Camp Wood Texas Directional Boring: Mailtrail Soil, Texas State Highway 55, Nueces River
Quick Answer: Can we get your line beneath Texas State Highway 55 without cutting its pavement? Trinity Boring Solutions does directional boring, also called horizontal directional drilling (HDD), in Camp Wood, Texas, for crossings such as that highway. Camp Wood is 521 road miles from the Yukon, Oklahoma main office, and the route to Nueces Street affects mobilization. Mailtrail soil is very gravelly clay loam, with cemented material commonly mapped about 40 inches down, so the bore needs a plan for firmer ground.
Camp Wood bores at a glance
- Incorporated city in Real County, Texas. Population 520 (Census Bureau 2024 estimate).
- Road distance from our Yukon, Oklahoma main office: 521 miles, about 10.6 hours of driving.
- Ground: Mailtrail soil is mapped on 56 percent of the area, with cemented material about 40 inches down.
- Rock: bedrock is mapped within 60 inches on 43 percent of the area.
- Highways inside the boundary: Texas State Highway 55 and RM 337. State permit office: TxDOT San Angelo District.
- Railroad track inside the boundary: none mapped.
- Public water: City of Camp Wood, surface water.
- Texas811: locate request at least two working days before a bore and no more than 14 days ahead.
- Range: 3/4 inch service lines to 48 inch casing, 10 feet to 5,000 feet.
- Phone answered 24 hours a day: (405) 409-7423
Who handles directional boring near the Camp Wood Nueces River?
Trinity Boring Solutions takes directional boring work in Camp Wood, Real County, where the Census Bureau Vintage 2024 estimate is 520 people. Can we get your line beneath Texas State Highway 55 or the Nueces River without cutting the surface? We install water, sewer, gas, electric conduit and fiber for routes along Nueces Street or crossings under those local features.
Our main office is in Yukon, Oklahoma, and Camp Wood work is done with our own crews and from satellite yards run by partner drilling contractors Trinity has personally vetted. We are a family business that started in 1965, and we have done directional boring since 1982. For a line along 5th Street or beneath Texas State Highway 55, our equipment handles 3/4 inch service lines through 48 inch casing.

What does Mailtrail soil mean for a Camp Wood bore?
The USDA soil survey maps Mailtrail soil across 56 percent of Camp Wood and Real soil across 43 percent. Mailtrail has very gravelly clay loam at the surface, while the Real soil is very cobbly clay loam. At about 40 inches below the surface, the survey maps cemented material under 56 percent of the city and bedrock under 43 percent. Average clay content at that depth is 42 percent, and no sandy area is mapped there. These patterns point to a bore through gravelly clay loam that may meet firm material or bedrock as it deepens.
| USDA soil survey, inside the Camp Wood city limits | What is mapped |
|---|---|
| Soil series mapped | Mailtrail 56 percent and Real 43 percent |
| Texture at the surface | very gravelly clay loam 56 percent and very cobbly clay loam 43 percent |
| Texture about 40 inches down | cemented material 56 percent and bedrock 43 percent |
| Average clay content about 40 inches down | 42 percent |
| Bedrock mapped within 60 inches | 43 percent of the area (0 percent hard rock, 43 percent weathered rock) |
| Seasonal water table within 60 inches | 0 percent of the area |
| Flood prone soils | 0 percent of the area |
| High corrosion risk for uncoated steel | 1 percent of the area |
USDA soil maps show bedrock within 60 inches across 43 percent of Camp Wood, with weathered bedrock mapped across that same share; hard bedrock is not mapped at that depth. The typical bedrock depth is 13 inches, so a route may meet rock early and need slower drilling or a rock tool. Near Nueces River, seasonal water tables and flood prone soils are not mapped, so we plan bore depths around field conditions. High steel corrosion risk covers 1 percent. The Glen Rose Formation, Albian in age, includes limestone, dolostone and marl, adding another reason to check the route rather than assume uniform ground.
What does it take to bore Camp Wood cemented material?
In Camp Wood, the Mailtrail and Real soil maps point to gravelly clay loam, cemented material and shallow mapped bedrock, so we plan the bore for changing ground along the route.
- Mailtrail soil is very gravelly clay loam, so we ream in stages and keep the pipe ready before the final pass can leave the hole open.
- With cemented material mapped under 56 percent of Camp Wood at about 40 inches, we check drilling response as the bore approaches firmer layers.
- Bedrock is mapped within 60 inches across 43 percent of the city, so we track depth and pitch closely as a route shifts from soil to rock.
- Before a bore near Nueces Street, we hydrovac expose each marked utility on the path; surface marks show position, not burial depth.

What does a bore have to cross in Camp Wood near Texas State Highway 55?
Texas State Highway 55 runs 1.0 mapped roadway mile inside Camp Wood, and RM 337 runs 0.5 mile, so a route under either can call for a highway bore plan. TxDOT rules require boring or tunneling beneath existing highway pavement. The city has 11.59 public road centerline miles and 19 named streets. Nueces Street is the longest at 0.82 mile, followed by 2nd Street at 0.8 mile and Leon Klink Street at 0.68 mile. A bore along those streets can avoid opening the road surface, with access pits set off the pavement.
| Crossing | Type | Mapped extent | Who has a say |
|---|---|---|---|
| Texas State Highway 55 | State highway | 1 roadway miles inside | State highway office |
| RM 337 | State highway | 0.5 roadway miles inside | State highway office |
| Nueces River | Stream nearby | 0.1 miles outside | Checked for Corps of Engineers jurisdiction |
| Camp Wood Creek | Stream nearby | 0.4 miles outside | Checked for Corps of Engineers jurisdiction |
| Miller Creek | Stream nearby | 0.7 miles outside | Checked for Corps of Engineers jurisdiction |
| Pulliam Creek | Stream nearby | 0.8 miles outside | Checked for Corps of Engineers jurisdiction |
No railroad is mapped inside Camp Wood or within 1 mile outside its limits, and no street and rail crossings are mapped in the city. No named stream runs inside the limits either. The Nueces River is 0.1 mile from the city boundary, with Camp Wood Creek 0.4 mile away, so nearby water crossings may still affect a route. The mapped street crossings of named streams in the city are none, and no lakes or ponds are mapped within 1 mile. A river or creek bore is checked for U.S. Army Corps of Engineers jurisdiction during planning.
Who has to sign off on a Camp Wood bore in Real County?
For a bore within Texas State Highway 55 or RM 337 right of way in Camp Wood, the utility owner applies for the TxDOT utility permit, and the TxDOT San Angelo District reviews it. The owner files through RULIS; we prepare the bore plan and profile and work under the permit issued to that owner. Cover is a key design measure: electric and communication lines need 60 inches below the lowest crossed grade, while water lines need 60 inches at crossings. Pressurized sewer lines also need 60 inches at crossings. TxDOT may set another depth in the permit. As an incorporated city in Real County, Camp Wood’s streets belong to the city, so we verify street authority before planning a bore. A crossing near the Nueces River is checked for federal waterway jurisdiction during planning.
Read the rules for yourself: Texas Utilities Code Chapter 251 on notice to Texas811, the Texas811 questions and answers page, the TxDOT Utility Accommodation Rules, 43 TAC 21.40 and TxDOT utility permits in RULIS.
What is already in the ground near the City of Camp Wood system?
The City of Camp Wood public water system draws from surface water and serves 1,380 people through 460 service connections, so a bore near Nueces Street needs its route checked against existing water lines. Electric service reported in Real County includes AEP Texas Central, Bandera Electric Cooperative, Central Texas Electric Cooperative, Medina Electric Cooperative and Pedernales Electric Cooperative. On Nueces Street, we confirm the line owner for the specific address before planning an electric conduit bore.
| Line owner | What it is | Source | Size |
|---|---|---|---|
| City of Camp Wood | Public water system | Surface water | 460 connections, 1,380 people served |
| AEP Texas Central, Bandera Electric Cooperative, Central Texas Electric Cooperative, Medina Electric Cooperative and Pedernales Electric Cooperative | Electric utilities reporting service in Real County | EIA Form 861 | Confirm the line owner by address |
The American Community Survey 2019 to 2023 five year estimates put Camp Wood’s median housing year at 1968, so we check utility records before boring on 2nd Street. For Camp Wood homes, 37 percent were built before 1960, 49 percent from 1960 to 1999 and 14 percent in 2000 or later; we check services before 5th Street bores. That mix makes a replacement route along 5th Street different from a new service connection: older buried lines may be present, so we expose marked utilities before drilling near them.

How far is Camp Wood from Leakey and the Yukon yard?
Camp Wood is an incorporated city in Real County, covering 0.5 square mile at an elevation of 1,463 feet, with ZIP code 78833. Barksdale is 4.6 miles north, Leakey is 15.4 miles east, Rocksprings is 26.9 miles northwest, Utopia is 30.1 miles east and Knippa is 34.0 miles southeast. Leakey is the county seat, while Uvalde is the nearest larger city, 34.4 miles southeast. The Yukon, Oklahoma yard is 521 road miles away, a 10.6 hour drive, which can affect mobilization for a Camp Wood project.
Places near Camp Wood
- Directional boring in Barksdale: 4.6 miles north
- Directional boring in Leakey: 15.4 miles east
- Directional boring in Rocksprings: 26.9 miles northwest
- Directional boring in Utopia: 30.1 miles east
- Directional boring in Knippa: 34 miles southeast
- Directional boring in Uvalde: 34.4 miles southeast
What would we bore along Camp Wood’s Nueces Street?
- Highway crossing: A line beneath Texas State Highway 55 needs a bore plan that accounts for the pavement and TxDOT right of way.
- Water service: A connection near the City of Camp Wood system needs a route checked against existing service lines and the surface water network.
- Fiber conduit: Along Nueces Street, a fiber bore can pass below the road surface, with marked utilities exposed before drilling near them.
- Creek crossing: A route near Camp Wood Creek calls for planning around the channel and checking U.S. Army Corps of Engineers jurisdiction.
- Street replacement: A sewer or water replacement along 5th Street can use a bore route that avoids opening the street surface.
- Electric conduit: Near RM 337, we confirm the line owner before planning a conduit bore through the state highway right of way.
More on each kind of work: water line boring, electric line boring, fiber optic boring, road, railroad and creek crossings and municipal boring.
What should I send for a Camp Wood bore near 5th Street?
For a 5th Street quote, send the address or map pin, what will go underground, the pipe or conduit size and the footage; a sketch or plans help. A route sketch can show whether the work follows a street or passes beneath Texas State Highway 55. That detail helps us understand access and what the bore must avoid.
The job scope sets the price through ground, crossings and logistics. Mailtrail’s gravelly clay loam and cemented material can change drilling time and reaming. A Texas State Highway 55 crossing brings pavement and right of way requirements into the plan, while a route near the Nueces River may need water crossing review. Pit locations, excavator time, sand backfill and marked utilities also matter. At 521 road miles from Yukon, mobilization is another part of the Camp Wood job.
Questions people ask about boring in Camp Wood
Does Trinity take directional boring jobs in Camp Wood and Real County, and who staffs them?
Yes. Trinity takes Camp Wood work in Real County, using its own crews and partner drilling contractors from vetted satellite yards. Along Texas State Highway 55, we stay involved from the first call through the bore log, regardless of which crew is on site. For a crossing under Texas State Highway 55, the same team coordinates the plan and field work.
What ground will a bore meet in Camp Wood Mailtrail soil?
The USDA soil survey maps Mailtrail across 56 percent of Camp Wood, with very gravelly clay loam at the surface. At about 40 inches down, cemented material is mapped under 56 percent of the city. Average clay content at that depth is 42 percent, so the drilling plan must account for firm ground rather than assume loose soil throughout.
How much rock is mapped in Camp Wood, and is it hard bedrock?
Bedrock is mapped within 60 inches across 43 percent of Camp Wood, and the mapped bedrock there is weathered rather than hard. The typical depth is 13 inches, so some routes may reach rock early. That can slow the bore and call for closer depth and pitch checks, especially where the Glen Rose Formation is mapped.
Who approves a bore beneath Texas State Highway 55 in Camp Wood?
The utility that owns the line submits the TxDOT utility permit application through RULIS, and the TxDOT San Angelo District reviews it. A crossing under Texas State Highway 55 is bored or tunneled beneath existing pavement. We provide the bore plan and profile for the utility owner’s application and work under the issued permit.
Can a line be bored beneath the Nueces River near Camp Wood?
A bore beneath the Nueces River can be considered after the route and ground are reviewed. The river is 0.1 mile from Camp Wood’s boundary, and water crossings are checked for U.S. Army Corps of Engineers jurisdiction during planning. The crossing design depends on the actual alignment, access and subsurface conditions.
Who runs Camp Wood’s public water system in Real County, and where is its source?
The City of Camp Wood runs the public water system, which uses surface water. The system serves 1,380 people through 460 service connections, so we verify connection locations before planning bores near RM 337. If your bore near Nueces Street could meet a water line, the route and line owner need to be checked before drilling.
Does Camp Wood’s distance from Uvalde change a job from the Yukon office?
Camp Wood is 521 road miles and a 10.6 hour drive from the Yukon, Oklahoma main office; Uvalde is 34.4 miles southeast. That distance can affect mobilization and scheduling for work near Texas State Highway 55. The route length, equipment and site access help determine the logistics for each job.
How much Texas811 notice do I need for a Camp Wood bore near Nueces Street?
For work near Nueces Street, Texas law calls for a locate request at least 48 hours before excavation, excluding Saturdays, Sundays and legal holidays, and no earlier than 14 days before. Texas811 describes this as at least two working days. If the start slips more than 14 days, request a new ticket; have worn or moved marks refreshed through Texas811 before work continues.
What affects the price of directional boring under Texas State Highway 55 in Camp Wood?
The route and scope set the price, not one single detail. For Texas State Highway 55, pavement, required cover, utility crossings and exposure work can affect the plan. Mailtrail ground conditions, bore length, pipe size, pits, excavator time and mobilization from Yukon also matter. A route near the Nueces River may add crossing review and access considerations.
Where the Camp Wood facts on this page come from
- USDA Natural Resources Conservation Service, Soil Data Access: soil survey map units inside Camp Wood
- U.S. Census Bureau, TIGER/Line 2024: Camp Wood boundary, roads, rail lines and streams
- U.S. Census Bureau, Vintage 2024 population estimates: Camp Wood
- U.S. Census Bureau, American Community Survey 2019 to 2023: Camp Wood housing units and year built
- Macrostrat geologic map compilation: map units under Camp Wood
- U.S. EPA Safe Drinking Water Information System: public water systems serving Camp Wood
- U.S. Energy Information Administration, Form EIA 861: electric utilities serving Real County
- U.S. Geological Survey, Elevation Point Query Service: Camp Wood elevation
- OpenStreetMap road network through the OSRM router: road miles from Yukon, Oklahoma to Camp Wood
- Texas Utilities Code Chapter 251, Underground Facility Damage Prevention and Safety
- TxDOT Utility Accommodation Rules, 43 Tex. Admin. Code 21.40: underground utilities
- Texas Department of Transportation: Right of Way Utility and Leasing Information System (RULIS) utility permits
Get a Quote for a Bore in Camp Wood
Send the address, what is going in, the size and the footage.
Trinity Boring Solutions
9102 NW Expressway, Yukon, OK 73099
(405) 409-7423 | darren@trinityboringsolutions.com
Free Bore Planner
Plan Your Bore in Camp Wood, Texas
Type the address of your job in Camp Wood. The Bore Planner opens an aerial map at that spot. Drop one pin where the bore starts and one where it ends, tell us what is going in and send the scope to our crew.
Talk to the crew that does the work
Fastest way to a number is a phone call. Tell us where the crossing is and what is going in the ground, and you will get a straight answer on the same call. Bores from 10 feet to 5,000 feet, 3/4 inch service line through 48 inch casing, anywhere in Oklahoma and Texas. We run 24/7 for main breaks and emergency repairs.
Answered by a person, not a call center.
Would rather not call? Send the details and we will come back with a written quote.
County and State Pages for Camp Wood
All counties: Texas county list.
