Taylor Landing Texas Directional Boring: Anahuac Soil, Taylor Bayou and Texas State Highway 73
Quick Answer: The water provider for a Taylor Landing address must be confirmed, and Entergy Texas reports electric service in Jefferson County, so we identify line owners before a bore. We take directional boring, also called horizontal directional drilling (HDD), for routes near Taylor Bayou and Country Club Road. Taylor Landing is 531 road miles from our Yukon, Oklahoma main office, with Texas State Highway 73 close to the city limits. Clay is common below the surface, so we plan fluid use and reaming to control the hole.
Taylor Landing bores at a glance
- Incorporated city in Jefferson County, Texas. Population 286 (Census Bureau 2024 estimate).
- Road distance from our Yukon, Oklahoma main office: 531 miles, about 10.3 hours of driving.
- Ground: Anahuac soil is mapped on 39 percent of the area, with clay about 40 inches down.
- Rock: no bedrock is mapped in the top 60 inches.
- No state or US highway is mapped inside the boundary. Closest: Texas State Highway 73.
- Railroad track inside the boundary: none mapped.
- Texas811: locate request at least two working days before a bore and no more than 14 days ahead.
- Range: 3/4 inch service lines to 48 inch casing, 10 feet to 5,000 feet.
- Phone answered 24 hours a day: (405) 409-7423
Who can I call for directional boring near Taylor Bayou in Taylor Landing?
We install water, sewer, gas, electric conduit and fiber lines for routes along streets such as Country Club Road and Bayou Lane in Taylor Landing. The Census Bureau Vintage 2024 estimate puts the city population at 286. That small service area still needs careful route planning: the line owner and existing utilities must be identified before we set a bore path in Jefferson County.
Our main office is in Yukon, Oklahoma, and Taylor Landing work is done with our own crews and from satellite yards run by partner drilling contractors Trinity has personally vetted. Our longest bore is roughly 4,100 feet with 48 inch pipe beneath the Arkansas River in Tulsa. A route near Country Club Road would be smaller in scale, but the same planning discipline applies. We have been a family business since 1965 and have done directional boring since 1982.

What is Taylor Landing soil like to bore, including Anahuac soil?
The USDA soil survey maps Anahuac soil series across 39 percent of Taylor Landing, with Aris at 29 percent and Zummo at 16 percent. Surface texture is silt loam across 57 percent of the mapped area, while at about 40 inches the survey maps clay across 87 percent and clay loam across 13 percent. Average clay content at that depth is 44 percent. Our mapped Anahuac, Aris, Zummo, and Meaton soil patterns guide planning, but they are not test borings. The clay can cling to a reamer and grip pipe, so the bore plan should account for staged reaming and fluid returns.
| USDA soil survey, inside the Taylor Landing city limits | What is mapped |
|---|---|
| Soil series mapped | Anahuac 39 percent, Aris 29 percent, Zummo 16 percent, Meaton 12 percent and Labelle 3 percent |
| Texture at the surface | silt loam 57 percent, very fine sandy loam 23 percent and muck 16 percent |
| Texture about 40 inches down | clay 87 percent and clay loam 13 percent |
| Engineering class about 40 inches down | fat clay (CH) 87 percent and lean clay (CL) 13 percent |
| Average clay content about 40 inches down | 44 percent |
| Bedrock mapped within 60 inches | None mapped |
| Seasonal water table within 60 inches | 73 percent of the area |
| Flood prone soils | 16 percent of the area |
| High corrosion risk for uncoated steel | 84 percent of the area |
The USDA soil survey maps a seasonal water table within 60 inches across 73 percent of Taylor Landing and flood prone soils across 16 percent, so pits may need pumping and a Taylor Bayou route needs channel clearance planning. High corrosion risk for uncoated steel is mapped across 84 percent of the area, which makes casing and tracer wire material a line owner decision. Bedrock is not mapped in the top five feet, though that does not rule out deeper rock. The geologic map shows Delta silt and clay of Pleistocene age, with compressible clay and silt that can affect drilling fluid and hole stability.
How do we drill Taylor Landing clay?
Taylor Landing has clay below the surface and a shallow seasonal water table in many mapped areas. We tailor the reaming and fluid plan to that ground, then track the drill head as it advances near local streets.
- Because clay is mapped across 87 percent of Taylor Landing at about 40 inches, we use staged reaming and adjust fluid so sticky cuttings do not load the reamer.
- With a seasonal water table mapped within 60 inches across much of Taylor Landing, we keep pits compact and pump water when needed.
- Near Taylor Bayou or mapped drainage, we plan the bore depth to pass beneath the channel and check whether the crossing falls under Corps jurisdiction.
- Before drilling near Country Club Road, we hydrovac pothole each marked utility on the route, then track the head by walkover and log depth and pitch.

What does a bore have to cross near Taylor Landing and Texas State Highway 73?
Texas State Highway 73 is 0.2 miles outside Taylor Landing city limits, so a route reaching its right of way needs state coordination. Inside the city, Country Club Road is the longest named street at 2.02 miles. Bayou Lane runs 0.38 miles and Greenwood Drive runs 0.31 miles. A bore route from one of these streets needs a site specific plan for pavement, driveways and other marked utilities. The highway is not within the city limits, but its nearby location can matter when a project connects to routes beyond the city.
| Crossing | Type | Mapped extent | Who has a say |
|---|---|---|---|
| Texas State Highway 73 | Highway nearby | 0.2 miles outside | State highway office |
| Taylor Bayou | Stream nearby | Along the boundary | Checked for Corps of Engineers jurisdiction |
| Lovell Lake | Lake or pond | 14 acres, nearby | Checked for Corps of Engineers jurisdiction |
No railroad is mapped inside Taylor Landing or within one mile outside the limits. Taylor Bayou runs along or touches the city boundary, and public records map no street crossings of named streams inside the city. The city also has 1.82 miles of unnamed drainage, so a route near a drainage line needs field review. Lovell Lake lies outside the limits within one mile. A bayou or lake crossing is checked for U.S. Army Corps of Engineers jurisdiction during planning.
Whose permission does a Taylor Landing bore in Jefferson County need?
Taylor Landing is incorporated, so its city streets belong to the city; no city department or permit process is assumed here. Texas State Highway 73 is just outside the limits, and work in its right of way needs a TxDOT utility permit reviewed by the TxDOT Beaumont District. The utility owner files through RULIS, while we prepare the bore plan and profile for that filing. Under existing highway pavement, TxDOT rules call for boring or tunneling. Cover requirements depend on the line: electric and communication crossings need 60 inches, water crossings need 60 inches, and pressurized sewer crossings need 60 inches. Taylor Bayou crossings are checked for federal waterway jurisdiction during planning.
Read the rules for yourself: Texas Utilities Code Chapter 251 on notice to Texas811, the Texas811 questions and answers page, the TxDOT Utility Accommodation Rules, 43 TAC 21.40 and TxDOT utility permits in RULIS.
Which utilities own lines in Taylor Landing, Jefferson County?
EPA drinking water records do not identify the provider serving a specific Taylor Landing address, so the water provider must be confirmed with the city, Jefferson County or the local water district before planning a bore. Entergy Texas reports electric service in the county, but that does not establish the owner at every address. We confirm the line owner before planning an electric conduit bore near Country Club Road or another city street.
| Line owner | What it is | Source | Size |
|---|---|---|---|
| Entergy Texas | Electric utilities reporting service in Jefferson County | EIA Form 861 | Confirm the line owner by address |
The 2019 to 2023 five year estimates place Taylor Landing’s median housing year at 1988, so we verify underground conflicts before setting a route. The survey estimates 79 percent of housing units were built from 1960 to 1999, 21 percent in 2000 or later, and none before 1960. That mix can mean work on existing service lines as well as new connections. Before drilling near Country Club Road, we use hydrovac potholing to expose marked utilities because locate marks show position, not depth.

Do you cover Taylor Landing and nearby Nederland?
Taylor Landing is in Jefferson County, covers 1.13 square miles and sits at an elevation of 6 feet. Its ZIP code is 77705. Fannett is 8.0 miles northwest, Beauxart Gardens is 8.5 miles northeast, and Nederland is 10.4 miles northeast. Nederland is the nearest larger city, while Beaumont, the county seat, is 15.1 miles north. From our Yukon, Oklahoma main office, Taylor Landing is 531 road miles away and about a 10.3 hour drive. Those distances matter when we plan crew and equipment mobilization for a Country Club Road project.
Places near Taylor Landing
- Directional boring in Fannett: 8 miles northwest
- Directional boring in Beauxart Gardens: 8.5 miles northeast
- Directional boring in Nederland: 10.4 miles northeast
- Directional boring in Central Gardens: 10.6 miles northeast
- Directional boring in Hamshire: 11.5 miles west
What kinds of bores come up near Taylor Bayou in Taylor Landing?
- Water service: A service route along Country Club Road needs a confirmed water provider and potholes where marked lines meet the planned path.
- Fiber conduit: A fiber route through Taylor Landing can use a bore beneath a driveway or paved section instead of cutting the surface.
- Highway crossing: Work reaching Texas State Highway 73 needs a utility owner permit filing and a bore profile for the TxDOT Beaumont District.
- Bayou crossing: A route at Taylor Bayou needs channel depth planning and a jurisdiction check before the bore path is set.
- Drainage crossing: Taylor Landing has 1.82 miles of unnamed drainage, so a crossing needs a route review that keeps the bore below the channel.
- Electric conduit: Entergy Texas reports county service, but the line owner at a Country Club Road address must be confirmed before planning.
More on each kind of work: water line boring, electric line boring, fiber optic boring, road, railroad and creek crossings and municipal boring.
What drives the price of directional boring near Country Club Road in Taylor Landing?
Start with a map pin or street address, especially if the route is near Country Club Road or Taylor Bayou; a precise location shows which access and crossing conditions need review. For work near Texas State Highway 73, we ask for the material, pipe or conduit size, and footage to plan the bore. A sketch or plans help us define the route and prepare a useful scope for Taylor Landing.
A short, clear route in the silt loam near Country Club Road may be simpler to plan than work through heavy clay or a drainage crossing. Price depends on footage, pipe or conduit size, soil, marked utilities to expose, pavement, pits, backfill and excavator time. A route toward Texas State Highway 73 can add permit coordination, while Taylor Landing’s 531 road miles from Yukon affect mobilization. Emergency timing or a high profile crossing can also change the work plan.
Questions people ask about boring in Taylor Landing
Does Trinity Boring Solutions take directional boring work in Jefferson County near Taylor Landing?
Yes, we take directional boring work in Taylor Landing and across Texas. Our Yukon office coordinates the job from the first call through the bore log, whether our own crew or a vetted drilling partner is on site. For a Country Club Road route, we first need the address, line scope and proposed path.
Can groundwater or flooding affect bore pits near Taylor Bayou in Taylor Landing?
Yes, water can affect pit planning near Taylor Bayou. The USDA soil survey maps a seasonal water table within 60 inches across 73 percent of Taylor Landing, and flood prone soils across 16 percent. We plan pit placement and pumping for wet ground, and check a bayou crossing for Corps jurisdiction.
Does Anahuac soil in Taylor Landing create a steel corrosion concern, and what pipe can go in?
The mapped soils show high corrosion risk for uncoated steel across 84 percent of Taylor Landing. Anahuac is the leading mapped soil series at 39 percent. The line owner should choose any coating for steel casing or tracer wire; HDPE does not present the same steel corrosion concern.
What ground does a bore pass through in Taylor Landing near Anahuac soil?
The USDA soil survey maps Anahuac soil across 39 percent of Taylor Landing and silt loam at the surface across 57 percent. At about 40 inches, clay is mapped across 87 percent of the area. That clay can stick to the reamer, so we plan staged reaming and manage fluid returns.
Will a directional bore in Taylor Landing hit rock near Taylor Bayou, or do we need route specific subsurface information first?
Bedrock is not mapped in the top five feet of Taylor Landing, but that mapping does not rule out rock deeper down. The geologic map identifies Delta silt and clay of Pleistocene age. We use the project route and available ground information to plan the bore rather than assume conditions below the mapped depth.
Who approves a bore under Texas State Highway 73 near Taylor Landing?
The utility owner applies for a TxDOT utility permit through RULIS, and the TxDOT Beaumont District reviews the filing for Jefferson County. We prepare the bore plan and profile for the owner’s application to the TxDOT Beaumont District when a state permit is needed. Texas State Highway 73 is 0.2 miles outside Taylor Landing, and TxDOT rules require boring or tunneling beneath existing highway pavement.
Does Trinity cover Fannett and rural sites outside Taylor Landing?
Yes, we take work in nearby communities and rural areas beyond Taylor Landing. Fannett is 8.0 miles northwest, and Nederland is 10.4 miles northeast. We review each route, access point and utility crossing individually, including the distance from our Yukon, Oklahoma main office.
How much 811 notice is needed for a bore on Country Club Road in Taylor Landing?
Texas law requires a Texas811 locate request at least 48 hours before excavation, excluding Saturdays, Sundays and legal holidays, and no earlier than 14 days before it. Paint on Country Club Road marks a line’s position, not its depth. If marks wear off or move, request refreshed marks before work continues.
What affects the cost of directional boring near Texas State Highway 73 in Taylor Landing?
The route and scope determine the price. We consider footage, pipe or conduit size, Taylor Landing’s clay, utilities that need potholing, pavement, pits, backfill and drainage crossings. A project reaching Texas State Highway 73 may need permit coordination, and the 531 road miles from Yukon affect mobilization.
Where the Taylor Landing facts on this page come from
- USDA Natural Resources Conservation Service, Soil Data Access: soil survey map units inside Taylor Landing
- U.S. Census Bureau, TIGER/Line 2024: Taylor Landing boundary, roads, rail lines and streams
- U.S. Census Bureau, Vintage 2024 population estimates: Taylor Landing
- U.S. Census Bureau, American Community Survey 2019 to 2023: Taylor Landing housing units and year built
- Macrostrat geologic map compilation: map units under Taylor Landing
- U.S. Energy Information Administration, Form EIA 861: electric utilities serving Jefferson County
- U.S. Geological Survey, Elevation Point Query Service: Taylor Landing elevation
- OpenStreetMap road network through the OSRM router: road miles from Yukon, Oklahoma to Taylor Landing
- Texas Utilities Code Chapter 251, Underground Facility Damage Prevention and Safety
- TxDOT Utility Accommodation Rules, 43 Tex. Admin. Code 21.40: underground utilities
- Texas Department of Transportation: Right of Way Utility and Leasing Information System (RULIS) utility permits
Get a Quote for a Bore in Taylor Landing
Send the address, what is going in, the size and the footage.
Trinity Boring Solutions
9102 NW Expressway, Yukon, OK 73099
(405) 409-7423 | darren@trinityboringsolutions.com
Free Bore Planner
Plan Your Bore in Taylor Landing, Texas
Type the address of your job in Taylor Landing. The Bore Planner opens an aerial map at that spot. Drop one pin where the bore starts and one where it ends, tell us what is going in and send the scope to our crew.
Talk to the crew that does the work
Fastest way to a number is a phone call. Tell us where the crossing is and what is going in the ground, and you will get a straight answer on the same call. Bores from 10 feet to 5,000 feet, 3/4 inch service line through 48 inch casing, anywhere in Oklahoma and Texas. We run 24/7 for main breaks and emergency repairs.
Answered by a person, not a call center.
Would rather not call? Send the details and we will come back with a written quote.
County and State Pages for Taylor Landing
Same county: Beaumont · Port Arthur · Groves · Port Neches · China · Bevil Oaks · Nome. All counties: Texas county list.
