Airport Road Addition Texas Directional Boring: Palobia Soil, FM 2191 and Los Olmos Creek
Quick Answer: Near the surface, the USDA soil survey maps mostly loamy fine sand in Airport Road Addition; bedrock is not mapped in the top five feet. Trinity does directional boring, also called horizontal directional drilling (HDD), beneath FM 2191 and Texas State Highway 285. Those roads are 631 road miles from our Yukon, Oklahoma main office. Palobia loamy fine sand covers 83 percent of mapped ground, so the loose surface needs fluid support while sandy clay loam appears at about 40 inches.
Airport Road Addition bores at a glance
- Unincorporated community in Brooks County, Texas. Population 96 (2020 Census count).
- Road distance from our Yukon, Oklahoma main office: 631 miles, about 12.3 hours of driving.
- Ground: Palobia soil is mapped on 88 percent of the area, with sandy clay loam about 40 inches down.
- Rock: no bedrock is mapped in the top 60 inches.
- Highways inside the boundary: FM 2191 and Texas State Highway 285. State permit office: TxDOT Pharr District.
- Railroad track inside the boundary: none mapped.
- Named streams inside the boundary: Los Olmos Creek.
- Texas811: locate request at least two working days before a bore and no more than 14 days ahead.
- Range: 3/4 inch service lines to 48 inch casing, 10 feet to 5,000 feet.
- Phone answered 24 hours a day: (405) 409-7423
Which contractor handles directional boring near FM 2191 in Airport Road Addition?
We take directional boring work in Airport Road Addition, an unincorporated community in Brooks County. The Census Bureau counted 96 people there in the 2020 Census; it does not publish yearly estimates for unincorporated places. We install water, sewer, gas, electric conduit and fiber lines, including routes beneath FM 2191 or Texas State Highway 285 where a line needs to pass under pavement.
Our main office is in Yukon, Oklahoma, and Airport Road Addition work is done with our own crews and from satellite yards run by partner drilling contractors Trinity has personally vetted. Our family business began in 1965 and has done directional boring since 1982. With electric providers reporting service in Brooks County, our record of no utility strike in over 25 years is relevant to planning each crossing carefully.

What is the Palobia soil like to bore in Airport Road Addition?
The USDA soil survey maps Palobia soil across 88 percent of Airport Road Addition. Palobia loamy fine sand, on 0 to 1 percent slopes, covers 83 percent of the mapped area; Palobia fine sandy loam covers another 5 percent. Near the surface, loamy fine sand accounts for 83 percent and fine sandy loam for 14 percent. At about 40 inches below the surface, sandy clay loam is mapped under 88 percent of the area, while sandy clay accounts for 9 percent and clay for 3 percent. These are survey patterns, not test borings.
| USDA soil survey, inside the Airport Road Addition mapped community boundary | What is mapped |
|---|---|
| Soil series mapped | Palobia 88 percent, Papagua 9 percent and Edroy 3 percent |
| Texture at the surface | loamy fine sand 83 percent, fine sandy loam 14 percent and clay 3 percent |
| Texture about 40 inches down | sandy clay loam 88 percent, sandy clay 9 percent and clay 3 percent |
| Engineering class about 40 inches down | clayey sand (SC) 88 percent and lean clay (CL) 12 percent |
| Average clay content about 40 inches down | 29 percent |
| Bedrock mapped within 60 inches | None mapped |
| Seasonal water table within 60 inches | 100 percent of the area |
| Flood prone soils | 0 percent of the area |
| High corrosion risk for uncoated steel | 100 percent of the area |
Bedrock is not mapped in the top five feet of Airport Road Addition. The geology map shows Holocene silt sheet deposits and Chibanian alluvium, described as mixed sand, silt and clay. A seasonal water table is mapped within 60 inches across the area, so pits may need pumping; flood prone soils are not mapped. High steel corrosion risk covers the mapped area, so the line owner should address casing and tracer wire materials. The wet ground and loose surface call for controlled fluid and stable pits.
How do we drill Airport Road Addition’s sandy clay loam?
Palobia loamy fine sand near the surface can loosen behind the bit, while sandy clay loam is mapped at about 40 inches. We adjust fluid and reaming to that change and the route under FM 2191.
- Palobia loamy fine sand is mapped near the surface, so we support the open hole with drilling fluid and have the pipe ready before the final ream.
- At about 40 inches, sandy clay loam is mapped under 88 percent of the area; we ream in stages to manage the change in ground.
- A seasonal water table is mapped within 60 inches across Airport Road Addition, so we keep pits small and pump water if they fill.
- Before approaching a marked line beneath FM 2191, we expose it with hydrovac potholing, then track the drill head and log depth and pitch.

What is in the way of a new line near FM 2191 in Airport Road Addition?
FM 2191 runs 4.0 mapped roadway miles inside the Airport Road Addition community boundary, and Texas State Highway 285 accounts for 2.0 miles. US 281 is 1.3 miles from the boundary, with US 281 Business 1.5 miles away. The mapped community has 9.38 public road centerline miles, but no named streets are supplied. A route beneath one of the state roads needs a planned bore that clears the pavement and any right of way requirements.
| Crossing | Type | Mapped extent | Who has a say |
|---|---|---|---|
| FM 2191 | State highway | 4 roadway miles inside | State highway office |
| Texas State Highway 285 | State highway | 2 roadway miles inside | State highway office |
| US 281 | Highway nearby | 1.3 miles outside | State highway office |
| US 281 Business | Highway nearby | 1.5 miles outside | State highway office |
| Los Olmos Creek | Stream | 1.6 channel miles inside | Checked for Corps of Engineers jurisdiction |
| Cibolo Creek | Stream nearby | 0.7 miles outside | Checked for Corps of Engineers jurisdiction |
No railroad is mapped inside Airport Road Addition or within 1 mile outside the community boundary, so the mapped route has no rail crossing to plan around. Los Olmos Creek runs 1.6 channel miles inside the community, with two mapped street crossings. Cibolo Creek is 0.7 miles outside the boundary, and no lakes or ponds are mapped within 1 mile. A proposed Los Olmos Creek crossing needs a route planned around the channel.
Who approves a bore in Brooks County near Airport Road Addition?
Airport Road Addition has no city government, so local streets fall under county authority and state roads under the state. For work in the right of way of FM 2191 or Texas State Highway 285, the utility that owns the line files for a TxDOT utility permit through RULIS; we provide the bore plan and profile for its application. The TxDOT Pharr District reviews it. TxDOT cover rules set highway crossing depths, and the permit can require a different depth. A Los Olmos Creek crossing is checked for U.S. Army Corps of Engineers jurisdiction during planning.
Read the rules for yourself: Texas Utilities Code Chapter 251 on notice to Texas811, the Texas811 questions and answers page, the TxDOT Utility Accommodation Rules, 43 TAC 21.40 and TxDOT utility permits in RULIS.
Who owns the lines serving Brooks County near Airport Road Addition?
EPA drinking water records cannot tie a water provider to a specific Airport Road Addition address. Before planning a bore, confirm the provider for that address with Brooks County or the local water district. Electric utilities reporting service in Brooks County are AEP Texas Central, Magic Valley Electric Cooperative, Medina Electric Cooperative and Nueces Electric Cooperative. The line owner for an electric conduit route must be confirmed before we plan a crossing near FM 2191.
| Line owner | What it is | Source | Size |
|---|---|---|---|
| AEP Texas Central, Magic Valley Electric Cooperative, Medina Electric Cooperative and Nueces Electric Cooperative | Electric utilities reporting service in Brooks County | EIA Form 861 | Confirm the line owner by address |
The American Community Survey 2019 to 2023 five year estimates put the median housing year in Airport Road Addition at 1985. The survey estimates 94 percent of housing was built from 1960 to 1999 and 6 percent in 2000 or later. That mix can mean a route is replacing an older service or serving newer construction. Before the drill approaches a marked line beneath FM 2191, we expose it with hydrovac potholing; paint shows position, not depth.

Do you cover Airport Road Addition and nearby Flowella?
Airport Road Addition is an unincorporated community in Brooks County, at an elevation of 100 feet and covering 2.11 square miles. Its ZIP code is 78355. Flowella is 2.1 miles east, Falfurrias is 2.9 miles west, and Cantu Addition is 3.7 miles west. Falfurrias is the county seat, while Kingsville is 24.8 miles northeast. Our Yukon, Oklahoma yard is 631 road miles away, a 12.3 hour drive, so that distance is part of planning mobilization for a job near FM 2191.
Places near Airport Road Addition
- Directional boring in Flowella: 2.1 miles east
- Directional boring in Falfurrias: 2.9 miles west
- Directional boring in Cantu Addition: 3.7 miles west
- Directional boring in Premont: 9.8 miles north
- Directional boring in Sarita: 18.6 miles east
- Directional boring in Kingsville: 24.8 miles northeast
What would we bore near Los Olmos Creek in Airport Road Addition?
- Highway crossing: A line beneath FM 2191 needs a bore planned for the pavement and the TxDOT right of way.
- Water service: A service near Texas State Highway 285 starts with confirming the address provider with Brooks County or the local water district.
- Fiber route: A fiber conduit along the community’s 9.38 public road centerline miles needs a path checked for marked utilities before drilling.
- Creek crossing: A proposed bore beneath Los Olmos Creek needs a channel plan and a check for federal jurisdiction during planning.
- Electric conduit: Before routing conduit near FM 2191, we confirm the line owner among utilities reporting service in Brooks County.
- Creek approach: Seasonal water table mapping across Airport Road Addition can affect pits beside Los Olmos Creek, so water management belongs in the plan.
More on each kind of work: water line boring, electric line boring, fiber optic boring, road, railroad and creek crossings and municipal boring.
What should I send for a Los Olmos Creek bore in Airport Road Addition?
For a quote near Los Olmos Creek, send the address or map pin, what will go underground, the pipe or conduit size, and the footage; a sketch or plans help. The route matters here: a creek approach, a run beneath FM 2191, or a path through Palobia loamy fine sand calls for different planning.
A short, accessible service near Texas State Highway 285 with few conflicts is simpler to plan than a long crossing near Los Olmos Creek. Price depends on length, pipe or conduit size, soil, utility crossings, pavement, creek work, pits, excavator time and backfill. Palobia loamy fine sand and the sandy clay loam below it affect drilling and reaming. A crossing in TxDOT right of way adds permit planning, and the 631 road miles from Yukon affect mobilization.
Questions people ask about boring in Airport Road Addition
Does Trinity take directional boring work in Airport Road Addition, Brooks County?
Yes. We take work in Airport Road Addition and staff it with our crews or partner drilling contractors we have vetted. You work with Trinity from the first call through the bore log, regardless of which crew is on site. That applies to routes near FM 2191 as well as other parts of Brooks County.
What ground does a bore pass through in Airport Road Addition near Palobia soil?
The USDA soil survey maps Palobia across 88 percent of Airport Road Addition, mostly as loamy fine sand near the surface. At about 40 inches, sandy clay loam is mapped beneath 88 percent of the area. Those survey patterns help us plan fluid and staged reaming, but they are not a substitute for site investigation.
Will a bore in Airport Road Addition hit rock?
Bedrock is not mapped in the top five feet of Airport Road Addition, but that does not establish what lies deeper. The geology map shows Holocene silt sheet and Chibanian alluvium, including mixed sand, silt and clay. We plan from the route and available site information rather than assume the map describes every bore depth.
Who approves a bore under FM 2191 in Airport Road Addition?
For work in the FM 2191 right of way, the utility that owns the line submits the TxDOT utility permit application through RULIS. The TxDOT Pharr District reviews it. We prepare the bore plan and profile for the owner, and the permit sets the applicable crossing conditions for that route.
Can a line be bored under Los Olmos Creek in Airport Road Addition?
A bore under Los Olmos Creek can be planned, but the route needs creek specific review. The stream has 1.6 channel miles inside Airport Road Addition, and a proposed crossing is checked for U.S. Army Corps of Engineers jurisdiction during planning. The ground and water conditions also affect pit placement and drilling fluid control.
Which electric company owns the lines in Airport Road Addition, Brooks County?
AEP Texas Central, Magic Valley Electric Cooperative, Medina Electric Cooperative and Nueces Electric Cooperative report service in Brooks County, but that does not identify the owner at every address. Confirm the line owner and conduit specifications before planning a bore near FM 2191 or another route.
How early should I call Texas811 for a bore in Airport Road Addition, Brooks County?
A ticket for work near FM 2191 can be made no earlier than 14 days before excavation and must be requested at least 48 hours ahead, excluding Saturdays, Sundays and legal holidays. Texas811 describes this as at least two working days. If work slips more than 14 days past the original notice, request a new ticket; refresh marks that wear off or move.
How far is Airport Road Addition from Yukon, and does Kingsville affect the job?
Airport Road Addition is 631 road miles and a 12.3 hour drive from our Yukon, Oklahoma main office. Kingsville is 24.8 miles northeast of the community. The distance from Yukon can affect mobilization planning, while the specific route near FM 2191 or Los Olmos Creek shapes the bore plan.
What affects the cost of a directional bore near FM 2191 in Airport Road Addition?
The job scope sets the cost: length, line size, soil, marked utility crossings, pavement, pits, backfill and creek work all matter. Palobia loamy fine sand near the surface and sandy clay loam below can change drilling and reaming needs. TxDOT right of way work near FM 2191 and mobilization from Yukon also affect the scope.
Where the Airport Road Addition facts on this page come from
- USDA Natural Resources Conservation Service, Soil Data Access: soil survey map units inside Airport Road Addition
- U.S. Census Bureau, TIGER/Line 2024: Airport Road Addition boundary, roads, rail lines and streams
- U.S. Census Bureau, 2020 Census: Airport Road Addition population count
- U.S. Census Bureau, American Community Survey 2019 to 2023: Airport Road Addition housing units and year built
- Macrostrat geologic map compilation: map units under Airport Road Addition
- U.S. Energy Information Administration, Form EIA 861: electric utilities serving Brooks County
- U.S. Geological Survey, Elevation Point Query Service: Airport Road Addition elevation
- OpenStreetMap road network through the OSRM router: road miles from Yukon, Oklahoma to Airport Road Addition
- Texas Utilities Code Chapter 251, Underground Facility Damage Prevention and Safety
- TxDOT Utility Accommodation Rules, 43 Tex. Admin. Code 21.40: underground utilities
- Texas Department of Transportation: Right of Way Utility and Leasing Information System (RULIS) utility permits
Get a Quote for a Bore in Airport Road Addition
Send the address, what is going in, the size and the footage.
Trinity Boring Solutions
9102 NW Expressway, Yukon, OK 73099
(405) 409-7423 | darren@trinityboringsolutions.com
Free Bore Planner
Plan Your Bore in Airport Road Addition, Texas
Type the address of your job in Airport Road Addition. The Bore Planner opens an aerial map at that spot. Drop one pin where the bore starts and one where it ends, tell us what is going in and send the scope to our crew.
Talk to the crew that does the work
Fastest way to a number is a phone call. Tell us where the crossing is and what is going in the ground, and you will get a straight answer on the same call. Bores from 10 feet to 5,000 feet, 3/4 inch service line through 48 inch casing, anywhere in Oklahoma and Texas. We run 24/7 for main breaks and emergency repairs.
Answered by a person, not a call center.
Would rather not call? Send the details and we will come back with a written quote.
County and State Pages for Airport Road Addition
Same county: Encino. All counties: Texas county list.