Barksdale Texas Directional Boring: Mailtrail Soil, Nueces River and Texas State Highway 55
Quick Answer: Need a line beneath Texas State Highway 55 or the Nueces River without cutting across it? We use directional boring, also called horizontal directional drilling (HDD), for Barksdale crossings. Water Street and Market Street are among the roads a bore may serve. Barksdale is 511 road miles from our Yukon, Oklahoma main office, and the Nueces River runs through the community. Mailtrail soil and clay loam can hold a bore open, while gravelly layers call for staged reaming.
Barksdale bores at a glance
- Unincorporated community in Edwards County, Texas. Population 91 (2020 Census count).
- Road distance from our Yukon, Oklahoma main office: 511 miles, about 10.5 hours of driving.
- Ground: Mailtrail soil is mapped on 35 percent of the area, with clay loam about 40 inches down.
- Rock: bedrock is mapped within 60 inches on 10 percent of the area.
- Highways inside the boundary: Texas State Highway 55 and RM 335. State permit office: TxDOT San Angelo District.
- Railroad track inside the boundary: none mapped.
- Named streams inside the boundary: Nueces River.
- Public water: Barksdale Water Supply Corporation, groundwater under the influence of surface water.
- Texas811: locate request at least two working days before a bore and no more than 14 days ahead.
- Range: 3/4 inch service lines to 48 inch casing, 10 feet to 5,000 feet.
- Phone answered 24 hours a day: (405) 409-7423
Does anyone bore beneath Texas State Highway 55 in Barksdale?
Can you get a line beneath Texas State Highway 55 or the Nueces River without cutting the surface? We take directional boring work in Barksdale, an unincorporated community in Edwards County with 91 people in the 2020 Census count. A bore can carry water, sewer, gas, electric conduit or fiber beneath a named road such as Market Street, or across the river where the route requires it.
Our main office is in Yukon, Oklahoma, and Barksdale work is done with our own crews and from satellite yards run by partner drilling contractors Trinity has personally vetted. We have bored since 1982, bringing four decades of experience to ground like the Mailtrail soil and Nuvalde clay loam mapped around Barksdale. We stay your point of contact from the first call through the bore log, regardless of which crew is on site.

What is Barksdale Mailtrail soil like to bore?
The USDA soil survey maps Mailtrail soil across 35% of Barksdale and Nuvalde across 28% of the mapped community. Surface textures are mainly clay loam and very gravelly clay loam. At about 40 inches below the surface, clay loam is mapped under 38% of the area, and the average clay content there is 23%. Sandy ground is mapped under 17%. Mailtrail, Nuvalde, Real, and Oakalla are mapped soil series, so we treat them as planning context rather than test borings. Clay loam can keep the bore open, while gravelly ground may shift the drill head or cave behind the bit.
| USDA soil survey, inside the Barksdale mapped community boundary | What is mapped |
|---|---|
| Soil series mapped | Mailtrail 35 percent, Nuvalde 28 percent, Real 10 percent, Oakalla 9 percent and Dev 9 percent |
| Texture at the surface | clay loam 38 percent, very gravelly clay loam 35 percent and very cobbly clay loam 10 percent |
| Texture about 40 inches down | clay loam 38 percent, cemented material 35 percent and bedrock 10 percent |
| Engineering class about 40 inches down | lean clay (CL) 38 percent, graded gravel with silt (GW GM) 9 percent and graded gravel (GW) 8 percent |
| Average clay content about 40 inches down | 23 percent |
| Bedrock mapped within 60 inches | 10 percent of the area (0 percent hard rock, 10 percent weathered rock) |
| Seasonal water table within 60 inches | 0 percent of the area |
| Flood prone soils | 26 percent of the area |
| High corrosion risk for uncoated steel | 0 percent of the area |
The USDA soil survey maps bedrock within 60 inches in 10% of Barksdale, with a typical mapped depth of 13 inches. That makes rock a possibility along a route, not a certainty at every bore. No seasonal water table is mapped within 40 or 60 inches, while flood prone soils cover 26% of the area, so a route near the Nueces River needs attention to channel depth and pit placement. On Water Street in Barksdale, we have no mapped high steel corrosion risk to rely on for steel design. The geologic map includes Cenozoic alluvium, undivided, and Early Cretaceous sedimentary rock; changing from river deposits to rock can affect drilling pace and steering.
How do we bore Barksdale clay loam ground?
Barksdale has clay loam, gravelly soils and mapped shallow bedrock. We choose the bit and fluid for the ground along the route, then track the drill head as it advances beneath a named street or the Nueces River.
- For Barksdale clay loam, we adjust drilling fluid and ream in stages so sticky soil is less likely to build up on the reamer or grip the pipe.
- Where the USDA maps very gravelly clay loam around Barksdale, we keep the pipe ready before the final ream and use staged passes to support the open bore.
- Mapped bedrock near Barksdale can slow a route beneath Rhodes Street; we select a suitable bit and watch the soil to rock transition for steering changes.
- For a bore near the Nueces River, we plan below the channel and track the drill head from the surface, recording depth and pitch as the route advances.

What could a new line cross in Barksdale near the Nueces River?
Texas State Highway 55 has 1.2 mapped roadway miles inside the Barksdale community, and RM 335 has 0.6 miles. There are no other highways mapped within 1.5 miles outside the boundary. Water Street is the longest named street at 0.55 miles, followed by Stovall Lane at 0.3 miles and Market Street at 0.29 miles. Rhodes Street also runs through the community. Those routes can shape the bore entry and exit locations, especially where highway pavement must stay intact.
| Crossing | Type | Mapped extent | Who has a say |
|---|---|---|---|
| Texas State Highway 55 | State highway | 1.2 roadway miles inside | State highway office |
| RM 335 | State highway | 0.6 roadway miles inside | State highway office |
| Nueces River | Stream | 4.88 channel miles inside | Checked for Corps of Engineers jurisdiction |
| Dry Creek | Stream nearby | 0.6 miles outside | Checked for Corps of Engineers jurisdiction |
No railroad is mapped inside the Barksdale community or within 1 mile outside it, and no street and rail crossings are mapped there. The Nueces River has 4.88 channel miles inside the community, with two mapped street crossings of named streams. Dry Creek is 0.6 miles outside the boundary. The river crossing needs a route planned beneath the channel, and creek work is checked for U.S. Army Corps of Engineers jurisdiction during planning. No lake or pond is mapped within 1 mile.
Who approves a bore in Barksdale and Edwards County?
Barksdale has no city government, so its local streets are not city streets; county or state authority depends on the road. For a bore in the right of way of Texas State Highway 55 or RM 335, the line owner, not the driller, files the TxDOT utility permit through RULIS. TxDOT’s San Angelo District reviews it, and we give the line owner the bore plan and profile. At highway crossings, electric and communication lines need 60 inches of cover and water lines need 60 inches; the permit can set a different depth. Highway work beneath existing pavement is bored or tunneled. The Nueces River route is also checked for federal waterway jurisdiction.
Read the rules for yourself: Texas Utilities Code Chapter 251 on notice to Texas811, the Texas811 questions and answers page, the TxDOT Utility Accommodation Rules, 43 TAC 21.40 and TxDOT utility permits in RULIS.
What is already in the ground in Barksdale near Barksdale Water Supply Corporation?
Barksdale Water Supply Corporation serves 279 people through 93 service connections. Its source is groundwater under the influence of surface water, so a new service route may need to meet existing water lines near Water Street or another road. Utilities reporting electric service in Edwards County include AEP Texas Central, AEP Texas North, Medina Electric Cooperative, Pedernales Electric Cooperative, Rio Grande Electric Cooperative and Southwest Texas Electric Cooperative. We confirm the line owner before planning an electric conduit bore in Barksdale.
| Line owner | What it is | Source | Size |
|---|---|---|---|
| Barksdale Water Supply Corporation | Public water system | Groundwater under the influence of surface water | 93 connections, 279 people served |
| AEP Texas Central, AEP Texas North, Medina Electric Cooperative, Pedernales Electric Cooperative, Rio Grande Electric Cooperative and Southwest Texas Electric Cooperative | Electric utilities reporting service in Edwards County | EIA Form 861 | Confirm the line owner by address |
Housing figures are not published for a place as small as Barksdale, so we cannot use a reliable local age profile to tell whether a line is a replacement or a new service. Longer service runs along Water Street or Market Street may affect the route. Barksdale receives an average of 23.7 inches of precipitation a year, with May the wettest month at 3.0 inches. We hydrovac pothole every marked utility on the bore path before drilling near it; paint shows location, not depth. For a proposed line beneath Water Street, potholing checks the marked lines where the path crosses.

Where is Barksdale in relation to Uvalde?
Barksdale is an unincorporated community in Edwards County, at an elevation of 1,525 feet and with 0.88 square miles of land. Its ZIP code is 78828. Camp Wood is 4.6 miles south, Leakey is 16.2 miles east, and Rocksprings, the county seat, is 22.4 miles northwest. Uvalde is the nearest larger city, 38.9 miles southeast. Our Yukon, Oklahoma main office is 511 road miles away, about a 10.5 hour drive, so distance is part of planning equipment and crew mobilization for a Barksdale job.
Places near Barksdale
- Directional boring in Camp Wood: 4.6 miles south
- Directional boring in Leakey: 16.2 miles east
- Directional boring in Rocksprings: 22.4 miles northwest
- Directional boring in Utopia: 32.1 miles east
- Directional boring in Brackettville: 36.6 miles southwest
- Directional boring in Uvalde: 38.9 miles southeast
Which Barksdale jobs could need a bore near Water Street?
- Highway crossing: A bore beneath Texas State Highway 55 can keep the existing pavement uncut while carrying a water line or conduit across the road.
- Water service: A service tied to Barksdale Water Supply Corporation may need a route along Water Street that avoids marked existing lines.
- Fiber route: Fiber conduit beneath Market Street can connect a property without opening the street surface along the bore path.
- Creek crossing: A bore beneath the Nueces River needs a route planned below the channel and a check for federal waterway jurisdiction.
- Street connection: A line crossing Rhodes Street can use entry and exit pits beside the road rather than an open cut through the pavement.
- RM crossing: A bore beneath RM 335 can carry a utility while leaving the road surface intact, with the line owner handling the TxDOT permit.
More on each kind of work: water line boring, electric line boring, fiber optic boring, road, railroad and creek crossings and municipal boring.
What drives the price of a Barksdale bore near Rhodes Street?
Start with a map pin at the exact spot on Rhodes Street or beside the Nueces River; the location shows which road, crossing and access conditions matter. For a Texas State Highway 55 crossing, we need to know what goes underground, plus pipe or conduit size and footage. A sketch or plans help us understand the route, entry and exit pits, and nearby utilities in Barksdale.
Ground and crossings lead the pricing discussion in Barksdale. Mailtrail clay loam, gravelly layers or shallow mapped bedrock can change the drilling method and time. The Nueces River or a marked utility crossing adds planning and exposure work, while pavement beside Texas State Highway 55 affects access and protection. Pipe size, bore length, pit and excavator needs, and backfill also shape the scope. At 511 road miles from Yukon, mobilization is another factor; urgent or high profile work can add planning demands.
Questions people ask about boring in Barksdale
Does Trinity Boring Solutions take jobs in Barksdale, Edwards County, and how are crews assigned?
Yes. We take directional boring work in Barksdale, and your contact with Trinity stays consistent from the first call through the bore log. Our own crews do the work, with partner contractor satellite yards used for support. That service model applies to routes such as a crossing beneath Texas State Highway 55.
Can you bore a line under the Nueces River in Barksdale?
A bore beneath the Nueces River can be planned to pass below the channel without cutting across the riverbank. The mapped channel runs 4.88 miles inside Barksdale, so the route and depth depend on the crossing location. During planning, we check whether the crossing falls under U.S. Army Corps of Engineers jurisdiction.
For underground work in Barksdale, who runs the public water system, and where does its water come from before we plan around the Nueces River?
Barksdale Water Supply Corporation runs the public water system. Its source is groundwater under the influence of surface water, and the system serves 279 people through 93 service connections. Those existing lines matter when planning a new service near Water Street or another Barksdale road.
Which electric utilities report service in Barksdale, Edwards County, and who confirms conduit needs?
AEP Texas Central, AEP Texas North, Medina Electric Cooperative, Pedernales Electric Cooperative, Rio Grande Electric Cooperative and Southwest Texas Electric Cooperative report electric service in Edwards County. The line owner for the specific Barksdale route must be confirmed before a conduit bore, so conduit requirements can be checked with the right owner.
Who is responsible for Barksdale streets such as Market Street, and must a bore cut the road?
Barksdale is unincorporated and has no city government, so Market Street is not under a city government’s authority. Local streets fall to county or state authority depending on the road. Directional boring can pass beneath a street without cutting across its surface; Texas State Highway 55 has separate TxDOT right of way permitting.
Could groundwater or flood prone soil affect bore pits near the Nueces River in Barksdale?
The soil survey maps flood prone soils across 26% of Barksdale, including ground to consider near the Nueces River. It does not map a seasonal water table within 60 inches, but river conditions and recent rain can still affect site planning. Pit placement and a route below the channel are considered before work starts.
Can I reach Trinity after hours about an urgent bore in Barksdale near Market Street?
Yes. Someone answers Trinity’s phone 24 hours a day at (405) 409-7423. For an urgent issue near Market Street, explain the location, what the line carries and the immediate need so we can discuss the next steps. Emergency work can change the job’s planning and mobilization.
How much notice does Texas811 need for a Barksdale bore along Water Street, and what if marks move?
For a bore along Water Street, request locates through Texas811 at least 48 hours before excavation, excluding Saturdays, Sundays and legal holidays, and no earlier than 14 days ahead. Texas811 describes this as at least two working days. If the start slips more than 14 days past the original notice, make a new request; worn or moved marks must be refreshed through Texas811 before work continues.
What affects the cost of a Barksdale bore beneath Texas State Highway 55?
The price depends on the job details, not one flat measure. Mailtrail clay loam, gravelly layers and mapped shallow bedrock affect equipment and time. A crossing beneath Texas State Highway 55 adds permit and pavement conditions; pipe size, footage, utility exposures, pits and backfill also matter. Mobilization from Yukon is part of the scope because Barksdale is 511 road miles away.
Where the Barksdale facts on this page come from
- USDA Natural Resources Conservation Service, Soil Data Access: soil survey map units inside Barksdale
- U.S. Census Bureau, TIGER/Line 2024: Barksdale boundary, roads, rail lines and streams
- U.S. Census Bureau, 2020 Census: Barksdale population count
- Macrostrat geologic map compilation: map units under Barksdale
- U.S. EPA Safe Drinking Water Information System: public water systems serving Barksdale
- U.S. Energy Information Administration, Form EIA 861: electric utilities serving Edwards County
- U.S. Geological Survey, Elevation Point Query Service: Barksdale elevation
- OpenStreetMap road network through the OSRM router: road miles from Yukon, Oklahoma to Barksdale
- Texas Utilities Code Chapter 251, Underground Facility Damage Prevention and Safety
- TxDOT Utility Accommodation Rules, 43 Tex. Admin. Code 21.40: underground utilities
- Texas Department of Transportation: Right of Way Utility and Leasing Information System (RULIS) utility permits
Get a Quote for a Bore in Barksdale
Send the address, what is going in, the size and the footage.
Trinity Boring Solutions
9102 NW Expressway, Yukon, OK 73099
(405) 409-7423 | darren@trinityboringsolutions.com
Free Bore Planner
Plan Your Bore in Barksdale, Texas
Type the address of your job in Barksdale. The Bore Planner opens an aerial map at that spot. Drop one pin where the bore starts and one where it ends, tell us what is going in and send the scope to our crew.
Talk to the crew that does the work
Fastest way to a number is a phone call. Tell us where the crossing is and what is going in the ground, and you will get a straight answer on the same call. Bores from 10 feet to 5,000 feet, 3/4 inch service line through 48 inch casing, anywhere in Oklahoma and Texas. We run 24/7 for main breaks and emergency repairs.
Answered by a person, not a call center.
Would rather not call? Send the details and we will come back with a written quote.
County and State Pages for Barksdale
All counties: Texas county list.
