Pearsall Texas Directional Boring: Duval Soil, Interstate 35 And Union Pacific Track
Quick Answer: Can you get a line under Interstate 35, Union Pacific track or a Pearsall street without cutting it? Yes, Trinity Boring Solutions handles directional boring, also called horizontal directional drilling (HDD), for those Pearsall crossings. Our Yukon, Oklahoma main office is 535 road miles away, and a bore near Oak Street has to be planned around its actual route. Duval soils include sandy surface layers over sandy clay loam at about 40 inches, so staged reaming may help keep the bore open.
Pearsall bores at a glance
- County seat of Frio County, Texas. Population 9,541 (Census Bureau 2024 estimate).
- Road distance from our Yukon, Oklahoma main office: 535 miles, about 10.3 hours of driving.
- Ground: Duval soil is mapped on 55 percent of the area, with sandy clay loam about 40 inches down.
- Rock: bedrock is mapped within 60 inches on 57 percent of the area.
- Highways inside the boundary: Interstate 35, Interstate 35 Business, Spur 581, FM 140 and FM 1581. State permit office: TxDOT San Antonio District.
- Railroad track inside the boundary: Union Pacific, with 9 mapped street and rail crossings.
- Public water: City of Pearsall, groundwater wells.
- Texas811: locate request at least two working days before a bore and no more than 14 days ahead.
- Range: 3/4 inch service lines to 48 inch casing, 10 feet to 5,000 feet.
- Phone answered 24 hours a day: (405) 409-7423
Who can I call for directional boring in Pearsall and Frio County?
Can you get a line under Interstate 35, Union Pacific track or a Pearsall street without cutting it? Yes. We take directional boring work in Pearsall, Frio County, where the Census Bureau Vintage 2024 estimate puts the population at 9,541. We install water, sewer, gas, electric conduit and fiber, including service runs along Oak Street and connections that need to pass beneath Interstate 35.
Our main office is in Yukon, Oklahoma, and Pearsall work is done with our own crews and from satellite yards run by partner drilling contractors Trinity has personally vetted. Our record of no utility strike in over 25 years matters around City of Pearsall groundwater lines and the electric providers reported in Frio County. We are a family business that started in 1965 and has done directional boring since 1982, experience we bring to routes such as Power Plant Road.

How does Duval soil affect directional boring in Pearsall?
The USDA soil survey maps Duval soil across 55 percent of Pearsall, with Poth soil at 28 percent. Very fine sandy loam is the mapped surface texture across 53 percent, and loamy fine sand across 43 percent. About 40 inches down, sandy clay loam is mapped across 66 percent and clay across 28 percent; the average clay content at that depth is 32 percent. For Pearsall, we treat these mapped patterns as planning context, not test borings, before setting a boring route. The sandy surface can loosen behind a drill, while the clay below can cling to a reamer, so the route and fluid plan matter.
| USDA soil survey, inside the Pearsall city limits | What is mapped |
|---|---|
| Soil series mapped | Duval 55 percent, Poth 28 percent, Poteet 5 percent, Webb 4 percent and Miguel 3 percent |
| Texture at the surface | very fine sandy loam 53 percent and loamy fine sand 43 percent |
| Texture about 40 inches down | sandy clay loam 66 percent, clay 28 percent and sandy clay 4 percent |
| Engineering class about 40 inches down | lean clay (CL) 61 percent, fat clay (CH) 28 percent and clayey sand (SC) 10 percent |
| Average clay content about 40 inches down | 32 percent |
| Bedrock mapped within 60 inches | 57 percent of the area (0 percent hard rock, 57 percent weathered rock) |
| Seasonal water table within 60 inches | 0 percent of the area |
| Flood prone soils | 5 percent of the area |
| High corrosion risk for uncoated steel | 6 percent of the area |
The USDA soil survey maps weathered bedrock within 60 inches across 57 percent of Pearsall, with typical depth at 51 inches; hard bedrock is not mapped in that depth. That points to slower drilling in some areas, not a uniform rock layer. Seasonal water tables are not mapped within 60 inches, while flood prone soils cover 5 percent, so a drainage crossing still needs its own depth plan. Across Pearsall, we account for the mapped high steel corrosion risk covering 6 percent when planning underground work. The Queen City Sand, a Lutetian unit of sandstone and siltstone, may include softer weathered material that calls for a slower drilling pace.
What does it take to bore Pearsall sandy clay loam?
Pearsall has sandy surface soils over sandy clay loam and clay at about 40 inches. We plan the bore around that change, the route on streets such as Oak Street, and the marked lines along the way.
- We check the route against Pearsall’s sandy surface soils and sandy clay loam below, then plan staged reaming where loose material could fall in behind the bit.
- Where Duval mapped soils include clay at about 40 inches, we adjust fluid and reaming so sticky cuttings do not grip the pipe.
- Before approaching marked lines near the City of Pearsall water system or electric routes, we hydrovac pothole to confirm their depth and position.
- A walkover locator tracks the drill under Oak Street or Colorado Street, while we log depth and pitch along the planned route.

What is in the way of a new line in Pearsall near Interstate 35?
Interstate 35 has 10.0 mapped roadway miles inside Pearsall, and Interstate 35 Business has 4.5. Spur 581, FM 140 and FM 1581 also run through the city, so a route may involve state highway right of way as well as a local street. Oak Street is the longest named street at 3.14 miles, followed by Power Plant Road at 2.71 and Colorado Street at 2.21. Those routes help define where a bore can start and finish without cutting pavement.
| Crossing | Type | Mapped extent | Who has a say |
|---|---|---|---|
| Interstate 35 | Interstate | 10 roadway miles inside | State highway office |
| Interstate 35 Business | Interstate | 4.5 roadway miles inside | State highway office |
| Spur 581 | State highway | 4.2 roadway miles inside | State highway office |
| FM 140 | State highway | 2.7 roadway miles inside | State highway office |
| FM 1581 | State highway | 1.5 roadway miles inside | State highway office |
| FM 1582 | State highway | 0.3 roadway miles inside | State highway office |
| FM 2779 | State highway | 0.2 roadway miles inside | State highway office |
| Union Pacific | Railroad | 3.97 track miles inside | The railroad |
Union Pacific has 3.97 track miles inside Pearsall on its Laredo Subdivision, and 9 mapped street and rail crossings make route coordination important. A crossing of the Union Pacific track needs an agreement with the railroad that owns it. No named streams or lakes are mapped in the city or within one mile, but 2.82 miles of unnamed drainage are mapped inside Pearsall. A drainage route still needs site review before a bore is laid out.
Do I need a permit for a Pearsall bore near Union Pacific track?
For a bore under Interstate 35, FM 140 or another state route in Pearsall, TxDOT reviews the highway right of way through its San Antonio District. The utility that owns the line submits the application in TxDOT’s online RULIS system; we prepare the bore plan and profile and work under that utility owner’s permit. TxDOT requires highway pavement crossings to be bored or tunneled, with the bore extending beneath all travel lanes on rural highways. A Union Pacific track crossing needs an agreement from the railroad, which sets its crossing conditions. Because Pearsall is incorporated, we coordinate city street boring with the city rather than assuming another road authority. No named stream crossings are mapped here.
Read the rules for yourself: Texas Utilities Code Chapter 251 on notice to Texas811, the Texas811 questions and answers page, the TxDOT Utility Accommodation Rules, 43 TAC 21.40 and TxDOT utility permits in RULIS.
Which utilities are near the City of Pearsall water system?
The City of Pearsall public water system draws from groundwater wells and reports 2,995 service connections serving 8,985 people. AEP Texas Central, Karnes Electric Cooperative and Medina Electric Cooperative report electric service in Frio County. That does not identify the provider at every Pearsall address, so we confirm the line owner before planning an electric conduit bore. Hydrovac potholing near the water system or an electric route lets us expose marked lines before drilling close to them.
| Line owner | What it is | Source | Size |
|---|---|---|---|
| City of Pearsall | Public water system | Groundwater wells | 2,995 connections, 8,985 people served |
| AEP Texas Central, Karnes Electric Cooperative and Medina Electric Cooperative | Electric utilities reporting service in Frio County | EIA Form 861 | Confirm the line owner by address |
The American Community Survey 2019 to 2023 five year estimates put Pearsall’s median housing year at 1977; 18 percent of homes were built before 1960, and 70 percent from 1960 to 1999. An older connection near Power Plant Road may call for a replacement route, while a newer service may need a shorter connection. We expose marked utilities on the bore path before the drill gets near them, since locate marks show position but not depth.

What is near Pearsall, including Moore?
Pearsall is the county seat of Frio County, at an elevation of 622 feet, and covers 6.55 square miles. Its ZIP code is 78061. North Pearsall is 2.0 miles north; Moore is 12.7 miles northeast; Hilltop is 14.6 miles south; and Dilley is 16.3 miles south. From our Yukon, Oklahoma main office, we plan Pearsall work around the 535 road miles and 10.3 hour drive. That distance is part of planning mobilization for a bore along Interstate 35 or a local street.
Places near Pearsall
- Directional boring in North Pearsall: 2 miles north
- Directional boring in Moore: 12.7 miles northeast
- Directional boring in Hilltop: 14.6 miles south
- Directional boring in Dilley: 16.3 miles south
- Directional boring in Yancey: 17.8 miles north
What boring work comes up near Colorado Street in Pearsall?
- Highway crossing: A bore beneath Interstate 35 can carry a water line or conduit without opening the roadway, subject to the TxDOT permit plan.
- Water service: A connection near Oak Street can tie into the City of Pearsall groundwater system after the line owner and route are confirmed.
- Fiber route: A bore along Colorado Street can place fiber conduit beneath pavement while marked utilities are exposed first.
- Rail crossing: A route beneath the Union Pacific Laredo Subdivision needs the railroad’s crossing agreement and its specified conditions.
- Drainage crossing: A bore near Pearsall’s mapped unnamed drainage needs a route and depth plan suited to the channel area.
- Utility replacement: A service near Power Plant Road can be bored around existing lines after those lines are located and pothole exposed.
More on each kind of work: water line boring, electric line boring, fiber optic boring, road, railroad and creek crossings and municipal boring.
What do you need to quote a bore near Oak Street in Pearsall?
For an Oak Street bore, send the address or map pin, what is going in the ground, pipe or conduit size, footage, and a sketch or plans if available. Note the route toward Colorado Street or any pavement, track or drainage crossing, so we can understand where the bore begins and ends.
The 535 road miles from Yukon affect mobilization for work near Interstate 35 or Oak Street. Pearsall’s sandy surface and clay below can change drilling and reaming needs. The route also matters: a Union Pacific crossing, pavement, marked utilities or drainage can add planning and exposure work. Length, pipe or conduit size, pits, excavator time, sand backfill and emergency timing also shape the scope. We review those details together rather than treating footage as the only factor.
Questions people ask about boring in Pearsall
Does Trinity Boring Solutions take directional boring work in Pearsall and Frio County?
Yes. We take Pearsall work with our own crews and with partner drilling contractors from satellite yards they run. From the first call through the bore log, we coordinate with Trinity and document whichever crew is on site in Pearsall. That service model applies to routes such as Oak Street and Interstate 35 in Frio County.
Who owns electric lines in Pearsall, Frio County, and who confirms conduit specs?
AEP Texas Central, Karnes Electric Cooperative and Medina Electric Cooperative report electric service in Frio County, but that does not establish the provider for every Pearsall address. We confirm the line owner for the planned route before a conduit bore and check its specifications. That step matters near streets such as Colorado Street, where other marked lines may also be present.
Does Pearsall control Colorado Street, and can a bore avoid cutting it?
Pearsall is incorporated, so Colorado Street is a city street. Directional boring can place a line beneath pavement without cutting across the street, depending on the route and site conditions. We locate and expose marked utilities first, then plan entry and exit pits off the pavement where the Colorado Street layout allows.
Do older Pearsall homes near Power Plant Road need replacement bores?
They may, but the address and line condition decide whether a replacement bore fits. The American Community Survey 2019 to 2023 estimates put the median housing year at 1977, with 18 percent of homes built before 1960. Around Power Plant Road, we would plan a route after locating existing utilities and checking where the new line must connect.
What ground does a Pearsall bore go through in Duval soil?
The USDA soil survey maps Duval soil across 55 percent of Pearsall. At about 40 inches, sandy clay loam is mapped across 66 percent and clay across 28 percent. That mix can mean loose material near the surface and stickier cuttings lower down, so staged reaming and a fluid plan may be needed along Oak Street or another route.
Is there rock near the surface for a Pearsall bore?
Weathered bedrock is mapped within 60 inches across 57 percent of Pearsall, with typical depth at 51 inches; hard bedrock is not mapped within that depth. The Queen City Sand unit includes sandstone and siltstone, so some routes may drill more slowly through weathered material. The mapped conditions help with planning but do not replace checking the actual bore path.
How much notice does Texas811 need for a Pearsall bore near Oak Street?
For a bore near Oak Street, submit the locate request at least 48 hours before excavation starts, not counting Saturdays, Sundays or legal holidays, and no earlier than 14 days before. If Pearsall’s start moves more than 14 days past the original notice, we submit a new request before boring begins. When marks shift on a Pearsall route, we refresh them through Texas811 before continuing the bore.
How far is Pearsall from Trinity’s Yukon main office, and does that affect a bore?
From our Yukon, Oklahoma main office, we plan Pearsall work around the 535 road miles and 10.3 hour drive. That distance affects mobilization planning for a job near Interstate 35 or the Union Pacific track. We also consider the bore length, ground conditions, crossings and equipment needs when planning the work.
What affects the cost of a Pearsall bore under Interstate 35?
The price depends on the work at the specific route, not just the highway crossing. Length, pipe or conduit size, Duval soil conditions, pavement, marked utilities, pits and the number of crossings can all affect the plan. Interstate 35 right of way and the distance from Yukon also matter when we assess mobilization and the required work.
Where the Pearsall facts on this page come from
- USDA Natural Resources Conservation Service, Soil Data Access: soil survey map units inside Pearsall
- U.S. Census Bureau, TIGER/Line 2024: Pearsall boundary, roads, rail lines and streams
- U.S. Census Bureau, Vintage 2024 population estimates: Pearsall
- U.S. Census Bureau, American Community Survey 2019 to 2023: Pearsall housing units and year built
- Macrostrat geologic map compilation: map units under Pearsall
- U.S. EPA Safe Drinking Water Information System: public water systems serving Pearsall
- U.S. Department of Transportation, North American Rail Network: track owners in Frio County
- U.S. Energy Information Administration, Form EIA 861: electric utilities serving Frio County
- U.S. Geological Survey, Elevation Point Query Service: Pearsall elevation
- OpenStreetMap road network through the OSRM router: road miles from Yukon, Oklahoma to Pearsall
- Texas Utilities Code Chapter 251, Underground Facility Damage Prevention and Safety
- TxDOT Utility Accommodation Rules, 43 Tex. Admin. Code 21.40: underground utilities
- Texas Department of Transportation: Right of Way Utility and Leasing Information System (RULIS) utility permits
Get a Quote for a Bore in Pearsall
Send the address, what is going in, the size and the footage.
Trinity Boring Solutions
9102 NW Expressway, Yukon, OK 73099
(405) 409-7423 | darren@trinityboringsolutions.com
Free Bore Planner
Plan Your Bore in Pearsall, Texas
Type the address of your job in Pearsall. The Bore Planner opens an aerial map at that spot. Drop one pin where the bore starts and one where it ends, tell us what is going in and send the scope to our crew.
Talk to the crew that does the work
Fastest way to a number is a phone call. Tell us where the crossing is and what is going in the ground, and you will get a straight answer on the same call. Bores from 10 feet to 5,000 feet, 3/4 inch service line through 48 inch casing, anywhere in Oklahoma and Texas. We run 24/7 for main breaks and emergency repairs.
Answered by a person, not a call center.
Would rather not call? Send the details and we will come back with a written quote.
County and State Pages for Pearsall