trinityboringsolutions.com

Rock Island Texas Directional Boring: Snakecreek Soil, Pin Oak Creek and US 90 Alternate

Quick Answer: Rock Island is an unincorporated community in Colorado County, so streets and permits fall to county or state authorities, not a city government. We take directional boring, also called horizontal directional drilling (HDD), work beneath Pin Oak Creek and other local crossings. County Road 118 Road is part of a community 463 road miles from our Yukon, Oklahoma main office. Snakecreek soil is common here, and its finer material can cling to a reamer or the pipe.

Family Business Since 1965 Boring Since 1982 24 Hour Phone No Utility Strike in 25 Years

Rock Island bores at a glance

  • Unincorporated community in Colorado County, Texas. Population 228 (2020 Census count).
  • Road distance from our Yukon, Oklahoma main office: 463 miles, about 9.3 hours of driving.
  • Ground: Snakecreek soil is mapped on 33 percent of the area, with sandy clay loam about 40 inches down.
  • Rock: no bedrock is mapped in the top 60 inches.
  • Highways inside the boundary: US 90 Alternate. State permit office: TxDOT Yoakum District.
  • Railroad track inside the boundary: none mapped.
  • Named streams inside the boundary: Pin Oak Creek and Sandy Creek.
  • Public water: Rock Island Water Supply Corporation, groundwater wells.
  • Texas811: locate request at least two working days before a bore and no more than 14 days ahead.
  • Range: 3/4 inch service lines to 48 inch casing, 10 feet to 5,000 feet.
  • Phone answered 24 hours a day: (405) 409-7423

Who can I call for directional boring near Pin Oak Creek in Rock Island?

Rock Island is an unincorporated community in Colorado County, with 228 people in the 2020 Census count. We install water, sewer, gas, electric conduit and fiber lines, including service runs along County Road 118 Road or connections near Pin Oak Creek. The county or state, rather than a city government, has authority over streets and permits here.

Our main office is in Yukon, Oklahoma, and Rock Island work is done with our own crews and from satellite yards run by partner drilling contractors Trinity has personally vetted. We have had no utility strike in over 25 years, working around buried services such as Rock Island Water Supply Corporation lines and electric facilities reported in Colorado County. Our family business began in 1965, and since 1982 we have done directional boring for crossings along US 90 Alternate in Rock Island.

Trinity Boring Solutions directional boring crew, drill rig and hydrovac trailer staged along an airport service road at Will Rogers World Airport in Oklahoma City
Our boring crew, drill and hydrovac trailer staged along a service road at Will Rogers World Airport in Oklahoma City. Photos on this page are from our jobs in Oklahoma and Texas.

How does Snakecreek soil affect a bore in Rock Island?

The USDA soil survey maps Snakecreek fine sandy loam, occasionally flooded and with 0 to 1 percent slopes, across 33 percent of Rock Island. Garwood soils account for 31 percent and Nada for 22 percent. At about 40 inches below the surface, the mapped texture is sandy clay loam across 74 percent of the area, clay across 22 percent and clay loam across 4 percent. These are mapped patterns, not site test results. The sandy surface can cut readily, while the finer material below may hold the hole and cling to tooling.

USDA soil survey, inside the Rock Island mapped community boundaryWhat is mapped
Soil series mappedSnakecreek 33 percent, Garwood 31 percent, Nada 22 percent, Telf 6 percent and Katy 4 percent
Texture at the surfacefine sandy loam 96 percent and loamy sand 4 percent
Texture about 40 inches downsandy clay loam 74 percent, clay 22 percent and clay loam 4 percent
Engineering class about 40 inches downlean clay (CL) 70 percent, clayey sand (SC) 26 percent and fat clay (CH) 4 percent
Average clay content about 40 inches down29 percent
Bedrock mapped within 60 inchesNone mapped
Seasonal water table within 60 inches37 percent of the area
Flood prone soils33 percent of the area
High corrosion risk for uncoated steel37 percent of the area

Bedrock is not mapped in the top five feet of Rock Island, though the geologic map identifies Alluvial silt and clay of Chibanian age below. A seasonal water table is mapped within 40 inches across 37 percent of the area, so pits near Pin Oak Creek may need pumping. Flood prone soils cover 33 percent, calling for a bore depth planned below the channel. High steel corrosion risk is mapped across 37 percent; the line owner selects any protection for steel casing or tracer wire, while HDPE avoids that steel corrosion concern.

How is a bore run through Rock Island sandy clay loam?

The USDA soil survey maps sandy clay loam at about 40 inches across much of Rock Island. We plan the fluid, reaming and pipe pull around that finer layer and the wet ground mapped near Pin Oak Creek.

  1. In Snakecreek areas, we select drilling fluid and reaming stages for the finer material, then have the pipe ready so it can be pulled after the final pass.
  2. Where the survey maps a seasonal water table near Pin Oak Creek, we keep pits small and pump water out so the bore setup stays usable.
  3. Before the drill approaches a marked line along County Road 106 Road, we hydrovac pothole that utility and verify its depth rather than relying on paint.
  4. At a US 90 Alternate crossing, we track the drill head from the surface, log depth and pitch, and keep the pavement intact.
Reel of 4 inch HDPE conduit on the exit side of a 385 foot directional bore under creeks and wetland in Guthrie, Oklahoma
A reel of 4 inch HDPE conduit on the exit side of a 385 foot bore under creeks and wetland in Guthrie, Oklahoma.

Where does a line have to go under County Road 118 Road in Rock Island?

US 90 Alternate runs 4.5 roadway miles inside the mapped Rock Island community boundary, and no other highway is listed within 1.5 miles outside it. County Road 118 Road is the longest named street, at 3.63 miles within the community; County Road 106 Road runs 3.31 miles, and Old 90A-Easterling runs 2.54 miles. A bore beneath one of these roads can avoid cutting the traveled surface, but the route and access pits still need to fit the road and the utility path.

CrossingTypeMapped extentWho has a say
US 90 AlternateUS highway4.5 roadway miles insideState highway office
Pin Oak CreekStream3.26 channel miles insideChecked for Corps of Engineers jurisdiction
Sandy CreekStream0.29 channel miles insideChecked for Corps of Engineers jurisdiction
Crasco CreekStream nearby0.2 miles outsideChecked for Corps of Engineers jurisdiction
Little Crasco CreekStream nearby0.4 miles outsideChecked for Corps of Engineers jurisdiction
East Sandy CreekStream nearby0.4 miles outsideChecked for Corps of Engineers jurisdiction
Swipe the table sideways to see every column.

No railroad is mapped inside the Rock Island boundary or within 1 mile outside it, and no street and rail crossing is mapped. Pin Oak Creek runs 3.26 channel miles inside the community, while Sandy Creek runs 0.29 miles. Seven mapped street crossings intersect named streams. A Pin Oak Creek crossing needs a planned path beneath the channel, and its jurisdiction is checked during planning; no lakes or ponds are mapped within 1 mile.

Who signs off on a Rock Island bore in Colorado County?

Rock Island has no city government, so streets and permits fall to the county or state rather than a municipal office. For a bore on US 90 Alternate right of way, the line owner, not the driller, submits the utility permit through TxDOT’s online RULIS system. The TxDOT Yoakum District reviews it. For a crossing on County Road 118 Road, we provide the bore plan and profile and work under the utility owner’s permit. TxDOT requires utility lines beneath existing highways to be bored or tunneled, with casing; a permit can set different cover depths.

Read the rules for yourself: Texas Utilities Code Chapter 251 on notice to Texas811, the Texas811 questions and answers page, the TxDOT Utility Accommodation Rules, 43 TAC 21.40 and TxDOT utility permits in RULIS.

Who owns lines near Rock Island Water Supply Corporation in Rock Island?

Rock Island Water Supply Corporation supplies groundwater to 230 people through 129 service connections. That gives a proposed water service near County Road 118 Road an existing local system to check against before its route is set. Electric providers reporting service in Colorado County are AEP Texas Central, CenterPoint Energy, Bluebonnet Electric Cooperative, Fayette Electric Cooperative, San Bernard Electric Cooperative and Wharton County Electric Cooperative. We confirm the line owner for a conduit bore rather than assuming one provider serves every address.

Line ownerWhat it isSourceSize
Rock Island Water Supply CorporationPublic water systemGroundwater wells129 connections, 230 people served
AEP Texas Central, CenterPoint Energy, Bluebonnet Electric Cooperative, Fayette Electric Cooperative, San Bernard Electric Cooperative and Wharton County Electric CooperativeElectric utilities reporting service in Colorado CountyEIA Form 861Confirm the line owner by address
Swipe the table sideways to see every column.

The American Community Survey 2019 to 2023 five year estimates put Rock Island’s median housing year at 1960; 50 percent of homes were built before 1960, 35 percent from 1960 to 1999 and 15 percent in 2000 or later. A job near older housing may involve replacing a service, while newer construction can call for an added connection. Before drilling near a marked utility along Elsie Street, we expose it with hydrovac potholing; paint shows position, not depth.

Large HDPE conduit reels staged on a Rotate A Reel trailer for a fiber and utility installation in Oklahoma
HDPE conduit reels on a reel trailer for a fiber and utility installation in Oklahoma.

What is near Rock Island, including El Campo?

Rock Island is an unincorporated community in Colorado County, at an elevation of 228 feet and with 5.02 square miles of mapped area. Its ZIP code is 77470. Sheridan is 6.4 miles west, Garwood is 10.5 miles southeast, Glidden is 12.7 miles north, Columbus is 13.1 miles north, and Nada is 13.2 miles southeast. Columbus is the county seat; El Campo, the nearest larger city, is 28.0 miles southeast. Our Yukon yard is 463 road miles away, a 9.3 hour drive, so that distance can affect mobilization for a Rock Island job.

Places near Rock Island

What boring work comes up near County Road 106 Road in Rock Island?

  • Highway crossing: A bore beneath US 90 Alternate follows the TxDOT permit plan and keeps the existing highway surface uncut.
  • Road crossing: A service under County Road 106 Road uses entry and exit pits outside the route of the buried line.
  • Water service: A connection near Rock Island Water Supply Corporation needs its path checked against marked groundwater well system lines.
  • Creek crossing: A Pin Oak Creek bore is planned below the channel, with the crossing checked for federal jurisdiction during planning.
  • Fiber conduit: A route along County Road 118 Road can be bored beneath pavement while marked utilities are exposed first.
  • Sewer line: A line near Sandy Creek needs a route and pit locations suited to the mapped wet and flood prone ground.

More on each kind of work: water line boring, electric line boring, fiber optic boring, road, railroad and creek crossings and municipal boring.

What should I send for a Rock Island quote near US 90 Alternate?

For a bore near US 90 Alternate, send the address or map pin, what is going in the ground, the pipe or conduit size and the footage; a sketch or plans help. A route that crosses County Road 118 Road or Pin Oak Creek gives us useful detail on access and the crossing plan.

Mobilization starts with the 463 road miles from our Yukon yard to Rock Island. The sandy clay loam mapped beneath the surface can affect drilling and reaming, while a US 90 Alternate crossing or a route beneath Pin Oak Creek changes the crossing work. Pipe size and length, marked utilities to expose, pavement or concrete, pits, excavator time and sand backfill also shape the job. High profile or emergency work can add requirements.

Questions people ask about boring in Rock Island

Does Trinity take directional boring jobs in Rock Island, Colorado County, and how are crews assigned?

Yes. We take directional boring work in Rock Island, with our own crews and partner contractor crews from satellite yards. From the first call through the bore log, we coordinate with you on crossings near County Road 141 Road, regardless of which crew is on site. For a route near County Road 118 Road, we plan around the local access and marked utilities.

Could groundwater or flooding near Pin Oak Creek affect a Rock Island bore pit?

It can. The USDA soil survey maps a seasonal water table within 40 inches across 37 percent of Rock Island, and flood prone soils across 33 percent. Near Pin Oak Creek, we plan pit placement and depth with wet ground in mind and pump a pit if water collects.

Does Snakecreek soil in Rock Island corrode steel, and what pipe can I use?

High steel corrosion risk is mapped across 37 percent of Rock Island, so the line owner should consider protection for steel casing or tracer wire. HDPE does not have that steel corrosion concern. The USDA soil survey maps Snakecreek soil across 33 percent of the area, but a site specific material choice belongs to the line owner.

What ground does a bore pass through in Rock Island’s Snakecreek areas?

The USDA soil survey maps Snakecreek fine sandy loam across 33 percent of Rock Island. At about 40 inches below the surface, sandy clay loam is mapped across 74 percent of the area and clay across 22 percent. Those mapped textures suggest finer ground that can hold an open hole and cling to the reamer.

Could a bore in Rock Island encounter rock near Pin Oak Creek?

Although bedrock is not mapped in Rock Island’s top five feet, crossings near Sandy Creek may still encounter deeper rock. The geologic map shows Alluvial silt and clay of Chibanian age. A bore near County Road 106 Road still needs its route planned for actual site conditions rather than assuming the mapped material continues at every depth.

Who approves a bore under US 90 Alternate in Rock Island, and which state office reviews it?

The line owner files the TxDOT utility permit through RULIS, and the TxDOT Yoakum District reviews it. For a County Road 106 Road crossing, we prepare the bore plan and profile for the utility owner’s application. For a US 90 Alternate crossing, TxDOT requires boring or tunneling beneath the existing highway and casing; the issued permit can specify cover.

How far is Rock Island from the Yukon office, and does El Campo change the job plan?

Rock Island is 463 road miles and a 9.3 hour drive from our Yukon, Oklahoma main office, so we plan travel before scheduling work. El Campo is 28.0 miles southeast and is the nearest larger city. The Yukon distance affects mobilization, while the specific route, such as a crossing at US 90 Alternate, affects the work plan.

How much notice does Texas811 need for a Rock Island bore along County Road 118 Road?

Request a Texas811 locate at least 48 hours before excavation, excluding Saturdays, Sundays and legal holidays, and no earlier than 14 days before work. If a start along County Road 118 Road slips more than 14 days past the original notice, make a new request. Before work resumes on a US 90 Alternate crossing, we have worn or moved marks refreshed through Texas811.

What affects the cost of a directional bore in Rock Island near US 90 Alternate?

The job scope sets the price, with no single local rate. Factors include length, pipe size, soil, marked utilities, pavement, creek crossings, pits and excavator time. The 463 road miles from Yukon affect mobilization; Snakecreek soil and a crossing beneath US 90 Alternate can also change the equipment, planning and work involved.

Where the Rock Island facts on this page come from

Darren Rice in a safety vest at the bore pit beside the Trinity Boring Solutions Ditch Witch directional drill, with drill rods racked, on the airfield at Will Rogers World Airport in Oklahoma City

About Trinity Boring Solutions

Trinity Boring Solutions is a family business in Yukon, Oklahoma, founded by Dean Rice in 1965 and owned today by Darren Rice, who started its directional boring side in 1982. The company bores across Oklahoma and Texas. No bore is too big or too small: 4 foot sidewalk sleeves to roughly 4,100 feet under the Arkansas River in Tulsa. Reach us at (405) 409-7423.

Get a Quote for a Bore in Rock Island

Send the address, what is going in, the size and the footage.

Trinity Boring Solutions
9102 NW Expressway, Yukon, OK 73099
(405) 409-7423 | darren@trinityboringsolutions.com

Trinity Boring Solutions | 24/7 Available ☎ Call (405) 409-7423 Free Quote

Free Bore Planner

Plan Your Bore in Rock Island, Texas

Type the address of your job in Rock Island. The Bore Planner opens an aerial map at that spot. Drop one pin where the bore starts and one where it ends, tell us what is going in and send the scope to our crew.

Talk to the crew that does the work

Fastest way to a number is a phone call. Tell us where the crossing is and what is going in the ground, and you will get a straight answer on the same call. Bores from 10 feet to 5,000 feet, 3/4 inch service line through 48 inch casing, anywhere in Oklahoma and Texas. We run 24/7 for main breaks and emergency repairs.

Call (405) 409-7423

Answered by a person, not a call center.

Would rather not call? Send the details and we will come back with a written quote.

Quick Quote In Page

County and State Pages for Rock Island

Same county: Eagle Lake · Weimar. All counties: Texas county list.