Merkel Texas Directional Boring: Sagerton Clay Loam, Interstate 20, Union Pacific
Quick Answer: Trinity Boring Solutions handles directional boring, also called horizontal directional drilling (HDD), for routes beneath Interstate 20 and other Merkel crossings. Merkel is 306 road miles from our Yukon, Oklahoma yard, so a bore near 1st Street includes a long mobilization in its scope. The USDA soil survey maps Sagerton clay loam widely, with clay at about 40 inches, where sticky cuttings can load a reamer and grip pipe. Staged reaming and a same day pull can help keep a 2nd Street route moving.
Merkel bores at a glance
- Incorporated city in Taylor County, Texas. Population 2,494 (Census Bureau 2024 estimate).
- Road distance from our Yukon, Oklahoma main office: 306 miles, about 6 hours of driving.
- Ground: Sagerton soil is mapped on 60 percent of the area, with clay about 40 inches down.
- Rock: bedrock is mapped within 60 inches on 8 percent of the area.
- Highways inside the boundary: Interstate 20, US 84, FM 1235 and FM 126. State permit office: TxDOT Abilene District.
- Railroad track inside the boundary: Union Pacific, with 4 mapped street and rail crossings.
- Public water: City of Merkel, surface water bought from another system.
- Texas811: locate request at least two working days before a bore and no more than 14 days ahead.
- Range: 3/4 inch service lines to 48 inch casing, 10 feet to 5,000 feet.
- Phone answered 24 hours a day: (405) 409-7423
Does anyone do directional boring near 1st Street in Merkel?
We take directional boring jobs in Merkel, including routes near 1st Street, in Taylor County. The Census Bureau Vintage 2024 estimate puts the town population at 2,494. 1st Street is the longest named street at 3.43 miles, and Interstate 20 runs through town alongside US 84. Water, sewer, gas, electric conduit and fiber lines can be routed beneath those streets or other marked crossings.
Our main office is in Yukon, Oklahoma, and Merkel work is done with our own crews and from satellite yards run by partner drilling contractors Trinity has personally vetted. We are a family business that started in 1965, with directional boring work since 1982. Our range from 3/4 inch service lines to 48 inch casing fits jobs from a City of Merkel water connection to a larger route beneath Interstate 20.

How does Sagerton soil affect a bore in Merkel?
The USDA soil survey maps Sagerton soil across much of Merkel, so clay handling matters on local bore routes. Sagerton accounts for 60 percent of mapped soil series, and Sagerton clay loam, moist, is mapped across 18 percent of the town. At about 40 inches below the surface, clay is mapped in 64 percent of the area and the average clay content is 39 percent. These mapped patterns are not test borings. Sticky clay can ball up on a reamer and grip pipe, so staged reaming and a same day pull help manage the hole.
| USDA soil survey, inside the Merkel city limits | What is mapped |
|---|---|
| Soil series mapped | Sagerton 60 percent, Tillman 16 percent, Rotan 14 percent and Stamford 5 percent |
| Texture at the surface | clay loam 90 percent and clay 7 percent |
| Texture about 40 inches down | clay 64 percent and clay loam 34 percent |
| Engineering class about 40 inches down | lean clay (CL) 90 percent and fat clay (CH) 8 percent |
| Average clay content about 40 inches down | 39 percent |
| Bedrock mapped within 60 inches | 8 percent of the area (0 percent hard rock, 8 percent weathered rock) |
| Seasonal water table within 60 inches | 0 percent of the area |
| Flood prone soils | 1 percent of the area |
| High corrosion risk for uncoated steel | 72 percent of the area |
The USDA soil survey maps bedrock within 60 inches in 8 percent of Merkel, with typical depth at 35 inches, so some routes may meet shallow weathered rock. Seasonal water tables are not mapped within 60 inches, while flood prone soils cover 1 percent. High steel corrosion risk is mapped across 72 percent, a concern for uncoated steel casing and tracer wire that the line owner should weigh. The Clear Fork Group, a Permian unit of claystone, siltstone, sandstone, dolostone, limestone and gypsum, means the ground can vary beyond the mapped clay.
What does it take for us to bore Merkel clay?
Merkel’s clay rich Sagerton soils call for controlled fluid and staged reaming. We plan the pass around the route, expose marked utilities, and track the drill head beneath local streets such as 5th Street.
- Clay control: Merkel maps clay at about 40 inches in 64 percent of the area, so we use thinner fluid with polymer and ream in stages.
- Manage returns: With 72 percent of Merkel mapped as heavy clay at about 40 inches, we watch fluid returns to avoid pressure lifting pavement near Interstate 20.
- Prepare the pull: Sticky Sagerton clay can grip pipe, so we have the line ready and pull it the same day the hole is opened near 5th Street.
- Check the route: Before drilling near marked lines along 1st Street, we expose each one with hydrovac and track depth and pitch from the surface.

What does a bore have to cross in Merkel near Union Pacific?
Merkel bores may need to pass beneath Interstate 20, US 84, FM 1235 or FM 126, all mapped within town limits. Interstate 20 accounts for 7.0 mapped roadway miles in the city, and US 84 for 6.5. A route can also meet 1st Street, which runs 3.43 miles, 2nd Street at 2.36 miles, or 5th Street at 1.76 miles. Those street and highway crossings make route layout important; boring can keep pavement and driveways uncut.
| Crossing | Type | Mapped extent | Who has a say |
|---|---|---|---|
| Interstate 20 | Interstate | 7 roadway miles inside | State highway office |
| US 84 | US highway | 6.5 roadway miles inside | State highway office |
| FM 1235 | State highway | 0.9 roadway miles inside | State highway office |
| FM 126 | State highway | 0.6 roadway miles inside | State highway office |
| Union Pacific | Railroad | 3.04 track miles inside | The railroad |
Union Pacific has 3.04 track miles in Merkel on the Baird Subdivision, and public mapping shows 4 street and rail crossings in town. A bore beneath the track needs an agreement with Union Pacific, with crossing conditions set by the railroad. No named streams are mapped inside town or within one mile, though 0.19 miles of unnamed drainage is mapped in the limits. With no lakes or ponds mapped within one mile, we can plan Merkel boring without a mapped water crossing nearby.
Do I need a permit for a Merkel bore in Taylor County?
For a bore in Merkel, the approval depends on whether the route uses a city street, a state highway right of way or Union Pacific track in Taylor County. The city is incorporated, so its streets belong to the city itself. Work in the right of way of Interstate 20, US 84, FM 1235 or FM 126 needs a TxDOT utility permit. The TxDOT Abilene District reviews the application in RULIS, and the utility owner, not the contractor, submits it. We prepare the bore plan and profile for that filing and work under the owner’s permit. A Union Pacific track crossing needs the railroad’s agreement.
Read the rules for yourself: Texas Utilities Code Chapter 251 on notice to Texas811, the Texas811 questions and answers page, the TxDOT Utility Accommodation Rules, 43 TAC 21.40 and TxDOT utility permits in RULIS.
What is already in the ground near the City of Merkel system?
The City of Merkel owns the public water system, which uses purchased surface water and serves 3,573 people through 1,379 service connections. For a bore near that system, we hydrovac marked utilities along the route before drilling close to them. AEP Texas North and Taylor Electric Cooperative report electric service in Taylor County; the line owner for a specific address needs to be confirmed before planning an electric conduit bore.
| Line owner | What it is | Source | Size |
|---|---|---|---|
| City of Merkel | Public water system | Surface water bought from another system | 1,379 connections, 3,573 people served |
| AEP Texas North and Taylor Electric Cooperative | Electric utilities reporting service in Taylor County | EIA Form 861 | Confirm the line owner by address |
We account for Merkel’s 1963 median housing year, reported in the American Community Survey 2019 to 2023 five year estimates, when planning underground work. It estimates 46 percent of housing units were built before 1960, 44 percent from 1960 to 1999, and 10 percent in 2000 or later. Along older streets such as 1st Street, a project may replace an existing line; newer services may need a route planned from the start. We expose marked lines with hydrovac before drilling near them, since paint shows position, not depth.

What is near Merkel, including Trent?
Merkel is an incorporated town in Taylor County, with Abilene as the county seat and the nearest larger city. The town covers 2.8 square miles at an elevation of 1,870 feet, and ZIP code 79536 serves Merkel. Trent is 6.7 miles west; Tye is 8.5 miles east; and Abilene is 15.9 miles east. Hawley lies 15.1 miles northeast, while Impact is 15.6 miles east. From our Yukon, Oklahoma main office, Merkel is 306 road miles away and about a 6.0 hour drive, which affects mobilization for a bore near Interstate 20.
Places near Merkel
- Directional boring in Trent: 6.7 miles west
- Directional boring in Tye: 8.5 miles east
- Directional boring in Hawley: 15.1 miles northeast
- Directional boring in Impact: 15.6 miles east
- Directional boring in Abilene: 15.9 miles east
What kinds of bores come up near 2nd Street in Merkel?
- Highway crossing: A route under Interstate 20 is bored beneath pavement, with the utility owner’s TxDOT permit covering work in the right of way.
- Water service: A connection near the City of Merkel system may need a route beneath 1st Street, with marked lines exposed before drilling.
- Fiber conduit: A conduit run along US 84 can pass beneath pavement without cutting the roadway, with the line owner confirmed first.
- Rail crossing: A bore under the 3.04 Union Pacific track miles needs the railroad’s agreement before the crossing is planned.
- Street connection: A sewer or water service near 2nd Street can be bored beneath the street, leaving the paved surface uncut.
- Drainage route: Where a bore route meets Merkel’s mapped unnamed drainage, we plan the path and check whether a water crossing is involved.
More on each kind of work: water line boring, electric line boring, fiber optic boring, road, railroad and creek crossings and municipal boring.
What do you need to quote a bore near Interstate 20 in Merkel?
For a Merkel quote, start with where the route sits, such as an address or map pin near 2nd Street. Tell us what will go underground, whether it is water, sewer or conduit, then give the pipe or conduit size and footage. A sketch or plans showing the route toward Interstate 20 help us see crossings and access before we scope the work.
The job details set the price, starting with mobilization from our Yukon yard, 306 road miles from Merkel. Sagerton clay can affect drilling and reaming, while a route beneath Interstate 20 or Union Pacific track adds crossing work. Pipe size and bore length matter too. We also account for utilities that must be exposed, pavement or concrete, drainage crossings, pits, excavator time and sand backfill. For Merkel work, high profile or emergency needs can change our plan.
Questions people ask about boring in Merkel
Does Trinity take directional boring jobs in Merkel and Taylor County?
Yes, we take directional boring work in Merkel and across Texas. Our crews and vetted partner drilling contractors handle the work, while you deal with Trinity from the first call through the bore log. A route near 1st Street or Interstate 20 can be scoped from its location, line type, size and footage.
Who approves a bore under Interstate 20 in Merkel?
TxDOT reviews a utility owner’s permit application for a bore in the Interstate 20 right of way through the TxDOT Abilene District. The utility owner files in RULIS, and we prepare the bore plan and profile for its application. The district permit governs the work beneath the highway pavement.
What does a bore beneath Union Pacific in Merkel require?
A bore beneath the Union Pacific Baird Subdivision needs an agreement from Union Pacific, the track owner. That agreement sets the railroad crossing conditions, including casing, depth and flagging. The route must be planned around the 3.04 track miles in Merkel and the specific street and rail crossing.
Who runs Merkel’s public water system, and where does its water come from?
The City of Merkel owns the public water system, and its source is purchased surface water. The system serves 3,573 people through 1,379 connections. For a bore near a City of Merkel water line, we locate and hydrovac expose marked utilities before the drill approaches.
Which electric line owner should I check for a Merkel job in Taylor County?
AEP Texas North and Taylor Electric Cooperative report electric service in Taylor County, but that does not identify the provider at every Merkel address. Confirm the line owner for the specific location before planning conduit near 5th Street or another route. We can plan around the marked lines once they are identified.
Who is in charge of 5th Street in Merkel, and does a bore require cutting it?
Merkel is incorporated, so we plan boring on its city streets with the city retaining ownership of those streets. A bore beneath 5th Street can pass under the pavement instead of cutting across it, subject to the route and approvals that apply. We expose marked utilities along the path before drilling near them.
How far is Merkel from the Yukon office, and does Abilene affect the job?
Merkel is 306 road miles and about a 6.0 hour drive from our Yukon, Oklahoma main office. Abilene is 15.9 miles east of Merkel, but the Yukon distance affects mobilization for work near Interstate 20 or elsewhere in town. Route length and ground conditions also shape the job.
How much Texas811 notice is needed for a bore near 1st Street in Merkel?
A Texas811 locate request for work near 1st Street must be made at least 48 hours before excavation, excluding Saturdays, Sundays and legal holidays, and no earlier than 14 days ahead. If the start slips more than 14 days beyond the original notice, make a new request. If marks are worn or moved for Merkel work, we refresh them through Texas811 before we continue.
What affects the cost of a directional bore near Interstate 20 in Merkel?
The scope sets the price: Merkel’s 306 road miles from Yukon affect mobilization, and Sagerton clay can change drilling and reaming needs. Pipe size, bore length, pavement, utility crossings and any Union Pacific or Interstate 20 requirements also matter. Pits, excavator time, backfill, drainage crossings and emergency timing can add work.
Where the Merkel facts on this page come from
- USDA Natural Resources Conservation Service, Soil Data Access: soil survey map units inside Merkel
- U.S. Census Bureau, TIGER/Line 2024: Merkel boundary, roads, rail lines and streams
- U.S. Census Bureau, Vintage 2024 population estimates: Merkel
- U.S. Census Bureau, American Community Survey 2019 to 2023: Merkel housing units and year built
- Macrostrat geologic map compilation: map units under Merkel
- U.S. EPA Safe Drinking Water Information System: public water systems serving Merkel
- U.S. Department of Transportation, North American Rail Network: track owners in Taylor County
- U.S. Energy Information Administration, Form EIA 861: electric utilities serving Taylor County
- U.S. Geological Survey, Elevation Point Query Service: Merkel elevation
- OpenStreetMap road network through the OSRM router: road miles from Yukon, Oklahoma to Merkel
- Texas Utilities Code Chapter 251, Underground Facility Damage Prevention and Safety
- TxDOT Utility Accommodation Rules, 43 Tex. Admin. Code 21.40: underground utilities
- Texas Department of Transportation: Right of Way Utility and Leasing Information System (RULIS) utility permits
Get a Quote for a Bore in Merkel
Send the address, what is going in, the size and the footage.
Trinity Boring Solutions
9102 NW Expressway, Yukon, OK 73099
(405) 409-7423 | darren@trinityboringsolutions.com
Free Bore Planner
Plan Your Bore in Merkel, Texas
Type the address of your job in Merkel. The Bore Planner opens an aerial map at that spot. Drop one pin where the bore starts and one where it ends, tell us what is going in and send the scope to our crew.
Talk to the crew that does the work
Fastest way to a number is a phone call. Tell us where the crossing is and what is going in the ground, and you will get a straight answer on the same call. Bores from 10 feet to 5,000 feet, 3/4 inch service line through 48 inch casing, anywhere in Oklahoma and Texas. We run 24/7 for main breaks and emergency repairs.
Answered by a person, not a call center.
Would rather not call? Send the details and we will come back with a written quote.
County and State Pages for Merkel
Same county: Potosi · Tuscola · Buffalo Gap · Lawn. All counties: Texas county list.