Quick Answer: Lake Shore Drive, Brook Valley Drive and Tamarack Drive are the longest named routes, and FM 2273 is the state highway through this community; we do directional boring, also called horizontal directional drilling (HDD), for crossings there. Thunderbird Bay has 24.49 public road miles, and the Yukon main office is 304 road miles away; a map pin on Lake Shore Drive helps set the route. Palopinto soil is often very stony clay loam, so a bore may encounter rock at shallow depth.

Family Business Since 1965 Boring Since 1982 24 Hour Phone No Utility Strike in 25 Years

Thunderbird Bay bores at a glance

  • Unincorporated community in Brown County, Texas. Population 764 (2020 Census count).
  • Road distance from our Yukon, Oklahoma main office: 304 miles, about 6.9 hours of driving.
  • Ground: Palopinto soil is mapped on 39 percent of the area, with bedrock about 40 inches down.
  • Rock: bedrock is mapped within 60 inches on 75 percent of the area.
  • Highways inside the boundary: FM 2273. State permit office: TxDOT Brownwood District.
  • Railroad track inside the boundary: none mapped.
  • Named streams inside the boundary: Rough Branch and Hog Creek.
  • Texas811: locate request at least two working days before a bore and no more than 14 days ahead.
  • Range: 3/4 inch service lines to 48 inch casing, 10 feet to 5,000 feet.
  • Phone answered 24 hours a day: (405) 409-7423

Who does directional boring near FM 2273 in Thunderbird Bay?

Lake Shore Drive, Brook Valley Drive and Tamarack Drive lead a network of 24.49 public road miles, with FM 2273 running through Thunderbird Bay. The 2020 Census counted 764 residents in this unincorporated Brown County community. Water, sewer, gas, electric conduit and fiber lines can run along its roads or serve properties off them, with the route and existing utilities checked before drilling.

Our main office is in Yukon, Oklahoma, and Thunderbird Bay work is done with our own crews and from satellite yards run by partner drilling contractors Trinity has personally vetted. Trinity is a family business started in 1965, with directional boring experience since 1982 and no utility strike in over 25 years. That record matters when planning around the lines along FM 2273 and Lake Shore Drive.

Trinity Boring Solutions branded compact directional drilling unit positioned beside a tree on a red dirt jobsite
Our compact directional drill set up beside a tree on a tight site. Photos on this page are from our jobs in Oklahoma and Texas.

What kind of ground is mapped in Thunderbird Bay near Palopinto soil?

The USDA soil survey maps Palopinto soil across 39 percent of Thunderbird Bay, with the Palopinto-Speck complex described as rubbly and on 1 to 5 percent slopes. Very stony clay loam is the leading surface texture, also mapped under 39 percent of the area. At about 40 inches below the surface, the survey maps bedrock under 59 percent, silty clay under 18 percent and an average clay content of 42 percent. Heavy clay is mapped under 25 percent, while sandy ground is not mapped at that depth. Palopinto, Bonti, Owens, and Frio are mapped soil patterns, not test borings, so we verify conditions along FM 2273.

USDA soil survey, inside the Thunderbird Bay mapped community boundaryWhat is mapped
Soil series mappedPalopinto 39 percent, Bonti 13 percent, Owens 9 percent, Frio 9 percent and Speck 8 percent
Texture at the surfacevery stony clay loam 39 percent, clay loam 13 percent and clay 9 percent
Texture about 40 inches downbedrock 59 percent, silty clay 18 percent and clay 7 percent
Engineering class about 40 inches downfat clay (CH) 18 percent and lean clay (CL) 12 percent
Average clay content about 40 inches down42 percent
Bedrock mapped within 60 inches75 percent of the area (46 percent hard rock, 29 percent weathered rock)
Seasonal water table within 60 inches0 percent of the area
Flood prone soils9 percent of the area
High corrosion risk for uncoated steel37 percent of the area

Bedrock is mapped within 60 inches under 75 percent of the area; hard bedrock accounts for 46 percent and weathered bedrock for 29 percent. That makes rock contact a real route planning consideration around Palopinto soil, though the map does not locate it at a particular address. Seasonal water tables within 60 inches are not mapped, while flood prone soils cover 9 percent. High steel corrosion risk is mapped under 37 percent, so the line owner should select any steel protection. The geologic map names Home Creek Limestone and Colony Creek Shale, undivided, of Pennsylvanian age; the limestone and shale contact may change drilling speed.

What does it take to bore through Thunderbird Bay bedrock?

Palopinto soil and bedrock mapped near the surface call for a plan that can adjust as the bit moves from stony soil into rock. We use the route, utility marks and field readings to guide each bore along Lake Shore Drive or another site route.

  1. We check the route against Palopinto soil mapping, where very stony clay loam is common, then adjust the drilling plan if the bore reaches mapped bedrock.
  2. With the area’s sticky clay, we manage drilling fluid and ream in stages so clay does not build up on the reamer or grip the pipe.
  3. Before a bore near Lake Shore Drive gets close to a marked utility, we use hydrovac potholing to expose the line and check its actual depth.
  4. As the drill advances near Rough Branch, a walkover locator tracks the head from the surface and we log depth and pitch along the route.
Rod box on the Vermeer D24x40 S3 Navigator with the bore path heading toward the trees on a rock bore in Guthrie, OK
Rod box on our Vermeer D24x40 with the bore path heading toward the trees on a rock bore in Guthrie, Oklahoma.

Where might a line go under Lake Shore Drive in Thunderbird Bay?

FM 2273 is the state highway mapped inside the Thunderbird Bay community boundary, with 1.3 roadway miles there and no other highway mapped within 1.5 miles outside it. Lake Shore Drive is the longest named street at 2.48 miles. Brook Valley Drive runs 1.86 miles and Tamarack Drive 1.39 miles, so a service route may involve local streets as well as the state road. A bore can pass beneath pavement rather than cut across it, subject to the applicable road approval and route plan.

CrossingTypeMapped extentWho has a say
FM 2273State highway1.3 roadway miles insideState highway office
Rough BranchStream1.06 channel miles insideChecked for Corps of Engineers jurisdiction
Hog CreekStream0.35 channel miles insideChecked for Corps of Engineers jurisdiction
Pecan BayouStream nearby0.5 miles outsideChecked for Corps of Engineers jurisdiction
Lake BrownwoodLake or pond6,365 acres, insideChecked for Corps of Engineers jurisdiction
Swipe the table sideways to see every column.

No railroad is mapped inside the community or within 1 mile outside it, and no street and rail crossings are mapped there. Rough Branch runs 1.06 channel miles inside Thunderbird Bay, while Hog Creek runs 0.35 miles; two mapped street crossings pass over named streams. Pecan Bayou is 0.5 miles outside the boundary, and Lake Brownwood is within the community. A creek or lake route needs planning for the channel and a check for federal water jurisdiction.

Who approves a bore in Thunderbird Bay and Brown County?

Thunderbird Bay is an unincorporated community with no city government, so public street approvals fall to the county or the state rather than a city office. For work in FM 2273 right of way, the line owner, not the drilling contractor, submits the utility application through TxDOT’s online RULIS system. Trinity gives the owner the bore plan and profile, and TxDOT’s Brownwood District reviews the request. TxDOT cover rules set crossing depths of 60 inches for electric, communication and water lines, and pressurized sewer lines; the district may require another depth. A Rough Branch or Lake Brownwood crossing is checked during planning for U.S. Army Corps of Engineers jurisdiction.

Read the rules for yourself: Texas Utilities Code Chapter 251 on notice to Texas811, the Texas811 questions and answers page, the TxDOT Utility Accommodation Rules, 43 TAC 21.40 and TxDOT utility permits in RULIS.

What utility lines serve Thunderbird Bay in Brown County?

Public water records do not identify which system serves a particular Thunderbird Bay address. The water provider for the specific address has to be confirmed with the city, the county or the local water district before a bore is planned. AEP Texas North, Oncor Electric Delivery Company and Comanche County Electric Cooperative Association report service in Brown County, but the line owner must be confirmed before an electric conduit bore near FM 2273 or Lake Shore Drive.

Line ownerWhat it isSourceSize
AEP Texas North, Oncor Electric Delivery Company and Comanche County Electric Cooperative AssociationElectric utilities reporting service in Brown CountyEIA Form 861Confirm the line owner by address
Swipe the table sideways to see every column.

The American Community Survey 2019 to 2023 five year estimates put the median housing year in Thunderbird Bay at 1986; 84 percent of units were built from 1960 to 1999, and 15 percent in 2000 or later. That mix can mean work for replacement lines as well as new service along streets such as Thunderbird Drive. Before the drill approaches a marked line, we expose it with hydrovac potholing because paint shows its position, not its depth.

Reel of yellow polyethylene gas pipe on a trailer staged for a directional bore
A reel of yellow polyethylene gas pipe on a trailer, staged for a directional bore.

Do you cover Thunderbird Bay near Brownwood?

Thunderbird Bay is in Brown County, at an elevation of 1,457 feet, and covers 2.54 square miles of mapped community area. Its ZIP code is 76857. May is 7.4 miles northeast, Lake Brownwood is 8.1 miles southwest, and Early is 12.6 miles southeast. Brownwood, the county seat and nearest larger city, is 13.8 miles south. The Yukon, Oklahoma main office is 304 road miles away, a 6.9 hour drive, so distance is part of planning a mobilization to FM 2273 or Lake Shore Drive.

Places near Thunderbird Bay

What boring work comes up near Rough Branch in Thunderbird Bay?

  • Highway crossing: A bore beneath FM 2273 uses a planned route through the state right of way and follows the permit issued to the line owner.
  • Street service: A water or sewer connection near Lake Shore Drive can pass beneath pavement, with marked utilities exposed before drilling reaches them.
  • Fiber route: Conduit along Brook Valley Drive can be installed by directional boring, with the route checked for existing lines and pavement crossings.
  • Creek crossing: A line near Rough Branch needs a route planned for the channel, with water jurisdiction checked during planning.
  • Lake crossing: Work near Lake Brownwood needs a route plan that accounts for the water crossing and the applicable review.
  • Electric conduit: Near Thunderbird Drive, we confirm the line owner and locate existing utilities before planning a new conduit bore.

More on each kind of work: water line boring, electric line boring, fiber optic boring, road, railroad and creek crossings and municipal boring.

What do you need to quote work near Thunderbird Drive in Thunderbird Bay?

A map pin matters on Thunderbird Drive because the route may meet a street, a utility or the Rough Branch drainage network. For a Lake Shore Drive bore, send us the address or pin, what will go in the ground, the pipe or conduit size, and the footage. A sketch or plans help us see the path and any marked crossings before we prepare the scope.

A short route with clear access and few crossings near Thunderbird Drive is simpler to plan. Palopinto soil and shallow mapped bedrock can add drilling time, while pavement or concrete, exposed utilities, pits, excavator time and sand backfill also shape the work. Creek crossings near Rough Branch need added route planning. The 304 road miles from Yukon can affect mobilization, and high profile or emergency work changes the job scope.

Questions people ask about boring in Thunderbird Bay

Does Trinity take directional boring work in Thunderbird Bay, Brown County, and who staffs it?

Yes. Trinity takes directional boring work in Thunderbird Bay, and the job is handled by our own crews or from a satellite yard run by a partner contractor we have vetted. You work with Trinity from the first call through the bore log, including work near FM 2273 and Lake Shore Drive.

Does Palopinto soil in Thunderbird Bay create a corrosion concern for steel pipe?

The USDA soil survey maps high steel corrosion risk under 37 percent of Thunderbird Bay, including areas where Palopinto soil is common. Near Rough Branch, we can specify HDPE, which is not subject to the soil corrosion concern in very stony clay loam. The line owner selects any coating for steel casing or tracer wire, based on the specific route and material near Lake Shore Drive.

What ground does a bore pass through in Thunderbird Bay Palopinto soil?

The USDA soil survey maps Palopinto soil under 39 percent of Thunderbird Bay, often as very stony clay loam. At about 40 inches, bedrock is mapped under 59 percent of the area, and silty clay under 18 percent. These are map patterns, not test borings, so the route still needs site specific planning near Rough Branch or a street crossing.

Is rock mapped in Thunderbird Bay, and how much of the area has bedrock within five feet?

Yes. The USDA soil survey maps bedrock within five feet under 75 percent of Thunderbird Bay. Hard bedrock is mapped under 46 percent and weathered bedrock under 29 percent. The map does not establish the depth at a specific point, so a bore near FM 2273 needs a route plan that allows for changing ground.

Who approves a bore under FM 2273 in Thunderbird Bay, and which state office reviews it?

The line owner files the utility application in TxDOT’s RULIS system for work in FM 2273 right of way; the driller does not file it. Trinity supplies the bore plan and profile, and the TxDOT Brownwood District reviews the request. TxDOT’s cover rules apply to crossings, subject to any depth set by the district permit.

Can a line be bored under Rough Branch in Thunderbird Bay?

A bore can be planned for a Rough Branch crossing, but the route needs to account for the creek channel. Rough Branch runs 1.06 channel miles inside the community, and planning checks whether the crossing is within U.S. Army Corps of Engineers jurisdiction. Site details determine the alignment and drilling approach.

What bore sizes and lengths can you handle near Thunderbird Drive in Thunderbird Bay?

Trinity handles lines from 3/4 inch service lines up to 48 inch casing, with bore lengths from 10 feet to 5,000 feet. The right setup near Thunderbird Drive depends on what is being installed, the route and the mapped ground, including the area’s shallow bedrock and stony Palopinto soil.

How early should I call Texas811 for a bore near Lake Shore Drive in Thunderbird Bay, and what if marks move?

Texas811 requires a locate request at least 48 hours before excavation, excluding Saturdays, Sundays and legal holidays, and no earlier than 14 days before work starts. If the start moves more than 14 days past the original notice, make a new request. Worn or moved marks near Lake Shore Drive must be refreshed before work continues.

What affects the cost of directional boring near FM 2273 in Thunderbird Bay?

For work near Brownwood, we set the price from the job scope, including the crossing route, pipe size, and footage. Length, pipe or conduit size, Palopinto soil and bedrock, crossings and exposed utilities all affect the work. Pavement, creek crossings near Rough Branch, pits and equipment time can add complexity. Mobilization from the Yukon office also matters because Thunderbird Bay is 304 road miles away.

Where the Thunderbird Bay facts on this page come from

Darren Rice in a safety vest at the bore pit beside the Trinity Boring Solutions Ditch Witch directional drill, with drill rods racked, on the airfield at Will Rogers World Airport in Oklahoma City

About Trinity Boring Solutions

Trinity Boring Solutions is a family business in Yukon, Oklahoma, founded by Dean Rice in 1965 and owned today by Darren Rice, who started its directional boring side in 1982. The company bores across Oklahoma and Texas. No bore is too big or too small: 4 foot sidewalk sleeves to roughly 4,100 feet under the Arkansas River in Tulsa. Reach us at (405) 409-7423.

Get a Quote for a Bore in Thunderbird Bay

Send the address, what is going in, the size and the footage.

Trinity Boring Solutions
9102 NW Expressway, Yukon, OK 73099
(405) 409-7423 | darren@trinityboringsolutions.com

Trinity Boring Solutions | 24/7 Available ☎ Call (405) 409-7423 Free Quote

Free Bore Planner

Plan Your Bore in Thunderbird Bay, Texas

Type the address of your job in Thunderbird Bay. The Bore Planner opens an aerial map at that spot. Drop one pin where the bore starts and one where it ends, tell us what is going in and send the scope to our crew.

Talk to the crew that does the work

Fastest way to a number is a phone call. Tell us where the crossing is and what is going in the ground, and you will get a straight answer on the same call. Bores from 10 feet to 5,000 feet, 3/4 inch service line through 48 inch casing, anywhere in Oklahoma and Texas. We run 24/7 for main breaks and emergency repairs.

Call (405) 409-7423

Answered by a person, not a call center.

Would rather not call? Send the details and we will come back with a written quote.

Quick Quote In Page

County and State Pages for Thunderbird Bay

Same county: Bangs · Blanket · Zephyr. All counties: Texas county list.