trinityboringsolutions.com

Homestead Meadows North Texas Directional Boring: Hueco Soil, US 62 and Cemented Material

Quick Answer: Homestead Meadows North is an unincorporated community, so streets belong to El Paso County or the state, not a city government. We do directional boring, also called horizontal directional drilling (HDD), for work along US 62 and other local routes. The Yukon, Oklahoma main office is 678 road miles away, a factor for work near Krag Street. Hueco soil is widespread, and cemented material mapped below the surface can affect drilling and reaming.

Family Business Since 1965 Boring Since 1982 24 Hour Phone No Utility Strike in 25 Years

Homestead Meadows North bores at a glance

  • Unincorporated community in El Paso County, Texas. Population 5,210 (2020 Census count).
  • Road distance from our Yukon, Oklahoma main office: 678 miles, about 13.3 hours of driving.
  • Ground: Hueco soil is mapped on 90 percent of the area, with cemented material about 40 inches down.
  • Rock: no bedrock is mapped in the top 60 inches.
  • Highways inside the boundary: US 62 and US 180. State permit office: TxDOT El Paso District.
  • Railroad track inside the boundary: none mapped.
  • Texas811: locate request at least two working days before a bore and no more than 14 days ahead.
  • Range: 3/4 inch service lines to 48 inch casing, 10 feet to 5,000 feet.
  • Phone answered 24 hours a day: (405) 409-7423

Who can I call for directional boring near US 62 in Homestead Meadows North?

Homestead Meadows North is an unincorporated community in El Paso County, so a city government does not own its streets. The Census Bureau counted 5,210 residents in 2020; it does not publish yearly estimates for unincorporated places. We install water, sewer, gas, electric conduit and fiber, including routes along Flager Street or connections from those roads to a property.

Our main office is in Yukon, Oklahoma, and Homestead Meadows North work is done with our own crews and from satellite yards run by partner drilling contractors Trinity has personally vetted. Our longest bore was roughly 4,100 feet with 48 inch pipe under the Arkansas River in Tulsa. A typical job near US 62 is smaller, such as a service line or conduit crossing a road without opening the paved surface.

Trinity Boring Solutions Vermeer D24x40 directional drill set up for a bore
Our Vermeer D24x40 directional drill set up for a bore. Photos on this page are from our jobs in Oklahoma and Texas.

How does Hueco soil affect a bore in Homestead Meadows North?

The USDA soil survey maps the Hueco and Wink series here, with the Hueco Wink association covering 90 percent of the mapped area. Surface texture is loamy fine sand over most of that area. At about 40 inches below the surface, cemented material is mapped under 90 percent of the area, while the survey records an average clay content of 13 percent at that depth. Sandy ground is mapped in 10 percent of the area at about 40 inches. These are mapped patterns, not test borings, so a site check still matters.

USDA soil survey, inside the Homestead Meadows North mapped community boundaryWhat is mapped
Soil series mappedHueco 90 percent and Wink 10 percent
Texture at the surfaceloamy fine sand 90 percent and fine sandy loam 10 percent
Texture about 40 inches downcemented material 90 percent and variable 10 percent
Engineering class about 40 inches downsilty clay (CL ML) 10 percent
Average clay content about 40 inches down13 percent
Bedrock mapped within 60 inchesNone mapped
Seasonal water table within 60 inches0 percent of the area
Flood prone soils0 percent of the area
High corrosion risk for uncoated steel0 percent of the area

Bedrock is not mapped in the top five feet, and seasonal water table, flood prone soils and high steel corrosion risk are not mapped in the survey. That does not rule out deeper rock. The geologic map shows Cenozoic Bolson deposits of clay, silt, sand and gypsum, with Permian Paleozoic sedimentary rocks below. Cemented layers may take more reaming than loose sand, while the fine surface material calls for controlled fluid so a hole does not wash out.

How do we drill cemented material in Homestead Meadows North?

The USDA survey maps cemented material under much of Homestead Meadows North at about 40 inches. We use the route, site conditions and utility marks to choose the bore path and pace the reaming.

  1. Route check: At a property near Krag Street, we review the proposed path, access for pits and mapped cemented material before choosing the bore setup.
  2. Utility exposure: We hydrovac marked lines near Montana Avenue before drilling close to them; paint shows location at the surface, not burial depth.
  3. Pilot bore: A walkover locator tracks the drill head near Cruz Tierra Street, while we record depth and pitch as the bore advances.
  4. Reaming and pullback: With pipe ready before the final ream, we size the hole for the planned line and keep the work near US 62 controlled.
Drilling fluid returns at the entry as the Vermeer D24x40 S3 drills a 385 foot sandstone rock bore in Guthrie, Oklahoma
Drilling fluid coming back to the entry pit as our Vermeer D24x40 drills a 385 foot bore in Guthrie, Oklahoma.

What does a bore have to cross on Krag Street in Homestead Meadows North?

US 62 and US 180 each have 4.3 mapped roadway miles inside the Homestead Meadows North community boundary. TxDOT rules apply when work occupies their right of way. Among the longer local routes, Krag Street measures 4.59 miles, Cruz Tierra Street 4.49 miles and Flager Street 4.38 miles inside the boundary. Montana Avenue also runs 4.29 miles. A bore under one of these roads can keep the pavement intact, but its path and pits still need to fit the site.

CrossingTypeMapped extentWho has a say
US 62US highway4.3 roadway miles insideState highway office
US 180US highway4.3 roadway miles insideState highway office
Swipe the table sideways to see every column.

No railroad is mapped inside Homestead Meadows North or within one mile outside its boundary, so there is no mapped track crossing to plan around. No named streams or lakes and ponds are mapped nearby either. The survey maps 5.38 miles of unnamed drainage within the community. A route near that drainage still needs site review; a water crossing, if one is identified, is checked for federal jurisdiction during planning.

Whose permission does a bore in El Paso County and Homestead Meadows North need?

Homestead Meadows North has no city government, so its streets fall to El Paso County or the state, depending on the road. For work in the US 62 or US 180 right of way, the line owner, not the driller, files the TxDOT utility application through RULIS. We give the owner the bore plan and profile, and the TxDOT El Paso District reviews it. TxDOT cover rules set 60 inches at highway crossings for electric, communication and water lines, and for pressurized sewer; the district may set a different depth. County road approval is handled by the relevant county authority.

Read the rules for yourself: Texas Utilities Code Chapter 251 on notice to Texas811, the Texas811 questions and answers page, the TxDOT Utility Accommodation Rules, 43 TAC 21.40 and TxDOT utility permits in RULIS.

Whose lines are already buried in El Paso County and Homestead Meadows North?

The provider for a specific Homestead Meadows North address has to be confirmed with the county or local water district before a bore is planned. EPA drinking water records do not tie systems to towns here. El Paso Electric and Rio Grande Electric Cooperative report electric service in El Paso County, but the line owner for a particular property must be identified before conduit work. We can hydrovac marked lines before drilling near them, including water and electric routes along Montana Avenue.

Line ownerWhat it isSourceSize
El Paso Electric and Rio Grande Electric CooperativeElectric utilities reporting service in El Paso CountyEIA Form 861Confirm the line owner by address
Swipe the table sideways to see every column.

The American Community Survey 2019 to 2023 five year estimates put the median Homestead Meadows North housing year at 1995. Survey estimates for Homestead Meadows North homes: 2 percent built before 1960, 66 percent from 1960 to 1999, and 32 percent in 2000 or later; we assess bore paths. A replacement line near Cruz Tierra Street may share space with older buried utilities, while a newer service still needs a clear path. We expose marked lines before the drill approaches because surface paint does not show depth.

Yellow polyethylene gas pipe pulled through a directional bore beside a commercial building
Yellow polyethylene gas pipe pulled through a directional bore beside a commercial building.

Where is Homestead Meadows North near Butterfield?

Homestead Meadows North is in El Paso County, at an elevation of 4,074 feet, and covers 15.59 square miles within its mapped community boundary. Its ZIP code is 79938. Homestead Meadows South is 2.6 miles south, and Butterfield is 5.2 miles east. Horizon City, the nearest larger city, is 11.7 miles south; El Paso, the county seat, is 15.3 miles west. The Yukon yard is 678 road miles away, a drive of 13.3 hours, which affects mobilization for work near US 62.

Places near Homestead Meadows North

What kinds of bores come up near Cruz Tierra Street in Homestead Meadows North?

  • Highway crossing: A utility route under US 62 needs a bore plan that fits the TxDOT right of way and keeps the paved lanes uncut.
  • Water service: A new service near Flager Street needs the address specific water provider confirmed before we set a bore route.
  • Fiber conduit: A conduit run along Cruz Tierra Street can pass beneath a driveway or paved section without cutting across its surface.
  • Electric conduit: Near Montana Avenue, we identify the electric line owner before setting conduit size and exposing marked utilities.
  • Drainage crossing: A proposed route near the 5.38 miles of unnamed drainage needs a site review for channel conditions and crossing jurisdiction.
  • Replacement line: A bore near Krag Street can route a replacement around marked existing lines instead of opening the full street.

More on each kind of work: water line boring, electric line boring, fiber optic boring, road, railroad and creek crossings and municipal boring.

What drives the price of a bore near Montana Avenue in Homestead Meadows North?

Start with a map pin or address near Montana Avenue; the exact spot shows whether the route reaches a road, driveway or drainage. For a Krag Street bore, tell us what will go underground, the pipe or conduit size, and the footage. A sketch or plans help us review the route and likely pits before preparing a scope.

The mapped cemented material is a key cost factor because it can take more reaming than loose surface soil. The number of utilities to expose, pipe size and bore length also shape the work. Pavement on US 62, drainage near the route, pit and excavator needs, and sand backfill can add scope. Montana Avenue work is 678 road miles from the Yukon yard, so mobilization matters too.

Questions people ask about boring in Homestead Meadows North

Does Trinity Boring Solutions take jobs in Homestead Meadows North and El Paso County?

Yes. We take directional boring work across Texas, including potential crossings of US 62 and US 180 in Homestead Meadows North. The main office is in Yukon, and our own crews and vetted partner contractor yards support work in El Paso County. A project near US 62 can include a service line, utility conduit or another planned underground route.

Who owns electric lines in Homestead Meadows North, El Paso County, and who confirms conduit specs?

El Paso Electric and Rio Grande Electric Cooperative report service in El Paso County, but either may not serve a particular Homestead Meadows North address. Confirm the line owner and conduit requirements for the specific site before planning. Near Montana Avenue, marked electric lines should be exposed before the drill approaches.

Does El Paso County control Flager Street in Homestead Meadows North, and must it be cut?

Homestead Meadows North has no city government, so streets are under county or state authority depending on the road. A directional bore can pass below Flager Street without cutting its pavement. The route, pits and any road right of way work still need to be coordinated with the responsible authority.

How do housing age and buried lines near Cruz Tierra Street affect Homestead Meadows North replacement bores?

The American Community Survey 2019 to 2023 estimates give Homestead Meadows North a median housing year of 1995. A replacement route near Cruz Tierra Street may meet existing buried services, so we review plans and expose marked utilities before drilling near them. Housing age alone does not establish the location or condition of a line.

What does Hueco soil mean for a bore in Homestead Meadows North?

The USDA soil survey maps the Hueco Wink association across 90 percent of Homestead Meadows North. It shows loamy fine sand at the surface and cemented material at about 40 inches under 90 percent of the area. That mapped layer can affect reaming, but the survey is not a test of a specific property.

Could Hueco or Wink soils affect whether directional boring in Homestead Meadows North encounters rock?

Bedrock is not mapped in the top five feet of Homestead Meadows North, which does not rule out rock at greater depth. The geologic map shows Cenozoic Bolson deposits and Permian Paleozoic sedimentary rocks. A site near US 180 may differ from the broad mapped pattern, so the route and ground conditions need review.

Does Trinity cover Homestead Meadows North, Homestead Meadows South and rural sites nearby?

Yes. We take work in Homestead Meadows North, nearby Homestead Meadows South and rural sites outside the mapped community boundary. Homestead Meadows South is 2.6 miles south. For a route near Butterfield, share the exact address or map pin so we can review access and the proposed bore path.

How much Texas811 notice is needed for a bore near Krag Street in Homestead Meadows North?

For a bore near Krag Street, submit a Texas811 locate request at least 48 hours before excavation, excluding Saturdays, Sundays and legal holidays, and no earlier than 14 days before work. If a Homestead Meadows North start slips more than 14 days past the original notice, we submit a new request through TxDOT El Paso District. On Montana Avenue, we refresh worn or moved marks before any underground work continues.

What affects directional boring cost near US 62 in Homestead Meadows North?

The scope near US 62 depends on the mapped cemented material, bore length, pipe or conduit size, and the utilities that need exposure. Pavement, drainage crossings, pits and equipment time also matter. Mobilization is part of planning because Homestead Meadows North is 678 road miles from the Yukon yard.

Where the Homestead Meadows North facts on this page come from

Darren Rice in a safety vest at the bore pit beside the Trinity Boring Solutions Ditch Witch directional drill, with drill rods racked, on the airfield at Will Rogers World Airport in Oklahoma City

About Trinity Boring Solutions

Trinity Boring Solutions is a family business in Yukon, Oklahoma, founded by Dean Rice in 1965 and owned today by Darren Rice, who started its directional boring side in 1982. The company bores across Oklahoma and Texas. No bore is too big or too small: 4 foot sidewalk sleeves to roughly 4,100 feet under the Arkansas River in Tulsa. Reach us at (405) 409-7423.

Get a Quote for a Bore in Homestead Meadows North

Send the address, what is going in, the size and the footage.

Trinity Boring Solutions
9102 NW Expressway, Yukon, OK 73099
(405) 409-7423 | darren@trinityboringsolutions.com

Trinity Boring Solutions | 24/7 Available ☎ Call (405) 409-7423 Free Quote

Free Bore Planner

Plan Your Bore in Homestead Meadows North, Texas

Type the address of your job in Homestead Meadows North. The Bore Planner opens an aerial map at that spot. Drop one pin where the bore starts and one where it ends, tell us what is going in and send the scope to our crew.

Talk to the crew that does the work

Fastest way to a number is a phone call. Tell us where the crossing is and what is going in the ground, and you will get a straight answer on the same call. Bores from 10 feet to 5,000 feet, 3/4 inch service line through 48 inch casing, anywhere in Oklahoma and Texas. We run 24/7 for main breaks and emergency repairs.

Call (405) 409-7423

Answered by a person, not a call center.

Would rather not call? Send the details and we will come back with a written quote.

Quick Quote In Page

County and State Pages for Homestead Meadows North

Same county: El Paso · Socorro · San Elizario · Fabens · Canutillo · Anthony · Westway · Agua Dulce · Vinton · Tornillo · Clint · Morning Glory. All counties: Texas county list.