Quick Answer: Can we get a line under Interstate 10 without cutting the pavement? We take directional boring, also called horizontal directional drilling (HDD), work in Winnie, Texas for crossings like this. Winnie is 515 road miles from our Yukon, Oklahoma main office, and Texas State Highway 124 is another route to consider. Morey soil and clay loam mapped below the surface can make cuttings sticky, so the drilling fluid and reaming plan matter. Near Stowell, we plan each bore around the route and ground.

Family Business Since 1965 Boring Since 1982 24 Hour Phone No Utility Strike in 25 Years

Winnie bores at a glance

  • Unincorporated community in Chambers County, Texas. Population 3,162 (2020 Census count).
  • Road distance from our Yukon, Oklahoma main office: 515 miles, about 9.9 hours of driving.
  • Ground: Morey soil is mapped on 62 percent of the area, with clay loam about 40 inches down.
  • Rock: no bedrock is mapped in the top 60 inches.
  • Highways inside the boundary: Interstate 10, Texas State Highway 124, FM 1406, Texas State Highway 73 and FM 1663. State permit office: TxDOT Beaumont District.
  • Railroad track inside the boundary: none mapped.
  • Texas811: locate request at least two working days before a bore and no more than 14 days ahead.
  • Range: 3/4 inch service lines to 48 inch casing, 10 feet to 5,000 feet.
  • Phone answered 24 hours a day: (405) 409-7423

Who can I call for directional boring near Spindletop Bayou in Winnie?

Can we get a line under a road or creek without cutting across it? For routes near Spindletop Bayou or Winnie streets, we plan directional boring to keep the surface crossing intact. The Census Bureau counted 3,162 people in Winnie in the 2020 Census. We install water and sewer lines, gas lines, electric conduit and fiber, including runs beneath Broadway Avenue or along Buccaneer Drive.

Our main office is in Yukon, Oklahoma, and Winnie work is done with our own crews and from satellite yards run by partner drilling contractors Trinity has personally vetted. We are a family business started in 1965, and we have drilled directionally since 1982. That experience spans 3/4 inch service lines through 48 inch casing, useful for planning everything from a small service bore near Gulfway Drive to a larger crossing beneath Interstate 10.

Trinity Boring Solutions Ditch Witch JT922 HDD rig and vacuum excavation truck on a commercial bore in Oklahoma City
Our Ditch Witch JT922 drill and vacuum excavation truck on a commercial bore in Oklahoma City. Photos on this page are from our jobs in Oklahoma and Texas.

What does the USDA soil survey show beneath Winnie and Morey soil?

The USDA soil survey maps Morey as the leading soil series in Winnie, at 62 percent of the mapped area. Morey Urban land complex accounts for 45 percent of the mapped area, and Morey Levac complex accounts for 14 percent. Surface soils are mostly loam, with silt loam also mapped. At about 40 inches below the surface, 93 percent of the mapped area is clay loam, and 4 percent is clay. These are mapped soil patterns, not test borings. For a bore near County Line Road, the actual route still needs to be assessed.

USDA soil survey, inside the Winnie mapped community boundaryWhat is mapped
Soil series mappedMorey 62 percent, Orcadia 28 percent, Leton 6 percent and Anahuac 4 percent
Texture at the surfaceloam 71 percent, silt loam 22 percent and very fine sandy loam 7 percent
Texture about 40 inches downclay loam 93 percent, clay 4 percent and loam 3 percent
Engineering class about 40 inches downlean clay (CL) 68 percent and fat clay (CH) 32 percent
Average clay content about 40 inches down32 percent
Bedrock mapped within 60 inchesNone mapped
Seasonal water table within 60 inches94 percent of the area
Flood prone soils6 percent of the area
High corrosion risk for uncoated steel97 percent of the area

The survey does not map bedrock in the top five feet of Winnie, but deeper rock is not ruled out. A seasonal water table is mapped within 60 inches across 94 percent of the area, so pits may need pumping. Flood prone soils account for 6 percent. High steel corrosion risk covers 97 percent, a factor for steel casing and tracer wire that the line owner should consider. The geologic map names Delta sand, silt, and gravel of Pleistocene age. Near Spindletop Bayou, route depth and water conditions need attention.

How do we drill Winnie clay loam without losing the bore line?

Winnie soil maps show clay loam at about 40 inches and a seasonal water table across much of the area. We match the fluid and reaming plan to the route, then track the drill head as the bore advances.

  1. Morey soil maps clay loam at about 40 inches, which can cling to the reamer; we use staged passes and plan to pull the pipe while the bore is fresh.
  2. With a seasonal water table mapped within 60 inches across 94 percent of Winnie, we keep pits manageable and have pumping available where water collects.
  3. Near Interstate 10 pavement, we watch drilling fluid pressure and returns so the bore plan accounts for the surface above the hole.
  4. At a route near Spindletop Bayou, we plan the path beneath the channel and check for Corps jurisdiction before setting the crossing.
Open bore pit in red Oklahoma dirt with white PVC conduit stub ups and an orange safety barrier
An open bore pit in red Oklahoma dirt with PVC conduit stubbed up and a safety barrier around it.

Which roads, tracks or creeks might a Winnie bore cross near Interstate 10?

Interstate 10 has 1.5 mapped roadway miles inside the Winnie community boundary. Texas State Highway 124 has 4.5 miles, FM 1406 has 3.9 miles and Texas State Highway 73 has 2.0 miles there. Texas State Highway 65 lies 0.9 miles outside the boundary. Buccaneer Drive is the longest named street at 2.87 miles, followed by Gulfway Drive at 2.82 miles and Broadway Avenue at 2.12 miles. A bore beneath these routes can avoid cutting pavement, but the alignment and right of way still shape the plan.

CrossingTypeMapped extentWho has a say
Interstate 10Interstate1.5 roadway miles insideState highway office
Texas State Highway 124State highway4.5 roadway miles insideState highway office
FM 1406State highway3.9 roadway miles insideState highway office
Texas State Highway 73State highway2 roadway miles insideState highway office
FM 1663State highway0.1 roadway miles insideState highway office
Texas State Highway 65Highway nearby0.9 miles outsideState highway office
Spindletop BayouStream nearby0.9 miles outsideChecked for Corps of Engineers jurisdiction
Swipe the table sideways to see every column.

No railroad is mapped inside Winnie or within one mile outside its boundary, so no local track crossing is identified. Spindletop Bayou is mapped 0.9 miles beyond the community boundary; no named stream runs inside it, and no street crossing of a named stream is mapped there. If a proposed route does cross a railroad or bayou, the route needs review for the owner agreement or waterway jurisdiction that applies. No lakes or ponds are mapped within one mile.

Do I need a permit for a Winnie bore in Chambers County?

Winnie is an unincorporated community with no city government, so there is no city street office to approve a bore. County or state control depends on the road. For work in the right of way of Interstate 10, Texas State Highway 124, FM 1406 or another state route, the utility owner applies through TxDOT’s RULIS system; the TxDOT Beaumont District reviews it. We prepare the bore plan and profile for the utility owner and work under its permit. TxDOT sets cover and installation requirements for highway crossings. A route near Spindletop Bayou is checked for Corps jurisdiction during planning.

Read the rules for yourself: Texas Utilities Code Chapter 251 on notice to Texas811, the Texas811 questions and answers page, the TxDOT Utility Accommodation Rules, 43 TAC 21.40 and TxDOT utility permits in RULIS.

Who owns the buried lines in Winnie and Chambers County?

The water provider for a specific Winnie address has to be confirmed with the county or local water district before a bore is planned. EPA drinking water records do not tie water systems to towns, so they do not identify the provider for an address on Buccaneer Drive. CenterPoint Energy and Entergy Texas report electric service in Chambers County. Neither should be assumed to serve every address. Before an electric conduit bore near Interstate 10, confirm the line owner and conduit specifications.

Line ownerWhat it isSourceSize
CenterPoint Energy and Entergy TexasElectric utilities reporting service in Chambers CountyEIA Form 861Confirm the line owner by address
Swipe the table sideways to see every column.

The American Community Survey 2019 to 2023 five year estimates put the median Winnie housing year at 1974. The survey estimates 30 percent of homes were built before 1960, 56 percent from 1960 to 1999 and 14 percent in 2000 or later. An older service near Broadway Avenue may be a replacement, while a newer build may need a new connection. We hydrovac expose marked utilities along the planned path before drilling near them, since paint shows position but not depth.

Mini excavator digging beside a pad mounted electrical transformer with red dirt spoil and a vacuum excavation trailer on site
Digging beside a pad mounted electric transformer with a vacuum excavation trailer on site.

Do you cover Winnie and nearby Stowell?

Winnie is an unincorporated community in Chambers County, with a mapped area of 3.96 square miles and an elevation of 21 feet. Its ZIP code is 77665. Stowell is 2.6 miles south, and Hamshire is 4.5 miles northeast. Anahuac, the county seat, is 18.2 miles west; Beaumont is 23.3 miles northeast. From our Yukon, Oklahoma main office, Winnie is 515 road miles away and about 9.9 drive hours. Those miles affect how we plan crew mobilization for a job near Texas State Highway 124.

Places near Winnie

What would we bore beneath Buccaneer Drive in Winnie?

  • Highway crossing: A bore beneath Interstate 10 can keep the pavement intact, with the line owner handling the TxDOT permit for its right of way.
  • Street service: A water or sewer run beneath Broadway Avenue can avoid an open cut across the roadway.
  • Fiber route: A conduit bore along Buccaneer Drive can connect a service without trenching the full street length.
  • Bayou crossing: A route near Spindletop Bayou needs a planned path beneath the channel and a check for Corps jurisdiction.
  • Electric conduit: Near Gulfway Drive, we confirm the electric line owner and expose marked utilities before drilling close to them.

More on each kind of work: water line boring, electric line boring, fiber optic boring, road, railroad and creek crossings and municipal boring.

What should I send for a Winnie bore near County Line Road?

For a quote near County Line Road, send the address or map pin, what will go in the ground, the pipe or conduit size and the footage; a sketch or plans help. Those details let us compare the proposed route with nearby streets and identify whether the bore approaches a highway or Spindletop Bayou.

The job details set the price. A short service run on loam near Gulfway Drive may be simpler to plan than a longer route through clay loam. We also account for pipe size, utilities to expose, pavement, pits and sand backfill. A crossing of Interstate 10 brings highway planning into the scope, and Spindletop Bayou or wet ground may affect the route and pits. Mobilization matters because Winnie is 515 road miles from Yukon.

Questions people ask about boring in Winnie

Does Trinity take directional boring jobs in Winnie, Chambers County, and how are crews assigned?

Yes. We take directional boring work in Winnie, and the crew may come from our own staff or a satellite yard run by a partner contractor we have vetted. You work with Trinity from the first call through the bore log, including for a route near Buccaneer Drive.

Can you bore a line under Spindletop Bayou near Winnie?

A bore under or near Spindletop Bayou may be possible, depending on the route and ground conditions. The bayou is mapped 0.9 miles outside the Winnie community boundary, so we would review the proposed crossing and check for Corps jurisdiction during planning. Share a map pin so the route can be assessed.

Who owns electric lines in Winnie, Chambers County, and who confirms conduit specs?

CenterPoint Energy and Entergy Texas report electric service in Chambers County, but the provider for a particular Winnie address must be confirmed. The line owner also confirms conduit specifications before a bore is planned. That check matters for a proposed route near Texas State Highway 124, where right of way requirements may apply.

Who is in charge of Broadway Avenue in Winnie, and does it have to be cut?

Winnie has no city government because it is an unincorporated community, so street responsibility rests with the county or state depending on the road. A directional bore can pass beneath Broadway Avenue without cutting the street surface. The road owner and any applicable permit still need to be established for the route.

Do older buried lines near Gulfway Drive in Winnie need replacement bores?

The American Community Survey 2019 to 2023 five year estimates put the median housing year at 1974, with 30 percent of homes built before 1960. That does not establish the age of a buried line near Gulfway Drive, but it makes checking the existing service important when planning a replacement bore. We expose marked utilities before drilling nearby.

Will groundwater or flood prone soil affect bore pits near Spindletop Bayou in Winnie?

It can. Winnie soil maps show a seasonal water table within 60 inches across 94 percent of the area, and flood prone soils in 6 percent. Spindletop Bayou is just outside the community boundary. We account for wet pits and plan a crossing below the channel where the route calls for one.

What bore sizes and lengths can you handle near County Line Road in Winnie?

We handle lines from 3/4 inch service size through 48 inch casing, and bore lengths from 10 feet to 5,000 feet. A route on County Line Road still needs a site specific plan, since soil, access and marked utilities affect the equipment and bore design.

How much Texas811 notice is needed for a bore on Buccaneer Drive in Winnie?

Texas law requires a locate request at least 48 hours before excavation starts, excluding Saturdays, Sundays and legal holidays; Texas811 describes that as at least two working days. The notice cannot be made more than 14 days before work. If a Buccaneer Drive start slips more than 14 days, submit a new request. Have worn or moved marks refreshed through Texas811 before work resumes.

What affects the cost of a directional bore under Interstate 10 in Winnie?

The scope drives the cost. Length, pipe size, Winnie clay loam, utilities to expose, pavement, pit work and sand backfill all affect the plan. An Interstate 10 crossing adds highway coordination, while wet ground can change pit work. Mobilization is also part of the job because Winnie is 515 road miles from our Yukon office.

Where the Winnie facts on this page come from

Darren Rice in a safety vest at the bore pit beside the Trinity Boring Solutions Ditch Witch directional drill, with drill rods racked, on the airfield at Will Rogers World Airport in Oklahoma City

About Trinity Boring Solutions

Trinity Boring Solutions is a family business in Yukon, Oklahoma, founded by Dean Rice in 1965 and owned today by Darren Rice, who started its directional boring side in 1982. The company bores across Oklahoma and Texas. No bore is too big or too small: 4 foot sidewalk sleeves to roughly 4,100 feet under the Arkansas River in Tulsa. Reach us at (405) 409-7423.

Get a Quote for a Bore in Winnie

Send the address, what is going in, the size and the footage.

Trinity Boring Solutions
9102 NW Expressway, Yukon, OK 73099
(405) 409-7423 | darren@trinityboringsolutions.com

Trinity Boring Solutions | 24/7 Available ☎ Call (405) 409-7423 Free Quote

Free Bore Planner

Plan Your Bore in Winnie, Texas

Type the address of your job in Winnie. The Bore Planner opens an aerial map at that spot. Drop one pin where the bore starts and one where it ends, tell us what is going in and send the scope to our crew.

Talk to the crew that does the work

Fastest way to a number is a phone call. Tell us where the crossing is and what is going in the ground, and you will get a straight answer on the same call. Bores from 10 feet to 5,000 feet, 3/4 inch service line through 48 inch casing, anywhere in Oklahoma and Texas. We run 24/7 for main breaks and emergency repairs.

Call (405) 409-7423

Answered by a person, not a call center.

Would rather not call? Send the details and we will come back with a written quote.