trinityboringsolutions.com

Jewett Texas Directional Boring: Padina Soil, Union Pacific and Yellow Branch

Quick Answer: Padina loamy fine sand is common in Jewett, and it can cave behind the bit, so directional boring, also called horizontal directional drilling (HDD), can carry a line beneath US 79 without cutting pavement. Union Pacific tracks add another crossing to plan around. Jewett is 334 road miles from our Yukon, Oklahoma main office, and the Union Pacific Hearne Subdivision runs through the city. Padina soil maps as 54 percent of the city area; staged reaming and drilling fluid help keep the sandy hole open.

Family Business Since 1965 Boring Since 1982 24 Hour Phone No Utility Strike in 25 Years

Jewett bores at a glance

  • Incorporated city in Leon County, Texas. Population 822 (Census Bureau 2024 estimate).
  • Road distance from our Yukon, Oklahoma main office: 334 miles, about 6.5 hours of driving.
  • Ground: Padina soil is mapped on 54 percent of the area, with loamy fine sand about 40 inches down.
  • Rock: no bedrock is mapped in the top 60 inches.
  • Highways inside the boundary: US 79 and FM 39. State permit office: TxDOT Bryan District.
  • Railroad track inside the boundary: Union Pacific, with 5 mapped street and rail crossings.
  • Named streams inside the boundary: Yellow Branch and West Fork.
  • Public water: City of Jewett, groundwater wells.
  • Texas811: locate request at least two working days before a bore and no more than 14 days ahead.
  • Range: 3/4 inch service lines to 48 inch casing, 10 feet to 5,000 feet.
  • Phone answered 24 hours a day: (405) 409-7423

Who does directional boring in Jewett and Leon County?

Jewett is in Leon County, with a population of 822 in the Census Bureau Vintage 2024 estimate. We take directional boring work in Jewett, placing water, sewer, gas, electric conduit or fiber beneath routes such as Main Street and Robinson Avenue. The line type and route determine the bore plan, especially where those streets meet existing utilities or pavement.

Our main office is in Yukon, Oklahoma, and Jewett work is done with our own crews and from satellite yards run by partner drilling contractors Trinity has personally vetted. Our family business began in 1965 and has drilled directionally since 1982. The 3/4 inch service line to 48 inch casing range fits jobs from a Main Street service to a larger US 79 crossing, with bore lengths from 10 feet to 5,000 feet.

Trinity Boring Solutions branded compact directional drilling unit positioned beside a tree on a red dirt jobsite
Our compact directional drill set up beside a tree on a tight site. Photos on this page are from our jobs in Oklahoma and Texas.

What ground does a Jewett bore encounter in Padina soil?

The USDA soil survey maps Padina soil across 54 percent of Jewett, with Padina loamy fine sand, 1 to 8 percent slopes, covering 51 percent. At about 40 inches below the surface, loamy fine sand is mapped across 55 percent of the city area, and sandy clay loam across 32 percent. The survey maps 60 percent of the area as sandy at that depth and gives average clay content as 15 percent. In Jewett, we use mapped soil patterns for planning, not as substitutes for test borings. In sandy ground, the hole can slough behind the drill, so staged reaming and drilling fluid help support it.

USDA soil survey, inside the Jewett city limitsWhat is mapped
Soil series mappedPadina 54 percent, Silstid 19 percent, Robco 11 percent, Hearne 6 percent and Arenosa 5 percent
Texture at the surfaceloamy fine sand 84 percent, fine sandy loam 10 percent and fine sand 5 percent
Texture about 40 inches downloamy fine sand 55 percent, sandy clay loam 32 percent and clay loam 6 percent
Engineering class about 40 inches downsilty sand (SM) 54 percent, clayey sand (SC) 19 percent and lean clay (CL) 18 percent
Average clay content about 40 inches down15 percent
Bedrock mapped within 60 inchesNone mapped
Seasonal water table within 60 inches13 percent of the area
Flood prone soils1 percent of the area
High corrosion risk for uncoated steel18 percent of the area

Across Jewett, bedrock is not mapped in the top five feet, so we do not assume deeper routes are rock free. The geologic map shows Quartz Sand Decomposition Residuum of Cenozoic age and Queen City Sand of Lutetian age, so a route may meet different material below the surface. A seasonal water table is mapped within 60 inches across 13 percent of the area, which can make pits wet. Flood prone soils cover 1 percent. High steel corrosion risk is mapped across 18 percent, so the line owner should consider casing and tracer wire materials; HDPE avoids that steel concern.

How do we bore Jewett’s loamy fine sand?

Jewett’s mapped loamy fine sand can loosen behind the bit. Around Padina soil, we support the bore with drilling fluid and ream in stages, while tracking the head and exposing marked lines before approaching them.

  1. Soil support: Padina loamy fine sand can fall into the hole, so we build support with drilling fluid and ream in stages before pulling the line.
  2. Wet pits: A seasonal water table is mapped within 60 inches across 13 percent of Jewett, so we plan compact pits and pumping where conditions call for it.
  3. Utility exposure: Along Robinson Avenue, we hydrovac each marked utility on the bore path before the drill approaches; paint alone does not show its depth.
  4. Tracking: At a Yellow Branch crossing, we follow the drill head from the surface and record depth and pitch to help keep the bore under the channel.
6 inch PVC sleeve coming out of the bore pit wall in red sandy soil with the Trinity water trailer behind, northeast Oklahoma City
A 6 inch PVC sleeve coming out of the bore pit wall in red sandy soil in northeast Oklahoma City.

What could a Jewett bore cross near Union Pacific tracks?

US 79 runs 2.2 mapped roadway miles inside Jewett, and FM 39 runs 1.4 miles. A route beneath either highway needs a plan for the right of way and pavement. Main Street is the longest named street at 2.07 miles in the city, followed by Robinson Avenue at 1.56 miles and Cottonwood Road at 1.21 miles. Division Street adds another 1.15 miles of named roadway. A map pin helps locate which pavement, driveway or street segment the bore must pass without an open cut.

CrossingTypeMapped extentWho has a say
US 79US highway2.2 roadway miles insideState highway office
FM 39State highway1.4 roadway miles insideState highway office
Union PacificRailroad2.47 track miles insideThe railroad
BNSF RailwayRailroad nearby0.4 miles outsideThe railroad
Yellow BranchStream0.69 channel miles insideChecked for Corps of Engineers jurisdiction
West ForkStream0.37 channel miles insideChecked for Corps of Engineers jurisdiction
Sand BranchStream nearbyAlong the boundaryChecked for Corps of Engineers jurisdiction
Lower Keechi CreekStream nearby0.2 miles outsideChecked for Corps of Engineers jurisdiction
Leather BranchStream nearby0.3 miles outsideChecked for Corps of Engineers jurisdiction
Panther CreekStream nearby0.7 miles outsideChecked for Corps of Engineers jurisdiction
Swipe the table sideways to see every column.

Union Pacific has 2.47 track miles inside Jewett on its Hearne Subdivision, and public mapping shows 5 street and rail crossings in the city. Any track crossing must be planned under an agreement with Union Pacific, which sets the crossing conditions. Yellow Branch runs 0.69 channel miles inside the city and West Fork runs 0.37 miles; mapped streets cross named streams at 3 places. For Jewett routes, we find no lakes or ponds mapped within one mile, which helps frame surface crossing checks. A creek route needs channel depth planning and a check for Corps jurisdiction.

Who approves a Jewett bore beneath US 79?

US 79 and FM 39 are state highways in Jewett, so work in their right of way needs a TxDOT utility permit reviewed by the Bryan District. The utility owner, not the drilling contractor, submits the application through TxDOT’s RULIS system; we prepare the bore plan and profile for that filing and work under the owner’s permit. TxDOT rules require boring or tunneling beneath existing highway pavement, with the bore extending under all travel lanes on rural highways. A Union Pacific track crossing needs an agreement with the railroad. For a crossing at Yellow Branch, planning checks whether Corps jurisdiction applies.

Read the rules for yourself: Texas Utilities Code Chapter 251 on notice to Texas811, the Texas811 questions and answers page, the TxDOT Utility Accommodation Rules, 43 TAC 21.40 and TxDOT utility permits in RULIS.

Whose lines are near the City of Jewett water system?

The City of Jewett public water system uses groundwater wells and reports 498 service connections serving 737 people. That makes water lines a key part of planning near streets such as Cottonwood Road. Entergy Texas, Oncor Electric Delivery Company, Houston County Electric Cooperative and Navasota Valley Electric Cooperative report electric service in Leon County. Those reports do not identify the provider at every Jewett address, so we confirm the line owner before planning an electric conduit bore.

Line ownerWhat it isSourceSize
City of JewettPublic water systemGroundwater wells498 connections, 737 people served
Entergy Texas, Oncor Electric Delivery Company, Houston County Electric Cooperative and Navasota Valley Electric CooperativeElectric utilities reporting service in Leon CountyEIA Form 861Confirm the line owner by address
Swipe the table sideways to see every column.

The American Community Survey 2019 to 2023 five year estimates place Jewett’s median housing year at 1986, useful context when planning underground work. The survey estimates 8 percent of housing units were built before 1960, 74 percent from 1960 to 1999 and 18 percent in 2000 or later. A replacement bore along Robinson Avenue may need to pass existing lines as well as pavement. We use hydrovac potholing to expose each marked utility on the path before the drill gets near it; surface marks show position, not depth.

Large HDPE conduit reels staged on a Rotate A Reel trailer for a fiber and utility installation in Oklahoma
HDPE conduit reels on a reel trailer for a fiber and utility installation in Oklahoma.

Do you cover Jewett and nearby Marquez?

Jewett is an incorporated city in Leon County, with 493 feet of elevation and 2.05 square miles of land. ZIP code 75846 covers the city. Buffalo is 8.1 miles northeast, Marquez is 11.0 miles southwest, and Centerville, the county seat, is 12.2 miles southeast. Mexia, the nearest larger city listed, is 29.6 miles northwest. From our Yukon, Oklahoma main office, the road distance is 334 miles and the drive is 6.5 hours. That distance is part of planning mobilization for a Jewett bore.

Places near Jewett

What kinds of bores come up on Jewett’s Main Street?

  • Water service: A connection near the City of Jewett water system can run beneath Cottonwood Road without opening the street pavement.
  • Highway crossing: A bore under US 79 needs a TxDOT utility permit and a route beneath all travel lanes on a rural highway.
  • Rail crossing: A route under the Union Pacific Hearne Subdivision needs an agreement with the railroad before the crossing is planned.
  • Creek crossing: A line beneath Yellow Branch needs depth planning, with Corps jurisdiction checked during planning.
  • Fiber conduit: A Main Street route can carry fiber beneath pavement, with marked utilities exposed before drilling near them.
  • Sewer line: A Division Street bore can avoid an open cut across the street while pits remain in the dirt on either side.

More on each kind of work: water line boring, electric line boring, fiber optic boring, road, railroad and creek crossings and municipal boring.

What do you need to quote a bore on Jewett’s Division Street?

A map pin on Division Street matters because it shows which pavement, utility crossings or nearby drainage the route may meet. For a Jewett quote, send the address or pin, what is going in the ground, pipe or conduit size and footage. A sketch or plans help us see the route and the pits needed.

A short bore through Padina soil with few crossings is simpler to plan than a route with pavement, tracks or drainage to pass. The price depends on length, pipe or conduit size, soil, utilities to expose, concrete or pavement, creek crossings, pits, excavator time and backfill. A Union Pacific crossing or work under US 79 adds planning needs. Jewett’s 334 road miles from Yukon also affects mobilization, while high profile or emergency work can require more coordination.

Questions people ask about boring in Jewett

Does Trinity take directional boring jobs in Jewett and Leon County, and who does the work?

Yes. We take directional boring jobs in Jewett, Leon County, and coordinate each project through Trinity from the first call to the bore log. Our own crews and vetted partner drilling contractors staff the work. Main Street or US 79 may shape the route, access and crossing plan.

Who controls Cottonwood Road in Jewett, and can a bore avoid cutting it?

Because Jewett is incorporated, we plan street boring with the city that owns those streets. A directional bore can pass beneath Cottonwood Road with pits on either side instead of an open cut through the pavement. The exact route still depends on marked utilities, surface conditions and access at the chosen address.

Does Jewett housing near Robinson Avenue mean older lines need replacement bores?

The American Community Survey 2019 to 2023 estimates put Jewett’s median housing year at 1986, with 8 percent of units built before 1960. That does not establish the age of any buried line. A replacement route near Robinson Avenue needs utility locating and hydrovac potholing before drilling close to marked lines.

Can groundwater or flooding affect bore pits near Yellow Branch in Jewett?

It can at some sites. The USDA soil survey maps a seasonal water table within 60 inches across 13 percent of Jewett, and flood prone soils across 1 percent. Near Yellow Branch, we plan pits for wet ground and plan the bore depth below the channel; Corps jurisdiction is checked during planning.

What is Padina soil like for directional boring in Jewett?

The USDA soil survey maps Padina soil across 54 percent of Jewett, mostly as Padina loamy fine sand. At about 40 inches, loamy fine sand is mapped across 55 percent of the city area. Sandy ground can cave behind the bit, so staged reaming and drilling fluid help keep the hole supported.

Will a directional bore in Jewett encounter deeper rock, since bedrock is not mapped in the top five feet?

Bedrock is not mapped in Jewett’s top five feet, but that does not rule out deeper rock. The geologic map shows Quartz Sand Decomposition Residuum of Cenozoic age and Queen City Sand of Lutetian age. We plan from the route and ground conditions rather than assuming the surface map describes every depth.

How early should I call Texas811 for a Jewett bore near Main Street?

For a bore near Main Street, place the Texas811 request at least 48 hours before excavation begins, excluding Saturdays, Sundays and legal holidays, and no more than 14 days ahead. If our start date moves more than 14 days past the original notice in Jewett, we submit a new request. Before work continues in Jewett, we have worn or moved marks refreshed through Texas811.

How far is Jewett from Trinity’s Yukon office, and does Mexia change the job plan?

From Yukon, Oklahoma, Jewett is 334 road miles and a 6.5 hour drive, so we plan travel around that distance. Mexia is 29.6 miles northwest of Jewett, but it does not change the route at the jobsite. The distance from Yukon affects mobilization planning, while access and crossings on the selected Jewett street shape the bore itself.

What affects the cost of directional boring in Jewett under US 79?

The route and scope drive the price, not the highway name alone. Length, pipe or conduit size, Padina soil, utility exposure, pavement, pits, backfill and drainage crossings all matter. A bore beneath US 79 also needs TxDOT permitting and highway planning, while Union Pacific tracks or a Yellow Branch crossing can add coordination.

Where the Jewett facts on this page come from

Darren Rice in a safety vest at the bore pit beside the Trinity Boring Solutions Ditch Witch directional drill, with drill rods racked, on the airfield at Will Rogers World Airport in Oklahoma City

About Trinity Boring Solutions

Trinity Boring Solutions is a family business in Yukon, Oklahoma, founded by Dean Rice in 1965 and owned today by Darren Rice, who started its directional boring side in 1982. The company bores across Oklahoma and Texas. No bore is too big or too small: 4 foot sidewalk sleeves to roughly 4,100 feet under the Arkansas River in Tulsa. Reach us at (405) 409-7423.

Get a Quote for a Bore in Jewett

Send the address, what is going in, the size and the footage.

Trinity Boring Solutions
9102 NW Expressway, Yukon, OK 73099
(405) 409-7423 | darren@trinityboringsolutions.com

Trinity Boring Solutions | 24/7 Available ☎ Call (405) 409-7423 Free Quote

Free Bore Planner

Plan Your Bore in Jewett, Texas

Type the address of your job in Jewett. The Bore Planner opens an aerial map at that spot. Drop one pin where the bore starts and one where it ends, tell us what is going in and send the scope to our crew.

Talk to the crew that does the work

Fastest way to a number is a phone call. Tell us where the crossing is and what is going in the ground, and you will get a straight answer on the same call. Bores from 10 feet to 5,000 feet, 3/4 inch service line through 48 inch casing, anywhere in Oklahoma and Texas. We run 24/7 for main breaks and emergency repairs.

Call (405) 409-7423

Answered by a person, not a call center.

Would rather not call? Send the details and we will come back with a written quote.

Quick Quote In Page

County and State Pages for Jewett

Same county: Hilltop Lakes · Normangee · Oakwood. All counties: Texas county list.