May Texas Directional Boring: Menard Soil, US 183 and Hog Creek
Quick Answer: Can you get a line under US 183 without cutting the road? Trinity Boring Solutions does directional boring, also called horizontal directional drilling (HDD), in May, Texas, for crossings such as US 183. May is 293 road miles from our Yukon, Oklahoma main office, and Ford Street is one place where access shapes a route. The USDA soil survey maps sandy clay loam at 40 inches across 46% of May, so clay can cling to tooling and calls for controlled fluid and staged reaming.
May bores at a glance
- Unincorporated community in Brown County, Texas. Population 277 (2020 Census count).
- Road distance from our Yukon, Oklahoma main office: 293 miles, about 6.5 hours of driving.
- Ground: Menard soil is mapped on 27 percent of the area, with sandy clay loam about 40 inches down.
- Rock: bedrock is mapped within 60 inches on 16 percent of the area.
- Highways inside the boundary: US 183 and FM 1689. State permit office: TxDOT Brownwood District.
- Railroad track inside the boundary: none mapped.
- Public water: May Water Supply Corporation, groundwater wells.
- Texas811: locate request at least two working days before a bore and no more than 14 days ahead.
- Range: 3/4 inch service lines to 48 inch casing, 10 feet to 5,000 feet.
- Phone answered 24 hours a day: (405) 409-7423
Who can I call for directional boring near Hog Creek in May?
Can you get a line under US 183 without cutting it? We take directional boring work in May, Brown County, for routes beneath roads and other obstacles. The Census Bureau counted 277 residents in the 2020 Census; it does not publish yearly estimates for unincorporated places. We install water, sewer, gas, electric conduit and fiber lines, including service routes along Ford Street and Lindley Street.
Our main office is in Yukon, Oklahoma, and May work is done with our own crews and from satellite yards run by partner drilling contractors Trinity has personally vetted. Our work ranges from 3/4 inch service lines, such as a water connection near Monsey, to 48 inch casing for a larger crossing near US 183. Our family business started in 1965, and we have done directional boring since 1982; May is 293 road miles from the Yukon main office.

What does Menard soil mean for boring in May?
The USDA soil survey maps Menard soil across 27% of May, with Menard fine sandy loam on 22% of the mapped area. Pedernales soil accounts for 25%, and Hext for 16%. At about 40 inches below the surface, sandy clay loam is mapped under 46% of the area, while sandy clay is mapped under 25%. The average clay content at that depth is 27%. We treat May’s mapped Menard, Pedernales, Hext, and Bosque soil patterns as planning context, not as test borings. The clay rich ground can cling to a reamer, so we plan fluid and reaming around the material encountered along a route such as Lindley Street.
| USDA soil survey, inside the May mapped community boundary | What is mapped |
|---|---|
| Soil series mapped | Menard 27 percent, Pedernales 25 percent, Hext 16 percent, Bosque 9 percent and May 9 percent |
| Texture at the surface | fine sandy loam 50 percent, loam 25 percent and loamy fine sand 14 percent |
| Texture about 40 inches down | sandy clay loam 46 percent, sandy clay 25 percent and bedrock 16 percent |
| Engineering class about 40 inches down | clayey sand (SC) 68 percent, lean clay (CL) 12 percent and silty sand (SM) 4 percent |
| Average clay content about 40 inches down | 27 percent |
| Bedrock mapped within 60 inches | 16 percent of the area (0 percent hard rock, 16 percent weathered rock) |
| Seasonal water table within 60 inches | 11 percent of the area |
| Flood prone soils | 9 percent of the area |
| High corrosion risk for uncoated steel | 7 percent of the area |
The USDA soil survey maps bedrock within 40 inches under 16% of May, with typical depth listed as 25 inches. That makes a route near Ford Street worth checking for shallow rock; the mapped Twin Mountains Formation is Aptian and includes sandstone and claystone. Seasonal water tables are mapped within 60 inches under 11% of the area, so pits may need pumping. Flood prone soils cover 9%, a concern to check around Hog Creek. High steel corrosion risk is mapped under 7%, which can affect casing or tracer wire choices made by the line owner.
How do we plan boring through May’s sandy clay loam near Hog Creek while accounting for the fine sandy loam surface?
May’s mapped sandy clay loam and shallow bedrock call for a bore plan that follows the ground rather than a fixed recipe. Near US 183, we check the route and adjust the drilling approach as conditions change.
- We review the sandy clay loam mapped under 46% of May at about 40 inches and select drilling fluid and reaming stages to manage clay buildup.
- With bedrock mapped within 40 inches under 16% of May, we watch for changing ground near Ford Street and slow the cut if rock appears.
- May has seasonal water tables mapped within 60 inches under 11% of its area, so we keep entry pits manageable and pump them if water collects.
- Before a bore approaches marked lines near Lindley Street, we use hydrovac to expose them, then track the drill head and log depth and pitch.

Where might a bore pass under US 183 in May?
US 183 runs 1.1 mapped roadway miles inside May, and FM 1689 adds 0.5 miles. A route under either highway needs room for the bore to extend beneath the travel lanes. Ford Street is the longest named street, at 0.48 miles inside the community, followed by Lindley Street at 0.34 miles. Monsey and Parsons Avenue each measure 0.22 miles. Those street routes may involve pavement and access limits, so a bore can keep the surface intact while the entry and exit pits sit off the traveled way.
| Crossing | Type | Mapped extent | Who has a say |
|---|---|---|---|
| US 183 | US highway | 1.1 roadway miles inside | State highway office |
| FM 1689 | State highway | 0.5 roadway miles inside | State highway office |
| Hog Creek | Stream nearby | 0.4 miles outside | Checked for Corps of Engineers jurisdiction |
No railroad is mapped inside May or within one mile outside the community, so there is no mapped track crossing to plan around. No named stream crosses the community boundary, and no street crossing of a named stream is mapped inside it. Hog Creek is 0.4 miles outside the boundary, and May has 2.82 miles of unnamed drainage. Those drainage routes still matter for pit placement and alignment. No lakes or ponds are mapped within one mile of May.
Who approves a bore in Brown County near May?
May is an unincorporated community with no city government, so its local streets are county matters rather than city streets. For work on US 183 or FM 1689 right of way, the utility owner needs a TxDOT utility permit reviewed by the TxDOT Brownwood District. The line owner files through RULIS, while we provide the bore plan and profile and work under the permit issued to that owner. TxDOT requires a highway crossing to be bored or tunneled, encased, and extended beneath all rural travel lanes. Hog Creek is nearby, so its crossing is checked for U.S. Army Corps of Engineers jurisdiction during planning.
Read the rules for yourself: Texas Utilities Code Chapter 251 on notice to Texas811, the Texas811 questions and answers page, the TxDOT Utility Accommodation Rules, 43 TAC 21.40 and TxDOT utility permits in RULIS.
What should I know about May Water Supply Corporation in May?
May Water Supply Corporation serves 363 people through 143 service connections, and its water comes from groundwater wells. For electric service in Brown County, public records list AEP Texas North, Oncor Electric Delivery Company and Comanche County Electric Cooperative Association as reporting service in the county. The line owner can vary by address, so we confirm who owns the line before a conduit bore near Ford Street or US 183.
| Line owner | What it is | Source | Size |
|---|---|---|---|
| May Water Supply Corporation | Public water system | Groundwater wells | 143 connections, 363 people served |
| AEP Texas North, Oncor Electric Delivery Company and Comanche County Electric Cooperative Association | Electric utilities reporting service in Brown County | EIA Form 861 | Confirm the line owner by address |
May’s 1952 median housing year is a community statistic, not a measure of buried conditions, so we plan underground work around verified site information. The survey reports 73% of housing built before 1960 and 22% built in 2000 or later. Those ages make replacement lines a reasonable project to ask about, but they do not date the buried lines along Lindley Street. Before drilling near any marked utility, we expose it with hydrovac because surface paint shows its position, not its depth.

Do you cover May and nearby Thunderbird Bay?
May is in Brown County, at an elevation of 1,654 feet, and the mapped community covers 1.49 square miles. Its ZIP code is 76857. Thunderbird Bay lies 7.4 miles southwest, while Rising Star is 8.5 miles north and Blanket is 13.3 miles southeast. Brownwood, the county seat and nearest larger city, is 18.7 miles south. Our Yukon, Oklahoma main office is 293 road miles away, a drive of 6.5 hours. That distance is part of planning a bore near May, especially when the route involves US 183 or a longer service run.
Places near May
- Directional boring in Thunderbird Bay: 7.4 miles southwest
- Directional boring in Rising Star: 8.5 miles north
- Directional boring in Blanket: 13.3 miles southeast
- Directional boring in Lake Brownwood: 15.5 miles southwest
- Directional boring in Early: 16.4 miles south
- Directional boring in Brownwood: 18.7 miles south
What kinds of bores could fit Lindley Street in May?
- Highway crossing: A bore under US 183 needs a route beneath the travel lanes, with entry and exit pits placed clear of the roadway.
- Water service: A service connection near May Water Supply Corporation may need a bore beneath Ford Street to avoid cutting the road surface.
- Fiber route: Conduit along Lindley Street can pass beneath pavement, with marked utilities exposed before the drill approaches them.
- Drainage crossing: A route near Hog Creek needs alignment and pit planning that accounts for the nearby channel and drainage ground.
- Street connection: A bore along Monsey can carry water, sewer or conduit beneath the street while keeping the traveled surface uncut.
More on each kind of work: water line boring, electric line boring, fiber optic boring, road, railroad and creek crossings and municipal boring.
What drives the price of a bore near Ford Street in May?
For a quote near Ford Street, first tell us the address or map pin and what the line will carry, such as water or fiber. Next, give us the pipe or conduit size and the footage, whether it is a short connection near Monsey or a longer route along US 183. A sketch or plan helps us see crossings, access and pit locations.
A short service run on a clear stretch of Ford Street may be simpler to plan than a long crossing under US 183. Length, pipe size, the sandy clay loam or shallow bedrock, and the number of utilities to expose all affect the scope. Pavement, drainage crossings near Hog Creek, pit work and excavator time can add steps. May’s 293 road miles from Yukon also affect mobilization. Emergency timing and the profile of the work matter too.
Questions people ask about boring in May
Does Trinity take directional boring jobs in Brown County near May, and how is the work staffed?
Yes. We take directional boring work in May and coordinate it from the first call through the bore log, including work near US 183. Our own crews and partner contractor crews may do the field work. We stay responsible for the job regardless of which crew is on site.
As we plan a US 183 bore, who runs May’s public water system, and where does its water come from?
May Water Supply Corporation runs the public water system, which draws water from groundwater wells. May’s public water system serves 363 people through 143 service connections, a scale we consider when planning underground work there. For a new connection near Ford Street, the water system can help identify the line owner and the connection point.
Which electric companies report service in Brown County near May, and who confirms conduit specs?
In Brown County, we account for reported electric service when planning bore routes and coordinating utility locates. That does not establish which company owns a line at a specific address on Lindley Street. We confirm the line owner and conduit requirements for the actual route before planning the bore.
Who is responsible for Monsey in May, and can a bore avoid cutting the street?
May has no city government, so Monsey is not a city street. Local streets are county matters. Directional boring can carry a line beneath the street without opening a trench through the roadway, with pits set on either side where access allows.
Could older buried lines near Lindley Street in May need replacement bores?
They could. The American Community Survey 2019 to 2023 five year estimates put May’s median housing year at 1952, with 73% of homes built before 1960. That does not establish the age of a buried line. We expose marked utilities near Lindley Street before drilling close to them.
Are groundwater or flood prone soils a concern for bore pits near Hog Creek in May?
They can be a planning concern. The USDA soil survey maps seasonal water tables within 60 inches under 11% of May and flood prone soils under 9%. Hog Creek is 0.4 miles outside the mapped community boundary. We account for drainage and water when choosing pit locations.
Can I reach Trinity after hours about an urgent bore near Monsey in May?
Yes. A person answers our phone at (405) 409-7423 24 hours a day for urgent work, including a service problem near Monsey. Tell us where the issue is and what line is involved so we can discuss the site and next steps.
How much notice does Texas811 need for a bore near Ford Street in May?
Count back at least 48 hours from the planned start, excluding Saturdays, Sundays and legal holidays. A Ford Street locate request cannot be made more than 14 days ahead. If a start near Ford Street slips more than 14 days past the original notice, we submit a new request. Before we continue a bore crossing US 183, we have worn or moved marks refreshed through Texas811.
What affects the cost of directional boring under US 183 in May?
The job scope sets the cost: length, pipe or conduit size, ground, exposed utilities, pavement and pit work all matter. A US 183 crossing may need a longer route beneath the travel lanes, while May’s sandy clay loam or shallow bedrock can change drilling time. Mobilization from Yukon is another consideration.
Where the May facts on this page come from
- USDA Natural Resources Conservation Service, Soil Data Access: soil survey map units inside May
- U.S. Census Bureau, TIGER/Line 2024: May boundary, roads, rail lines and streams
- U.S. Census Bureau, 2020 Census: May population count
- U.S. Census Bureau, American Community Survey 2019 to 2023: May housing units and year built
- Macrostrat geologic map compilation: map units under May
- U.S. EPA Safe Drinking Water Information System: public water systems serving May
- U.S. Energy Information Administration, Form EIA 861: electric utilities serving Brown County
- U.S. Geological Survey, Elevation Point Query Service: May elevation
- OpenStreetMap road network through the OSRM router: road miles from Yukon, Oklahoma to May
- Texas Utilities Code Chapter 251, Underground Facility Damage Prevention and Safety
- TxDOT Utility Accommodation Rules, 43 Tex. Admin. Code 21.40: underground utilities
- Texas Department of Transportation: Right of Way Utility and Leasing Information System (RULIS) utility permits
Get a Quote for a Bore in May
Send the address, what is going in, the size and the footage.
Trinity Boring Solutions
9102 NW Expressway, Yukon, OK 73099
(405) 409-7423 | darren@trinityboringsolutions.com
Free Bore Planner
Plan Your Bore in May, Texas
Type the address of your job in May. The Bore Planner opens an aerial map at that spot. Drop one pin where the bore starts and one where it ends, tell us what is going in and send the scope to our crew.
Talk to the crew that does the work
Fastest way to a number is a phone call. Tell us where the crossing is and what is going in the ground, and you will get a straight answer on the same call. Bores from 10 feet to 5,000 feet, 3/4 inch service line through 48 inch casing, anywhere in Oklahoma and Texas. We run 24/7 for main breaks and emergency repairs.
Answered by a person, not a call center.
Would rather not call? Send the details and we will come back with a written quote.
County and State Pages for May
Same county: Bangs · Zephyr. All counties: Texas county list.
