trinityboringsolutions.com

Smyer Texas Directional Boring: Acuff Loam, Highway 114 and Lubbock and Western

Quick Answer: Can a line pass beneath Texas State Highway 114 without cutting the pavement? We do directional boring, also called horizontal directional drilling (HDD), for crossings like this in Smyer. The Lubbock and Western Railway is another local crossing to plan around. Smyer is 371 road miles from our Yukon, Oklahoma main office, and Texas State Highway 114 is a key route to account for when planning access. Acuff soil covers 67 percent of the town, so clay in the bore path can hold the hole open and cling to the reamer.

Family Business Since 1965 Boring Since 1982 24 Hour Phone No Utility Strike in 25 Years

Smyer bores at a glance

  • Incorporated city in Hockley County, Texas. Population 444 (Census Bureau 2024 estimate).
  • Road distance from our Yukon, Oklahoma main office: 371 miles, about 7.2 hours of driving.
  • Ground: Acuff soil is mapped on 67 percent of the area, with sandy clay loam about 40 inches down.
  • Rock: no bedrock is mapped in the top 60 inches.
  • Highways inside the boundary: Texas State Highway 114, FM 168 and Texas State Highway 168. State permit office: TxDOT Lubbock District.
  • Railroad track inside the boundary: Lubbock and Western Railway, with 2 mapped street and rail crossings.
  • Public water: City of Smyer, groundwater wells.
  • Texas811: locate request at least two working days before a bore and no more than 14 days ahead.
  • Range: 3/4 inch service lines to 48 inch casing, 10 feet to 5,000 feet.
  • Phone answered 24 hours a day: (405) 409-7423

Who handles directional boring in Smyer near the Lubbock and Western Railway?

Can a line pass beneath Texas State Highway 114 without cutting its pavement? We take directional boring work in Smyer, Hockley County, including water, sewer, gas, electric conduit and fiber routes along streets such as 1st Street. The Census Bureau Vintage 2024 estimate puts Smyer’s population at 444. For a line crossing a local road or the Lubbock and Western Railway, the route and access shape the bore plan.

Our main office is in Yukon, Oklahoma, and Smyer work is done with our own crews and from satellite yards run by partner drilling contractors Trinity has personally vetted. For Smyer projects, our family business began in 1965, and we have done directional boring since 1982. We have had no utility strike in over 25 years, a record that matters when planning around the City of Smyer groundwater lines.

Ditch Witch JT922 compact directional drill beside the Trinity Boring Solutions truck at NE 24th Street in Oklahoma City
Our Ditch Witch JT922 compact directional drill beside the Trinity truck on a sleeve bore at NE 24th Street in Oklahoma City. Photos on this page are from our jobs in Oklahoma and Texas.

What ground does a Smyer bore encounter in Acuff soil?

The USDA soil survey maps Acuff soil across 67 percent of Smyer, with Amarillo soils covering 27 percent and Portales 5 percent. Surface texture is mapped as loam across 72 percent and fine sandy loam across 28 percent. About 40 inches down, sandy clay loam is mapped under 94 percent of the area, with average clay content of 30 percent. Those are mapped patterns, not test borings. The clay rich material can stick to a reamer, so the actual route still needs site specific planning.

USDA soil survey, inside the Smyer city limitsWhat is mapped
Soil series mappedAcuff 67 percent, Amarillo 27 percent and Portales 5 percent
Texture at the surfaceloam 72 percent and fine sandy loam 28 percent
Texture about 40 inches downsandy clay loam 94 percent and loam 5 percent
Engineering class about 40 inches downlean clay (CL) 99 percent
Average clay content about 40 inches down30 percent
Bedrock mapped within 60 inchesNone mapped
Seasonal water table within 60 inches1 percent of the area
Flood prone soils0 percent of the area
High corrosion risk for uncoated steel1 percent of the area

For our Smyer bore plans, bedrock is not mapped in the top five feet, but deeper rock remains possible. The Blackwater Draw Formation is mapped here with sand, silt and locally clayey material; the map also shows Cenozoic sedimentary rocks of Paleocene age. A seasonal water table within 40 inches is mapped under 1 percent of the area, and flood prone soils are not mapped. High steel corrosion risk is mapped under 1 percent, so the line owner should consider casing and tracer wire materials for the route.

How do crews handle Smyer’s sandy clay loam?

Smyer’s mapped sandy clay loam calls for controlled fluid and careful reaming. Along 1st Street or near the Lubbock and Western Railway, the bore plan also has to fit the marked utilities and available pit space.

  1. With sandy clay loam mapped under 94 percent of Smyer at about 40 inches, we manage drilling fluid to limit sticky buildup on the reamer.
  2. Acuff soil covers 67 percent of town, so we can ream in stages and have the pipe ready before opening the final pass.
  3. For a line beneath 1st Street, we hydrovac pothole each marked utility on the bore path before drilling near it; paint does not show depth.
  4. Near the Lubbock and Western Railway, we track the drill head from the surface and log its depth and pitch as the bore advances.
Bore pit with a 6 inch PVC sleeve, traffic cones and blue water line flags at NE 24th Street in Oklahoma City
A bore pit with a 6 inch PVC sleeve, traffic cones and blue water line flags at NE 24th Street in Oklahoma City.

Which roads and tracks could a Smyer bore cross near Texas State Highway 114?

Texas State Highway 114 runs 3.1 mapped roadway miles inside Smyer, while FM 168 has 0.8 miles and Texas State Highway 168 has 0.1 miles. A bore under existing highway pavement must use boring or tunneling, not an open trench. The longest named streets are 5th Street at 1.05 miles, 1st Street at 1.04 miles and 4th Street at 1.04 miles. Those road and street routes give a project a clear starting point for checking access and possible crossings.

CrossingTypeMapped extentWho has a say
Texas State Highway 114State highway3.1 roadway miles insideState highway office
FM 168State highway0.8 roadway miles insideState highway office
Texas State Highway 168State highway0.1 roadway miles insideState highway office
Lubbock and Western RailwayRailroad1.45 track miles insideThe railroad
Swipe the table sideways to see every column.

The Lubbock and Western Railway has 1.45 track miles inside Smyer, and public mapping shows two street and rail crossings in town. A crossing of that track needs an agreement from the railroad owner before the route is set. No streams are mapped inside or within one mile of Smyer, and no lakes or ponds are mapped within one mile. With no mapped creek crossing to plan around, a local bore is more likely to focus on roads, tracks and existing utilities.

Who signs off on Smyer bores in Hockley County?

For a bore within Texas State Highway 114, FM 168 or Texas State Highway 168 right of way, TxDOT reviews the utility permit through its Lubbock District. The utility that owns the line submits the application in TxDOT’s online RULIS system; we prepare the bore plan and profile for that filing and work under the utility owner’s permit. TxDOT requires lines beneath existing highway pavement to be bored or tunneled. For electric and communication lines crossing a highway, the usual minimum cover is 60 inches below the lowest crossed grade, subject to permit conditions. Smyer streets such as Grant Street belong to the town. A crossing of the Lubbock and Western Railway also needs its owner’s agreement.

Read the rules for yourself: Texas Utilities Code Chapter 251 on notice to Texas811, the Texas811 questions and answers page, the TxDOT Utility Accommodation Rules, 43 TAC 21.40 and TxDOT utility permits in RULIS.

Whose lines are already buried near the City of Smyer water system?

The City of Smyer public water system uses groundwater wells and reports 201 service connections serving 474 people. The electric utilities reporting service in Hockley County are Southwestern Public Service, Lamb County Electric Cooperative, Lyntegar Electric Cooperative and South Plains Electric Cooperative. Those countywide reports do not identify the provider at each address, so we confirm the line owner before planning an electric conduit bore near the City of Smyer system.

Line ownerWhat it isSourceSize
City of SmyerPublic water systemGroundwater wells201 connections, 474 people served
Southwestern Public Service, Lamb County Electric Cooperative, Lyntegar Electric Cooperative and South Plains Electric CooperativeElectric utilities reporting service in Hockley CountyEIA Form 861Confirm the line owner by address
Swipe the table sideways to see every column.

Smyer’s 1988 median housing year in the American Community Survey 2019 to 2023 five year estimates gives us context, not a substitute for checking underground conditions. The survey estimates 32 percent of housing was built before 1960, 37 percent from 1960 to 1999 and 31 percent in 2000 or later. A replacement line near 4th Street may follow older buried infrastructure, while a new service may need a different connection point. We hydrovac pothole marked utilities on the bore path before drilling near them; locate paint shows position, not depth.

Hydrovac truck and boring equipment staged beside an airport taxiway for utility daylighting in Oklahoma City
Our hydrovac truck and boring equipment beside an airport taxiway in Oklahoma City, set up to expose a utility crossing.

How far is Smyer from Opdyke West and our Yukon office?

Smyer is an incorporated town in Hockley County, at an elevation of 3,390 feet, with 0.8 square miles of land. For Smyer planning, we use ZIP codes 79367 and 79407 to help confirm the project location before reviewing the bore details. Opdyke West is 7.9 miles west, Wolfforth is 10.6 miles southeast and Levelland is 11.6 miles west. Levelland is the county seat, while Wolfforth is the nearest larger city listed. The Yukon yard is 371 road miles away, a 7.2 hour drive, so distance can affect crew mobilization for work near Texas State Highway 114.

Places near Smyer

Which Smyer jobs call for a bore near 1st Street?

  • Highway crossing: A line beneath Texas State Highway 114 needs a bored or tunneled route, with the utility owner handling the TxDOT permit.
  • Water service: A connection near the City of Smyer groundwater system can use a bore to cross a street without opening its full surface.
  • Street replacement: A replacement line near 1st Street can pass beneath pavement, with marked utilities exposed before the drill approaches.
  • Rail crossing: A route beneath the Lubbock and Western Railway needs the railroad owner’s agreement before crossing details are settled.
  • Electric conduit: Near 4th Street, we first confirm which Hockley County reporting utility owns the line at that address.
  • Fiber route: A fiber bore near Grant Street can be planned around pavement and existing utility marks rather than an open street trench.

More on each kind of work: water line boring, electric line boring, fiber optic boring, road, railroad and creek crossings and municipal boring.

What should I send to price a bore near Grant Street in Smyer?

A map pin matters near Grant Street because the exact route can determine whether a bore meets a street, Texas State Highway 114 or the Lubbock and Western Railway. For a Smyer crossing, send us the address or pin, installation material, pipe or conduit size, and footage so we can review the route. A sketch or plans help us see pits, access and nearby crossings before we scope the work.

The price reflects the full route, not just its length. Acuff soil and the sandy clay loam mapped below the surface affect drilling and reaming. Crossings, exposed utilities, pavement and the Lubbock and Western Railway add planning or equipment needs. Pit work, excavator time and sand backfill can also affect the scope. Mobilization matters because Smyer is 371 road miles from Yukon. High profile or emergency work can change the crew and schedule requirements.

Questions people ask about boring in Smyer

Does Trinity take directional boring jobs in Smyer and Hockley County?

Yes. We take work in Smyer and across Texas, with crews assigned from our Yukon office and partner contractor satellite yards we have vetted. The City of Smyer water system and the Lubbock and Western Railway are local features to consider when setting a route. On Smyer work, we stay involved from the first call through the bore log, regardless of which crew is on site.

Who controls 4th Street in Smyer, and can a bore avoid cutting it?

Smyer is incorporated, so its town streets, including 4th Street, belong to the town itself. A directional bore can pass beneath the street without cutting its surface, subject to the route and site conditions. We check the marked utilities and pit locations before drilling, since pavement can stay intact while the bore still requires careful access planning.

How do Smyer’s housing age and lines near 1st Street affect replacement bores?

Smyer’s median housing year is 1988, according to the American Community Survey 2019 to 2023 five year estimates. That mix of older and newer homes means a replacement near 1st Street may meet existing buried lines, while a new service may have a different route. We expose marked utilities before the drill approaches, then plan the bore around what is found.

What ground does a Smyer bore pass through in Acuff soil?

The USDA soil survey maps Acuff soil across 67 percent of Smyer. At about 40 inches below the surface, sandy clay loam is mapped under 94 percent of the area, with average clay content of 30 percent. That clay can cling to the reamer, so staged reaming and fluid control can matter along a route near Grant Street.

Will a directional bore in Smyer encounter rock even though bedrock is not mapped in the top five feet?

Bedrock is not mapped in Smyer’s top five feet, but that does not rule out deeper rock. The local geologic map shows the Blackwater Draw Formation, including sand and silt, as well as Cenozoic sedimentary rocks of Paleocene age. Those mapped units are not a test of a specific bore path, so the route still needs project planning.

Who approves our bore beneath Texas State Highway 114 in Smyer before we schedule the crossing?

TxDOT’s Lubbock District reviews utility permits for work in Texas State Highway 114 right of way. The utility owner submits the application through RULIS, and we prepare the bore plan and profile for that filing. The route must also meet the permit conditions for highway cover and crossing construction, including boring or tunneling beneath existing pavement.

Does Smyer’s distance from Yukon change a bore near Wolfforth?

Smyer is 371 road miles and a 7.2 hour drive from our Yukon yard; Wolfforth is 10.6 miles southeast of Smyer. The distance from Yukon can affect mobilization for a job near Texas State Highway 114 or a local street. The route, pipe size, soil and crossings also shape the work, so we review the site details together.

How much Texas811 notice does a Smyer bore near 5th Street need?

For a bore near 5th Street, Texas law requires a locate request at least 48 hours before excavation, excluding Saturdays, Sundays and legal holidays. The request cannot be made more than 14 days before the planned start. For a Smyer start delayed more than 14 days beyond the original notice, we submit a new request before work proceeds. For Smyer work, we have worn or moved marks refreshed through Texas811 before our boring continues.

What affects the cost of a directional bore under Texas State Highway 114 in Smyer?

The route and job scope determine the price. Acuff soil and the sandy clay loam mapped beneath Smyer affect ground work; highway pavement, utility crossings and exposed lines affect the crossing plan. Pipe size, bore length, pits, excavator time and backfill also matter. Mobilization from Yukon is another factor for work beneath Texas State Highway 114.

Where the Smyer facts on this page come from

Darren Rice in a safety vest at the bore pit beside the Trinity Boring Solutions Ditch Witch directional drill, with drill rods racked, on the airfield at Will Rogers World Airport in Oklahoma City

About Trinity Boring Solutions

Trinity Boring Solutions is a family business in Yukon, Oklahoma, founded by Dean Rice in 1965 and owned today by Darren Rice, who started its directional boring side in 1982. The company bores across Oklahoma and Texas. No bore is too big or too small: 4 foot sidewalk sleeves to roughly 4,100 feet under the Arkansas River in Tulsa. Reach us at (405) 409-7423.

Get a Quote for a Bore in Smyer

Send the address, what is going in, the size and the footage.

Trinity Boring Solutions
9102 NW Expressway, Yukon, OK 73099
(405) 409-7423 | darren@trinityboringsolutions.com

Trinity Boring Solutions | 24/7 Available ☎ Call (405) 409-7423 Free Quote

Free Bore Planner

Plan Your Bore in Smyer, Texas

Type the address of your job in Smyer. The Bore Planner opens an aerial map at that spot. Drop one pin where the bore starts and one where it ends, tell us what is going in and send the scope to our crew.

Talk to the crew that does the work

Fastest way to a number is a phone call. Tell us where the crossing is and what is going in the ground, and you will get a straight answer on the same call. Bores from 10 feet to 5,000 feet, 3/4 inch service line through 48 inch casing, anywhere in Oklahoma and Texas. We run 24/7 for main breaks and emergency repairs.

Call (405) 409-7423

Answered by a person, not a call center.

Would rather not call? Send the details and we will come back with a written quote.

Quick Quote In Page

County and State Pages for Smyer

Same county: Sundown · Anton · Whitharral. All counties: Texas county list.