trinityboringsolutions.com

Jacinto City Texas Directional Boring: Lake Charles Clay, Hunting Bayou, Union Pacific

Quick Answer: Lake Charles clay holds a bore, and we use directional boring, also called horizontal directional drilling (HDD), to place lines beneath Union Pacific tracks or around Hunting Bayou. The Yukon, Oklahoma main office is 463 road miles away, and Market Street Road is one local route to plan around. Clay can stick to the reamer and swell around pipe. We use controlled fluid and staged passes to keep the hole workable.

Family Business Since 1965 Boring Since 1982 24 Hour Phone No Utility Strike in 25 Years

Jacinto City bores at a glance

  • Incorporated city in Harris County, Texas. Population 9,431 (Census Bureau 2024 estimate).
  • Road distance from our Yukon, Oklahoma main office: 463 miles, about 9 hours of driving.
  • Ground: Lake Charles soil is mapped on 77 percent of the area, with clay about 40 inches down.
  • Rock: no bedrock is mapped in the top 60 inches.
  • No state or US highway is mapped inside the boundary. Closest: Interstate 10, US 90 and Interstate 610.
  • Railroad track inside the boundary: Union Pacific, with 10 mapped street and rail crossings.
  • Named streams inside the boundary: Hunting Bayou.
  • Public water: City of Jacinto City, surface water bought from another system.
  • Texas811: locate request at least two working days before a bore and no more than 14 days ahead.
  • Range: 3/4 inch service lines to 48 inch casing, 10 feet to 5,000 feet.
  • Phone answered 24 hours a day: (405) 409-7423

Who can handle directional boring in Jacinto City near Hunting Bayou?

Lake Charles clay is common across Jacinto City, so route planning matters for each line. The Census Bureau Vintage 2024 estimate puts the city at 9,431 people in Harris County. We install water, sewer, gas, electric conduit and fiber along routes such as Lane Street or Market Street Road, with the path set to avoid marked utilities and surface features.

Our main office is in Yukon, Oklahoma, and Jacinto City work is done with our own crews and from satellite yards run by partner drilling contractors Trinity has personally vetted. Our longest bore ran roughly 4,100 feet with 48 inch pipe under the Arkansas River in Tulsa. On a typical Lane Street run, we plan for the service line and local access rather than assume a long river bore. Our family business began in 1965, and we have done directional boring since 1982 for planned work in Jacinto City.

Ditch Witch JT922 compact directional drill beside the Trinity Boring Solutions truck at NE 24th Street in Oklahoma City
Our Ditch Witch JT922 compact directional drill beside the Trinity truck on a sleeve bore at NE 24th Street in Oklahoma City. Photos on this page are from our jobs in Oklahoma and Texas.

What is Lake Charles soil like to bore in Jacinto City?

The USDA soil survey maps Lake Charles soil across 77% of Jacinto City, with the Lake Charles and urban land complex covering 76%. Surface texture is mapped as clay across 80% of the city. At about 40 inches below the surface, 91% of the mapped soil is clay, and the average clay content there is 53%. These are mapped soil patterns, not site specific test results. Clay can hold the bore open, but it can also cling to the reamer and grip pipe, so the drilling fluid and timing of the pull matter.

USDA soil survey, inside the Jacinto City city limitsWhat is mapped
Soil series mappedLake Charles 77 percent, Bernard 10 percent, Texla 8 percent and Vamont 4 percent
Texture at the surfaceclay 80 percent, clay loam 10 percent and silt loam 8 percent
Texture about 40 inches downclay 91 percent and silty clay loam 8 percent
Engineering class about 40 inches downfat clay (CH) 92 percent and lean clay (CL) 8 percent
Average clay content about 40 inches down53 percent
Bedrock mapped within 60 inchesNone mapped
Seasonal water table within 60 inches22 percent of the area
Flood prone soils0 percent of the area
High corrosion risk for uncoated steel99 percent of the area

The USDA map for Jacinto City places no bedrock within 60 inches, so shallow rock is not the expected obstacle, though deeper layers are not addressed by that map. A seasonal water table within 60 inches is mapped across 22% of the area, which can mean wet bore pits. No flood prone soils are mapped, but Hunting Bayou still needs route review. The survey marks high steel corrosion risk across 99% of the area. The mapped Delta silt and clay unit is Pleistocene age; its clay and silt call for controlled fluid and careful reaming.

What does it take to bore through clay in Jacinto City?

Jacinto City’s Lake Charles soil is clay heavy, and Hunting Bayou adds a local drainage feature to consider. We match the fluid, reaming sequence and pit plan to the route rather than treat every street crossing alike.

  1. In Lake Charles clay, we use thinner fluid with polymer and ream in stages so sticky cuttings do not build up on the tool.
  2. With seasonal water table mapped within 60 inches across 22% of Jacinto City, we plan compact pits and pumping where wet ground requires it.
  3. Before a bore near Lane Street, we hydrovac expose each marked utility on the path; paint locates position, not depth.
  4. As the drill advances beneath a route near Hunting Bayou, a walkover locator tracks the head and the crew logs depth and pitch.
Drilling fluid returns at the entry as the Vermeer D24x40 S3 drills a 385 foot sandstone rock bore in Guthrie, Oklahoma
Drilling fluid coming back to the entry pit as our Vermeer D24x40 drills a 385 foot bore in Guthrie, Oklahoma.

What might a new line cross in Jacinto City near Union Pacific?

Interstate 10 and US 90 run along or touch the Jacinto City limits, while Interstate 610 is 0.3 miles away. There are no highways listed inside the limits, so a route near the boundary needs its right of way checked before the bore is laid out. Market Street Road runs 2.12 miles in the city, Munn Street 1.62 miles and Lane Street 1.51 miles. Flaxman Street adds another 1.23 miles of named route. These streets give planners specific corridors to review for pavement, driveways and buried lines.

CrossingTypeMapped extentWho has a say
Interstate 10Highway nearbyRuns along or touches the city limitsState highway office
US 90Highway nearbyRuns along or touches the city limitsState highway office
Interstate 610Highway nearby0.3 miles outsideState highway office
Union PacificRailroad2.4 track miles insideThe railroad
Port Terminal Railroad AssociationRailroad nearby0.7 miles outsideThe railroad
Hunting BayouStream1 channel miles insideChecked for Corps of Engineers jurisdiction
West CanalStream nearby0.7 miles outsideChecked for Corps of Engineers jurisdiction
Panther CreekStream nearby1 miles outsideChecked for Corps of Engineers jurisdiction
Swipe the table sideways to see every column.

Union Pacific has 2.4 track miles inside Jacinto City on its Baytown Subdivision, and public mapping shows 10 street and rail crossings. Hunting Bayou runs 1.0 channel mile in the city, but no street crossings of named streams are mapped. Unnamed drainage totals 1.4 miles, so a proposed route still needs to account for drainage even where a named stream crossing is not shown. With no lakes or ponds mapped within one mile, we plan Jacinto City directional boring around the mapped water conditions.

Who approves a bore in Jacinto City and Harris County?

Because Jacinto City is incorporated, we treat its city streets as city streets when planning directional boring routes. For work in Interstate 10, US 90 or another state highway right of way, the utility owner applies for a TxDOT utility permit through RULIS, reviewed by the TxDOT Houston District. Our bore plan and profile support the owner’s application, and the work follows the permit issued to that owner. TxDOT cover rules set 60 inches below the lowest crossed grade for electric and communication lines and water lines; water along a right of way calls for 36 inches. Union Pacific track work needs that railroad’s crossing agreement. Hunting Bayou is checked for Corps jurisdiction during planning.

Read the rules for yourself: Texas Utilities Code Chapter 251 on notice to Texas811, the Texas811 questions and answers page, the TxDOT Utility Accommodation Rules, 43 TAC 21.40 and TxDOT utility permits in RULIS.

What lines are already in the ground in Jacinto City near the City of Jacinto City system?

The City of Jacinto City public water system uses purchased surface water and reports 3,059 service connections serving 9,613 people. That system is a useful starting point for identifying water infrastructure, but the line owner still needs confirmation for a proposed route. CenterPoint Energy, Entergy Texas and San Bernard Electric Cooperative report electric service in Harris County. Before an electric conduit bore near Market Street Road, we confirm which owner is responsible for that address.

Line ownerWhat it isSourceSize
City of Jacinto CityPublic water systemSurface water bought from another system3,059 connections, 9,613 people served
CenterPoint Energy, Entergy Texas and San Bernard Electric CooperativeElectric utilities reporting service in Harris CountyEIA Form 861Confirm the line owner by address
Swipe the table sideways to see every column.

The American Community Survey 2019 to 2023 five year estimates put Jacinto City’s median housing year at 1960, which we consider when planning underground work. The survey estimates 50% of homes were built before 1960, 41% from 1960 to 1999 and 9% in 2000 or later. A replacement route near Munn Street may meet older service lines as well as newer connections. We hydrovac expose marked utilities on the bore path before drilling near them, because surface paint does not show a line’s depth.

Yellow polyethylene gas pipe pulled through a directional bore beside a commercial building
Yellow polyethylene gas pipe pulled through a directional bore beside a commercial building.

What is near Jacinto City, including Cloverleaf?

Jacinto City is in Harris County, covers 1.85 square miles and sits at an elevation of 31 feet. Its ZIP code is 77029. Galena Park is 1.5 miles south; Cloverleaf is 4.2 miles east and is the nearest larger city. South Houston is 7.3 miles south, Channelview is 7.8 miles east, and Houston is 9.0 miles west and the county seat. From the Yukon, Oklahoma main office, the road distance is 463 miles and the drive is 9.0 hours. That distance is part of planning mobilization for work on Market Street Road or nearby routes.

Places near Jacinto City

What kinds of bores come up around Market Street Road in Jacinto City?

  • Highway crossing: A route beneath Interstate 10 or US 90 needs a bore plan that accounts for the highway right of way and required cover.
  • Rail crossing: A line under Union Pacific’s Baytown Subdivision needs coordination for a crossing agreement and the track conditions it sets.
  • Drainage crossing: A bore near Hunting Bayou needs a route and depth plan that considers the channel and possible Corps jurisdiction.
  • Water service: Work near the City of Jacinto City water system starts with confirming the line owner and the existing service route.
  • Fiber conduit: A run along Market Street Road can be planned as a small conduit bore, with marked lines exposed along its path.
  • Street replacement: A bore near Munn Street can carry a replacement line below pavement rather than cutting across the street surface.

More on each kind of work: water line boring, electric line boring, fiber optic boring, road, railroad and creek crossings and municipal boring.

How do I get a quote for a bore near Flaxman Street in Jacinto City?

For a Flaxman Street quote, give us the address or map pin, what is going in the ground, pipe or conduit size and footage; a sketch or plans help. The route matters here. A map showing whether the work approaches Union Pacific tracks, Hunting Bayou or a paved street helps us understand the crossing before we set the scope.

The 463 road miles from Yukon are part of mobilization planning for a Jacinto City job. Lake Charles clay affects drilling and reaming, while a Union Pacific crossing or a route near Interstate 10 can add crossing and permit coordination. We also account for length, pipe or conduit size, utilities to expose, concrete or pavement, drainage crossings, pits, excavator time and sand backfill. High profile or emergency work can change the demands on the plan.

Questions people ask about boring in Jacinto City

Does Trinity Boring Solutions take directional boring jobs in Jacinto City and Harris County, and who staffs them?

Yes. Across Texas, including Jacinto City, we take directional boring work and plan routes with the local setting in mind. Our crews handle the work, with partner contractor satellite yards supporting service in the area. You work with Trinity from the first call through the bore log, whether the route is near Harris County streets or Hunting Bayou.

Who is responsible for Lane Street in Jacinto City, and does a bore require cutting it?

Lane Street is a city street because Jacinto City is incorporated. A directional bore can place a line below the street without opening a trench through its pavement. The route still needs utility locating and exposure along the bore path, especially where the street’s existing services may cross the planned line.

Could older buried lines affect a replacement bore near Munn Street in Jacinto City?

They can. The American Community Survey 2019 to 2023 estimates put the median housing year at 1960, with 50% of homes built before 1960. A replacement route near Munn Street may encounter older services, so we expose marked utilities with hydrovac before drilling close to them.

Do groundwater or flood prone soils affect bore pits near Hunting Bayou in Jacinto City?

Seasonal water table within 60 inches is mapped across 22% of Jacinto City, so pits can need pumping. The soil survey maps no flood prone soils, but a proposed route near Hunting Bayou still needs drainage review. We plan pit placement and the bore profile for the actual crossing.

Does Lake Charles soil in Jacinto City pose a steel corrosion concern, and what pipe can be used?

The USDA soil survey maps high steel corrosion risk across 99% of Jacinto City. That matters for uncoated steel casing and tracer wire. HDPE can be considered where the design allows it, while the line owner chooses materials and any coatings for steel components.

What ground will a bore pass through in Jacinto City’s Lake Charles soil?

The USDA soil survey maps Lake Charles soil across 77% of Jacinto City. At about 40 inches below the surface, 91% of mapped soil is clay, which can cling to the reamer and grip pipe. That ground calls for staged reaming and a fluid plan suited to the route.

Does Trinity serve Galena Park and rural sites outside Jacinto City too?

Yes. We take work across Texas, including locations around Jacinto City and nearby Galena Park, 1.5 miles south. We also consider rural sites outside city limits. The route, access and distance from our Yukon, Oklahoma main office all factor into planning a crew and equipment for the job.

How early should I request a Texas811 locate for Market Street Road in Jacinto City, and what if marks move?

Count back at least two working days from the planned start near Market Street Road, excluding Saturdays, Sundays and legal holidays. Texas law allows a request no earlier than 14 days before excavation. For Jacinto City work, if the start slips more than 14 days past the original notice, we make a new request. Before work continues in Jacinto City, we have worn or moved marks refreshed through Texas811.

What affects the cost of a directional bore near Interstate 10 in Jacinto City?

The job scope drives the price. A route near Interstate 10 may involve highway coordination, while Lake Charles clay affects the drilling plan and Union Pacific tracks may add a crossing. Length, pipe or conduit size, utilities to expose, pavement, drainage, pits, excavator time, backfill and mobilization from Yukon also matter.

Where the Jacinto City facts on this page come from

Darren Rice in a safety vest at the bore pit beside the Trinity Boring Solutions Ditch Witch directional drill, with drill rods racked, on the airfield at Will Rogers World Airport in Oklahoma City

About Trinity Boring Solutions

Trinity Boring Solutions is a family business in Yukon, Oklahoma, founded by Dean Rice in 1965 and owned today by Darren Rice, who started its directional boring side in 1982. The company bores across Oklahoma and Texas. No bore is too big or too small: 4 foot sidewalk sleeves to roughly 4,100 feet under the Arkansas River in Tulsa. Reach us at (405) 409-7423.

Get a Quote for a Bore in Jacinto City

Send the address, what is going in, the size and the footage.

Trinity Boring Solutions
9102 NW Expressway, Yukon, OK 73099
(405) 409-7423 | darren@trinityboringsolutions.com

Trinity Boring Solutions | 24/7 Available ☎ Call (405) 409-7423 Free Quote

Free Bore Planner

Plan Your Bore in Jacinto City, Texas

Type the address of your job in Jacinto City. The Bore Planner opens an aerial map at that spot. Drop one pin where the bore starts and one where it ends, tell us what is going in and send the scope to our crew.

Talk to the crew that does the work

Fastest way to a number is a phone call. Tell us where the crossing is and what is going in the ground, and you will get a straight answer on the same call. Bores from 10 feet to 5,000 feet, 3/4 inch service line through 48 inch casing, anywhere in Oklahoma and Texas. We run 24/7 for main breaks and emergency repairs.

Call (405) 409-7423

Answered by a person, not a call center.

Would rather not call? Send the details and we will come back with a written quote.

Quick Quote In Page

County and State Pages for Jacinto City

Same county: Pasadena · The Woodlands · Baytown · Atascocita · Spring · La Porte · Mission Bend · Deer Park · Cinco Ranch · Bellaire · Humble · Aldine. All counties: Texas county list.