sandy and average clay content is 14 percent. Fine sand cuts readily but can cave behind the drill, so staged reaming and drilling fluid help keep the bore open. For Darco soils, we treat mapped patterns as planning context, not as a substitute for test borings.

USDA soil survey, inside the Holly Lake Ranch mapped community boundaryWhat is mapped
Soil series mappedDarco 35 percent, Duffern 18 percent, Manco 16 percent, Tenaha 7 percent and Latch 6 percent
Texture at the surfacefine sand 35 percent, loamy fine sand 23 percent and sand 18 percent
Texture about 40 inches downfine sand 35 percent, sand 18 percent and clay loam 16 percent
Engineering class about 40 inches downsilty clayey sand (SC SM) 43 percent, lean clay (CL) 24 percent and sand with silt (SP SM) 18 percent
Average clay content about 40 inches down14 percent
Bedrock mapped within 60 inches7 percent of the area (0 percent hard rock, 7 percent weathered rock)
Seasonal water table within 60 inches24 percent of the area
Flood prone soils17 percent of the area
High corrosion risk for uncoated steel18 percent of the area

The soil survey maps bedrock within five feet in 7 percent of Holly Lake Ranch, all of it weathered; hard bedrock is not mapped in that depth. A seasonal water table is mapped within five feet across 24 percent, and flood prone soils across 17 percent, so pits near Big Sandy Creek may need pumping and careful depth planning. High steel corrosion risk covers 18 percent. The geologic map includes Quartz Sand Decomposition Residuum of Cenozoic age and Queen City Sand of Eocene age, so field conditions can vary along a route.

What does it take to bore Holly Lake Ranch fine sand?

Holly Lake Ranch fine sand can fall in behind the drill, while Manco loam is mapped as frequently flooded. We plan the bore and pits around those changing ground conditions.

  1. Darco fine sand is mapped across Holly Lake Ranch, so we ream in stages and have the pipe ready before the final pass can let the hole cave.
  2. Where Manco loam is frequently flooded or the seasonal water table is shallow, we plan smaller pits and pumping to manage water during work.
  3. Near Big Sandy Creek, we plan the bore depth beneath the channel and check during planning whether the crossing falls under U.S. Army Corps of Engineers jurisdiction.
  4. Along Holly Trail, we expose each marked utility on the route with hydrovac before drilling close, then track the drill head and log its depth and pitch.
Trinity Boring Solutions water trailer supplying water for bentonite drilling fluid on a sleeve bore in northeast OKC
Our water trailer feeding the bentonite drilling fluid mix on a sleeve bore in northeast Oklahoma City.

What is in the way of a new line in Holly Lake Ranch near FM 49?

A bore in Holly Lake Ranch may need to pass beneath FM 49 or FM 2869, both state highways within the mapped community boundary. Holly Trail is the longest named street at 4.62 miles, followed by Greenbriar Trail at 2.56 miles and Holly Drive at 1.87 miles. Valleywood Trail adds another 1.84 miles of mapped street. Those routes give a project several possible street and highway interfaces, so the alignment and crossing points need to be clear before drilling.

CrossingTypeMapped extentWho has a say
FM 49State highway3.8 roadway miles insideState highway office
FM 2869State highway2.9 roadway miles insideState highway office
Big Sandy CreekStream7.12 channel miles insideChecked for Corps of Engineers jurisdiction
Greenbriar CreekStream1.77 channel miles insideChecked for Corps of Engineers jurisdiction
Holly CreekStream1.72 channel miles insideChecked for Corps of Engineers jurisdiction
Boggy CreekStream0.89 channel miles insideChecked for Corps of Engineers jurisdiction
Honey CreekStream0.73 channel miles insideChecked for Corps of Engineers jurisdiction
Clear CreekStream0.34 channel miles insideChecked for Corps of Engineers jurisdiction
Black BranchStream0.3 channel miles insideChecked for Corps of Engineers jurisdiction
Blue BranchStream nearbyAlong the boundaryChecked for Corps of Engineers jurisdiction
Mulberry CreekStream nearbyAlong the boundaryChecked for Corps of Engineers jurisdiction
Mill CreekStream nearby0.5 miles outsideChecked for Corps of Engineers jurisdiction
Byrd BranchStream nearby0.8 miles outsideChecked for Corps of Engineers jurisdiction
Lake GreenbriarLake or pond152 acres, insideChecked for Corps of Engineers jurisdiction
Swipe the table sideways to see every column.

No railroad is mapped inside Holly Lake Ranch or within one mile outside it, so a track crossing is not part of the mapped local picture. Big Sandy Creek runs 7.12 channel miles through the community, and 12 mapped street crossings intersect named streams. Greenbriar Creek and Holly Creek also run through the area. Lake Greenbriar and Holly Lake are inside the mapped boundary, so a route near either waterbody needs crossing review during planning.

Do I need a permit to bore in Holly Lake Ranch, Wood County?

Holly Lake Ranch is an unincorporated community in Wood County, so it has no city government and its streets and permits belong to the county or state. For work in the right of way of FM 49 or FM 2869, the utility owner applies for a TxDOT utility permit through RULIS; the TxDOT Tyler District reviews it. For FM 49 crossings, we prepare the bore plan and profile for the utility owner and work under its permit. A route under Big Sandy Creek is checked during planning for U.S. Army Corps of Engineers jurisdiction.

Read the rules for yourself: Texas Utilities Code Chapter 251 on notice to Texas811, the Texas811 questions and answers page, the TxDOT Utility Accommodation Rules, 43 TAC 21.40 and TxDOT utility permits in RULIS.

What lines are already in the ground in Holly Lake Ranch, Wood County?

The water provider for a specific Holly Lake Ranch address has to be confirmed with Wood County or the local water district before a bore is planned. County electric service is reported by Oncor Electric Delivery Company, Southwestern Electric Power, Farmers Electric Cooperative, Upshur Rural Electric Cooperative and Wood County Electric Cooperative. Those reports do not identify the electric provider at every address, so we confirm the line owner before planning a conduit bore near Holly Trail or FM 49.

Line ownerWhat it isSourceSize
Oncor Electric Delivery Company, Southwestern Electric Power, Farmers Electric Cooperative, Upshur Rural Electric Cooperative and Wood County Electric CooperativeElectric utilities reporting service in Wood CountyEIA Form 861Confirm the line owner by address
Swipe the table sideways to see every column.

The American Community Survey 2019 to 2023 five year estimates put Holly Lake Ranch’s median housing year at 1993; 1 percent of housing was built before 1960, 65 percent from 1960 to 1999 and 34 percent in 2000 or later. That mix can mean either a replacement route or a new service near Valleywood Trail. Before drilling near marked lines, we use hydrovac potholing to expose them, since surface paint shows position but not depth.

Yellow polyethylene gas pipe pulled through a directional bore beside a commercial building
Yellow polyethylene gas pipe pulled through a directional bore beside a commercial building.

Do you cover Holly Lake Ranch and Gladewater?

Holly Lake Ranch is in Wood County, at an elevation of 387 feet, and covers 8.67 square miles in the mapped community boundary. Its ZIP code is 75765. Hawkins is 8.4 miles south, Big Sandy is 10.2 miles southeast and Gilmer is 14.8 miles east. Quitman, the county seat, is 15.4 miles west; Gladewater is the nearest larger city, 18.8 miles southeast. Our Yukon, Oklahoma yard is 304 road miles away, a 6.2 hour drive, which can affect mobilization for a Holly Trail or FM 49 project.

Places near Holly Lake Ranch

What boring work comes up in Holly Lake Ranch near Holly Trail?

  • Highway crossing: A line beneath FM 49 is bored or tunneled, with the utility owner handling the TxDOT right of way permit.
  • Water service: A service route near Holly Trail needs the address water provider confirmed before the bore is planned.
  • Fiber conduit: A fiber route along Greenbriar Trail can avoid an open cut across the street when the alignment allows.
  • Creek crossing: A route beneath Big Sandy Creek needs depth planning and a jurisdiction check during project planning.
  • Lake approach: A route near Lake Greenbriar needs careful alignment around the mapped waterbody and room for pits on each side.
  • Street service: A new line near Valleywood Trail can be planned around marked utilities exposed before drilling.

More on each kind of work: water line boring, electric line boring, fiber optic boring, road, railroad and creek crossings and municipal boring.

What drives the price of a Holly Lake Ranch bore near Valleywood Trail?

For a Valleywood Trail quote, start with the address or a map pin, then tell us what goes in the ground. On Holly Trail, we include the pipe or conduit size and footage in the boring details so the crossing scope is clear. A sketch or plans showing a route toward FM 49 or across a creek help us assess the crossing and prepare a useful scope.

A short route in open ground near Valleywood Trail may be simpler to plan than a bore beneath FM 49 or Big Sandy Creek. The price reflects length, pipe or conduit size, sand or clay conditions, utilities to expose, pavement, creek crossings, pits and sand backfill. Mobilization also matters because Holly Lake Ranch is 304 road miles from the Yukon yard. High profile or emergency work can call for added planning, so we account for the 304 road miles from the Yukon main office.

Questions people ask about boring in Holly Lake Ranch

Does Trinity take directional boring jobs in Holly Lake Ranch, Wood County, and who staffs them?

Yes. Trinity takes directional boring jobs in Holly Lake Ranch, Wood County, using its own crews and partner contractor yards that Trinity has vetted. You work with Trinity through planning and the bore log, whichever crew is on site. For a route near FM 49, we review the line, size and crossing details before setting the bore plan.

Can groundwater or flooding affect bore pits near Big Sandy Creek in Holly Lake Ranch?

Yes. The soil survey maps a seasonal water table within five feet across 24 percent of Holly Lake Ranch and flood prone soils across 17 percent. Near Big Sandy Creek, pits may need pumping, and wet sand can flow into an excavation. We plan pit placement and bore depth for the specific route rather than assume the same conditions throughout the community.

What ground should I expect in Holly Lake Ranch around Darco soil?

Darco is the leading mapped soil series in Holly Lake Ranch at 35 percent. Fine sand covers 35 percent of the surface, while the soil survey maps 63 percent of the area as sandy at about 40 inches. Sand is easy to cut but may cave behind the drill, so staged reaming and fluid management help keep the bore open.

Is there rock in Holly Lake Ranch, and how much is mapped in the top five feet?

The soil survey maps bedrock within five feet in 7 percent of Holly Lake Ranch, and that mapped bedrock is weathered. Hard bedrock is not mapped in that depth, which does not rule out rock deeper down. If a route near FM 2869 reaches weathered rock, drilling may slow compared with sandy soil.

Who approves a bore under FM 49 in Holly Lake Ranch?

TxDOT reviews a utility permit for work in the FM 49 right of way through its Tyler District. The utility owner, not the drilling contractor, files in TxDOT’s RULIS system. We prepare the bore plan and profile for that filing and work under the permit issued to the owner. A bore beneath the highway pavement is installed by boring or tunneling.

Can a new line be bored beneath Big Sandy Creek in Holly Lake Ranch?

A bore beneath Big Sandy Creek can be planned, with the route and depth developed for that crossing. The creek runs 7.12 channel miles through Holly Lake Ranch, and its crossing is checked during planning for U.S. Army Corps of Engineers jurisdiction. Nearby flood prone soils and water levels also affect pit placement and the work plan.

How much notice does Texas811 need for a bore near Holly Trail in Holly Lake Ranch?

For a bore near Holly Trail, submit the Texas811 locate request at least 48 hours before excavation, excluding Saturdays, Sundays and legal holidays, and no earlier than 14 days before it. Texas811 describes this as at least two working days. If work slips more than 14 days past the original notice, make a new request; worn or moved marks need refreshing before work continues.

Does Gladewater’s distance from Holly Lake Ranch change a job from the Yukon office?

Holly Lake Ranch is 304 road miles and a 6.2 hour drive from Trinity’s Yukon, Oklahoma main office. Gladewater is 18.8 miles southeast and is the nearest larger city, but the Yukon distance can affect mobilization for a job near FM 49. The quote also depends on route length, ground, crossings and the equipment the scope requires.

What affects the cost of directional boring under FM 49 in Holly Lake Ranch?

The scope sets the price for a Holly Lake Ranch bore beneath FM 49. Length, pipe or conduit size, Darco fine sand, utilities to expose, pavement, creek or drainage crossings, pits and backfill all affect the work. Mobilization from the Yukon yard also matters at 304 road miles. The route and site conditions determine which factors apply.

Where the Holly Lake Ranch facts on this page come from

Darren Rice in a safety vest at the bore pit beside the Trinity Boring Solutions Ditch Witch directional drill, with drill rods racked, on the airfield at Will Rogers World Airport in Oklahoma City

About Trinity Boring Solutions

Trinity Boring Solutions is a family business in Yukon, Oklahoma, founded by Dean Rice in 1965 and owned today by Darren Rice, who started its directional boring side in 1982. The company bores across Oklahoma and Texas. No bore is too big or too small: 4 foot sidewalk sleeves to roughly 4,100 feet under the Arkansas River in Tulsa. Reach us at (405) 409-7423.

Get a Quote for a Bore in Holly Lake Ranch

Send the address, what is going in, the size and the footage.

Trinity Boring Solutions
9102 NW Expressway, Yukon, OK 73099
(405) 409-7423 | darren@trinityboringsolutions.com

Trinity Boring Solutions | 24/7 Available ☎ Call (405) 409-7423 Free Quote

Free Bore Planner

Plan Your Bore in Holly Lake Ranch, Texas

Type the address of your job in Holly Lake Ranch. The Bore Planner opens an aerial map at that spot. Drop one pin where the bore starts and one where it ends, tell us what is going in and send the scope to our crew.

Talk to the crew that does the work

Fastest way to a number is a phone call. Tell us where the crossing is and what is going in the ground, and you will get a straight answer on the same call. Bores from 10 feet to 5,000 feet, 3/4 inch service line through 48 inch casing, anywhere in Oklahoma and Texas. We run 24/7 for main breaks and emergency repairs.

Call (405) 409-7423

Answered by a person, not a call center.

Would rather not call? Send the details and we will come back with a written quote.

Quick Quote In Page

County and State Pages for Holly Lake Ranch

Same county: Mineola · Winnsboro · Alba · Yantis. All counties: Texas county list.