trinityboringsolutions.com

Seth Ward Texas Directional Boring: Pullman Clay Loam, BNSF Railway, FM 1767

Quick Answer: Directional boring in Seth Ward, Texas, also called horizontal directional drilling (HDD), can pass beneath BNSF Railway tracks without cutting the crossing. The community has 30.66 public road miles, including long stretches of 34th Street and 24th Street. Our Yukon, Oklahoma yard is 329 road miles away, and BNSF Railway track runs inside the mapped community boundary. Pullman clay loam dominates the mapped soils, so sticky cuttings call for careful reaming and fluid control.

Family Business Since 1965 Boring Since 1982 24 Hour Phone No Utility Strike in 25 Years

Seth Ward bores at a glance

  • Unincorporated community in Hale County, Texas. Population 1,603 (2020 Census count).
  • Road distance from our Yukon, Oklahoma main office: 329 miles, about 6.1 hours of driving.
  • Ground: Pullman soil is mapped on 63 percent of the area, with clay loam about 40 inches down.
  • Rock: no bedrock is mapped in the top 60 inches.
  • Highways inside the boundary: Interstate 27 Business, FM 1767 and FM 400. State permit office: TxDOT Lubbock District.
  • Railroad track inside the boundary: BNSF Railway, with 6 mapped street and rail crossings.
  • Public water: Seth Ward Water Supply Corporation, groundwater wells.
  • Texas811: locate request at least two working days before a bore and no more than 14 days ahead.
  • Range: 3/4 inch service lines to 48 inch casing, 10 feet to 5,000 feet.
  • Phone answered 24 hours a day: (405) 409-7423

Who does directional boring near Seth Ward’s 34th Street?

We take directional boring work in Seth Ward, an unincorporated community in Hale County. The Census Bureau counted 1,603 people in 2020; it does not publish yearly estimates for unincorporated places. We install water, sewer, gas, electric conduit and fiber, including service routes along 34th Street and connections near FM 1767 where an open cut could disrupt pavement or access.

Our main office is in Yukon, Oklahoma, and Seth Ward work is done with our own crews and from satellite yards run by partner drilling contractors Trinity has personally vetted. Our longest bore reached roughly 4,100 feet with 48 inch pipe under the Arkansas River in Tulsa. A typical Seth Ward bore is much shorter, with its route shaped by Pullman soil and nearby streets or BNSF Railway tracks.

Trinity Boring Solutions Vermeer D24x40 directional drill set up for a bore
Our Vermeer D24x40 directional drill set up for a bore. Photos on this page are from our jobs in Oklahoma and Texas.

What is Pullman soil like to bore in Seth Ward?

The USDA soil survey maps Pullman soil across 63 percent of Seth Ward, with Olton at 33 percent and Randall at 4 percent. Pullman clay loam on nearly level ground is the largest mapped unit. At about 40 inches below the surface, clay loam is mapped across 96 percent of the area, with an average clay content of 40 percent; sandy ground is not mapped at that depth. In Seth Ward, we use mapped soil patterns as reference only, not as test borings for underground work. For a bore near 24th Street, the clay can stick to the reamer and grip pipe if the hole stays open too long.

USDA soil survey, inside the Seth Ward mapped community boundaryWhat is mapped
Soil series mappedPullman 63 percent, Olton 33 percent and Randall 4 percent
Texture at the surfaceclay loam 63 percent, loam 33 percent and clay 4 percent
Texture about 40 inches downclay loam 96 percent and clay 4 percent
Engineering class about 40 inches downlean clay (CL) 96 percent and fat clay (CH) 4 percent
Average clay content about 40 inches down40 percent
Bedrock mapped within 60 inchesNone mapped
Seasonal water table within 60 inches4 percent of the area
Flood prone soils0 percent of the area
High corrosion risk for uncoated steel100 percent of the area

Bedrock is not mapped in the top five feet, which does not rule out rock deeper down. The Blackwater Draw Formation is mapped as Cenozoic sand, fine alluvium and silt, locally clayey, with thickness up to 25 feet; the map also shows Cenozoic sedimentary rocks of Paleocene age. A seasonal water table within 60 inches is mapped in 4 percent of the area, so pits there may need pumping. In Seth Ward, we treat the lack of mapped flood prone soils as a mapping limit, not confirmation of underground conditions. High steel corrosion risk covers the mapped area, a concern for steel casing and tracer wire near FM 400; the line owner selects materials and coatings.

How do we drill Seth Ward’s clay loam?

Pullman clay loam covers much of Seth Ward, and the mapped soil at about 40 inches is mostly clay loam. For a route near 34th Street, we manage sticky cuttings, protect pavement from fluid pressure and keep the pipe ready for pullback.

  1. On Pullman clay loam, we use a thinner drilling fluid with polymer and ream in stages so sticky cuttings do not build up on the reamer.
  2. Because clay at about 40 inches averages 40 percent, we watch fluid returns near Columbia Street to avoid pressure lifting pavement.
  3. We line up the pipe before the last reaming pass and pull it in the same day, limiting the time Seth Ward’s clay can swell around the hole.
  4. At a marked line near FM 1767, we expose it with hydrovac before drilling close; a surface mark shows position, not depth.
Drilling fluid returns at the entry as the Vermeer D24x40 S3 drills a 385 foot sandstone rock bore in Guthrie, Oklahoma
Drilling fluid coming back to the entry pit as our Vermeer D24x40 drills a 385 foot bore in Guthrie, Oklahoma.

Where might a Seth Ward line pass under BNSF Railway?

Interstate 27 Business and FM 1767 each have 1.5 mapped roadway miles inside the community boundary, while FM 400 has 0.4. Interstate 27, US 87, Texas State Highway 194 and US 70 are also close outside that boundary. The longest named streets are 34th Street at 1.57 miles, 24th Street at 1.53 miles and Columbia Street at 1.51 miles. A bore route must account for pavement, driveways and any marked lines along its path, not just the road crossing.

CrossingTypeMapped extentWho has a say
Interstate 27 BusinessInterstate1.5 roadway miles insideState highway office
FM 1767State highway1.5 roadway miles insideState highway office
FM 400State highway0.4 roadway miles insideState highway office
Interstate 27Highway nearby0.2 miles outsideState highway office
US 87Highway nearby0.3 miles outsideState highway office
Texas State Highway 194Highway nearby1 miles outsideState highway office
US 70Highway nearby1.4 miles outsideState highway office
BNSF RailwayRailroad2.43 track miles insideThe railroad
Swipe the table sideways to see every column.

BNSF Railway has 2.43 track miles inside the mapped community boundary, and six street and rail crossings are mapped. A crossing beneath those tracks needs an agreement from BNSF Railway that sets the crossing conditions. No streams or named waterways are mapped inside or within one mile of Seth Ward, and no lakes or ponds are mapped within one mile. That means the route focus here is roads, rail and buried utilities rather than a mapped creek crossing.

Who approves a Seth Ward bore in Hale County?

Seth Ward has no city government, so street authority rests with Hale County or the state according to the road. A bore beneath Interstate 27 Business, FM 1767 or FM 400 in state right of way needs a TxDOT utility permit reviewed by the TxDOT Lubbock District. The line owner, not our drilling crew, submits the application through TxDOT’s online RULIS system; we prepare the bore plan and profile for that filing. TxDOT rules require boring or tunneling beneath existing highway pavement, with the bore extending beneath all travel lanes on rural highways. Required cover varies by line type, and the permit may set another depth. A crossing under BNSF Railway tracks needs the railroad’s agreement.

Read the rules for yourself: Texas Utilities Code Chapter 251 on notice to Texas811, the Texas811 questions and answers page, the TxDOT Utility Accommodation Rules, 43 TAC 21.40 and TxDOT utility permits in RULIS.

What is already in the ground near Seth Ward Water Supply Corporation?

Seth Ward Water Supply Corporation serves 1,700 people through 887 service connections and draws water from groundwater wells. Near Columbia Street, its lines and other marked utilities need to be identified before a new service route is drilled. Electric service reported in Hale County includes Southwestern Public Service, Lamb County Electric Cooperative, Lighthouse Electric Cooperative and South Plains Electric Cooperative. We confirm the electric line owner for the specific address before planning conduit.

Line ownerWhat it isSourceSize
Seth Ward Water Supply CorporationPublic water systemGroundwater wells887 connections, 1,700 people served
Southwestern Public Service, Lamb County Electric Cooperative, Lighthouse Electric Cooperative and South Plains Electric CooperativeElectric utilities reporting service in Hale CountyEIA Form 861Confirm the line owner by address
Swipe the table sideways to see every column.

The American Community Survey 2019 to 2023 five year estimates put Seth Ward’s median housing year at 1958; 56 percent of homes were built before 1960, 43 percent from 1960 to 1999 and 1 percent in 2000 or later. A replacement bore near 24th Street may have to pass older service lines, while a new service has its own route to clear. Before drilling close to a marked utility, we hydrovac pothole it to check its depth; paint shows position, not depth.

Hydrovac truck and boring equipment staged beside an airport taxiway for utility daylighting in Oklahoma City
Our hydrovac truck and boring equipment beside an airport taxiway in Oklahoma City, set up to expose a utility crossing.

Where is Seth Ward in relation to Plainview?

Seth Ward is an unincorporated community in Hale County, 2.25 square miles in area, at an elevation of 3,374 feet. Its ZIP code is 79072. Plainview, the county seat and nearest larger city, is 2.4 miles southwest; Kress is 10.8 miles north and Edmonson is 12.3 miles west. From our Yukon, Oklahoma main office, the trip is 329 road miles and 6.1 drive hours. That distance matters when planning equipment and crew mobilization for a bore near FM 1767 or BNSF Railway.

Places near Seth Ward

What would we bore near Seth Ward’s 24th Street?

  • Highway crossing: A route beneath Interstate 27 Business uses boring or tunneling under existing pavement, with the alignment planned around the travel lanes.
  • Water service: A connection near Seth Ward Water Supply Corporation’s groundwater system needs a route that clears marked lines along 24th Street.
  • Fiber conduit: A run beside FM 1767 can avoid opening pavement while connecting a service across the mapped street network.
  • Rail crossing: A bore beneath BNSF Railway tracks needs the railroad agreement and crossing conditions planned before drilling.
  • Street replacement: A service replacement near Columbia Street can pass below pavement after existing marked utilities are exposed.
  • Electric conduit: A route near FM 400 starts with confirming the line owner and checking for other marked utilities along the alignment.

More on each kind of work: water line boring, electric line boring, fiber optic boring, road, railroad and creek crossings and municipal boring.

How do I get a quote for a Seth Ward bore near Interstate 27 Business?

Start with a map pin or address near Interstate 27 Business; the exact spot shows whether the route approaches pavement, a BNSF Railway crossing or a marked utility. For Seth Ward work, tell us what will go underground, including pipe or conduit size and footage, so we can plan the bore. A sketch or plans help us review the alignment and access before we scope a bore.

Price depends on the work at the specific location. The 329 road miles from Yukon affect mobilization, while Pullman clay loam can shape drilling and reaming time. We also consider pipe or conduit size, bore length, utilities to expose, pavement, pits, excavator time and sand backfill. A route under BNSF Railway or beside Interstate 27 Business may involve crossing conditions and planning that a short service route near 34th Street does not.

Questions people ask about boring in Seth Ward

Does Trinity Boring Solutions take work in Seth Ward and Hale County, and who staffs it?

Yes. We take directional boring projects in Seth Ward and across Texas, planning each underground route for its site. Our crews handle the drilling, with work also supported from satellite yards run by partner contractors we have vetted. Whether the work is near 34th Street or BNSF Railway, you work with Trinity from the first call through the bore log.

What should we account for when planning a directional bore under BNSF Railway in Seth Ward?

A crossing beneath BNSF Railway tracks needs an agreement from the railroad that owns them. That agreement sets the conditions for the crossing, including casing, depth and flagging. With 2.43 track miles and six mapped street and rail crossings inside the community boundary, the route and crossing location matter to the plan.

Who runs the water system in Seth Ward, and where does its water come from?

Seth Ward Water Supply Corporation runs the public water system, which uses groundwater wells. Seth Ward’s system serves 1,700 people through 887 service connections, a scale we consider when planning underground work. For a new bore near Columbia Street, we identify the system’s lines and expose marked utilities along the planned path before drilling close to them.

Which electric company serves my Seth Ward address in Hale County?

The specific line owner must be confirmed for the address before we plan an electric conduit bore. Utilities reporting electric service in Hale County include Southwestern Public Service, Lamb County Electric Cooperative, Lighthouse Electric Cooperative and South Plains Electric Cooperative. A route near FM 400 does not by itself identify which provider owns the line.

Who controls Columbia Street in Seth Ward, and can a bore avoid cutting it?

Seth Ward has no city government, so street authority belongs to Hale County or the state depending on the road. Directional boring can pass beneath Columbia Street without cutting its pavement when the route and conditions allow. We first locate and expose marked utilities along the planned path.

Are buried lines near Seth Ward’s 24th Street as old as the housing?

Housing records do not date individual buried lines, but the American Community Survey estimates a median housing year of 1958, with 56 percent built before 1960. A replacement bore near 24th Street may encounter older services. We use utility marks and hydrovac potholing to check line position and depth before drilling nearby.

How early should I request a 34th Street bore locate in Seth Ward?

Count back at least two working days from the planned start, excluding Saturdays, Sundays and legal holidays, before requesting a locate through Texas811 for 34th Street. The request can be made no earlier than 14 days ahead. If the start slips more than 14 days past the original notice, make a new request; refresh marks that wear off or move before work continues.

How far is Seth Ward from Yukon, and does Plainview make the job closer?

Seth Ward is 329 road miles and a 6.1 drive hour trip from our Yukon, Oklahoma main office. Plainview is 2.4 miles southwest of Seth Ward, but it does not change that distance from Yukon. Mobilization is one part of planning a bore near BNSF Railway or FM 1767.

What affects the cost of directional boring near Interstate 27 Business in Seth Ward?

The route and job scope determine the price, not one feature alone. We consider length, pipe or conduit size, Pullman clay loam, utilities that must be exposed, pavement and any crossing conditions at Interstate 27 Business or BNSF Railway. The 329 road miles from Yukon also affect mobilization, as can pits, excavator time and backfill.

Where the Seth Ward facts on this page come from

Darren Rice in a safety vest at the bore pit beside the Trinity Boring Solutions Ditch Witch directional drill, with drill rods racked, on the airfield at Will Rogers World Airport in Oklahoma City

About Trinity Boring Solutions

Trinity Boring Solutions is a family business in Yukon, Oklahoma, founded by Dean Rice in 1965 and owned today by Darren Rice, who started its directional boring side in 1982. The company bores across Oklahoma and Texas. No bore is too big or too small: 4 foot sidewalk sleeves to roughly 4,100 feet under the Arkansas River in Tulsa. Reach us at (405) 409-7423.

Get a Quote for a Bore in Seth Ward

Send the address, what is going in, the size and the footage.

Trinity Boring Solutions
9102 NW Expressway, Yukon, OK 73099
(405) 409-7423 | darren@trinityboringsolutions.com

Trinity Boring Solutions | 24/7 Available ☎ Call (405) 409-7423 Free Quote

Free Bore Planner

Plan Your Bore in Seth Ward, Texas

Type the address of your job in Seth Ward. The Bore Planner opens an aerial map at that spot. Drop one pin where the bore starts and one where it ends, tell us what is going in and send the scope to our crew.

Talk to the crew that does the work

Fastest way to a number is a phone call. Tell us where the crossing is and what is going in the ground, and you will get a straight answer on the same call. Bores from 10 feet to 5,000 feet, 3/4 inch service line through 48 inch casing, anywhere in Oklahoma and Texas. We run 24/7 for main breaks and emergency repairs.

Call (405) 409-7423

Answered by a person, not a call center.

Would rather not call? Send the details and we will come back with a written quote.

Quick Quote In Page

County and State Pages for Seth Ward

Same county: Abernathy · Petersburg. All counties: Texas county list.