Crosbyton Texas Directional Boring: Olton Loam, US 82 and Clay Loam
Quick Answer: Crosbyton is an incorporated county seat, so its city streets belong to the city; we take directional boring, also called horizontal directional drilling (HDD), for routes beneath Main Street and other public roads. The Yukon main office is 315 road miles away, and US 82 runs through Crosbyton. USDA maps show Olton loam across 94 percent of the city, with clay loam below that can cling to a reamer and grip pipe. That ground calls for staged reaming and a planned pull on streets such as Aspen Street.
Crosbyton bores at a glance
- County seat of Crosby County, Texas. Population 1,465 (Census Bureau 2024 estimate).
- Road distance from our Yukon, Oklahoma main office: 315 miles, about 6.1 hours of driving.
- Ground: Olton soil is mapped on 97 percent of the area, with clay loam about 40 inches down.
- Rock: no bedrock is mapped in the top 60 inches.
- Highways inside the boundary: US 82, FM 651 and Texas State Highway 114. State permit office: TxDOT Lubbock District.
- Railroad track inside the boundary: none mapped.
- Public water: City of Crosbyton, surface water bought from another system.
- Texas811: locate request at least two working days before a bore and no more than 14 days ahead.
- Range: 3/4 inch service lines to 48 inch casing, 10 feet to 5,000 feet.
- Phone answered 24 hours a day: (405) 409-7423
Who does directional boring beneath US 82 in Crosbyton?
Crosbyton is a small incorporated city and the county seat of Crosby County. The Census Bureau Vintage 2024 estimate is 1,465 for Crosbyton, and we use that scale when planning underground work in Crosby County. We take water, sewer, gas, electric conduit and fiber work, including service routes beneath Main Street or connections that need to cross US 82.
Our main office is in Yukon, Oklahoma, and Crosbyton work is done with our own crews and from satellite yards run by partner drilling contractors Trinity has personally vetted. For routes serving Crosbyton’s 33.42 public road miles, our equipment ranges from 3/4 inch service lines to 48 inch casing. Our family business began in 1965 and has done directional boring since 1982; Crosbyton is 315 road miles from our Yukon main office.

How does Olton soil affect drilling in Crosbyton?
The USDA soil survey maps Olton soil across 97 percent of Crosbyton and Randall soil across 3 percent. Olton loam on 94 percent of the mapped area has slopes from 0 to 1 percent; another 3 percent is Olton loam with 1 to 3 percent slopes. At about 40 inches, 97 percent is mapped as clay loam, with an average clay content of 39 percent. The surface is mapped as loam over 97 percent of the city. When we plan a bore around Olton and Randall mapped patterns, we treat them as mapping, not as test borings. Clay can stick to a reamer and grip the pipe.
| USDA soil survey, inside the Crosbyton city limits | What is mapped |
|---|---|
| Soil series mapped | Olton 97 percent and Randall 3 percent |
| Texture at the surface | loam 97 percent and clay 3 percent |
| Texture about 40 inches down | clay loam 97 percent and clay 3 percent |
| Engineering class about 40 inches down | lean clay (CL) 97 percent and fat clay (CH) 3 percent |
| Average clay content about 40 inches down | 39 percent |
| Bedrock mapped within 60 inches | None mapped |
| Seasonal water table within 60 inches | 3 percent of the area |
| Flood prone soils | 0 percent of the area |
| High corrosion risk for uncoated steel | 100 percent of the area |
Bedrock is not mapped in the top five feet of Crosbyton, which does not rule out deeper rock. A seasonal water table is mapped within 40 inches in 3 percent of the area, so pits there may need pumping. With loam as the surface soil texture, we plan in Crosbyton knowing flood prone soils are not mapped. High steel corrosion risk is mapped across the city, a concern for uncoated steel casing and tracer wire; the line owner chooses coatings. The Blackwater Draw Formation, of Cenozoic age, includes sand, silt and locally clayey material, so field conditions can vary.
How is a bore run through Crosbyton clay loam?
Crosbyton’s mapped clay loam can hold the bore open but also cling to the reamer. We plan the fluid and reaming sequence around that soil and the route, such as a crossing near Aspen Street.
- We review the route and plans against Crosbyton’s Olton loam map, then choose a bore path that fits the street and the proposed line.
- Before drilling near a marked utility on Aspen Street, we use hydrovac potholing to expose it; surface paint does not show its depth.
- In Crosbyton’s clay loam, we use a thinner drilling fluid with polymer and open the hole in stages to limit clay buildup on the reamer.
- We track the drill head from the surface and record depth and pitch, then pull the pipe the same day the hole is opened to reduce clay grip.

Where does a line have to go under Aspen Street in Crosbyton?
US 82, FM 651 and Texas State Highway 114 run inside Crosbyton. For a route beneath one of those highways, the bore plan has to account for its right of way and the required cover. The city’s longest named streets include Aspen Street at 1.43 miles, Main Street at 1.25 miles and Front Street at 1.14 miles. Ayrshire Avenue also runs 1.14 miles. A bore beneath one of these roads can avoid cutting pavement, but the route and entry pits still need to fit the site.
| Crossing | Type | Mapped extent | Who has a say |
|---|---|---|---|
| US 82 | US highway | 3 roadway miles inside | State highway office |
| FM 651 | State highway | 3.6 roadway miles inside | State highway office |
| Texas State Highway 114 | State highway | 1.5 roadway miles inside | State highway office |
Crosbyton has no mapped railroad inside the city or within one mile outside it, so there is no mapped local track crossing to plan around. No named streams or lakes and ponds within one mile are mapped either. The street and rail crossing inventory also shows none mapped in the city. For a route under Aspen Street, we still check the marked utilities along the actual bore path and expose them before drilling near them.
Do I need a permit to bore in Crosby County in Crosbyton?
As Crosbyton is an incorporated city, we account for city street jurisdiction when planning a bore on Aspen Street. Work in the right of way of US 82, FM 651 or Texas State Highway 114 needs a TxDOT utility permit. The utility owner, not the drilling contractor, files through TxDOT’s online RULIS system, and the Lubbock District reviews it. Electric and communication lines crossing a highway need 60 inches of cover below the lowest point of the crossed grade; water lines need 60 inches, and pressurized sewer lines need 60 inches at crossings. A Texas811 locate request for a Main Street bore must be made at least 48 hours before excavation, excluding weekends and legal holidays, and no earlier than 14 days ahead.
Read the rules for yourself: Texas Utilities Code Chapter 251 on notice to Texas811, the Texas811 questions and answers page, the TxDOT Utility Accommodation Rules, 43 TAC 21.40 and TxDOT utility permits in RULIS.
What is already in the ground for the City of Crosbyton?
The City of Crosbyton public water system serves 1,741 people through 745 service connections and uses purchased surface water. For a water route near Aspen Street, that system’s owner and connection point matter to the bore plan. Southwestern Public Service, Lighthouse Electric Cooperative and South Plains Electric Cooperative report electric service in Crosby County. We confirm which line owner applies before planning an electric conduit bore.
| Line owner | What it is | Source | Size |
|---|---|---|---|
| City of Crosbyton | Public water system | Surface water bought from another system | 745 connections, 1,741 people served |
| Southwestern Public Service, Lighthouse Electric Cooperative and South Plains Electric Cooperative | Electric utilities reporting service in Crosby County | EIA Form 861 | Confirm the line owner by address |
American Community Survey 2019 to 2023 five year estimates put Crosbyton’s median housing year at 1968; 35 percent of housing was built before 1960 and 11 percent in 2000 or later. A replacement route along Main Street may have older buried lines to locate, while a new service has a different connection point. On Front Street, we hydrovac pothole each marked utility along the bore path before drilling near it. For example, a marked line beneath Front Street must be exposed because paint shows position, not depth.

Where is Crosbyton in relation to Slaton?
Crosbyton is in Crosby County, covers 2.11 square miles and sits at an elevation of 3,008 feet. Its ZIP code is 79322. Ralls is 8.8 miles west, Lorenzo is 17.3 miles west, Dickens is 23.1 miles east, Floydada is 24.3 miles north and Spur is 25.0 miles southeast. Crosbyton is the county seat, and Slaton is the nearest larger city, 27.4 miles southwest. From the Yukon main office, the road distance is 315 miles and the drive is 6.1 hours, which affects mobilization for a bore on US 82.
Places near Crosbyton
- Directional boring in Ralls: 8.8 miles west
- Directional boring in Lorenzo: 17.3 miles west
- Directional boring in Dickens: 23.1 miles east
- Directional boring in Floydada: 24.3 miles north
- Directional boring in Spur: 25 miles southeast
- Directional boring in Slaton: 27.4 miles southwest
What boring work comes up on Main Street in Crosbyton?
- Highway crossing: A route beneath US 82 needs a bore plan that accounts for highway cover and the TxDOT right of way.
- Water service: A connection to the City of Crosbyton system needs a route sized for the service and clear of marked lines near Aspen Street.
- Fiber route: A fiber conduit beneath Main Street can pass below pavement, with the entry and exit pits placed outside the traveled surface.
- Street replacement: A sewer or water replacement along Front Street can use a bore to avoid an open cut through the street surface.
- Airport service: A utility route serving Crosbyton Municipal Airport needs a site specific alignment and checks for marked lines along its path.
More on each kind of work: water line boring, electric line boring, fiber optic boring, road, railroad and creek crossings and municipal boring.
How do I get a quote for work on Ayrshire Avenue in Crosbyton?
For a quote near Ayrshire Avenue, send the address or map pin, what is going in the ground, the pipe or conduit size and the footage; a sketch or plans help. Include whether the route crosses Aspen Street or a state highway. Those details let us assess access, the likely bore path and the work needed to protect marked lines.
The largest local cost variable is the Olton clay loam, because sticky soil can require staged reaming and careful fluid control. Next are pipe size and bore length, followed by marked utilities to expose and any concrete or pavement along Main Street or US 82. Pits, excavator time and sand backfill also affect the scope. Crosbyton is 315 road miles from Yukon, so mobilization matters; creek crossings are not a mapped local feature.
Questions people ask about boring in Crosbyton
Does Trinity take directional boring jobs in Crosbyton and Crosby County?
Yes. Across Texas, we take directional boring work in Crosbyton, where US 82 is among the highways inside city limits. Our own crews and partner drilling contractors Trinity has personally vetted can staff the work, with Trinity handling the job from the first call through the bore log. For a route beneath US 82, the assigned crew follows the approved plan and the utility owner’s permit.
Which permits for a bore under US 82 in Crosbyton go through the TxDOT Lubbock District?
TxDOT reviews a utility permit for work in the US 82 right of way through its Lubbock District. The utility owner submits the application in RULIS, not the drilling contractor. A crossing plan must account for the required cover, including 60 inches for electric, communication and water lines crossing the highway.
Who runs Crosbyton’s public water system in Crosby County, and does it use purchased surface water?
The City of Crosbyton owns and runs the public water system, which uses purchased surface water. In Crosbyton, county seat of Crosby County, we keep the water system’s 1,741 people and 745 service connections in mind when planning underground work. For a new water bore near Aspen Street, the system’s connection location helps determine the route and the line that must be exposed before drilling.
Which electric providers report service in Crosbyton and Crosby County?
Southwestern Public Service, Lighthouse Electric Cooperative and South Plains Electric Cooperative report electric service in Crosby County. That does not establish which provider owns a line at a particular Crosbyton address. We identify the applicable line owner before planning a conduit bore so its requirements can be reflected in the route.
Who controls Front Street in Crosbyton, and does a bore require cutting it?
Crosbyton is incorporated, so Front Street is a city street. Directional boring can pass beneath its pavement without opening a trench across the road, with pits placed on either side where the site allows. Marked utilities along the planned path still need to be exposed before the drill approaches.
How do housing and buried lines affect a replacement bore on Main Street in Crosbyton?
Crosbyton’s median housing year is 1968, and American Community Survey estimates show 35 percent of housing predates 1960. That age can make careful utility locating important for a replacement route along Main Street. We expose marked lines by hydrovac potholing before drilling near them, since paint indicates location but not depth.
How far is Crosbyton from Slaton and Trinity’s Yukon office, and does that change a job?
Slaton is 27.4 miles southwest of Crosbyton. The Yukon main office is 315 road miles away, with a drive of 6.1 hours. That distance affects mobilization planning for a bore in Crosbyton, including a route beneath US 82; the scope and location details help determine the equipment and crew plan.
How much notice do I need for a Texas811 ticket on Aspen Street in Crosbyton?
Request a Texas811 locate at least 48 hours before excavation, not counting Saturdays, Sundays or legal holidays, and no earlier than 14 days before work. If a Crosbyton start slips more than 14 days past the original notice, submit a new request. Worn or moved marks along Aspen Street must be refreshed through Texas811 before work continues.
What do Olton and Randall soils mean for the cost of a directional bore under US 82 in Crosbyton?
The price depends on the specific scope, not a set local rate. Important factors include bore length and pipe size, Crosbyton’s sticky Olton clay loam, utilities that need exposure, pavement, pits and excavator time. A US 82 crossing also involves highway cover and permitting, while the 315 road miles from Yukon affect mobilization.
Where the Crosbyton facts on this page come from
- USDA Natural Resources Conservation Service, Soil Data Access: soil survey map units inside Crosbyton
- U.S. Census Bureau, TIGER/Line 2024: Crosbyton boundary, roads, rail lines and streams
- U.S. Census Bureau, Vintage 2024 population estimates: Crosbyton
- U.S. Census Bureau, American Community Survey 2019 to 2023: Crosbyton housing units and year built
- Macrostrat geologic map compilation: map units under Crosbyton
- U.S. EPA Safe Drinking Water Information System: public water systems serving Crosbyton
- U.S. Energy Information Administration, Form EIA 861: electric utilities serving Crosby County
- U.S. Geological Survey, Elevation Point Query Service: Crosbyton elevation
- OpenStreetMap road network through the OSRM router: road miles from Yukon, Oklahoma to Crosbyton
- Texas Utilities Code Chapter 251, Underground Facility Damage Prevention and Safety
- TxDOT Utility Accommodation Rules, 43 Tex. Admin. Code 21.40: underground utilities
- Texas Department of Transportation: Right of Way Utility and Leasing Information System (RULIS) utility permits
Get a Quote for a Bore in Crosbyton
Send the address, what is going in, the size and the footage.
Trinity Boring Solutions
9102 NW Expressway, Yukon, OK 73099
(405) 409-7423 | darren@trinityboringsolutions.com
Free Bore Planner
Plan Your Bore in Crosbyton, Texas
Type the address of your job in Crosbyton. The Bore Planner opens an aerial map at that spot. Drop one pin where the bore starts and one where it ends, tell us what is going in and send the scope to our crew.
Talk to the crew that does the work
Fastest way to a number is a phone call. Tell us where the crossing is and what is going in the ground, and you will get a straight answer on the same call. Bores from 10 feet to 5,000 feet, 3/4 inch service line through 48 inch casing, anywhere in Oklahoma and Texas. We run 24/7 for main breaks and emergency repairs.
Answered by a person, not a call center.
Would rather not call? Send the details and we will come back with a written quote.
County and State Pages for Crosbyton
All counties: Texas county list.
