Homestead Meadows South Texas Directional Boring: Hueco Soil, US 62 And Montana Avenue
Quick Answer: What lies below a bore on Montana Avenue? The USDA soil survey maps loamy fine sand across most of Homestead Meadows South, with cemented material at about 40 inches under 94% of the mapped area. We do directional boring, also called horizontal directional drilling (HDD), for crossings such as US 62. The Yukon, Oklahoma main office is 675 road miles away, and Montana Avenue access can shape mobilization. Hueco soil is sandy near the surface, so the hole needs support as it is opened.
Homestead Meadows South bores at a glance
- Unincorporated community in El Paso County, Texas. Population 7,142 (2020 Census count).
- Road distance from our Yukon, Oklahoma main office: 675 miles, about 13.2 hours of driving.
- Ground: Hueco soil is mapped on 94 percent of the area, with cemented material about 40 inches down.
- Rock: no bedrock is mapped in the top 60 inches.
- Highways inside the boundary: US 62 and US 180. State permit office: TxDOT El Paso District.
- Railroad track inside the boundary: none mapped.
- Texas811: locate request at least two working days before a bore and no more than 14 days ahead.
- Range: 3/4 inch service lines to 48 inch casing, 10 feet to 5,000 feet.
- Phone answered 24 hours a day: (405) 409-7423
Who can I call for directional boring near US 62 in Homestead Meadows South?
We take directional boring work in Homestead Meadows South, an unincorporated community in El Paso County. The Census Bureau counted 7,142 people in the 2020 Census; it does not publish yearly estimates for unincorporated places. We install water, sewer, gas, electric conduit and fiber lines, including service runs to properties along US 62 and Montana Avenue.
Our main office is in Yukon, Oklahoma, and Homestead Meadows South work is done with our own crews and from satellite yards run by partner drilling contractors Trinity has personally vetted. For work near US 62, our record of no utility strike in over 25 years matters alongside the lines already serving El Paso County. For directional boring planning along Montana Avenue, our family business began in 1965, and we have done directional boring since 1982.

What ground does a bore meet in Homestead Meadows South Hueco soil?
The USDA soil survey maps Hueco soil across 94% of Homestead Meadows South, with Dune land covering the remaining 6%. At the surface, the mapped Hueco texture is loamy fine sand. About 40 inches down, the survey maps cemented material under 94% of the area and fine sand under 6%. These are mapped soil patterns, not test borings, so a route near Montana Avenue still needs field checks. The sand can cut easily but may cave behind the drill, which calls for staged reaming and fluid that supports the bore wall.
| USDA soil survey, inside the Homestead Meadows South mapped community boundary | What is mapped |
|---|---|
| Soil series mapped | Hueco 94 percent and Dune land (miscellaneous area) 6 percent |
| Texture at the surface | loamy fine sand 94 percent and fine sand 6 percent |
| Texture about 40 inches down | cemented material 94 percent and fine sand 6 percent |
| Engineering class about 40 inches down | silty sand (SM) 6 percent |
| Average clay content about 40 inches down | 5 percent |
| Bedrock mapped within 60 inches | None mapped |
| Seasonal water table within 60 inches | 0 percent of the area |
| Flood prone soils | 0 percent of the area |
| High corrosion risk for uncoated steel | 0 percent of the area |
Bedrock is not mapped within the top five feet in Homestead Meadows South, though that does not establish conditions at greater depth. The survey maps no seasonal water table within 60 inches, no flood prone soils and no high steel corrosion risk. The geologic map shows Holocene sand sheet deposits and Permian Paleozoic sedimentary rocks. On a Hueco soil route, sand can slough into an open hole; the mapped cemented material may also affect drilling, so the crew checks conditions as the bore advances.
What does it take to bore cemented material in Homestead Meadows South?
On a Homestead Meadows South route, the Hueco soil survey points to sand near the surface and cemented material at about 40 inches across most of the mapped area. We plan the bore for the actual ground we encounter, not just the map pattern.
- We check the Hueco soil route against the plan and field conditions; the map shows cemented material at about 40 inches over most of the community, not a continuous test log.
- Where Homestead Meadows South sand can fall in behind the bit, we use drilling fluid to support the hole and enlarge it in stages before pulling pipe.
- Before drilling near Montana Avenue, we hydrovac expose each marked utility on the path; surface paint gives position but does not show how deep a line sits.
- We follow the drill head from the surface and record depth and pitch on a US 62 crossing, adjusting the path to the planned profile and exposed utilities.

What is in the way of a new line near Montana Avenue in Homestead Meadows South?
US 62 and US 180 each have 6.5 mapped roadway miles inside the Homestead Meadows South boundary. Montana Avenue is the longest named street at 6.46 miles, followed by Marvin Lane at 2.41 miles and Snohomish Loop and Krag Street at 1.4 miles each. A bore beside those roads can keep pavement and driveways intact, but the route, pits and utility exposures still need room. Street access and the road owner affect how we set up each crossing.
| Crossing | Type | Mapped extent | Who has a say |
|---|---|---|---|
| US 62 | US highway | 6.5 roadway miles inside | State highway office |
| US 180 | US highway | 6.5 roadway miles inside | State highway office |
No railroad is mapped inside Homestead Meadows South or within one mile outside the community boundary, so there is no mapped track crossing to plan around. No streams are mapped inside or within one mile, and no lakes or ponds are mapped within one mile. That leaves no mapped stream crossing for a Montana Avenue bore, though the exact work location and any buried utilities still need to be checked.
Who approves a bore in Homestead Meadows South and El Paso County?
For a bore under US 62 or US 180, TxDOT is the road authority, and the TxDOT El Paso District reviews a utility permit for work in highway right of way. The utility owner files through TxDOT’s online RULIS system; we provide the bore plan and profile and work under the permit issued to that owner. Homestead Meadows South has no city government, so county streets fall to the county and state highways to TxDOT. Texas811 must be notified at least 48 hours before excavation, excluding Saturdays, Sundays and legal holidays.
Read the rules for yourself: Texas Utilities Code Chapter 251 on notice to Texas811, the Texas811 questions and answers page, the TxDOT Utility Accommodation Rules, 43 TAC 21.40 and TxDOT utility permits in RULIS.
Whose lines may already be buried in Homestead Meadows South, El Paso County?
The water provider for a specific Homestead Meadows South address has to be confirmed with the city, the county or the local water district before a bore is planned. EPA drinking water records for Texas do not tie water systems to towns, so the provider could not be matched here. El Paso Electric and Rio Grande Electric Cooperative report service in El Paso County. We confirm the line owner for an electric conduit route before planning around a property or road.
| Line owner | What it is | Source | Size |
|---|---|---|---|
| El Paso Electric and Rio Grande Electric Cooperative | Electric utilities reporting service in El Paso County | EIA Form 861 | Confirm the line owner by address |
The American Community Survey 2019 to 2023 five year estimates put the median Homestead Meadows South home year at 1996; 65% were built from 1960 to 1999 and 34% in 2000 or later. That mix can mean either replacement work or a new service, including along Montana Avenue. Before drilling near a marked line, we hydrovac pothole it to see its depth; paint on Snohomish Loop shows a line’s position, not its depth.

Where is Homestead Meadows South near Homestead Meadows North?
Homestead Meadows South is an unincorporated El Paso County community at 4,069 feet, covering 3.66 square miles, with ZIP code 79938. Homestead Meadows North is 2.6 miles north; Butterfield is 5.3 miles northeast. Horizon City, the nearest larger city, is 9.2 miles south, while El Paso, the county seat, is 15.9 miles west. From our Yukon yard, the drive is 675 road miles and 13.2 hours. Those distances affect mobilization for a Montana Avenue or US 62 project.
Places near Homestead Meadows South
- Directional boring in Homestead Meadows North: 2.6 miles north
- Directional boring in Butterfield: 5.3 miles northeast
- Directional boring in Horizon City: 9.2 miles south
- Directional boring in Sparks: 10.5 miles southwest
- Agua Dulce: 10.9 miles south
What kinds of bores come up near Snohomish Loop in Homestead Meadows South?
- US highway crossing: A bore under US 62 or US 180 needs a route and setup suited to the highway right of way and its mapped roadway.
- Street service: A water or sewer service near Montana Avenue can pass beneath pavement rather than leave an open cut across the street.
- Fiber conduit: A fiber run near Snohomish Loop can be bored between planned pits, with marked utilities exposed before drilling approaches them.
- Utility replacement: A replacement line near Krag Street may need potholing to identify the depth of existing lines before the new route is drilled.
- Residential service: A new electric conduit or water service near Marvin Lane can be planned around the address, line size and available access.
- Neighboring area bore: We take Texas work near Homestead Meadows North as well as Homestead Meadows South, with the route and ground checked at the job address.
More on each kind of work: water line boring, electric line boring, fiber optic boring, road, railroad and creek crossings and municipal boring.
What should I send for a Homestead Meadows South quote near Krag Street?
Send an address or map pin first; a point near Krag Street can put the bore on a different side of a road or utility than a general area description. Include what will go in the ground, pipe or conduit size and footage. A sketch or plans help us see how the proposed route meets Montana Avenue or a nearby property.
The price follows the work at the specific Homestead Meadows South address. Hueco sand and the cemented material mapped below it affect drilling and reaming; crossings of US 62 or other utilities add planning and exposure work. Pavement, pit size, excavator time and sand backfill also matter. At 675 road miles from Yukon, mobilization is part of the job scope, as are creek or drainage crossings if the proposed route includes one.
Questions people ask about boring in Homestead Meadows South
Does Trinity take jobs in Homestead Meadows South, El Paso County, and how are crews assigned?
Yes. We take directional boring work in Homestead Meadows South, and the work is handled by our own crews or crews from satellite yards operated by drilling partners we have vetted. The Yukon main office remains your point of contact from the first call through the bore log, including for a route near US 62.
What ground should I expect for a bore through Hueco soil in Homestead Meadows South?
The USDA soil survey maps Hueco soil across 94% of Homestead Meadows South, with loamy fine sand at the surface. At about 40 inches, cemented material is mapped across 94% of the area. Sand can collapse behind the bit, so the crew may support the hole with fluid and ream in stages; the map is not a site test.
Given the Hueco soil series, will a bore in Homestead Meadows South encounter rock at the planned depth?
Although loamy fine sand describes Homestead Meadows South surface soil, we cannot rule out rock below the top five feet. The geologic map shows Holocene sand sheet deposits and Permian Paleozoic sedimentary rocks. A bore near Montana Avenue still needs to be planned for the conditions found along its actual path.
For a crossing under US 62 in Homestead Meadows South, should we seek approval from the TxDOT El Paso District?
TxDOT reviews a utility permit for a US 62 right of way bore through its El Paso District. The utility owner submits the application in TxDOT’s RULIS system, while we prepare the bore plan and profile and work under the owner’s permit. The route and cover are reviewed for the specific highway crossing.
Who owns electric lines in Homestead Meadows South, El Paso County, and who confirms conduit specifications?
El Paso Electric and Rio Grande Electric Cooperative report electric service in El Paso County, but that does not identify the owner at every Homestead Meadows South address. The line owner must be confirmed for the specific conduit route, and that owner confirms the line requirements before the bore is planned near Montana Avenue or another road.
Who is responsible for Snohomish Loop in Homestead Meadows South, and must it be cut for a bore?
Homestead Meadows South has no city government, so public streets are under county responsibility unless the road is a state highway. A bore can pass beneath Snohomish Loop without cutting its pavement, subject to the route, access and any applicable road approval. The marked utilities along the path still need exposure before drilling near them.
Does Trinity cover Homestead Meadows North and rural sites outside Homestead Meadows South?
Yes. We take work across Texas, including locations outside the mapped Homestead Meadows South boundary. Homestead Meadows North is 2.6 miles north, and a project there or at a rural address is scoped from its own map pin, ground conditions and line crossings rather than assumed to match Montana Avenue.
How much notice does Texas811 need for a bore near Montana Avenue in Homestead Meadows South?
For excavation near Montana Avenue, Texas law requires a locate request at least 48 hours before work starts, excluding Saturdays, Sundays and legal holidays; Texas811 describes this as at least two working days. The request cannot be made earlier than 14 days before work. If the start slips more than 14 days past the original notice, make a new request; worn or moved marks must be refreshed through Texas811 before work continues.
What affects the cost of directional boring under US 62 in Homestead Meadows South?
For a bore near US 180, we set pricing according to the job scope. Hueco sand and mapped cemented material affect drilling, while a US 62 crossing, other utility crossings and pavement affect planning and setup. Pipe size and length, pits, excavator time and backfill also matter. Mobilization from the Yukon office is another factor for this 675 road mile trip.
Where the Homestead Meadows South facts on this page come from
- USDA Natural Resources Conservation Service, Soil Data Access: soil survey map units inside Homestead Meadows South
- U.S. Census Bureau, TIGER/Line 2024: Homestead Meadows South boundary, roads, rail lines and streams
- U.S. Census Bureau, 2020 Census: Homestead Meadows South population count
- U.S. Census Bureau, American Community Survey 2019 to 2023: Homestead Meadows South housing units and year built
- Macrostrat geologic map compilation: map units under Homestead Meadows South
- U.S. Energy Information Administration, Form EIA 861: electric utilities serving El Paso County
- U.S. Geological Survey, Elevation Point Query Service: Homestead Meadows South elevation
- OpenStreetMap road network through the OSRM router: road miles from Yukon, Oklahoma to Homestead Meadows South
- Texas Utilities Code Chapter 251, Underground Facility Damage Prevention and Safety
- TxDOT Utility Accommodation Rules, 43 Tex. Admin. Code 21.40: underground utilities
- Texas Department of Transportation: Right of Way Utility and Leasing Information System (RULIS) utility permits
Get a Quote for a Bore in Homestead Meadows South
Send the address, what is going in, the size and the footage.
Trinity Boring Solutions
9102 NW Expressway, Yukon, OK 73099
(405) 409-7423 | darren@trinityboringsolutions.com
Free Bore Planner
Plan Your Bore in Homestead Meadows South, Texas
Type the address of your job in Homestead Meadows South. The Bore Planner opens an aerial map at that spot. Drop one pin where the bore starts and one where it ends, tell us what is going in and send the scope to our crew.
Talk to the crew that does the work
Fastest way to a number is a phone call. Tell us where the crossing is and what is going in the ground, and you will get a straight answer on the same call. Bores from 10 feet to 5,000 feet, 3/4 inch service line through 48 inch casing, anywhere in Oklahoma and Texas. We run 24/7 for main breaks and emergency repairs.
Answered by a person, not a call center.
Would rather not call? Send the details and we will come back with a written quote.
County and State Pages for Homestead Meadows South
Same county: El Paso · Socorro · San Elizario · Fort Bliss · Fabens · Canutillo · Anthony · Westway · Agua Dulce · Vinton · Tornillo · Clint. All counties: Texas county list.
