trinityboringsolutions.com

Hilltop Texas Directional Boring: Duval Soil, Interstate 35 and Martin Branch

Quick Answer: EPA records do not let us match a water provider to a Hilltop address, and AEP Texas Central, Karnes Electric Cooperative and Medina Electric Cooperative report service in Frio County; confirm the line owner before a bore. We do directional boring, also called horizontal directional drilling (HDD), for routes that need to cross Interstate 35 without cutting the roadway. Hilltop is 549 road miles from our Yukon, Oklahoma main office, and FM 117 is another local route to plan around. Duval soil is common here, with sandy clay loam mapped at about 40 inches, so we plan reaming and fluid for the ground at the actual bore path.

Family Business Since 1965 Boring Since 1982 24 Hour Phone No Utility Strike in 25 Years

Hilltop bores at a glance

  • Unincorporated community in Frio County, Texas. Population 356 (2020 Census count).
  • Road distance from our Yukon, Oklahoma main office: 549 miles, about 10.6 hours of driving.
  • Ground: Duval soil is mapped on 64 percent of the area, with sandy clay loam about 40 inches down.
  • Rock: bedrock is mapped within 60 inches on 64 percent of the area.
  • Highways inside the boundary: Interstate 35 and FM 117. State permit office: TxDOT San Antonio District.
  • Railroad track inside the boundary: none mapped.
  • Named streams inside the boundary: Martin Branch.
  • Texas811: locate request at least two working days before a bore and no more than 14 days ahead.
  • Range: 3/4 inch service lines to 48 inch casing, 10 feet to 5,000 feet.
  • Phone answered 24 hours a day: (405) 409-7423

Who can I call for directional boring near Martin Branch in Hilltop?

Hilltop is an unincorporated community in Frio County, with a population of 356 in the 2020 Census count. For a route near Interstate 35, FM 117 or Martin Branch, our crews install water, sewer, gas, electric conduit and fiber lines by directional boring. The line owner and the exact route matter before we set the bore path, especially where an existing utility must be crossed.

Our main office is in Yukon, Oklahoma, and Hilltop work is done with our own crews and from satellite yards run by partner drilling contractors Trinity has personally vetted. Our longest bore was roughly 4,100 feet with 48 inch pipe under the Arkansas River in Tulsa. A typical Hilltop bore would be much shorter and planned around Duval soil, Interstate 35 or Martin Branch. Our family business started in 1965, and we have done directional boring since 1982, experience we bring to planning work in Hilltop.

Compact Ditch Witch drill rig boring a new utility line across a front yard on a residential street in Edmond, Oklahoma
Our compact Ditch Witch drill boring a new utility line across a front yard on a residential street in Edmond, Oklahoma. Photos on this page are from our jobs in Oklahoma and Texas.

How does Duval soil affect a bore in Hilltop?

The USDA soil survey maps Duval soil across 64% of Hilltop, with Duval very fine sandy loam mapped on much of the community. At the surface, very fine sandy loam covers 89% of the mapped area. About 40 inches down, sandy clay loam is mapped across 89%, and the survey shows sandy ground in 61% of the area at that depth. Average clay content there is 28%. These are mapped soil patterns, not test borings, so the route still needs site specific planning.

USDA soil survey, inside the Hilltop mapped community boundaryWhat is mapped
Soil series mappedDuval 64 percent, Webb 15 percent, Poteet 10 percent, Amphion 4 percent and Zavco 3 percent
Texture at the surfacevery fine sandy loam 89 percent, sandy clay loam 7 percent and clay 3 percent
Texture about 40 inches downsandy clay loam 89 percent, clay loam 4 percent and sandy clay 3 percent
Engineering class about 40 inches downlean clay (CL) 68 percent, clayey sand (SC) 28 percent and fat clay (CH) 3 percent
Average clay content about 40 inches down28 percent
Bedrock mapped within 60 inches64 percent of the area (0 percent hard rock, 64 percent weathered rock)
Seasonal water table within 60 inches0 percent of the area
Flood prone soils10 percent of the area
High corrosion risk for uncoated steel25 percent of the area

The soil survey maps weathered bedrock within 60 inches across 64% of Hilltop, with a typical depth of 52 inches; hard bedrock is not mapped at that depth. That can slow a bore compared with soil, but does not by itself indicate hard rock. Seasonal water tables are not mapped within 60 inches, while flood prone soils cover 10%, including areas to consider near Martin Branch. High steel corrosion risk covers 25%, so the line owner should consider casing and tracer wire materials. The geologic map unit is El Pico Clay, of Lutetian age, with clay, silty clay, sandstone and coal.

How do we run a bore through Hilltop sandy clay loam?

Hilltop’s mapped sandy clay loam and very fine sandy loam call for a bore plan that accounts for both soil and weathered rock. We adjust the drilling approach to the route, including any crossing near Interstate 35 or Martin Branch.

  1. We check the route against Duval soil and sandy clay loam mapped at about 40 inches, then choose a fluid and reaming plan for the observed ground.
  2. Where sandy layers could loosen behind the drill, we use drilling fluid to support the bore and stage the reaming before pulling pipe.
  3. If the route reaches weathered bedrock mapped within 60 inches, we allow for slower drilling and watch the soil to rock transition for steering changes.
  4. At Interstate 35, FM 117 or Martin Branch, we pothole marked utilities, track the drill head from the surface and log depth and pitch.
Rock bit on the drill rod at the front of a Vermeer D24x40 S3 with broken sandstone at the entry of a rock bore in Guthrie, OK
Rock bit on the drill rod with broken sandstone at the entry of a rock bore in Guthrie, Oklahoma.

What might a Hilltop bore cross near Union Pacific?

Interstate 35 and FM 117 run inside the mapped Hilltop community boundary. Interstate 35 Business is just outside it, and Texas State Highway 85 is also nearby. A utility route crossing existing highway pavement is installed by boring or tunneling, not by opening a trench through the roadway. On a state highway right of way, the required cover depends on the line type and whether it crosses or runs along the right of way. Hilltop has 8.78 public road centerline miles, but no named streets are recorded, so the address and route map are important for locating access.

CrossingTypeMapped extentWho has a say
Interstate 35Interstate2.2 roadway miles insideState highway office
FM 117State highway1.9 roadway miles insideState highway office
Interstate 35 BusinessHighway nearby0.1 miles outsideState highway office
Texas State Highway 85Highway nearby0.8 miles outsideState highway office
Union PacificRailroad nearby0.1 miles outsideThe railroad
Martin BranchStream2.26 channel miles insideChecked for Corps of Engineers jurisdiction
Swipe the table sideways to see every column.

No railroad is mapped inside Hilltop, but a Union Pacific line lies 0.1 miles outside the community boundary. If a bore reaches that track, the railroad’s crossing agreement sets the conditions, including casing, depth and flagging. Martin Branch runs 2.26 channel miles inside the community, and one street crossing of a named stream is mapped. With no lakes or ponds mapped within one mile of Hilltop, we can plan underground routes around the mapped local water features. A creek crossing near Martin Branch needs a check for U.S. Army Corps of Engineers jurisdiction during planning.

Whose permission does a Hilltop bore in Frio County need?

Hilltop has no city government, so street authority belongs to Frio County or the state, depending on the road. Interstate 35 and FM 117 are state routes, and work in their right of way needs a TxDOT utility permit reviewed by the TxDOT San Antonio District. The line owner, not the drilling contractor, files through TxDOT’s online RULIS system; we prepare the bore plan and profile for that filing. A Union Pacific crossing near Hilltop also needs the railroad’s agreement. For a Martin Branch crossing, planning includes a check for federal waterway jurisdiction.

Read the rules for yourself: Texas Utilities Code Chapter 251 on notice to Texas811, the Texas811 questions and answers page, the TxDOT Utility Accommodation Rules, 43 TAC 21.40 and TxDOT utility permits in RULIS.

Who owns the lines at a Hilltop address in Frio County?

EPA drinking water records do not tie a water system to Hilltop, so the provider for a specific address must be confirmed with Frio County or the local water district before a bore is planned. AEP Texas Central, Karnes Electric Cooperative and Medina Electric Cooperative report electric service in the county. Those records do not identify the electric owner at every Hilltop address, so we confirm the line owner before planning an electric conduit bore.

Line ownerWhat it isSourceSize
AEP Texas Central, Karnes Electric Cooperative and Medina Electric CooperativeElectric utilities reporting service in Frio CountyEIA Form 861Confirm the line owner by address
Swipe the table sideways to see every column.

Hilltop’s median housing year is 2013 in the American Community Survey 2019 to 2023 five year estimates, a reference point as we plan underground work around each site’s conditions. It estimates that 4% of homes were built before 1960 and 75% in 2000 or later. That mix can mean either a replacement route or a new service near Interstate 35 or FM 117. Before the drill approaches marked lines, we hydrovac pothole them to verify depth; locate marks show position, not depth.

Trinity Boring Solutions crew running a 2 inch conduit directional bore with airport hangars and a parked jet in the background in Oklahoma City
Our crew running a 2 inch conduit bore near the hangars at an Oklahoma City airport.

Do you cover Hilltop and nearby Pearsall?

Hilltop is in Frio County, at an elevation of 516 feet, and covers 1.25 square miles. The community’s ZIP code is 78017. Dilley is 1.8 miles south, while Pearsall is 14.6 miles north and is the county seat and nearest larger city. Cotulla is 18.2 miles south. From our Yukon, Oklahoma main office, Hilltop is 549 road miles away, a drive of 10.6 hours. That distance is part of planning crew mobilization for a bore near Interstate 35 or Martin Branch.

Places near Hilltop

What would we bore near Martin Branch in Hilltop?

  • Highway crossing: An Interstate 35 route needs a bore plan that keeps pavement intact and accounts for the TxDOT right of way.
  • State route bore: A line crossing FM 117 calls for the utility owner to handle the TxDOT permit before work in the right of way.
  • Creek crossing: A route near Martin Branch needs depth planned below the channel and a jurisdiction check during crossing design.
  • Rail crossing: If a Hilltop route extends to the Union Pacific track outside the community boundary, the railroad agreement sets crossing conditions.
  • Water service: A new service near Dilley needs the water provider confirmed for the specific address before the route is laid out.
  • Conduit bore: Along Interstate 35 or FM 117, we expose marked utilities before the drill approaches their locations.

More on each kind of work: water line boring, electric line boring, fiber optic boring, road, railroad and creek crossings and municipal boring.

What do you need to quote a Hilltop bore near Interstate 35?

For a Hilltop quote, send the address or map pin, what will go underground, the pipe or conduit size and the footage; a sketch or plans help. Near Interstate 35, a route drawing also helps show whether the line crosses highway right of way, FM 117 or an existing utility.

The price depends on the work at the specific Hilltop site. A short route through Duval very fine sandy loam may be simpler to plan than a longer bore through weathered bedrock or a route near the flood prone ground by Martin Branch. Pipe size, footage, utilities to expose, pavement, creek crossings, pits and excavator time all affect the scope. A Union Pacific crossing can add coordination, while the 549 road miles from Yukon affect mobilization.

Questions people ask about boring in Hilltop

Does Trinity take directional boring work in Hilltop, Frio County, and how is the crew assigned?

Yes. We take directional boring work in Hilltop, Frio County, with our own crews and partner contractor crews from vetted satellite yards. The Yukon office handles the job from the first call through the bore log, regardless of which crew is on site. A route near Martin Branch or Interstate 35 is planned around its specific access and ground conditions.

Who owns electric lines in Hilltop, Frio County, and who confirms conduit details?

AEP Texas Central, Karnes Electric Cooperative and Medina Electric Cooperative report electric service in Frio County, but those records do not identify the owner at every Hilltop address. Confirm the line owner for the specific location before setting conduit specifications. If the route approaches Interstate 35, the owner also needs to account for the highway right of way.

Who controls streets in Hilltop, Frio County, and can a bore avoid cutting one?

Hilltop is unincorporated and has no city government, so Frio County or the state has authority over a street or highway, depending on the route. Directional boring can pass beneath pavement without cutting it. For a crossing beneath Interstate 35 or FM 117, the state highway permit and applicable bore requirements still need to be addressed.

How old are homes and buried lines in Hilltop, Frio County, and what does that mean for replacement bores?

Hilltop’s American Community Survey 2019 to 2023 estimates give a median housing year of 2013, with 75% built in 2000 or later. Housing age does not confirm the age of a buried line, so we check the route and expose marked utilities before drilling near them. This helps plan either a replacement bore or a new service near FM 117.

Could groundwater or flood prone ground affect bore pits near Martin Branch in Hilltop?

Seasonal water tables are not mapped within 60 inches in Hilltop, but flood prone soils cover 10% of the community. Near Martin Branch, we consider channel conditions and pit placement rather than assuming the route is dry. A creek crossing also needs a check for U.S. Army Corps of Engineers jurisdiction during planning.

Does Duval soil in Hilltop corrode steel, and what pipe should we use?

The USDA soil survey maps high steel corrosion risk across 25% of Hilltop, where Duval soil is the leading soil series. The line owner selects suitable materials or coatings for steel casing and tracer wire. For Hilltop underground work, HDPE is not affected by soil corrosion, so we consider it where corrosion is a concern. The right choice depends on the line design and the ground along the actual route.

How far is Hilltop from the Yukon office, and does the distance from Pearsall affect a job?

From our Yukon, Oklahoma main office, Hilltop is 549 road miles away and takes a 10.6 hour drive, shaping our travel schedule. Pearsall is 14.6 miles north and is the county seat. The distance from Yukon can affect crew mobilization, so we consider it with bore length, pipe size, access and whether the route crosses Interstate 35 or Martin Branch.

How much 811 notice is needed for a bore in Hilltop, Frio County, and what if marks move?

For a Hilltop bore, submit the Texas811 locate request at least 48 hours before excavation, excluding Saturdays, Sundays and legal holidays, and no earlier than 14 days before work. For a Hilltop start, if the schedule slips more than 14 days past the original notice, we make a new request. Have worn or moved marks refreshed through Texas811 before drilling continues near Interstate 35 or FM 117.

What affects the cost of directional boring in Hilltop near Interstate 35?

The job details determine the price, not one local feature alone. Length, pipe size, Duval soil or weathered bedrock, marked utilities to expose, pavement and pits all affect the work. A Martin Branch crossing adds site planning, a Union Pacific route requires railroad coordination, and the 549 road miles from Yukon affect mobilization.

Where the Hilltop facts on this page come from

Darren Rice in a safety vest at the bore pit beside the Trinity Boring Solutions Ditch Witch directional drill, with drill rods racked, on the airfield at Will Rogers World Airport in Oklahoma City

About Trinity Boring Solutions

Trinity Boring Solutions is a family business in Yukon, Oklahoma, founded by Dean Rice in 1965 and owned today by Darren Rice, who started its directional boring side in 1982. The company bores across Oklahoma and Texas. No bore is too big or too small: 4 foot sidewalk sleeves to roughly 4,100 feet under the Arkansas River in Tulsa. Reach us at (405) 409-7423.

Get a Quote for a Bore in Hilltop

Send the address, what is going in, the size and the footage.

Trinity Boring Solutions
9102 NW Expressway, Yukon, OK 73099
(405) 409-7423 | darren@trinityboringsolutions.com

Trinity Boring Solutions | 24/7 Available ☎ Call (405) 409-7423 Free Quote

Free Bore Planner

Plan Your Bore in Hilltop, Texas

Type the address of your job in Hilltop. The Bore Planner opens an aerial map at that spot. Drop one pin where the bore starts and one where it ends, tell us what is going in and send the scope to our crew.

Talk to the crew that does the work

Fastest way to a number is a phone call. Tell us where the crossing is and what is going in the ground, and you will get a straight answer on the same call. Bores from 10 feet to 5,000 feet, 3/4 inch service line through 48 inch casing, anywhere in Oklahoma and Texas. We run 24/7 for main breaks and emergency repairs.

Call (405) 409-7423

Answered by a person, not a call center.

Would rather not call? Send the details and we will come back with a written quote.

Quick Quote In Page

County and State Pages for Hilltop

Same county: Moore · Bigfoot. All counties: Texas county list.