Olney Texas Directional Boring: Sagerton Loam, Mud Creek and Texas State Highway 79
Quick Answer: Can we get a line beneath Texas State Highway 79 without cutting pavement? Trinity Boring Solutions provides directional boring, also called horizontal directional drilling (HDD), for Olney routes like that. Olney is 187 road miles from our Yukon, Oklahoma main office, and a Mud Creek crossing needs its own route planning. Sagerton soil is common here, while clay loam deeper down can cling to the reamer and pipe. Along Avenue C, we expose marked utilities before drilling near them because paint shows position, not depth.
Olney bores at a glance
- Incorporated city in Young County, Texas. Population 3,029 (Census Bureau 2024 estimate).
- Road distance from our Yukon, Oklahoma main office: 187 miles, about 3.9 hours of driving.
- Ground: Sagerton soil is mapped on 41 percent of the area, with clay loam about 40 inches down.
- Rock: bedrock is mapped within 60 inches on 12 percent of the area.
- Highways inside the boundary: Texas State Highway 79, Texas State Highway 114, FM 210, Texas State Highway 251 and Loop 132. State permit office: TxDOT Wichita Falls District.
- Railroad track inside the boundary: none mapped.
- Named streams inside the boundary: Mud Creek and Salt Creek.
- Public water: City of Olney, surface water.
- Texas811: locate request at least two working days before a bore and no more than 14 days ahead.
- Range: 3/4 inch service lines to 48 inch casing, 10 feet to 5,000 feet.
- Phone answered 24 hours a day: (405) 409-7423
Which contractor handles directional boring near Olney’s Mud Creek?
Trinity Boring Solutions handles directional boring in Olney, including routes beneath Mud Creek without cutting the channel. Can we get a line under that creek or Texas State Highway 79 without opening the surface? We install water, sewer, gas, electric conduit and fiber along Olney streets such as Avenue C. The Census Bureau Vintage 2024 estimate puts Olney at 3,029 people in Young County.
Our main office is in Yukon, Oklahoma, and Olney work is done with our own crews and from satellite yards run by partner drilling contractors Trinity has personally vetted. From a 3/4 inch service line to 48 inch casing, a short Avenue C connection and a longer Texas State Highway 79 route fit our range. Our family business started in 1965 and has done directional boring since 1982, including work suited to Olney’s 38.88 public road centerline miles.

What ground does Olney’s Sagerton soil create for a bore?
The USDA soil survey maps Sagerton soil across 41 percent of Olney, with Sagerton loam map units covering 22 percent and 19 percent. At about 40 inches, clay loam is mapped under 48 percent of the area and clay under 33 percent; average clay content there is 38 percent. Surface loam covers 59 percent, while clay loam covers 19 percent and fine sandy loam 18 percent. Our mapped Sagerton soil patterns in Olney guide planning, but they are not test borings and do not confirm subsurface conditions. For a bore, sticky clay can build up on a reamer and grip the pipe.
| USDA soil survey, inside the Olney city limits | What is mapped |
|---|---|
| Soil series mapped | Sagerton 41 percent, Tillman 19 percent, Gowen 11 percent, Anocon 9 percent and Winters 7 percent |
| Texture at the surface | loam 59 percent, clay loam 19 percent and fine sandy loam 18 percent |
| Texture about 40 inches down | clay loam 48 percent, clay 33 percent and sandy clay loam 11 percent |
| Engineering class about 40 inches down | lean clay (CL) 69 percent and fat clay (CH) 21 percent |
| Average clay content about 40 inches down | 38 percent |
| Bedrock mapped within 60 inches | 12 percent of the area (0 percent hard rock, 12 percent weathered rock) |
| Seasonal water table within 60 inches | 0 percent of the area |
| Flood prone soils | 11 percent of the area |
| High corrosion risk for uncoated steel | 77 percent of the area |
The USDA soil survey maps bedrock within 60 inches in 12 percent of Olney, all described as weathered bedrock; hard bedrock is not mapped in that depth. A shallow seasonal water table is not mapped, but flood prone soils cover 11 percent, so Mud Creek routes need attention to channel depth. High steel corrosion risk is mapped across 77 percent, a concern for uncoated steel casing or tracer wire that the line owner can weigh. Quaternary alluvial sand, silt, clay and gravel and the Permian Archer City Formation mean ground can change along a bore.
What does it take to bore Olney’s clay loam?
Olney’s 38 percent average clay content at about 40 inches calls for control of fluid and reaming. Sagerton loam and deeper clay are mapped patterns, so the route and exposed ground guide the final method.
- With clay loam mapped under 48 percent of Olney at about 40 inches, we use staged reaming and manage fluid so sticky cuttings do not load up the reamer.
- Mud Creek routes need a planned depth under the channel; flood prone soils cover 11 percent of the city, so the crossing location can affect the bore profile.
- On Texas State Highway 79, we track the drill head from the surface and log depth and pitch while working to the approved bore plan.
- Along Avenue C, we hydrovac pothole marked utilities before drilling near them, since locate paint shows line position but not its depth.

Which roads or creeks can a bore cross in Olney near Texas State Highway 79?
Olney has Texas State Highway 79 and Texas State Highway 114 inside its limits, along with FM 210, Texas State Highway 251, Loop 132 and FM 2178. Texas State Highway 79 has 2.6 mapped roadway miles in the city, so an under road route may need TxDOT planning. Avenue C runs 1.7 miles, Main Street 1.61 miles and Elm Street 1.59 miles. These streets give a project route specific limits to check for pavement, access and buried lines.
| Crossing | Type | Mapped extent | Who has a say |
|---|---|---|---|
| Texas State Highway 79 | State highway | 2.6 roadway miles inside | State highway office |
| Texas State Highway 114 | State highway | 1.7 roadway miles inside | State highway office |
| FM 210 | State highway | 0.5 roadway miles inside | State highway office |
| Texas State Highway 251 | State highway | 0.5 roadway miles inside | State highway office |
| Loop 132 | State highway | 0.2 roadway miles inside | State highway office |
| FM 2178 | State highway | 0.1 roadway miles inside | State highway office |
| Mud Creek | Stream | 1.08 channel miles inside | Checked for Corps of Engineers jurisdiction |
| Salt Creek | Stream | 0.1 channel miles inside | Checked for Corps of Engineers jurisdiction |
| Red Haw Creek | Stream nearby | 0.2 miles outside | Checked for Corps of Engineers jurisdiction |
Railroad maps show no track inside Olney or within 1 mile outside the city, and no mapped street and rail crossing is listed. Mud Creek runs 1.08 channel miles in the city, while Salt Creek runs 0.1 mile; two mapped street crossings of named streams make creek routes a real planning consideration. Mud Creek and Salt Creek lie within Olney, while no lakes or ponds are mapped within 1 mile. A crossing near Mud Creek also needs a check for federal waterway jurisdiction during planning.
Whose approval does an Olney bore in Young County need?
For a bore under Texas State Highway 79 in Olney, TxDOT’s Wichita Falls District reviews the utility permit, and the utility owner submits it through the online RULIS system. Electric and communication lines crossing a highway need at least 60 inches of cover below the lowest point of the crossed grade; water lines also need 60 inches, and pressurized sewer lines need 60 inches. TxDOT requires boring or tunneling beneath existing highway pavement, with crossings encased and rural highway bores extending under all travel lanes. Olney is incorporated, so Avenue C is a city street. Mud Creek routes are checked for U.S. Army Corps of Engineers jurisdiction.
Read the rules for yourself: Texas Utilities Code Chapter 251 on notice to Texas811, the Texas811 questions and answers page, the TxDOT Utility Accommodation Rules, 43 TAC 21.40 and TxDOT utility permits in RULIS.
What is already in the ground near the City of Olney water system?
The City of Olney public water system serves 3,007 people through 1,791 service connections and uses surface water. That system gives a water project a local utility to identify, but the specific line and connection still need checking along streets such as Elm Street. In Young County, Oncor Electric Delivery Company, Texas New Mexico Power and United Electric Cooperative Service report electric service. Confirm the line owner for an electric conduit bore rather than assuming one company serves every Avenue C address.
| Line owner | What it is | Source | Size |
|---|---|---|---|
| City of Olney | Public water system | Surface water | 1,791 connections, 3,007 people served |
| Oncor Electric Delivery Company, Texas-New Mexico Power and United Electric Cooperative Service | Electric utilities reporting service in Young County | EIA Form 861 | Confirm the line owner by address |
The American Community Survey 2019 to 2023 five year estimates put Olney’s median housing year at 1967; 38 percent of homes were built before 1960, 57 percent from 1960 to 1999 and 5 percent in 2000 or later. That mix can mean work for replacement lines as well as new services along Elm Street. Before drilling near a marked utility, we hydrovac pothole it to see its depth; locate paint alone does not show how deep a line sits.

What places are near Olney and Graham?
Olney is in Young County, at an elevation of 1,187 feet, and covers 2.02 square miles. ZIP code 76374 serves Olney, including work locations on Main Street that we plan for underground access. Megargel is 11.6 miles northwest and Newcastle is 11.6 miles south; Elbert is 15.4 miles southwest, Loving is 15.5 miles southeast and Archer City is 17.5 miles northeast. Graham, the county seat and nearest larger city, is 21.0 miles southeast. From our Yukon yard, Olney is 187 road miles away, a 3.9 hour drive, which factors into planning a job on Avenue C or Mud Creek.
Places near Olney
- Directional boring in Megargel: 11.6 miles northwest
- Directional boring in Newcastle: 11.6 miles south
- Directional boring in Elbert: 15.4 miles southwest
- Directional boring in Loving: 15.5 miles southeast
- Directional boring in Archer City: 17.5 miles northeast
- Directional boring in Graham: 21 miles southeast
What boring work comes up along Olney’s Elm Street?
- Highway crossing: A Texas State Highway 79 bore can keep a new water or conduit line beneath pavement rather than cutting across the roadway.
- Water service: A connection near the City of Olney system needs its route checked against existing lines along streets such as Avenue C.
- Creek crossing: A Mud Creek bore needs a profile planned below the channel and a review for U.S. Army Corps of Engineers jurisdiction.
- Street utility: Elm Street’s 1.59 miles of mapped roadway can present a route for sewer, water or electric conduit beneath pavement.
- Fiber route: A fiber bore along Main Street can place conduit underground without opening the street surface along the route.
- Drainage route: Near Salt Creek, the bore plan can account for the mapped channel and nearby street crossings.
More on each kind of work: water line boring, electric line boring, fiber optic boring, road, railroad and creek crossings and municipal boring.
What do you need to quote a bore on Olney’s Avenue C?
For an Avenue C quote, send the address or map pin, what will go underground, the pipe or conduit size and footage; a sketch or plans help. A route near Elm Street can involve older buried services, while a route by Mud Creek raises a different crossing question. Those local details help us plan what to inspect before the drill path is set.
At 187 road miles from Yukon, mobilization is part of planning an Olney job. The route length and pipe size matter, as do Sagerton soil and sticky clay, which can affect reaming and fluid handling. A Texas State Highway 79 crossing brings pavement, cover and permit planning into scope; Mud Creek adds creek crossing review. We also consider marked utilities to expose, concrete or pavement, pits and excavator time, sand backfill, emergency timing and high profile work.
Questions people ask about boring in Olney
Does Trinity Boring Solutions take jobs in Olney, Young County, and how are crews assigned?
Yes, we take directional boring work in Olney, Young County. Our own crews and vetted partner contractors working from satellite yards can staff the project. You work with Trinity from the first call through the bore log, whichever crew is on site, for a route such as one beneath Texas State Highway 79.
Is there rock under Olney, and how much bedrock is mapped near the surface?
The USDA soil survey maps weathered bedrock within 60 inches in 12 percent of Olney, while hard bedrock is not mapped in that depth. A route through Sagerton soil may still encounter changing ground, so the mapped survey is a guide rather than a site specific drilling test.
Who approves a Texas State Highway 79 bore in Olney through TxDOT Wichita Falls District?
TxDOT’s Wichita Falls District reviews the utility permit for a Texas State Highway 79 crossing in Olney. The utility owner submits the application through RULIS, and we prepare the bore plan and profile for that filing. The district permit sets the route conditions, including any depth requirement that differs from the usual cover.
Can a new line be bored beneath Mud Creek in Olney?
A line can be planned beneath Mud Creek without cutting the channel, subject to the route and ground conditions. Mud Creek has 1.08 channel miles in Olney, and creek crossings are checked for U.S. Army Corps of Engineers jurisdiction during planning. Flood prone soils cover 11 percent of the city, making channel depth part of the profile.
Who runs Olney’s public water system, and what is its water source?
The City of Olney owns and runs the public water system, which uses surface water. It has 1,791 service connections and serves 3,007 people. A proposed water bore near Avenue C still needs a route check against the existing system and other marked utilities.
Which electric companies report service in Olney, Young County, and who confirms conduit details?
Oncor Electric Delivery Company, Texas New Mexico Power and United Electric Cooperative Service report electric service in Young County. Those records do not identify the provider at every Olney address. Confirm the line owner for the specific route before settling conduit specifications, especially near existing lines along Elm Street.
How early should I request an 811 locate for an Olney bore near Avenue C?
For an Avenue C bore, request a Texas811 locate at least 48 hours before excavation, excluding Saturdays, Sundays and legal holidays, and no earlier than 14 days ahead. If a Young County start slips more than 14 days past the original notice, we submit a new request before work proceeds. Along Avenue C in Olney, we have worn or moved marks refreshed through Texas811 before work continues.
How far is Olney from the Yukon office, and does Graham change the job plan?
Olney is 187 road miles and a 3.9 hour drive from our Yukon, Oklahoma main office, so we plan travel before underground work. Graham is 21.0 miles southeast and is the nearest larger city, but it does not change the route conditions in Olney. The distance from Yukon affects mobilization for a job near Mud Creek or Avenue C.
What affects the cost of directional boring under Texas State Highway 79 in Olney?
The job scope determines the price, including length, pipe or conduit size, soil, exposed utilities, pavement and pit work. A Texas State Highway 79 crossing adds highway permit and cover planning, while Sagerton soil and a Mud Creek route can change drilling needs. Mobilization from Yukon, emergency timing and high profile work also matter.
Where the Olney facts on this page come from
- USDA Natural Resources Conservation Service, Soil Data Access: soil survey map units inside Olney
- U.S. Census Bureau, TIGER/Line 2024: Olney boundary, roads, rail lines and streams
- U.S. Census Bureau, Vintage 2024 population estimates: Olney
- U.S. Census Bureau, American Community Survey 2019 to 2023: Olney housing units and year built
- Macrostrat geologic map compilation: map units under Olney
- U.S. EPA Safe Drinking Water Information System: public water systems serving Olney
- U.S. Energy Information Administration, Form EIA 861: electric utilities serving Young County
- U.S. Geological Survey, Elevation Point Query Service: Olney elevation
- OpenStreetMap road network through the OSRM router: road miles from Yukon, Oklahoma to Olney
- Texas Utilities Code Chapter 251, Underground Facility Damage Prevention and Safety
- TxDOT Utility Accommodation Rules, 43 Tex. Admin. Code 21.40: underground utilities
- Texas Department of Transportation: Right of Way Utility and Leasing Information System (RULIS) utility permits
Get a Quote for a Bore in Olney
Send the address, what is going in, the size and the footage.
Trinity Boring Solutions
9102 NW Expressway, Yukon, OK 73099
(405) 409-7423 | darren@trinityboringsolutions.com
Free Bore Planner
Plan Your Bore in Olney, Texas
Type the address of your job in Olney. The Bore Planner opens an aerial map at that spot. Drop one pin where the bore starts and one where it ends, tell us what is going in and send the scope to our crew.
Talk to the crew that does the work
Fastest way to a number is a phone call. Tell us where the crossing is and what is going in the ground, and you will get a straight answer on the same call. Bores from 10 feet to 5,000 feet, 3/4 inch service line through 48 inch casing, anywhere in Oklahoma and Texas. We run 24/7 for main breaks and emergency repairs.
Answered by a person, not a call center.
Would rather not call? Send the details and we will come back with a written quote.
County and State Pages for Olney
All counties: Texas county list.
