Kirby Texas Directional Boring: Branyon Clay, FM 78 and Rosillo Creek

Quick Answer: The City of Kirby water system and the electric line owner are the first things to confirm before a bore near Rosillo Creek. We do directional boring, also called horizontal directional drilling (HDD), for lines crossing FM 78 and other Kirby routes. The 474 road miles from our Yukon office matter when planning work along Seguin Road. Branyon clay is sticky and can grip pipe, so we plan the reaming and pull around that ground.

Family Business Since 1965 Boring Since 1982 24 Hour Phone No Utility Strike in 25 Years

Kirby bores at a glance

  • Incorporated city in Bexar County, Texas. Population 8,104 (Census Bureau 2024 estimate).
  • Road distance from our Yukon, Oklahoma main office: 474 miles, about 9.2 hours of driving.
  • Ground: Branyon soil is mapped on 79 percent of the area, with clay about 40 inches down.
  • Rock: no bedrock is mapped in the top 60 inches.
  • Highways inside the boundary: FM 78. State permit office: TxDOT San Antonio District.
  • Railroad track inside the boundary: none mapped.
  • Named streams inside the boundary: Rosillo Creek and Rittiman Creek.
  • Public water: City of Kirby, groundwater wells.
  • Texas811: locate request at least two working days before a bore and no more than 14 days ahead.
  • Range: 3/4 inch service lines to 48 inch casing, 10 feet to 5,000 feet.
  • Phone answered 24 hours a day: (405) 409-7423

Who handles directional boring in Kirby, Bexar County?

Kirby is in Bexar County, where the Census Bureau Vintage 2024 estimate puts the population at 8,104. We install water, sewer, gas, electric conduit and fiber lines, including service runs along Old Seguin Road and connections that need to cross FM 78. Before planning an electric conduit bore, we confirm which reporting utility owns the line at that address.

Our main office is in Yukon, Oklahoma, and Kirby work is done with our own crews and from satellite yards run by partner drilling contractors Trinity has personally vetted. More than 25 years without a utility strike is the record we bring to work around the City of Kirby water system and lines near Old Seguin Road. Our family business began in 1965, and we have drilled directionally since 1982.

Ditch Witch JT922 compact directional drill beside the Trinity Boring Solutions truck at NE 24th Street in Oklahoma City
Our Ditch Witch JT922 compact directional drill beside the Trinity truck on a sleeve bore at NE 24th Street in Oklahoma City. Photos on this page are from our jobs in Oklahoma and Texas.

What does Branyon soil mean for directional boring in Kirby?

The USDA soil survey maps Branyon soil across 79% of Kirby, including Branyon clay map units on 67% and 12% of the mapped area. Surface texture is clay on 93% of the area and gravelly clay on 7%. At about 40 inches below the surface, the mapped texture is clay throughout the area, with average clay content of 53%. That heavy clay can stick to a reamer and swell around pipe. We manage the fluid and ream in stages rather than opening the full hole at once.

USDA soil survey, inside the Kirby city limitsWhat is mapped
Soil series mappedBranyon 79 percent, Houston Black 11 percent and Tinn 10 percent
Texture at the surfaceclay 93 percent and gravelly clay 7 percent
Texture about 40 inches downclay 100 percent
Engineering class about 40 inches downfat clay (CH) 100 percent
Average clay content about 40 inches down53 percent
Bedrock mapped within 60 inchesNone mapped
Seasonal water table within 60 inches0 percent of the area
Flood prone soils10 percent of the area
High corrosion risk for uncoated steel100 percent of the area

The soil survey does not place bedrock within 60 inches in Kirby, but that says nothing about deeper conditions. Its geology mapping lists Alluvium, undivided, of Cenozoic age and Late Cretaceous sedimentary units of sand, chalk and mud. A seasonal water table is not mapped within 60 inches, while flood prone soils cover 10% of the area, including ground to consider near Rosillo Creek. High steel corrosion risk is mapped across the area, so the line owner selects any coating for steel casing or tracer wire. HDPE avoids that steel corrosion concern.

How do we bore through clay in Kirby?

Branyon clay is the main ground condition to plan around in Kirby. At about 40 inches, the USDA soil survey maps clay across the area, so we control fluid, watch returns and time the pipe pull to suit the hole.

  1. In Branyon clay, we use a thinner drilling fluid with polymer and ream in stages so sticky cuttings do not build up on the reamer.
  2. Because heavy clay covers Kirby at about 40 inches, we watch fluid returns closely to avoid pressure lifting pavement near FM 78.
  3. We have pipe ready before the final ream and pull it the same day the hole is opened, limiting time for Branyon clay to grip it.
  4. Before the drill approaches any marked utility, we expose it with hydrovac; paint along Seguin Road shows position, not depth, so we check the actual line.
Bore pit with a 6 inch PVC sleeve, traffic cones and blue water line flags at NE 24th Street in Oklahoma City
A bore pit with a 6 inch PVC sleeve, traffic cones and blue water line flags at NE 24th Street in Oklahoma City.

Where might a Kirby line need to go under FM 78?

FM 78 runs 1.7 roadway miles inside Kirby, and Interstate 410 is 0.1 miles from the limits. Interstate 35, Interstate 10 and US 90 are each 0.6 miles away. For street work, Seguin Road and Old Seguin Road each run 1.67 miles in the city; Ackerman Road runs 1.41 miles, and Binz Engleman Road runs 1.07 miles. Those routes can mean a bore under pavement or a driveway, with pits placed off the crossing rather than cutting through it.

CrossingTypeMapped extentWho has a say
FM 78State highway1.7 roadway miles insideState highway office
Interstate 410Highway nearby0.1 miles outsideState highway office
Loop 13Highway nearby0.3 miles outsideState highway office
Interstate 35Highway nearby0.6 miles outsideState highway office
Interstate 10Highway nearby0.6 miles outsideState highway office
US 90Highway nearby0.6 miles outsideState highway office
Union PacificRailroad nearby0 miles outsideThe railroad
Rosillo CreekStream2.25 channel miles insideChecked for Corps of Engineers jurisdiction
Rittiman CreekStream0.22 channel miles insideChecked for Corps of Engineers jurisdiction
Ackerman CreekStream nearby0.3 miles outsideChecked for Corps of Engineers jurisdiction
Pershing CreekStream nearby0.6 miles outsideChecked for Corps of Engineers jurisdiction
Swipe the table sideways to see every column.

No railroad runs inside Kirby, but Union Pacific tracks run along or touch the city boundary. Public mapping shows no street and rail crossings inside the limits, so a proposed crossing at that boundary needs to be planned with the track owner. Rosillo Creek runs 2.25 channel miles in the city and Rittiman Creek runs 0.22 miles; mapped streets cross named streams at four locations. Creek work needs a route that stays under the channel, with jurisdiction checked during planning.

Do I need a permit for a Kirby bore near Union Pacific?

Kirby is incorporated, so its city streets belong to the city itself. FM 78 is a state highway: electric and communication lines crossing it need at least 60 inches of cover below the lowest crossed grade, and water lines need the same crossing cover. Pressurized sewer crossings also need 60 inches. The line owner, not our crew, applies through TxDOT’s RULIS system for review by the TxDOT San Antonio District; we prepare the bore plan and profile for work under that permit. A bore beneath existing FM 78 pavement is installed by boring or tunneling, and highway crossings are encased. A Union Pacific crossing needs that railroad’s agreement, which sets casing, depth and flagging. For Rosillo Creek or Rittiman Creek, we check for U.S. Army Corps of Engineers jurisdiction during planning.

Read the rules for yourself: Texas Utilities Code Chapter 251 on notice to Texas811, the Texas811 questions and answers page, the TxDOT Utility Accommodation Rules, 43 TAC 21.40 and TxDOT utility permits in RULIS.

What is already in the ground in Kirby near City of Kirby lines?

The City of Kirby public water system uses groundwater wells and serves 8,142 people through 2,745 service connections. That makes water lines a key locate when planning a replacement service or a crossing near Old Seguin Road. Utilities reporting electric service in Bexar County include City of San Antonio, Bandera Electric Cooperative, Guadalupe Valley Electric Cooperative, Karnes Electric Cooperative and Pedernales Electric Cooperative. We confirm the line owner at the job address before laying out a conduit bore.

Line ownerWhat it isSourceSize
City of KirbyPublic water systemGroundwater wells2,745 connections, 8,142 people served
City of San Antonio, Bandera Electric Cooperative, Guadalupe Valley Electric Cooperative, Karnes Electric Cooperative and Pedernales Electric CooperativeElectric utilities reporting service in Bexar CountyEIA Form 861Confirm the line owner by address
Swipe the table sideways to see every column.

The American Community Survey 2019 to 2023 five year estimates put Kirby’s median housing year at 1977. They show 7% of homes built before 1960, 84% from 1960 to 1999, and 9% from 2000 onward. A replacement bore along Old Seguin Road may follow older buried service routes, while newer connections can need a fresh path. Before drilling near any marked utility, we expose it with hydrovac because paint shows position, not depth. For a proposed crossing under Old Seguin Road, that pothole shows where the existing line sits.

Hydrovac truck and boring equipment staged beside an airport taxiway for utility daylighting in Oklahoma City
Our hydrovac truck and boring equipment beside an airport taxiway in Oklahoma City, set up to expose a utility crossing.

How far is Kirby from Terrell Hills and our Yukon office?

Kirby covers 2.0 square miles in Bexar County, at an elevation of 685 feet, and uses ZIP code 78219. Windcrest is 3.7 miles north, while Terrell Hills is 3.9 miles west. Alamo Heights is 5.2 miles west, China Grove is 5.3 miles southeast, and Converse is 6.0 miles northeast. San Antonio, the county seat, is 8.4 miles west. From our Yukon yard, the road distance is 474 miles and the drive is 9.2 hours, so distance is part of planning crew and equipment mobilization for a Kirby job.

Places near Kirby

What kinds of bores come up near Seguin Road in Kirby?

  • Highway crossing: A water or communication line under FM 78 needs a planned bore beneath pavement, with required cover and casing addressed in the permit.
  • Water service: A replacement service near Old Seguin Road can use a bore to pass below pavement without opening a trench through the street.
  • Fiber conduit: A route along Binz Engleman Road can be bored around existing utilities after marked lines are exposed and their depth is checked.
  • Creek crossing: A proposed line beneath Rosillo Creek needs a path planned under the channel and a jurisdiction check during planning.
  • Rail crossing: A proposed route near the Union Pacific boundary needs the track owner’s agreement to set casing, depth and flagging.
  • Electric conduit: Near Ackerman Road, we first confirm the owner of the electric line before planning a conduit route.

More on each kind of work: water line boring, electric line boring, fiber optic boring, road, railroad and creek crossings and municipal boring.

How do I get a quote for a Kirby bore near Binz Engleman Road?

For a bore near Binz Engleman Road, start with the address or a map pin so we can locate the route. Tell us what goes in the ground, such as water line or fiber conduit, then give the pipe or conduit size and the footage. A sketch or plans showing the crossing and nearby utilities help us scope the work.

Price follows the ground, crossings and logistics at the Kirby site. Branyon clay affects drilling fluid and reaming; a crossing beneath FM 78 brings highway cover, casing and permit planning into the scope. Rosillo Creek can add crossing and access considerations. We also account for length, pipe size, utilities to expose, pavement, pits, excavator time and backfill. The 474 road miles from Yukon affect mobilization, and emergency work can change the crew and equipment plan.

Questions people ask about boring in Kirby

Does Trinity take directional boring jobs in Kirby, Bexar County?

Yes. We take directional boring work in Kirby, Bexar County, and staff it with our own crews or from satellite yards operated by drilling partners we have vetted. You work with Trinity from the first call through the bore log, including for a route near FM 78.

What do older homes near Old Seguin Road mean for replacement bores in Kirby?

Kirby’s median housing year is 1977, and the American Community Survey 2019 to 2023 estimates place 84% of homes in the 1960 to 1999 era. A replacement bore near Old Seguin Road may need to follow an established service route around existing lines. We expose marked utilities before drilling near them.

Can groundwater or flooding affect bore pits near Rosillo Creek in Kirby?

It can affect planning near Rosillo Creek, where flood prone soils are mapped on 10% of Kirby’s area. A seasonal water table is not mapped within 60 inches, but the survey pattern is not a site test. We assess pit placement and plan creek depth for the actual crossing.

Does Branyon soil in Kirby corrode steel, and what pipe can I use?

The USDA soil survey maps high steel corrosion risk across Kirby, including areas with Branyon soil. HDPE is not subject to that steel corrosion concern. If the design uses steel casing or tracer wire near Binz Engleman Road, the line owner selects any coating needed for the material.

What ground will a bore pass through in Branyon soil in Kirby?

Branyon is the dominant mapped soil series in Kirby, covering 79% of the area. At about 40 inches below the surface, the USDA soil survey maps clay throughout the area, with average clay content of 53%. That sticky ground can load a reamer and grip pipe, so we stage the reaming and plan the pull.

Will a directional bore in Kirby hit rock?

The soil survey does not map bedrock within 60 inches in Kirby, so it does not indicate shallow bedrock along a proposed route. It cannot rule out deeper rock. The geologic map includes Cenozoic Alluvium, undivided, and Late Cretaceous sedimentary units of sand, chalk and mud, which are planning context rather than a site boring.

What bore sizes and lengths can you handle near Binz Engleman Road in Kirby?

We handle lines from 3/4 inch service lines up to 48 inch casing, with bore lengths from 10 feet to 5,000 feet. For a route near Binz Engleman Road, the planned size and footage help determine the equipment and pit layout. A sketch can show the proposed path and crossings.

How much Texas811 notice do I need for a Kirby bore along Seguin Road?

For a Seguin Road bore, plan around the Texas811 ticket window and request locates at least 48 hours before excavation, not counting Saturdays, Sundays or legal holidays. Do not request more than 14 days ahead. If the start slips more than 14 days past the original notice, make a new request; refresh worn or moved marks before work continues.

What affects the cost of directional boring under FM 78 in Kirby?

The job’s length, pipe size, Branyon clay, utilities to expose, pavement and pit work all affect the price. A crossing under FM 78 also brings highway requirements into planning, while a route near Rosillo Creek may add crossing considerations. Mobilization from Yukon matters too, given the 474 road miles to Kirby.

Where the Kirby facts on this page come from

Darren Rice in a safety vest at the bore pit beside the Trinity Boring Solutions Ditch Witch directional drill, with drill rods racked, on the airfield at Will Rogers World Airport in Oklahoma City

About Trinity Boring Solutions

Trinity Boring Solutions is a family business in Yukon, Oklahoma, founded by Dean Rice in 1965 and owned today by Darren Rice, who started its directional boring side in 1982. The company bores across Oklahoma and Texas. No bore is too big or too small: 4 foot sidewalk sleeves to roughly 4,100 feet under the Arkansas River in Tulsa. Reach us at (405) 409-7423.

Get a Quote for a Bore in Kirby

Send the address, what is going in, the size and the footage.

Trinity Boring Solutions
9102 NW Expressway, Yukon, OK 73099
(405) 409-7423 | darren@trinityboringsolutions.com

Trinity Boring Solutions | 24/7 Available ☎ Call (405) 409-7423 Free Quote

Free Bore Planner

Plan Your Bore in Kirby, Texas

Type the address of your job in Kirby. The Bore Planner opens an aerial map at that spot. Drop one pin where the bore starts and one where it ends, tell us what is going in and send the scope to our crew.

Talk to the crew that does the work

Fastest way to a number is a phone call. Tell us where the crossing is and what is going in the ground, and you will get a straight answer on the same call. Bores from 10 feet to 5,000 feet, 3/4 inch service line through 48 inch casing, anywhere in Oklahoma and Texas. We run 24/7 for main breaks and emergency repairs.

Call (405) 409-7423

Answered by a person, not a call center.

Would rather not call? Send the details and we will come back with a written quote.

Quick Quote In Page

County and State Pages for Kirby

Same county: San Antonio · Universal City · Live Oak · Timberwood Park · Leon Valley · Helotes · Lackland AFB · Selma · Fair Oaks Ranch · Schertz · Sandy Oaks · Scenic Oaks. All counties: Texas county list.