trinityboringsolutions.com

Tuscola Texas Directional Boring: Sagerton Clay Loam, US 83, BNSF Railway

Quick Answer: We handle directional boring, also called horizontal directional drilling (HDD), in Tuscola, where a route may cross US 83 or BNSF Railway. Brown Avenue, Kent Avenue and Graham Street shape local routing, and our Yukon yard is 313 road miles away. Sagerton clay loam dominates the mapped ground, so sticky cuttings call for staged reaming and careful fluid control. Jim Ned Creek crossings and US 83 inside the city limits can affect access and planning.

Family Business Since 1965 Boring Since 1982 24 Hour Phone No Utility Strike in 25 Years

Tuscola bores at a glance

  • Incorporated city in Taylor County, Texas. Population 847 (Census Bureau 2024 estimate).
  • Road distance from our Yukon, Oklahoma main office: 313 miles, about 6.1 hours of driving.
  • Ground: Sagerton soil is mapped on 84 percent of the area, with clay loam about 40 inches down.
  • Rock: no bedrock is mapped in the top 60 inches.
  • Highways inside the boundary: US 83 and FM 613. State permit office: TxDOT Abilene District.
  • Railroad track inside the boundary: BNSF Railway, with 5 mapped street and rail crossings.
  • Named streams inside the boundary: Jim Ned Creek.
  • Texas811: locate request at least two working days before a bore and no more than 14 days ahead.
  • Range: 3/4 inch service lines to 48 inch casing, 10 feet to 5,000 feet.
  • Phone answered 24 hours a day: (405) 409-7423

Which contractor handles directional boring near US 83 in Tuscola?

Trinity Boring Solutions handles directional boring in Tuscola, Taylor County, for routes such as US 83. Brown Avenue, Kent Avenue and Graham Street are among the longest named streets within 15.43 public road centerline miles. BNSF Railway and Jim Ned Creek also shape route planning. The Census Bureau Vintage 2024 estimate puts Tuscola at 847 residents; we install water, sewer, gas, electric conduit and fiber along local streets and crossings.

Our main office is in Yukon, Oklahoma, and Tuscola work is done with our own crews and from satellite yards run by partner drilling contractors Trinity has personally vetted. For a short service connection near Brown Avenue or a large casing route planned beneath US 83, our range runs from 3/4 inch service lines to 48 inch casing. Our family business began in 1965, and we have done directional boring since 1982 for routes such as Tuscola crossings.

Trinity Boring Solutions directional boring crew, drill rig and hydrovac trailer staged along an airport service road at Will Rogers World Airport in Oklahoma City
Our boring crew, drill and hydrovac trailer staged along a service road at Will Rogers World Airport in Oklahoma City. Photos on this page are from our jobs in Oklahoma and Texas.

How does Sagerton soil affect boring in Tuscola?

The USDA soil survey maps Sagerton clay loam across much of Tuscola, so we plan for sticky cuttings rather than assuming the hole will stay clean on its own. Sagerton soils account for 84 percent of mapped soil series, and Sagerton clay loam, moist, 0 to 1 percent slopes covers 55 percent of the mapped area. At about 40 inches, the survey maps clay loam across 60 percent and clay across 37 percent; average clay content at that depth is 35 percent. We use Tuscola mapped patterns as planning information, not test borings, when preparing underground work.

USDA soil survey, inside the Tuscola city limitsWhat is mapped
Soil series mappedSagerton 84 percent and Rowena 11 percent
Texture at the surfaceclay loam 98 percent
Texture about 40 inches downclay loam 60 percent and clay 37 percent
Engineering class about 40 inches downlean clay (CL) 89 percent and fat clay (CH) 11 percent
Average clay content about 40 inches down35 percent
Bedrock mapped within 60 inchesNone mapped
Seasonal water table within 60 inches0 percent of the area
Flood prone soils2 percent of the area
High corrosion risk for uncoated steel37 percent of the area

For Tuscola, bedrock is not mapped in the top five feet, and a seasonal water table is not mapped within 60 inches; neither map pattern rules out different conditions along a particular route. Flood prone soils cover 2 percent of the mapped area, a point to consider near Jim Ned Creek. For Tuscola planning, we flag mapped high steel corrosion risk across 37 percent and advise line owners to consider casing and tracer wire materials. The geologic map shows the Permian Clear Fork Group, including claystone, siltstone, sandstone, dolostone, limestone and gypsum; deeper rock could slow drilling.

How do we drill Tuscola clay loam?

In Tuscola, Sagerton clay loam calls for controlled fluid and staged reaming so sticky cuttings do not load the tools or grip the pipe. We adjust the bore plan to the route and what the ground shows.

  1. In Sagerton clay loam, we manage fluid carefully and ream in stages, since clay can stick to the tools and swell around pipe.
  2. Because heavy clay is mapped under Tuscola, we watch fluid returns closely near pavement to reduce the risk of pressure lifting the surface.
  3. At marked utilities along Brown Avenue or Kent Avenue, we hydrovac pothole before drilling nearby; surface paint shows position, not depth.
  4. For a Jim Ned Creek route, we plan below the channel, track the drill head from the surface and log depth and pitch as the bore advances.
Reel of 4 inch HDPE conduit on the exit side of a 385 foot directional bore under creeks and wetland in Guthrie, Oklahoma
A reel of 4 inch HDPE conduit on the exit side of a 385 foot bore under creeks and wetland in Guthrie, Oklahoma.

What does a bore have to cross on Brown Avenue in Tuscola?

Tuscola routes may cross US 83 or FM 613, both mapped inside the city limits, so the road owner and route conditions matter to the bore plan. US 83 has 1.4 mapped roadway miles in the city and FM 613 has 2.0. Brown Avenue is the longest named street at 0.71 miles, followed by Kent Avenue and Graham Street at 0.63 miles each. Railroad Avenue has 0.56 miles inside the limits. A bore can pass below pavement instead of cutting across it, with depth and access planned for the specific route.

CrossingTypeMapped extentWho has a say
US 83US highway1.4 roadway miles insideState highway office
FM 613State highway2 roadway miles insideState highway office
BNSF RailwayRailroad2.38 track miles insideThe railroad
Jim Ned CreekStream0.59 channel miles insideChecked for Corps of Engineers jurisdiction
Swipe the table sideways to see every column.

BNSF Railway owns 2.38 track miles inside Tuscola, on the BNSF Railway Lampasas Subdivision; the city has 5 mapped street and rail crossings. A route under those tracks needs the railroad’s crossing agreement, which sets conditions such as casing, depth and flagging. Jim Ned Creek runs 0.59 channel miles through the city, and 2 mapped street crossings cross named streams. A creek crossing needs planning for the channel and a check for U.S. Army Corps of Engineers jurisdiction.

Whose permission does a Tuscola bore in Taylor County need?

Tuscola is incorporated, so its city streets belong to the city, while work on US 83 or FM 613 right of way needs a TxDOT utility permit. TxDOT’s Abilene District reviews the application in its online RULIS system; the utility owner files, and we prepare the bore plan and profile for that application. Under US 83, required cover depends on the line: electric and communication lines need 60 inches at a crossing, water needs 60 inches, and pressurized sewer needs 60 inches. At a Tuscola BNSF Railway crossing, we account for the railroad agreement before planning boring work. Jim Ned Creek is checked for federal jurisdiction during planning.

Read the rules for yourself: Texas Utilities Code Chapter 251 on notice to Texas811, the Texas811 questions and answers page, the TxDOT Utility Accommodation Rules, 43 TAC 21.40 and TxDOT utility permits in RULIS.

What is already in the ground in Taylor County near Tuscola?

The water provider for a specific Tuscola address must be confirmed with the city, Taylor County or the local water district before a bore is planned. County electric service reporting names AEP Texas North and Taylor Electric Cooperative, but that does not identify the owner of a line at every Brown Avenue address. We confirm the line owner before planning a conduit bore, then match the route and conduit details to that owner’s requirements.

Line ownerWhat it isSourceSize
AEP Texas North and Taylor Electric CooperativeElectric utilities reporting service in Taylor CountyEIA Form 861Confirm the line owner by address
Swipe the table sideways to see every column.

The American Community Survey 2019 to 2023 five year estimates put Tuscola’s median housing year at 1976; 32 percent of housing units date from before 1960, 44 percent from 1960 to 1999 and 24 percent from 2000 or later. That mix can mean work on older lines as well as new services near Kent Avenue. Before drilling near a marked utility, we use hydrovac potholing to expose it: paint shows a line’s position, not its depth.

Hydrovac truck and boring equipment staged beside an airport taxiway for utility daylighting in Oklahoma City
Our hydrovac truck and boring equipment beside an airport taxiway in Oklahoma City, set up to expose a utility crossing.

How far is Tuscola from Buffalo Gap and our Yukon yard?

Tuscola is in Taylor County at an elevation of 1,978 feet, with 0.85 square miles inside its incorporated limits and ZIP code 79562. Buffalo Gap is 5.4 miles northwest, and Lawn is 5.9 miles southeast; Potosi is 10.9 miles northeast. Abilene, the county seat and nearest larger city, is 17.1 miles north. From our Yukon, Oklahoma yard, the road distance is 313 miles and the drive takes 6.1 hours, so mobilization is part of planning for a Tuscola job.

Places near Tuscola

What would we bore near Kent Avenue in Tuscola?

  • Highway crossing: A route beneath US 83 needs a bore plan shaped by the roadway, line type and required cover.
  • Water service: A new service near Brown Avenue needs the address specific water provider confirmed before we plan the connection.
  • Fiber conduit: A fiber route along Kent Avenue can be bored beneath pavement, with marked utilities exposed before the drill approaches.
  • Rail crossing: A route under BNSF Railway needs the railroad’s agreement and a plan for its crossing conditions.
  • Creek crossing: A line beneath Jim Ned Creek needs channel focused planning and a jurisdiction check during planning.
  • Street connection: A service near Railroad Avenue can use a bore to avoid cutting pavement, with route length and access included in the scope.

More on each kind of work: water line boring, electric line boring, fiber optic boring, road, railroad and creek crossings and municipal boring.

What should I send for a Railroad Avenue bore quote in Tuscola?

For a Tuscola quote, send the address or map pin, what is going in the ground, pipe or conduit size and footage; a sketch or plans help. If the route is near Railroad Avenue, include any known track or street crossing so we can assess the path and access before discussing the scope.

The job details set the price, with Sagerton clay loam affecting ground handling and the number of utilities to expose affecting field time. A route near US 83 or BNSF Railway can add crossing requirements, while pavement, pits, excavator time and sand backfill change the work involved. Jim Ned Creek crossings need their own planning, and the 313 road miles from Yukon affect mobilization. Length, pipe size and any emergency timing also matter.

Questions people ask about boring in Tuscola

Does Trinity take directional boring jobs in Taylor County near Tuscola, and who staffs them?

Yes, we take directional boring work in Tuscola, and Trinity stays responsible from the first call through the bore log. Our own crews and partner drilling contractors from vetted satellite yards handle the field work. That lets us plan for local routes such as Brown Avenue without suggesting there is a Trinity office in Taylor County.

Will we hit rock while directional boring in Tuscola?

Rock is not mapped in Tuscola’s top five feet, but that does not rule out rock at greater depth. The geologic map identifies the Permian Clear Fork Group, with claystone, siltstone, sandstone, dolostone, limestone and gypsum. A route that reaches harder material may need slower drilling or different tooling than the mapped Sagerton clay loam suggests.

Who approves a Tuscola bore under US 83?

TxDOT handles a Tuscola bore in US 83 right of way through the Abilene District. The utility owner submits the utility permit application in RULIS, and we prepare the bore plan and profile for it. The permit sets the route conditions, including cover requirements that depend on whether the line carries water, electric, communication or pressurized sewer.

What agreement do we need for a Tuscola bore under BNSF Railway?

A Tuscola crossing under BNSF Railway needs an agreement from the railroad that owns the track. The agreement sets crossing details, including casing, depth and flagging. BNSF Railway has 2.38 track miles inside the city, so we identify whether the proposed route reaches its right of way before the bore is planned.

Can a line be bored under Jim Ned Creek in Tuscola?

Yes, a line can be planned beneath Jim Ned Creek, but the route needs to account for the channel and be checked for U.S. Army Corps of Engineers jurisdiction. The creek has 0.59 channel miles inside Tuscola. We plan the crossing depth and route around the creek rather than treating it like an ordinary street bore.

Who owns electric lines in Taylor County near Tuscola, and who confirms conduit specs?

AEP Texas North and Taylor Electric Cooperative report electric service in Taylor County, but that does not establish which one owns a particular line in Tuscola. We confirm the line owner at the project address before planning an electric conduit bore. That matters for a route near US 83 as well as one along a local street.

Does Trinity cover Buffalo Gap and rural sites outside Tuscola?

We take work across Texas, including projects near Buffalo Gap and rural sites outside Tuscola. Buffalo Gap is 5.4 miles northwest of the city, and the route, access and distance from our Yukon yard help shape mobilization. Send the project location so we can assess the specific ground and crossings.

How much notice does Texas811 need before a Tuscola bore on Brown Avenue?

For a Brown Avenue excavation, request a Texas811 locate at least 48 hours ahead, excluding Saturdays, Sundays and legal holidays, and no earlier than 14 days before work begins. The notice window matters if a Tuscola schedule shifts: a start more than 14 days after the original notice needs a new request. We ask for worn or moved marks in Tuscola to be refreshed through Texas811 before work continues.

What affects the cost of directional boring in Tuscola under US 83?

The cost of a Tuscola bore under US 83 depends on length, pipe size, ground, crossings and access, not a single standard rate. Sagerton clay loam affects drilling and fluid handling; pavement, marked utilities and highway requirements affect the crossing plan. Mobilization from Yukon also matters, as does any creek or railroad crossing in the route.

Where the Tuscola facts on this page come from

Darren Rice in a safety vest at the bore pit beside the Trinity Boring Solutions Ditch Witch directional drill, with drill rods racked, on the airfield at Will Rogers World Airport in Oklahoma City

About Trinity Boring Solutions

Trinity Boring Solutions is a family business in Yukon, Oklahoma, founded by Dean Rice in 1965 and owned today by Darren Rice, who started its directional boring side in 1982. The company bores across Oklahoma and Texas. No bore is too big or too small: 4 foot sidewalk sleeves to roughly 4,100 feet under the Arkansas River in Tulsa. Reach us at (405) 409-7423.

Get a Quote for a Bore in Tuscola

Send the address, what is going in, the size and the footage.

Trinity Boring Solutions
9102 NW Expressway, Yukon, OK 73099
(405) 409-7423 | darren@trinityboringsolutions.com

Trinity Boring Solutions | 24/7 Available ☎ Call (405) 409-7423 Free Quote

Free Bore Planner

Plan Your Bore in Tuscola, Texas

Type the address of your job in Tuscola. The Bore Planner opens an aerial map at that spot. Drop one pin where the bore starts and one where it ends, tell us what is going in and send the scope to our crew.

Talk to the crew that does the work

Fastest way to a number is a phone call. Tell us where the crossing is and what is going in the ground, and you will get a straight answer on the same call. Bores from 10 feet to 5,000 feet, 3/4 inch service line through 48 inch casing, anywhere in Oklahoma and Texas. We run 24/7 for main breaks and emergency repairs.

Call (405) 409-7423

Answered by a person, not a call center.

Would rather not call? Send the details and we will come back with a written quote.

Quick Quote In Page

County and State Pages for Tuscola

Same county: Merkel · Trent · Impact. All counties: Texas county list.