Quick Answer: What does the top five feet look like on the Cloverleaf soil survey, and what lies beneath it? Bacliff soil is widespread, clay dominates at about 40 inches, and the geologic map shows Beaumont Formation. We do directional boring, also called horizontal directional drilling (HDD), beneath Loop 8 and other obstacles in Cloverleaf, Texas. The Yukon main office is 468 road miles away; heavy clay can ball on a reamer and grip pipe, so staged reaming matters along Loop 8.
Cloverleaf bores at a glance
- Unincorporated community in Harris County, Texas. Population 24,100 (2020 Census count).
- Road distance from our Yukon, Oklahoma main office: 468 miles, about 9.1 hours of driving.
- Ground: Bacliff soil is mapped on 83 percent of the area, with clay about 40 inches down.
- Rock: no bedrock is mapped in the top 60 inches.
- Highways inside the boundary: Loop 8. State permit office: TxDOT Houston District.
- Railroad track inside the boundary: Union Pacific, with 1 mapped street and rail crossings.
- Named streams inside the boundary: Carpenters Bayou.
- Texas811: locate request at least two working days before a bore and no more than 14 days ahead.
- Range: 3/4 inch service lines to 48 inch casing, 10 feet to 5,000 feet.
- Phone answered 24 hours a day: (405) 409-7423
Who handles directional boring by Union Pacific in Cloverleaf?
What does the top five feet look like near Barbara Mae Street, and what is under it? The USDA soil survey maps clay rich Bacliff soils, while the geologic map names Beaumont Formation. Cloverleaf is in Harris County, and the Census Bureau counted 24,100 residents in the 2020 Census. Along Barbara Mae Street, we bore water, sewer, gas, electric conduit or fiber beneath pavement instead of opening the full route.
Our main office is in Yukon, Oklahoma, and Cloverleaf work is done with our own crews and from satellite yards run by partner drilling contractors Trinity has personally vetted. Our longest bore ran roughly 4,100 feet of 48 inch pipe beneath the Arkansas River in Tulsa, showing the reach behind a shorter Loop 8 service crossing. A typical Cloverleaf job could route a service line beneath a driveway or Barbara Mae Street.

What kind of ground does Cloverleaf’s Bacliff soil survey show?
The USDA soil survey maps Bacliff soil across 83 percent of Cloverleaf, with Verland at 13 percent and Vamont at 3 percent. Clay is the surface texture across 83 percent of the mapped community. At about 40 inches below the surface, clay is mapped under 97 percent of the area, and the average clay content is 49 percent. These are mapped soil patterns, not test borings at a Barbara Mae Street address. For a bore, sticky clay can build up on a reamer and grip pipe as it is pulled through.
| USDA soil survey, inside the Cloverleaf mapped community boundary | What is mapped |
|---|---|
| Soil series mapped | Bacliff 83 percent, Verland 13 percent and Vamont 3 percent |
| Texture at the surface | clay 83 percent, silty clay loam 10 percent and silty clay 3 percent |
| Texture about 40 inches down | clay 97 percent and clay loam 3 percent |
| Engineering class about 40 inches down | fat clay (CH) 100 percent |
| Average clay content about 40 inches down | 49 percent |
| Bedrock mapped within 60 inches | None mapped |
| Seasonal water table within 60 inches | 97 percent of the area |
| Flood prone soils | 0 percent of the area |
| High corrosion risk for uncoated steel | 97 percent of the area |
For a bore near Carpenters Bayou, the soil survey maps a seasonal water table within 60 inches across 97 percent of Cloverleaf, so pits may need pumping. Because flood prone soils are not mapped in Cloverleaf, we confirm ground conditions before selecting a bore route. High steel corrosion risk is mapped across 97 percent, which makes casing and tracer wire material a line owner decision; HDPE is not affected by soil corrosion. The survey gives no bedrock indication in the top five feet. The geologic map identifies Beaumont Formation, areas predominantly clay, of Pleistocene age, with clay and silt that can make drilling sticky.
What does it take to bore Cloverleaf’s clay?
Bacliff clay can stay open, then cling to the reamer or pipe. Along Loop 8, we match fluid and reaming to the ground, while watching returns so pressure does not lift pavement.
- Bacliff clay can stick to the reamer, so we use thinner fluid with polymer and open the hole in stages before pulling pipe.
- Where the soil survey maps heavy clay, we watch fluid returns along Loop 8 to keep pressure from lifting pavement.
- Seasonal water is mapped within 60 inches across 97 percent of Cloverleaf, so Carpenters Bayou area pits may need pumping.
- Before drilling near Barbara Mae Street, we hydrovac pothole marked utilities, then track the drill head and log depth and pitch.

Where might a Cloverleaf line go under Loop 8?
Loop 8 has 1.0 mapped roadway mile inside the Cloverleaf community boundary. Interstate 10 runs along or touches that boundary, and US 90 is 1.5 miles outside it. A bore beside Barbara Mae Street, Hollypark Drive or Nimitz Street can avoid cutting the surface, but the route and access still shape the plan. Barbara Mae Street has 1.59 miles inside the community, Hollypark Drive has 1.31 miles, and Nimitz Street has 1.3 miles.
| Crossing | Type | Mapped extent | Who has a say |
|---|---|---|---|
| Loop 8 | State highway | 1 roadway miles inside | State highway office |
| Interstate 10 | Highway nearby | Runs along or touches the city limits | State highway office |
| US 90 | Highway nearby | 1.5 miles outside | State highway office |
| Union Pacific | Railroad | 0.23 track miles inside | The railroad |
| Port Terminal Railroad Association | Railroad nearby | 0.4 miles outside | The railroad |
| Carpenters Bayou | Stream | 0.16 channel miles inside | Checked for Corps of Engineers jurisdiction |
| West Canal | Stream nearby | Along the boundary | Checked for Corps of Engineers jurisdiction |
| Goodyear Creek | Stream nearby | Along the boundary | Checked for Corps of Engineers jurisdiction |
| Jordon Gully | Stream nearby | 0.3 miles outside | Checked for Corps of Engineers jurisdiction |
| Greens Bayou | Stream nearby | 0.5 miles outside | Checked for Corps of Engineers jurisdiction |
Union Pacific owns 0.23 track mile inside Cloverleaf on the Union Pacific Baytown Subdivision, and one mapped street and rail crossing makes the track a route to check. Carpenters Bayou runs for 0.16 channel mile inside the community, with one mapped street crossing of a named stream. West Canal and Goodyear Creek touch the boundary, so a nearby drainage route may also affect bore placement.
Who approves a Cloverleaf bore in Harris County?
Cloverleaf is an unincorporated community with no city government, so its streets and permits fall to the county or state. For work in the Loop 8 right of way, TxDOT’s Houston District reviews the utility permit. The utility owner, not our crew, submits the application in TxDOT’s RULIS system; we prepare the bore plan and profile for that filing and work under the owner’s permit. A crossing of Union Pacific track needs an agreement from the railroad, and a Carpenters Bayou crossing is checked for U.S. Army Corps of Engineers jurisdiction during planning.
Read the rules for yourself: Texas Utilities Code Chapter 251 on notice to Texas811, the Texas811 questions and answers page, the TxDOT Utility Accommodation Rules, 43 TAC 21.40 and TxDOT utility permits in RULIS.
Who owns buried lines in Harris County near Cloverleaf?
Before we plan a Cloverleaf bore, we confirm the address’s water provider with the county or local water district. Electric service reported in Harris County includes CenterPoint Energy, Entergy Texas and San Bernard Electric Cooperative; those reports do not identify the line owner at each address. We confirm the owner before planning a conduit bore along Bandera Street or another route.
| Line owner | What it is | Source | Size |
|---|---|---|---|
| CenterPoint Energy, Entergy Texas and San Bernard Electric Cooperative | Electric utilities reporting service in Harris County | EIA Form 861 | Confirm the line owner by address |
The American Community Survey 2019 to 2023 five year estimates place Cloverleaf’s median housing year at 1980, context we consider when planning underground work. The survey estimates Cloverleaf homes are 10 percent before 1960, 75 percent from 1960 to 1999, and 15 percent in 2000 or later; we consider this profile in bore planning. That mix can mean replacement lines as well as new services. We hydrovac pothole every marked utility on the bore path before drilling near it; for a line under Barbara Mae Street, that means exposing marked lines first because paint shows position, not depth.

Where is Cloverleaf in relation to Channelview?
Cloverleaf is an unincorporated community in Harris County, at an elevation of 33 feet and covering 3.09 square miles. ZIP code 77015 serves the area. Channelview is 3.7 miles east, Jacinto City is 4.2 miles west, and Galena Park is 4.6 miles southwest. Pasadena, the nearest larger city, is 9.4 miles south; Houston, the county seat, is 12.7 miles west. Our Yukon, Oklahoma main office is 468 road miles away, a 9.1 hour drive, so mobilization matters when planning work near Loop 8.
Places near Cloverleaf
- Directional boring in Channelview: 3.7 miles east
- Directional boring in Jacinto City: 4.2 miles west
- Directional boring in Galena Park: 4.6 miles southwest
- Sheldon: 5.5 miles northeast
- Highlands: 7.3 miles east
- Directional boring in Pasadena: 9.4 miles south
What boring work comes up near Carpenters Bayou in Cloverleaf?
- Highway crossing: A bore under Loop 8 can carry conduit beneath the roadway without cutting the pavement.
- Street service: A water or sewer service beneath Barbara Mae Street can cross pavement while keeping the surface intact.
- Rail crossing: A route through Union Pacific track needs the railroad’s agreement before the crossing is planned.
- Creek crossing: A Carpenters Bayou bore needs a route planned around the channel and a jurisdiction check during planning.
- Fiber conduit: A fiber route near Hollypark Drive can be bored beneath pavement, with marked utilities exposed along the path.
- Drainage crossing: A bore near West Canal can avoid an open cut across the boundary drainage route.
More on each kind of work: water line boring, electric line boring, fiber optic boring, road, railroad and creek crossings and municipal boring.
What drives the price of work near Barbara Mae Street in Cloverleaf?
For a Barbara Mae Street quote, start with the address or a map pin. Tell us what is going in the ground, such as a water service or fiber conduit, then give the pipe or conduit size and footage. A sketch or plans showing the route toward Loop 8 help us see crossings and access before we scope the bore.
Cloverleaf’s clay is the first ground factor: Bacliff soil can cling to tooling and pipe, affecting reaming and pullback. The count of utilities to expose and cross matters next, especially near Loop 8 or Union Pacific track. Pavement, creek or drainage crossings, pits, excavator time and sand backfill also shape the work. The 468 road miles from Yukon affect mobilization, and high profile or emergency work can change the plan.
Questions people ask about boring in Cloverleaf
Does Trinity take directional boring jobs in Cloverleaf and Harris County?
Yes. We take directional boring work in Cloverleaf, and the job can be staffed by our own crews or vetted partner drilling contractors working from satellite yards. Our Yukon main office remains your point of contact, whether the route is near Loop 8 or Barbara Mae Street.
Could groundwater or flooding affect bore pits near Carpenters Bayou in Cloverleaf?
Seasonal groundwater can affect pits: the soil survey maps a water table within 60 inches across 97 percent of Cloverleaf. Flood prone soils are not mapped, but Carpenters Bayou is a local channel to account for in route planning. Small pits and pumping may be needed where conditions are wet.
Does Bacliff soil in Cloverleaf corrode steel, and what pipe can I use?
The soil survey maps high steel corrosion risk across 97 percent of Cloverleaf, including areas with Bacliff soil. The line owner should consider casing and tracer wire materials. HDPE is not affected by soil corrosion, while the owner selects any coating for steel components near Bandera Street.
What ground is under a Cloverleaf bore through Bacliff soil?
The USDA soil survey maps Bacliff soil across 83 percent of Cloverleaf. Clay is mapped under 97 percent of the area at about 40 inches, with an average clay content of 49 percent. Clay may cling to the reamer and pipe, so a bore near Barbara Mae Street needs a controlled reaming plan.
Can we determine whether a Cloverleaf bore will hit rock before finalizing the route?
Bedrock is not mapped in Cloverleaf’s top five feet, which does not rule out deeper rock. The geologic map identifies Beaumont Formation, areas predominantly clay, of Pleistocene age. A bore near Loop 8 still needs planning for the actual ground along its route.
Who approves a Cloverleaf bore under Loop 8?
TxDOT’s Houston District reviews a utility permit for work in the Loop 8 right of way. The utility owner submits the application through RULIS, while we prepare the bore plan and profile. A route under Interstate 10 also needs the applicable TxDOT utility permit when it uses highway right of way.
What bore sizes and lengths can Trinity handle near Bandera Street in Cloverleaf?
For Cloverleaf projects, we handle lines from 3/4 inch service lines up to 48 inch casing and bore lengths from 10 feet to 5,000 feet. The right setup for a Bandera Street route depends on what the line carries, the size requested, and the nearby utilities and pavement.
How early should I call Texas811 for a Cloverleaf bore by Barbara Mae Street?
For a Barbara Mae Street start, request the Texas811 locate at least 48 hours ahead, excluding Saturdays, Sundays and legal holidays, and no earlier than 14 days before work. The ticket has a 20 day life; if the start slips more than 14 days past the original notice, make a new request. On Cloverleaf work, we refresh worn or moved marks before continuing so the marked route stays clear for the next boring step.
What affects the cost of a Cloverleaf bore near Loop 8?
Bacliff clay can affect reaming and pipe pullback, while the number of utilities to expose and crossings near Loop 8 also shape the job. Pavement, drainage, pits, equipment time and backfill matter. Mobilization from the Yukon office reflects the 468 road miles to Cloverleaf, and urgent or high profile work can add planning needs.
Where the Cloverleaf facts on this page come from
- USDA Natural Resources Conservation Service, Soil Data Access: soil survey map units inside Cloverleaf
- U.S. Census Bureau, TIGER/Line 2024: Cloverleaf boundary, roads, rail lines and streams
- U.S. Census Bureau, 2020 Census: Cloverleaf population count
- U.S. Census Bureau, American Community Survey 2019 to 2023: Cloverleaf housing units and year built
- Macrostrat geologic map compilation: map units under Cloverleaf
- U.S. Department of Transportation, North American Rail Network: track owners in Harris County
- U.S. Energy Information Administration, Form EIA 861: electric utilities serving Harris County
- U.S. Geological Survey, Elevation Point Query Service: Cloverleaf elevation
- OpenStreetMap road network through the OSRM router: road miles from Yukon, Oklahoma to Cloverleaf
- Texas Utilities Code Chapter 251, Underground Facility Damage Prevention and Safety
- TxDOT Utility Accommodation Rules, 43 Tex. Admin. Code 21.40: underground utilities
- Texas Department of Transportation: Right of Way Utility and Leasing Information System (RULIS) utility permits
Get a Quote for a Bore in Cloverleaf
Send the address, what is going in, the size and the footage.
Trinity Boring Solutions
9102 NW Expressway, Yukon, OK 73099
(405) 409-7423 | darren@trinityboringsolutions.com
Free Bore Planner
Plan Your Bore in Cloverleaf, Texas
Type the address of your job in Cloverleaf. The Bore Planner opens an aerial map at that spot. Drop one pin where the bore starts and one where it ends, tell us what is going in and send the scope to our crew.
Talk to the crew that does the work
Fastest way to a number is a phone call. Tell us where the crossing is and what is going in the ground, and you will get a straight answer on the same call. Bores from 10 feet to 5,000 feet, 3/4 inch service line through 48 inch casing, anywhere in Oklahoma and Texas. We run 24/7 for main breaks and emergency repairs.
Answered by a person, not a call center.
Would rather not call? Send the details and we will come back with a written quote.
County and State Pages for Cloverleaf
Same county: Houston · The Woodlands · Baytown · Atascocita · Spring · La Porte · Mission Bend · Deer Park · Cinco Ranch · Bellaire · Humble · South Houston. All counties: Texas county list.