trinityboringsolutions.com

Dickens Texas Directional Boring: Olton Clay Loam, US 82 and J2 Creek

Quick Answer: US 82 is a key crossing in Dickens, where Trinity Boring Solutions takes directional boring, also called horizontal directional drilling (HDD), work in Texas without opening the highway pavement. Our Yukon, Oklahoma main office is 289 road miles from 5th Street, so the crew move is part of planning. Olton clay loam is common in Dickens. Sticky clay can cling to the reamer, so we plan the fluid and reaming sequence around it.

Family Business Since 1965 Boring Since 1982 24 Hour Phone No Utility Strike in 25 Years

Dickens bores at a glance

  • County seat of Dickens County, Texas. Population 209 (Census Bureau 2024 estimate).
  • Road distance from our Yukon, Oklahoma main office: 289 miles, about 5.6 hours of driving.
  • Ground: Olton soil is mapped on 24 percent of the area, with clay loam about 40 inches down.
  • Rock: bedrock is mapped within 60 inches on 3 percent of the area.
  • Highways inside the boundary: US 82, Texas State Highway 114 and Texas State Highway 70. State permit office: TxDOT Childress District.
  • Railroad track inside the boundary: none mapped.
  • Named streams inside the boundary: J2 Creek.
  • Public water: City of Dickens, groundwater wells.
  • Texas811: locate request at least two working days before a bore and no more than 14 days ahead.
  • Range: 3/4 inch service lines to 48 inch casing, 10 feet to 5,000 feet.
  • Phone answered 24 hours a day: (405) 409-7423

Who handles directional boring in Dickens County?

US 82 and the streets feeding it are places where a buried line may need a bore instead of an open cut. Dickens is the Dickens County seat, with 209 residents in the Census Bureau Vintage 2024 estimate. We install water, sewer, gas, electric conduit and fiber, including service runs from Montgomery or 4th Street toward a building or along a street.

Our main office is in Yukon, Oklahoma, and Dickens work is done with our own crews and from satellite yards run by partner drilling contractors Trinity has personally vetted. We have had no utility strike in over 25 years, while Dickens already has City of Dickens groundwater lines and electric service reported by AEP Texas North, Lighthouse Electric Cooperative and South Plains Electric Cooperative. Our family business dates to 1965, and we have drilled directionally since 1982.

Aerial view of a bore pit with drill rig and conduit alongside a directional drill rig and conduit on a concrete lot
Our crew at a bore pit beside the directional drill on a conduit job, seen from above. Photos on this page are from our jobs in Oklahoma and Texas.

What does the soil survey show for Dickens and Olton soil?

The USDA soil survey maps Olton soil across 24% of Dickens, while Bippus covers 21%. The mapped surface texture is clay loam across 46% of the city. At about 40 inches below the surface, clay loam accounts for 35% of mapped ground and sandy clay loam for 32%; average clay content at that depth is 27%. We use the Olton and Bippus soil maps as planning context, not as test borings for Dickens crossings. On a route near 5th Street, the actual material can still change along the bore, so the alignment and fluid plan need to suit the site.

USDA soil survey, inside the Dickens city limitsWhat is mapped
Soil series mappedOlton 24 percent, Bippus 21 percent, Mobeetie 16 percent, Miles 11 percent and Berda 10 percent
Texture at the surfaceclay loam 46 percent, fine sandy loam 27 percent and loam 23 percent
Texture about 40 inches downclay loam 35 percent, sandy clay loam 32 percent and fine sandy loam 16 percent
Engineering class about 40 inches downlean clay (CL) 64 percent, silty clayey sand (SC SM) 16 percent and clayey sand (SC) 11 percent
Average clay content about 40 inches down27 percent
Bedrock mapped within 60 inches3 percent of the area (3 percent hard rock, 0 percent weathered rock)
Seasonal water table within 60 inches0 percent of the area
Flood prone soils8 percent of the area
High corrosion risk for uncoated steel24 percent of the area

For Dickens work in Olton soils, the USDA maps bedrock within 60 inches across 3% of Dickens, so we verify depth at each bore. The geologic map shows Quaternary red siltstone and shale clast loamy colluvium, with shale, siltstone, clay and sandstone; the underlying Dockum Group is Triassic. No seasonal water table is mapped within 60 inches, while flood prone soils cover 8%. High steel corrosion risk is mapped across 24%, which matters for steel casing and tracer wire; the line owner selects any coating.

How do we drill Dickens clay loam?

Olton and Bippus soils make clay loam a practical concern on a Dickens bore. We match the mud and reaming sequence to the ground, then track the drill head and record depth and pitch as the route advances.

  1. Clay loam near 5th Street can build up on the reamer, so we use a thinner fluid mix and ream in stages before pulling the pipe.
  2. The USDA survey maps sandy clay loam at about 40 inches in Dickens, so we keep the mud suited to the soil and watch for ground that loosens when wet.
  3. Where a route crosses J2 Creek, we plan depth below the channel and check the crossing for possible federal jurisdiction before setting the bore path.
  4. Near US 82, we expose every marked utility on the route before drilling close, then track the head from above and log depth and pitch.
Reel of 4 inch HDPE conduit on the exit side of a 385 foot directional bore under creeks and wetland in Guthrie, Oklahoma
A reel of 4 inch HDPE conduit on the exit side of a 385 foot bore under creeks and wetland in Guthrie, Oklahoma.

What does a bore have to cross in Dickens near 5th Street?

US 82 runs 2.9 mapped roadway miles inside Dickens, while Texas State Highway 114 runs 2.7 miles and Texas State Highway 70 runs 0.7 miles. The named streets also shape a route: 5th Street is 1.16 miles, 4th Street is 0.83 miles and Montgomery is 0.65 miles within city limits. A bore under one of these roads can leave its pavement intact, but the alignment, access pits and any right of way work must be planned for the specific crossing.

CrossingTypeMapped extentWho has a say
US 82US highway2.9 roadway miles insideState highway office
Texas State Highway 114State highway2.7 roadway miles insideState highway office
Texas State Highway 70State highway0.7 roadway miles insideState highway office
J2 CreekStream0.9 channel miles insideChecked for Corps of Engineers jurisdiction
Swipe the table sideways to see every column.

No railroad is mapped inside Dickens or within one mile outside the city limits, so there is no mapped track crossing to plan for here. J2 Creek has 0.9 channel miles inside the city and four mapped street crossings, which makes creek and drainage alignment a real consideration. We plan around J2 Creek crossings; no lakes or ponds are mapped within one mile of Dickens. A J2 Creek crossing is checked during planning for possible U.S. Army Corps of Engineers jurisdiction.

Do I need a permit to bore under US 82 in Dickens?

For work in US 82, Texas State Highway 114 or Texas State Highway 70 right of way, the utility that owns the line submits the application through TxDOT’s online RULIS system, not the driller. We provide the bore plan and profile for that filing, and TxDOT Childress District reviews it. TxDOT sets the permitted cover: electric and communication lines need 60 inches at a crossing, water lines need 60 inches, and pressurized sewer lines need 60 inches. A bore under an existing highway is installed by boring or tunneling, and rural highway crossings extend beneath all travel lanes.

Read the rules for yourself: Texas Utilities Code Chapter 251 on notice to Texas811, the Texas811 questions and answers page, the TxDOT Utility Accommodation Rules, 43 TAC 21.40 and TxDOT utility permits in RULIS.

Whose lines are already buried in Dickens County?

The City of Dickens public water system serves 208 people through 157 connections and draws from groundwater wells. Electric service reported in Dickens County comes from AEP Texas North, Lighthouse Electric Cooperative and South Plains Electric Cooperative; the serving line owner must be confirmed before planning a conduit bore. That check matters near Montgomery or US 82 because the route can encounter different buried services, and each marked line on the bore path has to be exposed before the drill gets close.

Line ownerWhat it isSourceSize
City of DickensPublic water systemGroundwater wells157 connections, 208 people served
AEP Texas North, Lighthouse Electric Cooperative and South Plains Electric CooperativeElectric utilities reporting service in Dickens CountyEIA Form 861Confirm the line owner by address
Swipe the table sideways to see every column.

The American Community Survey 2019 to 2023 five year estimates put Dickens housing’s median year built at 1974. Thirty one percent of housing was built before 1960, while 14% dates from 2000 or later. That mix can mean either replacing an older line or extending a newer service near 4th Street. Before a bore under 4th Street gets near a marked utility, our crew hydrovacs each marked line; paint shows its position, not its depth.

Exposed underground utility line in a hand dug potholing pit before a directional bore in Oklahoma
An existing utility line exposed in a pothole before a directional bore in Oklahoma.

What is near Dickens and Spur?

Dickens is the county seat of Dickens County, at an elevation of 2,544 feet, and covers 0.96 square miles. Its ZIP code is 79229. Spur is 10.0 miles south, Roaring Springs is 19.2 miles north, and Crosbyton is 23.1 miles west. The Yukon, Oklahoma main office is 289 road miles away, a drive of 5.6 hours. That distance affects how we plan mobilization for work along US 82 or near J2 Creek, particularly when the job needs more equipment or a longer crew stay.

Places near Dickens

What kinds of bores come up in Dickens near 4th Street?

  • Highway crossing: A bore under US 82 keeps the line below the paved crossing, with the utility owner handling the TxDOT filing.
  • Water service: A connection near 4th Street can tie into the City of Dickens groundwater system after the existing line route is exposed.
  • Fiber route: A run along Montgomery can pass beneath street pavement, with marked utilities exposed before the drill approaches them.
  • Creek crossing: A J2 Creek bore needs a planned path beneath the channel and a jurisdiction check during planning.
  • Street service: A service near 5th Street can be bored between work pits to avoid cutting the street surface.
  • State highway route: A line near Texas State Highway 114 needs its right of way and proposed alignment included in the permit planning.

More on each kind of work: water line boring, electric line boring, fiber optic boring, road, railroad and creek crossings and municipal boring.

How do I get a quote for a Dickens bore near J2 Creek?

For a route near J2 Creek, send the address or map pin, what will go underground, pipe or conduit size and footage; a sketch or plans help us see the route. If the proposed bore approaches 5th Street or a drainage channel, show that crossing on the sketch so we can assess access and alignment before pricing the work.

The 289 road miles from Yukon shape mobilization for a Dickens job. Olton clay loam can change the drilling and reaming plan, while a US 82 crossing or J2 Creek approach adds crossing details to review. Price also reflects pipe size and bore length, marked utilities to expose, pavement or concrete, pits, excavator time and sand backfill. High profile or emergency work can call for added planning, and the site sketch helps us see which factors apply.

Questions people ask about boring in Dickens

Does Trinity take directional boring work in Dickens County, and who staffs it?

Yes. We take directional boring work in Dickens County, and our own crews or crews from partner drilling contractors we have vetted can staff the site. The Yukon office stays your contact through the work and bore log. For a route near US 82, share the proposed path and line details so we can plan the right crew and equipment.

Who controls Montgomery in Dickens, and can a bore avoid cutting the street?

Montgomery is a city street because Dickens is incorporated, so the street belongs to the city. Directional boring can place a line below the pavement rather than opening a trench across it. The planned entry and exit pits still need workable locations, and a route near US 82 may involve separate state right of way review.

What do Dickens housing ages near 4th Street mean for replacement bores?

The American Community Survey 2019 to 2023 estimates put the median housing year at 1974, with 31% built before 1960 and 14% built in 2000 or later. A 4th Street project could replace an older service or provide a new connection. We expose marked utilities along the proposed path before drilling near them.

What ground should I expect for a Dickens bore in Olton soil?

The USDA soil survey maps Olton soil across 24% of Dickens and clay loam across 46% of the surface. At about 40 inches, clay loam covers 35% of mapped ground and sandy clay loam 32%. Sticky clay can load the reamer, so staged reaming and a suitable fluid plan help keep the bore moving.

Will a Dickens directional bore hit rock?

The USDA soil survey maps bedrock within 60 inches across 3% of Dickens, so shallow rock is limited in the mapped area but deeper rock is still possible. The geologic map includes Quaternary siltstone and shale clast material, with Triassic Dockum Group below. A site review helps us choose the drilling approach for the actual route.

Who approves a Dickens bore beneath US 82?

TxDOT reviews work in US 82 right of way through its Childress District. The utility that owns the line files through the online RULIS system, and we provide the bore plan and profile. Cover and installation details are set through the permit; for example, a water line crossing needs 60 inches of cover under the stated TxDOT rules.

How much notice does Texas811 need for a Dickens bore near 5th Street?

For a 5th Street excavation, make the Texas811 request at least 48 hours ahead, excluding Saturdays, Sundays and legal holidays, and no earlier than 14 days before work starts. If the start moves more than 14 days beyond the original notice, place a new request. Before we continue boring on 5th Street, we get worn or moved utility marks refreshed through Texas811.

How far is Dickens from the Yukon office, and does that change a bore job?

Dickens is 289 road miles from our Yukon, Oklahoma main office, with a drive of 5.6 hours. That distance affects how we plan equipment and crew mobilization for work near J2 Creek or US 82. The proposed route, ground and crossing needs also shape the schedule and scope.

What affects the cost of directional boring under US 82 in Dickens?

The job details set the price, not just the footage. For a US 82 crossing, we consider the line size and length, required cover, soil conditions such as Olton clay loam, utilities to expose, pavement, pits and equipment time. A J2 Creek crossing or the 289 road mile trip from Yukon can also affect the work plan.

Where the Dickens facts on this page come from

Darren Rice in a safety vest at the bore pit beside the Trinity Boring Solutions Ditch Witch directional drill, with drill rods racked, on the airfield at Will Rogers World Airport in Oklahoma City

About Trinity Boring Solutions

Trinity Boring Solutions is a family business in Yukon, Oklahoma, founded by Dean Rice in 1965 and owned today by Darren Rice, who started its directional boring side in 1982. The company bores across Oklahoma and Texas. No bore is too big or too small: 4 foot sidewalk sleeves to roughly 4,100 feet under the Arkansas River in Tulsa. Reach us at (405) 409-7423.

Get a Quote for a Bore in Dickens

Send the address, what is going in, the size and the footage.

Trinity Boring Solutions
9102 NW Expressway, Yukon, OK 73099
(405) 409-7423 | darren@trinityboringsolutions.com

Trinity Boring Solutions | 24/7 Available ☎ Call (405) 409-7423 Free Quote

Free Bore Planner

Plan Your Bore in Dickens, Texas

Type the address of your job in Dickens. The Bore Planner opens an aerial map at that spot. Drop one pin where the bore starts and one where it ends, tell us what is going in and send the scope to our crew.

Talk to the crew that does the work

Fastest way to a number is a phone call. Tell us where the crossing is and what is going in the ground, and you will get a straight answer on the same call. Bores from 10 feet to 5,000 feet, 3/4 inch service line through 48 inch casing, anywhere in Oklahoma and Texas. We run 24/7 for main breaks and emergency repairs.

Call (405) 409-7423

Answered by a person, not a call center.

Would rather not call? Send the details and we will come back with a written quote.

Quick Quote In Page

County and State Pages for Dickens

All counties: Texas county list.