trinityboringsolutions.com

Levelland Texas Directional Boring: Amarillo Soil, US 385 And Lubbock and Western Railway

Quick Answer: US 385 and the Lubbock and Western Railway are key crossings; we do directional boring, also called horizontal directional drilling (HDD), in Levelland, Texas. Levelland is 383 road miles from our Yukon, Oklahoma main office, making an Ellis Street bore a mobilization and route planning job. Amarillo soil is common here, and sandy clay loam at about 40 inches can grip the reamer. We manage the hole before pulling pipe on Levelland runs.

Family Business Since 1965 Boring Since 1982 24 Hour Phone No Utility Strike in 25 Years

Levelland bores at a glance

  • County seat of Hockley County, Texas. Population 12,494 (Census Bureau 2024 estimate).
  • Road distance from our Yukon, Oklahoma main office: 383 miles, about 7.5 hours of driving.
  • Ground: Amarillo soil is mapped on 59 percent of the area, with sandy clay loam about 40 inches down.
  • Rock: no bedrock is mapped in the top 60 inches.
  • Highways inside the boundary: US 385, Texas State Highway 114, FM 300 and Texas State Highway 114 Business. State permit office: TxDOT Lubbock District.
  • Railroad track inside the boundary: Lubbock and Western Railway, with 10 mapped street and rail crossings.
  • Public water: City of Levelland, surface water bought from another system.
  • Texas811: locate request at least two working days before a bore and no more than 14 days ahead.
  • Range: 3/4 inch service lines to 48 inch casing, 10 feet to 5,000 feet.
  • Phone answered 24 hours a day: (405) 409-7423

Who handles directional boring near US 385 in Levelland?

US 385 is one of the first route questions for a bore in Levelland, Hockley County. The Census Bureau Vintage 2024 estimate puts the city population at 12,494. We install water, sewer, gas, electric conduit and fiber lines, including runs along Ellis Street or services that need to pass beneath Texas State Highway 114.

Our main office is in Yukon, Oklahoma, and Levelland work is done with our own crews and from satellite yards run by partner drilling contractors Trinity has personally vetted. Our longest bore is roughly 4,100 feet of 48 inch pipe under the Arkansas River in Tulsa. That shows our reach; a Levelland job is typically a shorter service or utility crossing. For Levelland planning, our family business dates to 1965, and we have done directional boring since 1982.

Aerial view of a bore pit with drill rig and conduit alongside a directional drill rig and conduit on a concrete lot
Our crew at a bore pit beside the directional drill on a conduit job, seen from above. Photos on this page are from our jobs in Oklahoma and Texas.

What is Amarillo soil like to bore in Levelland?

The USDA soil survey maps Amarillo soil across 59 percent of Levelland. Fine sandy loam is the mapped surface texture across 74 percent of the city, while sandy clay loam accounts for 84 percent at about 40 inches below the surface. The survey reports an average clay content of 27 percent at that depth, with loam mapped under 11 percent. For Levelland bore planning, we treat these as mapped patterns, not test borings. The sandy loam can cut readily, but the clay below can make the reamer sticky and hold onto pipe.

USDA soil survey, inside the Levelland city limitsWhat is mapped
Soil series mappedAmarillo 59 percent, Midessa 15 percent, Acuff 10 percent, Portales 7 percent and Drake 3 percent
Texture at the surfacefine sandy loam 74 percent and loam 22 percent
Texture about 40 inches downsandy clay loam 84 percent and loam 11 percent
Engineering class about 40 inches downlean clay (CL) 96 percent
Average clay content about 40 inches down27 percent
Bedrock mapped within 60 inchesNone mapped
Seasonal water table within 60 inches1 percent of the area
Flood prone soils0 percent of the area
High corrosion risk for uncoated steel3 percent of the area

Bedrock is not mapped in the top five feet of Levelland, which does not rule out rock at greater depth. The Blackwater Draw Formation, a Cenozoic unit, includes fine to medium sand with silty and locally clayey material. A seasonal water table is mapped within 60 inches in 1 percent of the area, so pits may need pumping if they encounter water. In Levelland, we do not have mapped flood prone soils to guide directional boring plans. High steel corrosion risk covers 3 percent of the city; the line owner should consider casing and tracer wire materials there.

How do we drill Levelland’s sandy clay loam while using mapped soil information to plan the bore?

Levelland’s sandy clay loam can hold a hole while its clay grabs the reamer. We choose fluid and reaming steps for that mix, then track the head and record the bore route.

  1. In Amarillo fine sandy loam, we keep the fluid suited to the ground so loose surface material does not wash away during the bore.
  2. Where Levelland’s sandy clay loam is present below, we ream in stages and have the pipe ready before opening the hole for the final pass.
  3. Before the drill nears any marked utility on a Levelland route, we hydrovac pothole it because surface paint does not show its depth.
  4. Along College Avenue, we track the drill head from above with a walkover locator and log depth and pitch as the bore advances.
Trinity Boring Solutions water trailer supplying water for bentonite drilling fluid on a sleeve bore in northeast OKC
Our water trailer feeding the bentonite drilling fluid mix on a sleeve bore in northeast Oklahoma City.

Where might a Levelland bore pass under Lubbock and Western Railway?

US 385, Texas State Highway 114, FM 300 and Texas State Highway 114 Business run inside Levelland. FM 1490, FM 3261 and Texas State Highway 300 sit just outside the limits. A route along Ellis Street, Alamo Road or College Avenue may also need careful alignment around existing pavement and buried lines. Boring lets a utility pass below these road surfaces without cutting through the pavement, while pits stay off the travel way.

CrossingTypeMapped extentWho has a say
US 385US highway5.1 roadway miles insideState highway office
Texas State Highway 114State highway6.2 roadway miles insideState highway office
FM 300State highway2 roadway miles insideState highway office
Texas State Highway 114 BusinessState highway1.6 roadway miles insideState highway office
FM 1490Highway nearby0.1 miles outsideState highway office
FM 3261Highway nearby0.2 miles outsideState highway office
Texas State Highway 300Highway nearby1 miles outsideState highway office
Lubbock and Western RailwayRailroad6.18 track miles insideThe railroad
Swipe the table sideways to see every column.

The Lubbock and Western Railway has 6.18 track miles in Levelland, and public mapping shows 10 street and rail crossings. A bore beneath its track needs an agreement from the railroad owner, which sets the crossing conditions. No streams or lakes are mapped in or within one mile of the city, so the route does not have a mapped local creek or lake crossing to plan around.

Who approves a Levelland bore in Hockley County?

US 385 and Texas State Highway 114 are state routes, while FM 300 is a farm to market road. Work in their rights of way needs a TxDOT utility permit. TxDOT’s Lubbock District reviews the application, which the utility owner submits through RULIS; we prepare the bore plan and profile for that filing. At US 385 in Levelland, we follow TxDOT rules calling for boring or tunneling beneath existing highway pavement. Avenue H is a city street, not one of those state routes. A bore under the Lubbock and Western Railway needs the railroad owner’s agreement. No local stream or lake crossing is mapped.

Read the rules for yourself: Texas Utilities Code Chapter 251 on notice to Texas811, the Texas811 questions and answers page, the TxDOT Utility Accommodation Rules, 43 TAC 21.40 and TxDOT utility permits in RULIS.

Whose lines are near the City of Levelland water system?

The City of Levelland public water system uses purchased surface water and serves 12,652 people through 5,826 service connections. That network is a key existing utility to locate before planning work near College Avenue or another city street. Electric service reported in Hockley County includes Southwestern Public Service, Lamb County Electric Cooperative, Lyntegar Electric Cooperative and South Plains Electric Cooperative. We confirm the electric line owner for the specific route before planning a conduit bore.

Line ownerWhat it isSourceSize
City of LevellandPublic water systemSurface water bought from another system5,826 connections, 12,652 people served
Southwestern Public Service, Lamb County Electric Cooperative, Lyntegar Electric Cooperative and South Plains Electric CooperativeElectric utilities reporting service in Hockley CountyEIA Form 861Confirm the line owner by address
Swipe the table sideways to see every column.

For underground work in Levelland, we account for the survey’s 1975 median housing year when planning around established homes. Levelland’s housing age mix guides our underground planning: 23 percent before 1960, 69 percent from 1960 to 1999 and 8 percent in 2000 or later. A job near Ellis Street may involve replacing older buried pipe or extending a newer service. Before drilling near any marked utility, we expose it with hydrovac potholing; paint shows position, not depth.

Hydrovac truck and boring equipment staged beside an airport taxiway for utility daylighting in Oklahoma City
Our hydrovac truck and boring equipment beside an airport taxiway in Oklahoma City, set up to expose a utility crossing.

Where is Levelland in relation to Lubbock?

Levelland is the Hockley County seat, at an elevation of 3,503 feet, and covers 10.21 square miles. The city’s ZIP code is 79336. Opdyke West is 3.7 miles east, Whitharral is 11.1 miles north, Sundown is 11.3 miles southwest, Smyer is 11.6 miles east and Whiteface is 14.4 miles west. Lubbock is 27.4 miles east. Our Yukon yard is 383 road miles away, a 7.5 hour drive, so distance is part of planning a Levelland mobilization.

Places near Levelland

What kinds of bores come up on Ellis Street in Levelland?

  • Highway crossing: A utility under US 385 needs a planned bore route that keeps the existing pavement intact.
  • Rail crossing: A line beneath the Lubbock and Western Railway needs an owner agreement and a route planned around its track.
  • Water service: A service near College Avenue needs its path checked against the City of Levelland water network before drilling.
  • Fiber drop: A fiber route along Ellis Street can use a bore to cross pavement without cutting the street surface.
  • Electric conduit: A conduit route near Avenue H starts with confirming which Hockley County electric line owner serves that address.
  • Long service run: A route toward Opdyke West needs footage and mobilization considered alongside the Levelland access point.

More on each kind of work: water line boring, electric line boring, fiber optic boring, road, railroad and creek crossings and municipal boring.

How do I get a quote for a Levelland bore near Avenue H?

Start with the address or a map pin, such as a point on Avenue H. Tell us what will go underground, whether it is water, sewer, gas, electric conduit or fiber, then give the pipe or conduit size and footage. A sketch or plans showing the route toward US 385 help us see the crossings and access points.

For a Levelland route, footage matters, but soil and crossings shape the work too. Amarillo fine sandy loam over sandy clay loam affects fluid and reaming choices. A US 385 or Lubbock and Western Railway crossing adds alignment and approval details. We also consider pipe size, utilities to expose, pavement, pits, excavator time, sand backfill and whether the job is urgent. Mobilization from Yukon matters at 383 road miles.

Questions people ask about boring in Levelland

Does Trinity Boring Solutions take directional boring work in Levelland and Hockley County?

Yes. We take directional boring work in Levelland, and our crews are supported by partner drilling contractors we have vetted. The work is staffed through our Yukon main office and satellite yards, not a Levelland office. You deal with Trinity from the first call through the bore log, including a route near US 385.

Will a Levelland bore hit rock near Amarillo soil?

The USDA soil survey does not map bedrock in Levelland’s top five feet, but that does not rule out deeper rock. The map shows the Blackwater Draw Formation, a Cenozoic unit with sand and locally clayey material. A route near Amarillo soil still needs field conditions checked as the bore proceeds.

Who approves our bore beneath US 385 in Levelland, and what authorization should we confirm before work?

For work in the US 385 right of way, the utility owner applies for a TxDOT utility permit through RULIS. TxDOT’s Lubbock District reviews it, and we provide the bore plan and profile for the owner’s application. Existing highway pavement is crossed by boring or tunneling rather than an open trench.

What does a Levelland bore under Lubbock and Western Railway need?

The Lubbock and Western Railway owns the track running through Levelland. The utility owner needs an agreement with the railroad before the crossing, and its terms set the casing, depth and flagging conditions. If the route also uses highway right of way, TxDOT asks for a copy of that agreement.

Who runs Levelland’s public water system, and where does its supply originate for underground work planning?

The City of Levelland runs the public water system, which uses purchased surface water. For Levelland underground planning, public records count 5,826 service connections and 12,652 people served by the system. Those lines should be located and checked when planning a bore near College Avenue or another route in the city.

Which electric line owner should I check in Levelland and Hockley County?

Southwestern Public Service, Lamb County Electric Cooperative, Lyntegar Electric Cooperative and South Plains Electric Cooperative report electric service in Hockley County. That list does not identify the provider at every Levelland address. Confirm the owner for the planned route before setting electric conduit size or planning a bore.

Can I call Trinity after hours about an urgent Levelland bore near College Avenue?

Yes. Someone answers Trinity’s phone 24 hours a day at (405) 409-7423. For an urgent job near College Avenue, tell us what is damaged or needed and where the route runs so we can discuss the work and emergency response.

How much notice does Texas811 need for a Levelland bore along Ellis Street?

Request the locate for an Ellis Street bore at least 48 hours before excavation, excluding Saturdays, Sundays and legal holidays, and no earlier than 14 days ahead. For Levelland work, if the start moves more than 14 days past the original notice, we submit a new request. In Levelland, we arrange to have worn or moved marks refreshed through Texas811 before work continues.

What factors affect the cost of our directional bore beneath US 385 in Levelland?

The route, footage and pipe or conduit size all matter. An US 385 crossing brings highway planning into the scope, while Levelland’s sandy clay loam affects drilling methods. Utilities to expose, pavement, pits, excavator time, backfill, emergency timing and the 383 road miles from Yukon can also affect the job price.

Where the Levelland facts on this page come from

Darren Rice in a safety vest at the bore pit beside the Trinity Boring Solutions Ditch Witch directional drill, with drill rods racked, on the airfield at Will Rogers World Airport in Oklahoma City

About Trinity Boring Solutions

Trinity Boring Solutions is a family business in Yukon, Oklahoma, founded by Dean Rice in 1965 and owned today by Darren Rice, who started its directional boring side in 1982. The company bores across Oklahoma and Texas. No bore is too big or too small: 4 foot sidewalk sleeves to roughly 4,100 feet under the Arkansas River in Tulsa. Reach us at (405) 409-7423.

Get a Quote for a Bore in Levelland

Send the address, what is going in, the size and the footage.

Trinity Boring Solutions
9102 NW Expressway, Yukon, OK 73099
(405) 409-7423 | darren@trinityboringsolutions.com

Trinity Boring Solutions | 24/7 Available ☎ Call (405) 409-7423 Free Quote

Free Bore Planner

Plan Your Bore in Levelland, Texas

Type the address of your job in Levelland. The Bore Planner opens an aerial map at that spot. Drop one pin where the bore starts and one where it ends, tell us what is going in and send the scope to our crew.

Talk to the crew that does the work

Fastest way to a number is a phone call. Tell us where the crossing is and what is going in the ground, and you will get a straight answer on the same call. Bores from 10 feet to 5,000 feet, 3/4 inch service line through 48 inch casing, anywhere in Oklahoma and Texas. We run 24/7 for main breaks and emergency repairs.

Call (405) 409-7423

Answered by a person, not a call center.

Would rather not call? Send the details and we will come back with a written quote.

Quick Quote In Page

County and State Pages for Levelland

Same county: Anton · Ropesville. All counties: Texas county list.