Tahoka Texas Directional Boring: Amarillo Fine Sandy Loam, US 87 and Lockwood Street
Quick Answer: Amarillo fine sandy loam covers much of Tahoka, while sandy clay loam below can hold a borehole around the reamer. We handle directional boring, also called horizontal directional drilling (HDD), for crossings such as US 87 in Tahoka. The Yukon, Oklahoma main office is 380 road miles from Lockwood Street, a distance that affects crew mobilization. At about 40 inches, sandy clay loam is mapped across 94 percent of the city, so we plan staged reaming and fluid for that ground.
Tahoka bores at a glance
- County seat of Lynn County, Texas. Population 2,507 (Census Bureau 2024 estimate).
- Road distance from our Yukon, Oklahoma main office: 380 miles, about 7.4 hours of driving.
- Ground: Amarillo soil is mapped on 72 percent of the area, with sandy clay loam about 40 inches down.
- Rock: no bedrock is mapped in the top 60 inches.
- Highways inside the boundary: US 87, US 380 and Loop 472. State permit office: TxDOT Lubbock District.
- Railroad track inside the boundary: none mapped.
- Public water: City of Tahoka, surface water bought from another system.
- Texas811: locate request at least two working days before a bore and no more than 14 days ahead.
- Range: 3/4 inch service lines to 48 inch casing, 10 feet to 5,000 feet.
- Phone answered 24 hours a day: (405) 409-7423
Which contractor handles directional boring near US 87 in Tahoka?
Amarillo fine sandy loam is the main mapped surface soil in Tahoka, and the sandy clay loam below can grip a pipe as the hole is opened. We take directional boring work in Tahoka, the Lynn County seat, where the Census Bureau Vintage 2024 estimate puts the population at 2,507. Along US 87 and streets such as Lockwood Street, our crews install water, sewer, gas, electric conduit and fiber lines by bore.
Our main office is in Yukon, Oklahoma, and Tahoka work is done with our own crews and from satellite yards run by partner drilling contractors Trinity has personally vetted. Our reach includes a roughly 4,100 foot, 48 inch pipe bore under the Arkansas River in Tulsa, Oklahoma. A typical Tahoka job beside US 87 is much shorter, with the bore plan set by its route and Amarillo soil.

What ground should a bore expect in Tahoka’s Amarillo soil?
Amarillo soil dominates Tahoka, with the USDA soil survey mapping Amarillo fine sandy loam across 62 percent of the city at 0 to 1 percent slopes and another 10 percent at 1 to 3 percent slopes. Acuff loam accounts for 21 percent. At the surface, fine sandy loam covers 73 percent and loam 25 percent of mapped area. At about 40 inches, sandy clay loam is mapped under 94 percent of Tahoka, with average clay content of 27 percent. These are mapped patterns, not test borings.
| USDA soil survey, inside the Tahoka city limits | What is mapped |
|---|---|
| Soil series mapped | Amarillo 72 percent and Acuff 21 percent |
| Texture at the surface | fine sandy loam 73 percent and loam 25 percent |
| Texture about 40 inches down | sandy clay loam 94 percent |
| Engineering class about 40 inches down | lean clay (CL) 97 percent |
| Average clay content about 40 inches down | 27 percent |
| Bedrock mapped within 60 inches | None mapped |
| Seasonal water table within 60 inches | 0 percent of the area |
| Flood prone soils | 0 percent of the area |
| High corrosion risk for uncoated steel | 3 percent of the area |
The USDA soil survey maps bedrock in none of Tahoka’s area within 60 inches, but that says nothing about deeper conditions. Seasonal water tables and flood prone soils are also mapped in none of the area, while high steel corrosion risk appears in 3 percent. The Blackwater Draw Formation is Cenozoic and includes sand, silt and locally clayey material; the map also shows Paleocene Cenozoic sedimentary rocks. Sandy clay loam can cling to a reamer, so we manage fluid and pull the pipe promptly after opening the hole.
How do we bore through Tahoka’s sandy clay loam?
In Tahoka, the sandy clay loam mapped at about 40 inches calls for controlled fluid and staged reaming. We track the drill head from the surface and log its depth and pitch along the planned route.
- The USDA soil survey maps sandy clay loam under 94 percent of Tahoka at about 40 inches, so we ream in stages and adjust fluid to limit sticky buildup.
- Amarillo fine sandy loam is common near Tahoka streets; we keep the pipe ready so it can be pulled promptly after the final ream.
- Before drilling near a marked water line by the City of Tahoka system or an electric line, we expose it with hydrovac potholing because paint does not show depth.
- For a route beneath US 87, we track the head from the surface and log depth and pitch as the bore advances.

Which roads or waterways could a bore cross in Tahoka near Lockwood Street?
Tahoka has US 87, US 380 and Loop 472 within its limits, with no listed state or US highway just outside them in the nearby buffer. A bore beneath existing highway pavement must use boring or tunneling. Lockwood Street runs 2.44 miles in the city, 1st Street runs 2.4 miles and 4th Street runs 2.31 miles. Those routes help define a bore path; the mapped road inventory lists 47.96 public road centerline miles across Tahoka.
| Crossing | Type | Mapped extent | Who has a say |
|---|---|---|---|
| US 87 | US highway | 3.2 roadway miles inside | State highway office |
| US 380 | US highway | 2.4 roadway miles inside | State highway office |
| Loop 472 | State highway | 1.6 roadway miles inside | State highway office |
No railroad is mapped inside Tahoka or within one mile outside the limits, so there is no mapped track route to plan around. The city map also shows no named streams, lakes or ponds nearby, and no mapped street crossing of a named stream. That leaves US 87 and the named streets as the main mapped crossing constraints; a particular site still needs route planning against its actual utilities and access.
Who approves a bore under Tahoka roads in Lynn County?
Tahoka’s city streets, including Lockwood Street, belong to the incorporated city, while a bore in the right of way of US 87, US 380 or Loop 472 needs a TxDOT utility permit. For US 87 in Lynn County, the TxDOT Lubbock District reviews the filing in its online RULIS system. The utility owner, not the drilling contractor, submits the application; we prepare the bore plan and profile and work under the owner’s permit. Existing highway pavement is bored or tunneled, with highway cover and encasement set by TxDOT rules and the permit.
Read the rules for yourself: Texas Utilities Code Chapter 251 on notice to Texas811, the Texas811 questions and answers page, the TxDOT Utility Accommodation Rules, 43 TAC 21.40 and TxDOT utility permits in RULIS.
What is already in the ground near the City of Tahoka water system?
The City of Tahoka public water system uses purchased surface water and serves 2,459 people through 1,023 service connections. For a bore near its water lines, we pothole marked utilities before drilling close to them. Electric service reported in Lynn County includes Oncor Electric Delivery Company, Southwestern Public Service, Lyntegar Electric Cooperative and South Plains Electric Cooperative. The line owner for a specific Tahoka address must be confirmed before planning an electric conduit bore.
| Line owner | What it is | Source | Size |
|---|---|---|---|
| City of Tahoka | Public water system | Surface water bought from another system | 1,023 connections, 2,459 people served |
| Oncor Electric Delivery Company, Southwestern Public Service, Lyntegar Electric Cooperative and South Plains Electric Cooperative | Electric utilities reporting service in Lynn County | EIA Form 861 | Confirm the line owner by address |
The American Community Survey 2019 to 2023 five year estimates put Tahoka’s median housing year at 1966; 33 percent of housing was built before 1960, 61 percent from 1960 to 1999 and 6 percent in 2000 or later. That mix can mean a route is serving an older line or a newer connection near the City of Tahoka system. We use hydrovac potholing to expose marked water and electric lines before the drill approaches, since surface marks do not show depth.

How far is Tahoka from Wilson and the Yukon yard?
Tahoka is in Lynn County, whose seat is Tahoka, and stands at an elevation of 3,095 feet across 2.38 square miles. ZIP code 79373 covers the city. Wilson is 11.4 miles north; New Home is 13.1 miles northwest; O’Donnell is 13.9 miles south. Slaton, the nearest larger city, is 21.2 miles northeast. The Yukon, Oklahoma yard is 380 road miles away, a 7.4 hour drive, so mobilization is part of planning a Tahoka job near US 87 or Lockwood Street.
Places near Tahoka
- Directional boring in Wilson: 11.4 miles north
- Directional boring in New Home: 13.1 miles northwest
- Directional boring in O’Donnell: 13.9 miles south
- Directional boring in Slaton: 21.2 miles northeast
- Directional boring in Post: 24 miles east
What kinds of bores come up in Tahoka near 1st Street?
- Highway crossing: A bore beneath US 87 can keep the roadway intact, with the route planned for TxDOT cover and permit conditions.
- Water service: A connection near the City of Tahoka system needs a route checked against marked water lines before the drill approaches.
- Street conduit: A conduit bore along Lockwood Street can avoid opening pavement, with utility locations exposed along the proposed path.
- Fiber run: A fiber route near 1st Street can be bored beneath driveways and sidewalks, with pits placed in dirt at each end.
- Electric conduit: A run near 4th Street starts with confirming the electric line owner and exposing marked utilities on the bore path.
- US 380 crossing: A bore beneath US 380 needs a route and depth plan that follows TxDOT permit requirements for that highway.
More on each kind of work: water line boring, electric line boring, fiber optic boring, road, railroad and creek crossings and municipal boring.
What do you need to quote a bore in Tahoka near 2nd Street?
For a bore near 2nd Street, start with the address or map pin so we can identify the route. Tell us what will go in the ground, such as a water line near the City of Tahoka system or conduit along a street. Include the pipe or conduit size and footage. A sketch or plans help show crossings and access.
Price follows the route and scope, not just the footage. Tahoka’s sandy clay loam affects drilling and reaming; crossings of US 87 or other utilities add planning and exposure work. Pavement, concrete, pits, excavator time and sand backfill also matter. The number of lines to cross, any drainage issue at the site, high profile or emergency timing, and mobilization from the Yukon yard 380 road miles away all shape the job.
Questions people ask about boring in Tahoka
Does Trinity Boring Solutions take directional boring work in Tahoka and Lynn County?
Yes. We take directional boring work in Tahoka and Lynn County, with the job staffed by our own crews or crews from vetted drilling contractor partners. The customer works with Trinity from the first call through the bore log, whether the work is near US 87 or on a local street.
Will a Tahoka bore hit rock beneath Amarillo soil?
The USDA soil survey maps no bedrock within 60 inches in Tahoka, so rock is not mapped in the top five feet. The geologic map shows the Cenozoic Blackwater Draw Formation and Paleocene Cenozoic sedimentary rocks. Those mapped units do not establish what a specific bore encounters at depth.
Who approves a Tahoka bore under US 87?
TxDOT reviews a utility permit for a bore in the US 87 right of way through the Lubbock District. The line owner files through TxDOT’s online RULIS system, not the drilling contractor. We provide the bore plan and profile for the owner’s application, and the bore must follow the issued permit.
Who runs Tahoka’s public water system and what is its source?
The City of Tahoka owns and runs the public water system, which uses purchased surface water. Public records show 1,023 service connections serving 2,459 people. A bore near those lines needs marked utilities exposed before drilling, so the route can account for the water system.
Which electric companies report service in Tahoka and Lynn County?
Oncor Electric Delivery Company, Southwestern Public Service, Lyntegar Electric Cooperative and South Plains Electric Cooperative report electric service in Lynn County. That list does not identify the provider at every Tahoka address. We confirm the actual line owner before planning conduit, including a route near the City of Tahoka water system.
Who controls Tahoka streets such as 4th Street, and must pavement be cut?
Tahoka is incorporated, so its city streets, including 4th Street, belong to the city. Directional boring can pass beneath pavement without cutting across it. If the route is in a state or US highway right of way, TxDOT permit conditions apply instead.
Does the 21.2 mile distance from Slaton affect a Tahoka bore?
Slaton is 21.2 miles northeast of Tahoka, while the Yukon, Oklahoma main office is 380 road miles away. That distance can affect mobilization for a bore near US 87 or Lockwood Street. Route length, equipment needs and the work scope also factor into planning.
How much notice does Texas811 need for a Tahoka bore near Lockwood Street?
For a bore near Lockwood Street, place the Texas811 locate request at least 48 hours before excavation, excluding Saturdays, Sundays and legal holidays; Texas811 describes this as two working days. The ticket has a 20 day life. If work slips more than 14 days past the original notice, request a new ticket, and have worn or moved marks refreshed before continuing.
What affects the cost of directional boring in Tahoka under US 87?
The price depends on the route and scope under US 87, not only its length. Tahoka’s sandy clay loam affects drilling, while highway permits, pavement, utility crossings and potholing can add work. Pipe size, pits, excavator time, backfill, schedule demands and mobilization from Yukon also matter.
Where the Tahoka facts on this page come from
- USDA Natural Resources Conservation Service, Soil Data Access: soil survey map units inside Tahoka
- U.S. Census Bureau, TIGER/Line 2024: Tahoka boundary, roads, rail lines and streams
- U.S. Census Bureau, Vintage 2024 population estimates: Tahoka
- U.S. Census Bureau, American Community Survey 2019 to 2023: Tahoka housing units and year built
- Macrostrat geologic map compilation: map units under Tahoka
- U.S. EPA Safe Drinking Water Information System: public water systems serving Tahoka
- U.S. Energy Information Administration, Form EIA 861: electric utilities serving Lynn County
- U.S. Geological Survey, Elevation Point Query Service: Tahoka elevation
- OpenStreetMap road network through the OSRM router: road miles from Yukon, Oklahoma to Tahoka
- Texas Utilities Code Chapter 251, Underground Facility Damage Prevention and Safety
- TxDOT Utility Accommodation Rules, 43 Tex. Admin. Code 21.40: underground utilities
- Texas Department of Transportation: Right of Way Utility and Leasing Information System (RULIS) utility permits
Get a Quote for a Bore in Tahoka
Send the address, what is going in, the size and the footage.
Trinity Boring Solutions
9102 NW Expressway, Yukon, OK 73099
(405) 409-7423 | darren@trinityboringsolutions.com
Free Bore Planner
Plan Your Bore in Tahoka, Texas
Type the address of your job in Tahoka. The Bore Planner opens an aerial map at that spot. Drop one pin where the bore starts and one where it ends, tell us what is going in and send the scope to our crew.
Talk to the crew that does the work
Fastest way to a number is a phone call. Tell us where the crossing is and what is going in the ground, and you will get a straight answer on the same call. Bores from 10 feet to 5,000 feet, 3/4 inch service line through 48 inch casing, anywhere in Oklahoma and Texas. We run 24/7 for main breaks and emergency repairs.
Answered by a person, not a call center.
Would rather not call? Send the details and we will come back with a written quote.
County and State Pages for Tahoka
All counties: Texas county list.