trinityboringsolutions.com

Dilley Texas Directional Boring: Duval Soil, Interstate 35 and Union Pacific Track

Quick Answer: Can we get your line beneath Interstate 35 without cutting the pavement? Yes, we use directional boring, also called horizontal directional drilling (HDD), for road crossings in Dilley. The Yukon main office is 551 road miles away, and Union Pacific track inside town means a rail route needs separate planning. Duval soil covers 86 percent of mapped ground, with sandy clay loam at about 40 inches; that mix can cut readily but needs staged reaming to keep the hole stable.

Family Business Since 1965 Boring Since 1982 24 Hour Phone No Utility Strike in 25 Years

Dilley bores at a glance

  • Incorporated city in Frio County, Texas. Population 3,953 (Census Bureau 2024 estimate).
  • Road distance from our Yukon, Oklahoma main office: 551 miles, about 10.6 hours of driving.
  • Ground: Duval soil is mapped on 86 percent of the area, with sandy clay loam about 40 inches down.
  • Rock: bedrock is mapped within 60 inches on 86 percent of the area.
  • Highways inside the boundary: Interstate 35, Interstate 35 Business, Texas State Highway 85 and FM 117. State permit office: TxDOT San Antonio District.
  • Railroad track inside the boundary: Union Pacific, with 6 mapped street and rail crossings.
  • Public water: City of Dilley, groundwater wells.
  • Texas811: locate request at least two working days before a bore and no more than 14 days ahead.
  • Range: 3/4 inch service lines to 48 inch casing, 10 feet to 5,000 feet.
  • Phone answered 24 hours a day: (405) 409-7423

Does anyone provide directional boring in Dilley under Interstate 35?

Can we get a line beneath Interstate 35 or a Dilley street without cutting the pavement? We do directional boring for water, sewer, gas, electric conduit and fiber, routing those lines beneath roads or along streets such as Leona Street. Dilley is in Frio County, with a population of 3,953 in the Census Bureau Vintage 2024 estimate. That scale and road layout help shape the route and access plan.

Our main office is in Yukon, Oklahoma, and Dilley work is done with our own crews and from satellite yards run by partner drilling contractors Trinity has personally vetted. A short service bore near Miller Street could use a 3/4 inch line, while a major crossing can call for 48 inch casing; our bore lengths range from 10 feet to 5,000 feet. For Dilley planning, we draw on our family business history from 1965 and directional boring experience dating to 1982.

Aerial view of a Trinity Boring Solutions directional drill set up for a gas line bore at a commercial site
Our directional drill set up for a gas line bore at a commercial site, seen from above. Photos on this page are from our jobs in Oklahoma and Texas.

What does the USDA survey show about Duval soil in Dilley?

The USDA soil survey maps Duval soil across 86 percent of Dilley, with Webb soil mapped across 6 percent. Very fine sandy loam is the surface texture across 96 percent of the mapped area. At about 40 inches below the surface, sandy clay loam is mapped across 96 percent, and average clay content is 27 percent. For Dilley planning, we treat mapped soil patterns as context, not as test borings. For a bore, the sandy fraction can make cutting easier, while the clay can cling to tooling, so the route needs attention as the hole is opened.

USDA soil survey, inside the Dilley city limitsWhat is mapped
Soil series mappedDuval 86 percent and Webb 6 percent
Texture at the surfacevery fine sandy loam 96 percent
Texture about 40 inches downsandy clay loam 96 percent
Engineering class about 40 inches downlean clay (CL) 88 percent and clayey sand (SC) 10 percent
Average clay content about 40 inches down27 percent
Bedrock mapped within 60 inches86 percent of the area (0 percent hard rock, 86 percent weathered rock)
Seasonal water table within 60 inches0 percent of the area
Flood prone soils2 percent of the area
High corrosion risk for uncoated steel10 percent of the area

Weathered bedrock is mapped within 60 inches across 86 percent of Dilley, with typical depth about 52 inches; hard bedrock is not mapped at that depth. The Laredo Formation, an Eocene unit of sandstone and clay, means a bore may meet slower weathered sandstone below the soil. Seasonal water tables are not mapped within five feet, and flood prone soils cover 2 percent. High steel corrosion risk is mapped across 10 percent, so the line owner should weigh casing and tracer wire materials.

How do we bore Dilley sandy clay loam?

Dilley soil changes from very fine sandy loam at the surface to sandy clay loam around 40 inches down. We plan the bore for that clay and sand mix, then track the drill path as the ground changes.

  1. In Duval soil, the sandy clay loam can hold to the reamer; we open the hole in stages and plan the pipe pull without leaving it open.
  2. Where Dilley’s sandy fraction loosens behind the bit, we manage drilling fluid and staged reaming to support the hole before the line is pulled.
  3. With weathered bedrock mapped near 52 inches, we watch for the change from soil to sandstone and adjust drilling pace and steering.
  4. At a Dilley crossing, we hydrovac expose marked utilities before the drill approaches; a walkover locator tracks depth and pitch along the route.
Vermeer D24x40 S3 Navigator and water truck at the entry of a 385 foot sandstone rock bore above the wetland in Guthrie, Oklahoma
Our Vermeer D24x40 and water truck at the entry of a 385 foot sandstone rock bore in Guthrie, Oklahoma.

What does a bore have to cross in Dilley near Union Pacific?

Interstate 35, Interstate 35 Business, Texas State Highway 85 and FM 117 run within Dilley, so a route may need to pass below a highway rather than cut its pavement. Leona Street is the longest named street at 1.42 miles in town; Miller Street runs 1.16 miles, while Hugo Street and White Street each run 1.03 miles. These streets give a project a local route reference, but the exact crossing and access points still matter.

CrossingTypeMapped extentWho has a say
Interstate 35Interstate3.3 roadway miles insideState highway office
Interstate 35 BusinessInterstate1 roadway miles insideState highway office
Texas State Highway 85State highway3.4 roadway miles insideState highway office
FM 117State highway1.2 roadway miles insideState highway office
Union PacificRailroad1.01 track miles insideThe railroad
Martin BranchStream nearby0.6 miles outsideChecked for Corps of Engineers jurisdiction
Swipe the table sideways to see every column.

Union Pacific has 1.01 track miles in Dilley on its Laredo Subdivision, and public mapping shows 6 street and rail crossings in town. A route across the tracks needs coordination with the railroad. No named stream is mapped inside the city limits, but Martin Branch is 0.6 miles outside them. If a proposed route reaches that channel, planning checks whether the crossing falls under U.S. Army Corps of Engineers jurisdiction. With no lakes or ponds mapped within one mile of Dilley, we plan boring work using the mapped conditions.

Who approves a Dilley bore in Frio County?

A bore beneath Interstate 35, Texas State Highway 85 or FM 117 needs the applicable TxDOT utility permit for work in highway right of way. At crossings, electric and communication lines need at least 60 inches of cover below the lowest crossed grade, and water lines need 60 inches; pressurized sewer also needs 60 inches. The line owner files through TxDOT RULIS, with the TxDOT San Antonio District reviewing the application. For Dilley utility work, we prepare the bore plan and profile for the utility owner and work under its permit. Existing highway pavement is bored or tunneled beneath, and rural highway crossings extend under all travel lanes.

Read the rules for yourself: Texas Utilities Code Chapter 251 on notice to Texas811, the Texas811 questions and answers page, the TxDOT Utility Accommodation Rules, 43 TAC 21.40 and TxDOT utility permits in RULIS.

Whose lines are already buried near City of Dilley water lines?

The City of Dilley public water system draws from groundwater wells and reports 3,691 service connections serving 4,505 people. Before hydrovac potholing near a water route, we use the marked line locations to expose each utility on the bore path. AEP Texas Central, Karnes Electric Cooperative and Medina Electric Cooperative report electric service in Frio County. We confirm the owner for the specific address before planning an electric conduit bore.

Line ownerWhat it isSourceSize
City of DilleyPublic water systemGroundwater wells3,691 connections, 4,505 people served
AEP Texas Central, Karnes Electric Cooperative and Medina Electric CooperativeElectric utilities reporting service in Frio CountyEIA Form 861Confirm the line owner by address
Swipe the table sideways to see every column.

The American Community Survey 2019 to 2023 five year estimates place Dilley’s median housing year at 1983, context we consider in planning underground work. It estimates 17 percent of homes were built before 1960, 58 percent from 1960 to 1999 and 25 percent in 2000 or later. Older streets such as Miller Street may have replacement work alongside newer service needs, but records do not identify a particular buried line’s age. We expose marked utilities before the drill approaches them.

Trinity Boring Solutions crew running a 2 inch conduit directional bore with airport hangars and a parked jet in the background in Oklahoma City
Our crew running a 2 inch conduit bore near the hangars at an Oklahoma City airport.

How far is Dilley from Pearsall and our Yukon office?

Dilley is an incorporated city in Frio County, covering 2.33 square miles at an elevation of 561 feet, with ZIP code 78017. Hilltop is 1.8 miles north, Pearsall is 16.3 miles north, and Cotulla is 16.4 miles south. Pearsall is both the county seat and the nearest larger city. The Yukon, Oklahoma main office is 551 road miles away, a 10.6 hour drive. Distance affects how we plan crew mobilization for work around Interstate 35 and the city’s streets.

Places near Dilley

What would we bore near Hugo Street in Dilley?

  • Highway crossing: A bore beneath Interstate 35 can keep a new water or fiber line out of the pavement, subject to TxDOT requirements.
  • Water service: A route near the City of Dilley system may connect a service without opening a street, after existing lines are located.
  • Fiber route: Hugo Street offers a named route reference for a fiber bore, with the alignment checked against marked utilities.
  • Rail crossing: A route beneath Union Pacific track needs the railroad’s crossing agreement and its conditions for the work.
  • Creek crossing: If a project reaches Martin Branch, the proposed channel crossing is checked for possible Corps jurisdiction.
  • Street replacement: A bore near Miller Street can place replacement water or sewer line beneath pavement rather than cutting across it.

More on each kind of work: water line boring, electric line boring, fiber optic boring, road, railroad and creek crossings and municipal boring.

What should I send for a Dilley quote near Martin Branch?

A map pin matters near Martin Branch because the exact approach and channel location shape a crossing plan. Send the Dilley address or pin, what will go underground, the pipe or conduit size and the footage. A sketch or plans help us check the route against nearby roads, tracks and marked utilities.

Ground conditions affect the work: Duval soil’s sandy clay loam and the mapped weathered bedrock can change the drilling plan. Crossings add scope, especially beneath Interstate 35 or Union Pacific track, where cover, casing and coordination matter. Logistics count too: the 551 road miles from Yukon affect mobilization, while pavement, access for pits, hydrovac work and any creek crossing also shape the job price.

Questions people ask about boring in Dilley

Does Trinity Boring Solutions take directional boring work in Frio County near Dilley?

Yes. We take directional boring work in Dilley and across Texas, with our own crews and work coordinated through partner drilling contractors we have vetted. For Dilley inquiries, we keep you connected with Trinity from the first call through the bore log, whichever crew is on site. Dilley’s Interstate 35 crossings are one example of the work we can plan.

Who is responsible for Hugo Street in Dilley, and does a bore require cutting it?

Because Dilley is incorporated, we treat its streets as city owned when planning boring and permit coordination. A bore near Hugo Street can pass beneath pavement without an open cut when the route and clearance allow. The street’s 1.03 miles in town give a useful location reference, but the proposed alignment determines the actual plan.

How old are homes and buried lines near Miller Street in Dilley?

The American Community Survey 2019 to 2023 estimates give Dilley a median housing year of 1983, but they do not date individual buried lines. Miller Street may have both older replacement needs and newer services. We locate and expose marked utilities before drilling near them, rather than assuming a line’s age or depth.

What ground does a Dilley bore encounter in Duval soil?

The USDA soil survey maps Duval soil across 86 percent of Dilley. At about 40 inches, sandy clay loam is mapped across 96 percent of the area. That mix can be sticky on tooling, so we plan staged reaming and a timely pipe pull rather than treating the map as a site specific test.

Will a bore in Dilley hit rock near Interstate 35?

Weathered bedrock is mapped within five feet across 86 percent of Dilley, with typical depth about 52 inches; hard bedrock is not mapped within that depth. The Laredo Formation includes sandstone and clay, so a bore may slow at weathered sandstone or at the soil to rock transition.

Who approves a utility bore under Interstate 35 in Dilley?

For work in Interstate 35 right of way, the utility owner applies for a TxDOT permit through RULIS, and the TxDOT San Antonio District reviews it. We prepare the bore plan and profile for that owner. The required cover depends on the line type and crossing, and the permit can set a different depth.

What bore sizes and lengths can you handle near White Street in Dilley?

We handle lines from 3/4 inch service lines through 48 inch casing, with bore lengths from 10 feet to 5,000 feet. A project near White Street still needs a route and access review, since pavement, marked utilities and the ground below the street affect the setup.

How early should I call Texas811 for a bore along Leona Street in Dilley?

The locate request for a Leona Street bore must be made at least 48 hours before excavation, excluding Saturdays, Sundays and legal holidays, and no earlier than 14 days before it. If the start slips more than 14 days past the notice, make a new request. Before work continues in Dilley, we have worn or moved marks refreshed through Texas811.

What affects the cost of a directional bore under Interstate 35 in Dilley?

The job scope drives the price. Duval soil and weathered bedrock affect ground work; Interstate 35 crossings can add cover, casing and pavement constraints. Union Pacific crossings need coordination, while hydrovac exposures, pit access, pipe size, footage and mobilization from 551 road miles away also affect the plan.

Where the Dilley facts on this page come from

Darren Rice in a safety vest at the bore pit beside the Trinity Boring Solutions Ditch Witch directional drill, with drill rods racked, on the airfield at Will Rogers World Airport in Oklahoma City

About Trinity Boring Solutions

Trinity Boring Solutions is a family business in Yukon, Oklahoma, founded by Dean Rice in 1965 and owned today by Darren Rice, who started its directional boring side in 1982. The company bores across Oklahoma and Texas. No bore is too big or too small: 4 foot sidewalk sleeves to roughly 4,100 feet under the Arkansas River in Tulsa. Reach us at (405) 409-7423.

Get a Quote for a Bore in Dilley

Send the address, what is going in, the size and the footage.

Trinity Boring Solutions
9102 NW Expressway, Yukon, OK 73099
(405) 409-7423 | darren@trinityboringsolutions.com

Trinity Boring Solutions | 24/7 Available ☎ Call (405) 409-7423 Free Quote

Free Bore Planner

Plan Your Bore in Dilley, Texas

Type the address of your job in Dilley. The Bore Planner opens an aerial map at that spot. Drop one pin where the bore starts and one where it ends, tell us what is going in and send the scope to our crew.

Talk to the crew that does the work

Fastest way to a number is a phone call. Tell us where the crossing is and what is going in the ground, and you will get a straight answer on the same call. Bores from 10 feet to 5,000 feet, 3/4 inch service line through 48 inch casing, anywhere in Oklahoma and Texas. We run 24/7 for main breaks and emergency repairs.

Call (405) 409-7423

Answered by a person, not a call center.

Would rather not call? Send the details and we will come back with a written quote.

Quick Quote In Page

County and State Pages for Dilley

Same county: Moore · Bigfoot. All counties: Texas county list.