Callisburg Texas Directional Boring: Soil, FM 678 and Hickory Creek
Quick Answer: We do directional boring, also called horizontal directional drilling (HDD), for lines beneath Callisburg streets such as McDaniel Street. Callisburg is 158 road miles from our Yukon yard, so we plan crew and equipment travel around the route to FM 678. The USDA soil survey maps sandy clay and clay below the surface, where sticky ground can cling to a reamer. Near Hickory Creek, the bore plan also accounts for the channel and the street crossing mapped there.
Callisburg bores at a glance
- Incorporated city in Cooke County, Texas. Population 356 (Census Bureau 2024 estimate).
- Road distance from our Yukon, Oklahoma main office: 158 miles, about 3.2 hours of driving.
- Ground: Callisburg soil is mapped on 35 percent of the area, with sandy clay about 40 inches down.
- Rock: bedrock is mapped within 60 inches on 41 percent of the area.
- Highways inside the boundary: FM 678 and FM 2896. State permit office: TxDOT Wichita Falls District.
- Railroad track inside the boundary: none mapped.
- Named streams inside the boundary: Hickory Creek.
- Public water: City of Callisburg, groundwater wells.
- Texas811: locate request at least two working days before a bore and no more than 14 days ahead.
- Range: 3/4 inch service lines to 48 inch casing, 10 feet to 5,000 feet.
- Phone answered 24 hours a day: (405) 409-7423
Who can I call for directional boring in Callisburg and Cooke County?
Callisburg is 158 road miles from our Yukon yard, so we schedule our own crews and equipment for the trip before setting a start date. The Census Bureau Vintage 2024 estimate puts the city population at 356. Along FM 678, McDaniel Street or another route in Callisburg, we install water, sewer, gas, electric conduit and fiber for new services or replacement lines.
Our main office is in Yukon, Oklahoma, and Callisburg work is done with our own crews and from satellite yards run by partner drilling contractors Trinity has personally vetted. A short service line near Phillips Street and a large casing bore are different ends of our 3/4 inch service line to 48 inch casing range. We are a family business started in 1965, and we have done directional boring since 1982.

What does the USDA soil survey show beneath Callisburg?
The USDA soil survey maps Callisburg soil across 35 percent of the city and Crockett soil across 30 percent. Fine sandy loam covers 89 percent of the mapped surface. At about 40 inches below the surface, sandy clay accounts for 39 percent of the area, clay for 34 percent and sandy clay loam for 15 percent. The survey reports an average clay content of 36 percent at that depth. We treat Crockett soil mapping as planning context, not test borings, before setting a bore alignment in Callisburg. The clay share matters because sticky cuttings can gather on the reamer and the ground can grip pipe.
| USDA soil survey, inside the Callisburg city limits | What is mapped |
|---|---|
| Soil series mapped | Callisburg 35 percent, Crockett 30 percent, Gasil 11 percent, Birome 6 percent and Aubrey 4 percent |
| Texture at the surface | fine sandy loam 89 percent and stony fine sandy loam 6 percent |
| Texture about 40 inches down | sandy clay 39 percent, clay 34 percent and sandy clay loam 15 percent |
| Engineering class about 40 inches down | lean clay (CL) 85 percent and fat clay (CH) 5 percent |
| Average clay content about 40 inches down | 36 percent |
| Bedrock mapped within 60 inches | 41 percent of the area (0 percent hard rock, 41 percent weathered rock) |
| Seasonal water table within 60 inches | 0 percent of the area |
| Flood prone soils | 4 percent of the area |
| High corrosion risk for uncoated steel | 79 percent of the area |
The survey maps weathered bedrock within 60 inches across 41 percent of Callisburg and within 40 inches across 6 percent; typical depth is 47 inches. That can mean slower drilling where the bit reaches weathered rock. Seasonal water tables are not mapped within 60 inches, while flood prone soils cover 4 percent, so Hickory Creek still needs a channel specific plan. High steel corrosion risk covers 79 percent, a concern for uncoated steel casing and tracer wire. The geologic map includes Cenozoic Quartz Sand Decomposition Residuum and Cenomanian Woodbine Formation, so conditions can vary between sand, clay and rock.
How do we drill Callisburg sandy clay?
Callisburg soil changes with depth, from fine sandy loam near the surface to mapped sandy clay and clay below. We adjust the drilling fluid and reaming sequence to keep the hole workable without pushing fluid toward pavement on McDaniel Street.
- In Callisburg’s fine sandy loam, we use the first pass to read changing ground before opening the hole farther along a route near McDaniel Street.
- Where Callisburg soil turns to sticky clay, we use thinner fluid with polymer and ream in stages so cuttings do not build up on the tool.
- Because heavy clay covers much of Callisburg at about 40 inches, we watch fluid returns near FM 678 pavement and pull the pipe after the final ream.
- For a route near Hickory Creek, we track the drill head from the surface and log depth and pitch while keeping the planned path below the channel.

What does a bore have to cross in Callisburg near McDaniel Street?
FM 678 has 1.5 mapped roadway miles inside Callisburg, and FM 2896 has 1.4. Those state routes can bring right of way limits and pavement into a bore plan. The longest named streets are McDaniel Street at 1.39 miles, Big Indian Road at 1.38 miles and Phillips Street at 1.19 miles. Thrasher Road adds another 1.18 miles. A route beneath one of these streets can keep the surface intact, with entry and exit pits placed off the pavement where the site allows.
| Crossing | Type | Mapped extent | Who has a say |
|---|---|---|---|
| FM 678 | State highway | 1.5 roadway miles inside | State highway office |
| FM 2896 | State highway | 1.4 roadway miles inside | State highway office |
| Hickory Creek | Stream | 0.52 channel miles inside | Checked for Corps of Engineers jurisdiction |
| Timber Creek | Stream nearby | 0.4 miles outside | Checked for Corps of Engineers jurisdiction |
| North Branch Big Mineral Creek | Stream nearby | 0.4 miles outside | Checked for Corps of Engineers jurisdiction |
No railroad is mapped inside Callisburg or within one mile outside its limits, so there is no mapped track crossing to plan around. Hickory Creek runs 0.52 channel miles through the city, and one street crossing of a named stream is mapped there. Timber Creek and North Branch Big Mineral Creek are each 0.4 miles from the city limits. Around Hickory Creek in Callisburg, we verify water features along the bore route because no lakes or ponds are mapped within one mile. A Hickory Creek crossing needs a channel focused depth plan and a jurisdiction check during planning.
Who has to sign off on a Callisburg bore at FM 678?
At FM 678, the cover depth helps set the bore profile: electric and communication lines crossing a state highway need 60 inches below the lowest point of the crossed grade, while water crossings need 60 inches and pressurized sewer crossings need 60 inches. A line running along the right of way has different cover requirements, and the permit can set another depth. The utility owner applies through TxDOT’s online RULIS system, with review by the TxDOT Wichita Falls District. On FM 678 crossings, we provide the bore plan and profile and work under the permit issued to the utility owner through TxDOT Wichita Falls District. Beneath existing highway pavement, the installation is bored or tunneled; rural crossings extend beneath all travel lanes. Callisburg streets belong to the city, while a Hickory Creek crossing is checked for federal waterway jurisdiction during planning. No railroad is mapped nearby.
Read the rules for yourself: Texas Utilities Code Chapter 251 on notice to Texas811, the Texas811 questions and answers page, the TxDOT Utility Accommodation Rules, 43 TAC 21.40 and TxDOT utility permits in RULIS.
Whose lines are already buried near the City of Callisburg water system?
The City of Callisburg public water system uses groundwater wells and reports 759 service connections serving 2,277 people. That network is a reason to identify the line owner and existing water routes before laying out a bore along FM 678 or McDaniel Street. Electric service is reported in Cooke County by Oncor Electric Delivery Company, Texas-New Mexico Power, Cooke County Electric Cooperative Association, Denton County Electric Cooperative, Grayson-Collin Electric Cooperative and Wise Electric Cooperative. The specific line owner must be confirmed before planning a conduit bore.
| Line owner | What it is | Source | Size |
|---|---|---|---|
| City of Callisburg | Public water system | Groundwater wells | 759 connections, 2,277 people served |
| Oncor Electric Delivery Company, Texas-New Mexico Power, Cooke County Electric Cooperative Association, Denton County Electric Cooperative, Grayson-Collin Electric Cooperative and Wise Electric Cooperative | Electric utilities reporting service in Cooke County | EIA Form 861 | Confirm the line owner by address |
The American Community Survey 2019 to 2023 five year estimates place Callisburg’s median housing year at 1979, so we verify utilities before boring. The estimates place 19 percent of homes before 1960, 56 percent from 1960 to 1999 and 25 percent in 2000 or later. Replacement work along Big Indian Road may meet older services, while newer connections can require a different route. Before the drill approaches any marked utility on a bore path, we expose it with hydrovac potholing because surface marks show position, not depth. For example, a proposed line beneath Phillips Street needs its marked utilities exposed first.

What is near Callisburg and Whitesboro?
Callisburg covers 2.05 square miles in Cooke County at an elevation of 815 feet. Callisburg’s ZIP codes are 76240 and 76273, and we confirm the street address before coordinating underground work. Oak Ridge is 3.7 miles south, and Whitesboro is 7.0 miles southeast. Gainesville, the county seat and nearest larger city, is 8.7 miles southwest. Lake Kiowa is 8.8 miles south, while Sadler is 9.8 miles east. Our Yukon yard is 158 road miles away, a drive of 3.2 hours. That distance affects how we schedule mobilization for work on FM 678 or the city streets.
Places near Callisburg
- Oak Ridge: 3.7 miles south
- Directional boring in Whitesboro: 7 miles southeast
- Directional boring in Gainesville: 8.7 miles southwest
- Directional boring in Lake Kiowa: 8.8 miles south
- Directional boring in Sadler: 9.8 miles east
What boring work comes up around Callisburg and Big Indian Road?
- Street service: A water, sewer or electric conduit bore near Big Indian Road can pass beneath pavement instead of opening a trench across the street.
- Highway crossing: A route beneath FM 678 needs a bore profile that accounts for the state right of way and the required cover.
- Fiber drop: A fiber conduit route along McDaniel Street can use entry and exit pits in dirt rather than cutting the paved surface.
- Creek crossing: A water or communication line near Hickory Creek needs a planned path beneath the channel and a jurisdiction check.
- Water connection: A service near the City of Callisburg system needs the existing well fed water line identified before the new bore is laid out.
- Replacement bore: A line near Thrasher Road may need a new path around existing services, with each marked utility exposed before drilling nearby.
More on each kind of work: water line boring, electric line boring, fiber optic boring, road, railroad and creek crossings and municipal boring.
What should I send for a Callisburg bore near Thrasher Road?
For a bore near Thrasher Road, start with the address or a map pin so we can place the route. Tell us what is going in the ground, such as water or fiber, and the pipe or conduit size. Add the footage along with a sketch or plans if you have them. A route under FM 678 needs its crossing details too.
The 158 road miles from Yukon are the first scheduling factor for a Callisburg job. Soil also matters: sandy clay and clay can stick to the reamer, while mapped weathered bedrock can slow the bore. We look at length, pipe or conduit size, soil and rock, utilities to expose, pavement, creek crossings, pits, excavator time and sand backfill. A Hickory Creek route or work beneath FM 678 can add planning and crossing demands. Emergency or high profile work also changes the job scope.
Questions people ask about boring in Callisburg
Does Trinity Boring Solutions take Callisburg jobs in Cooke County, and who staffs them?
Yes. We take directional boring work in Callisburg, with our own crews and vetted partner contractor crews available for jobs 158 road miles from our Yukon yard. You work with Trinity from the first call through the bore log, whether the crew is on site or traveling in for work near FM 678.
Who owns electric lines in Callisburg and Cooke County, and who confirms conduit specs?
Several utilities report electric service in Cooke County: Oncor Electric Delivery Company, Texas-New Mexico Power and four electric cooperatives. We do not assume one serves every address. Before planning a conduit bore near Phillips Street or elsewhere in Callisburg, we confirm the line owner and the conduit requirements with that owner.
Does the city control Phillips Street in Callisburg, and does a bore require cutting it?
Callisburg is incorporated, so Phillips Street is a city street. Directional boring can pass beneath the street without cutting the pavement, with pits placed on either side where the site permits. FM 678 is a state highway, so work in its right of way follows a separate TxDOT utility permit process.
How old are Callisburg homes and buried lines near Big Indian Road?
The American Community Survey 2019 to 2023 estimates put the median housing year at 1979, with 19 percent of homes built before 1960. Housing age does not establish the age of a particular buried line. For replacement work near Big Indian Road, we expose marked utilities before the drill approaches and plan the bore around what is found.
Does Callisburg soil corrode steel, and what pipe can we use in Callisburg?
The USDA soil survey maps high steel corrosion risk across 79 percent of Callisburg, so uncoated steel casing and tracer wire need consideration. For bore planning in Callisburg’s Birome soil series, we can use HDPE, which is not subject to that soil corrosion concern. The line owner chooses any coating for steel, and the right pipe depends on the line design and what is being installed near FM 678.
What ground does a bore pass through in Callisburg soil around Callisburg?
The USDA soil survey maps fine sandy loam across 89 percent of the surface, then sandy clay across 39 percent and clay across 34 percent at about 40 inches. Those are mapped area shares, not test results at a specific address. Near McDaniel Street, the actual bore profile still has to account for changing ground and any weathered bedrock.
How far is Callisburg from Yukon when coming from Gainesville?
Callisburg is 158 road miles from our Yukon yard, a drive of 3.2 hours. Gainesville is 8.7 miles southwest of Callisburg. The travel distance affects crew and equipment scheduling for work near FM 678, but the bore plan still depends on the route, ground and crossings at the job site.
How much notice does Texas811 need for a Callisburg bore on McDaniel Street?
For work on McDaniel Street, submit the Texas811 locate request at least 48 hours before excavation, not counting Saturdays, Sundays or legal holidays, and no earlier than 14 days before work. If our start for a bore near Thrasher Road slips more than 14 days past the original notice, we submit a new request. Along McDaniel Street in Callisburg, we have worn or moved marks refreshed through Texas811 before continuing bore work.
What affects the cost of a directional bore near FM 678 in Callisburg?
The job scope sets the price, not the road name alone. For a bore near FM 678, relevant factors include the length, pipe or conduit size, sandy clay or weathered rock, pavement, utilities that need exposure, and highway crossing requirements. Hickory Creek crossings, pits, excavator time, backfill and the trip from Yukon can also affect the work.
Where the Callisburg facts on this page come from
- USDA Natural Resources Conservation Service, Soil Data Access: soil survey map units inside Callisburg
- U.S. Census Bureau, TIGER/Line 2024: Callisburg boundary, roads, rail lines and streams
- U.S. Census Bureau, Vintage 2024 population estimates: Callisburg
- U.S. Census Bureau, American Community Survey 2019 to 2023: Callisburg housing units and year built
- Macrostrat geologic map compilation: map units under Callisburg
- U.S. EPA Safe Drinking Water Information System: public water systems serving Callisburg
- U.S. Energy Information Administration, Form EIA 861: electric utilities serving Cooke County
- U.S. Geological Survey, Elevation Point Query Service: Callisburg elevation
- OpenStreetMap road network through the OSRM router: road miles from Yukon, Oklahoma to Callisburg
- Texas Utilities Code Chapter 251, Underground Facility Damage Prevention and Safety
- TxDOT Utility Accommodation Rules, 43 Tex. Admin. Code 21.40: underground utilities
- Texas Department of Transportation: Right of Way Utility and Leasing Information System (RULIS) utility permits
Get a Quote for a Bore in Callisburg
Send the address, what is going in, the size and the footage.
Trinity Boring Solutions
9102 NW Expressway, Yukon, OK 73099
(405) 409-7423 | darren@trinityboringsolutions.com
Free Bore Planner
Plan Your Bore in Callisburg, Texas
Type the address of your job in Callisburg. The Bore Planner opens an aerial map at that spot. Drop one pin where the bore starts and one where it ends, tell us what is going in and send the scope to our crew.
Talk to the crew that does the work
Fastest way to a number is a phone call. Tell us where the crossing is and what is going in the ground, and you will get a straight answer on the same call. Bores from 10 feet to 5,000 feet, 3/4 inch service line through 48 inch casing, anywhere in Oklahoma and Texas. We run 24/7 for main breaks and emergency repairs.
Answered by a person, not a call center.
Would rather not call? Send the details and we will come back with a written quote.
County and State Pages for Callisburg
Same county: Muenster · Lindsay · Valley View · Road Runner · Oak Ridge · Myra. All counties: Texas county list.