Malone Texas Directional Boring: Houston Black Soil, Texas State Highway 171 and Ash Creek
Quick Answer: Along Live Oak and other Malone streets, Trinity Boring Solutions handles directional boring, also called horizontal directional drilling (HDD), in Texas for routes that need to pass beneath pavement. Malone is 280 road miles from our Yukon, Oklahoma main office, so distance is part of planning work near Pecan Street. Houston Black soil is heavy clay that can grip pipe and load the reamer. Ash Creek is 0.1 miles from the town limits, a nearby crossing to consider on routes outside town.
Malone bores at a glance
- Incorporated city in Hill County, Texas. Population 250 (Census Bureau 2024 estimate).
- Road distance from our Yukon, Oklahoma main office: 280 miles, about 5.4 hours of driving.
- Ground: Houston Black soil is mapped on 82 percent of the area, with clay about 40 inches down.
- Rock: bedrock is mapped within 60 inches on 1 percent of the area.
- Highways inside the boundary: Texas State Highway 171, FM 308 and FM 744. State permit office: TxDOT Waco District.
- Railroad track inside the boundary: none mapped.
- Public water: City of Malone, groundwater wells.
- Texas811: locate request at least two working days before a bore and no more than 14 days ahead.
- Range: 3/4 inch service lines to 48 inch casing, 10 feet to 5,000 feet.
- Phone answered 24 hours a day: (405) 409-7423
Who can I call for directional boring near Live Oak in Malone?
We take directional boring work in Malone, Hill County, where the Census Bureau Vintage 2024 estimate puts the population at 250. Water, sewer, gas, electric conduit and fiber lines can be bored beneath Live Oak, Hackberry Street or other town roads to avoid an open cut. We also handle service lines and longer routes, with the path and access shaping the plan.
Our main office is in Yukon, Oklahoma, and Malone work is done with our own crews and from satellite yards run by partner drilling contractors Trinity has personally vetted. Our longest bore ran roughly 4,100 feet with 48 inch pipe under the Arkansas River in Tulsa. A typical Malone job is smaller, such as a service line routed beneath Pecan Street, but the same planning and bore logging apply. Our family business began in 1965, and since 1982 we have done directional boring with 280 road miles between Malone and our Yukon main office, so we plan mobilization accordingly.

How does Houston Black soil affect a Malone bore?
The USDA soil survey maps Houston Black across 82% of Malone, with Heiden at 14% and Tinn at 3%. Houston Black clay is mapped on both 0 to 1 percent slopes and 1 to 3 percent slopes. At about 40 inches below the surface, the mapped texture is clay throughout the town, with an average clay content of 53%. The survey classifies the soil at that depth as heavy clay across the mapped area, not as results from test borings. For a bore near Live Oak, that sticky ground can ball up on a reamer and grip the pipe.
| USDA soil survey, inside the Malone city limits | What is mapped |
|---|---|
| Soil series mapped | Houston Black 82 percent, Heiden 14 percent and Tinn 3 percent |
| Texture at the surface | clay 100 percent |
| Texture about 40 inches down | clay 100 percent |
| Engineering class about 40 inches down | fat clay (CH) 100 percent |
| Average clay content about 40 inches down | 53 percent |
| Bedrock mapped within 60 inches | 1 percent of the area (0 percent hard rock, 1 percent weathered rock) |
| Seasonal water table within 60 inches | 0 percent of the area |
| Flood prone soils | 3 percent of the area |
| High corrosion risk for uncoated steel | 100 percent of the area |
The USDA soil survey maps bedrock within 60 inches on 1% of the area, with a typical depth of 45 inches; it is not mapped within 40 inches. Seasonal water tables are not mapped within 60 inches, while flood prone soils cover 3%. High steel corrosion risk is mapped throughout Malone, so the line owner should consider casing and tracer wire materials; HDPE avoids that soil corrosion concern. The geologic map includes Silty clay decomposition residuum of Cenozoic age and the Late Cretaceous Ozan Formation. Both descriptions include clay, so the Houston Black ground calls for careful fluid control.
How do crews handle Malone clay?
Houston Black clay covers most of Malone, and heavy clay can cling to the tooling and pipe. We adjust the drilling fluid and reaming sequence to keep the hole manageable under streets such as Hackberry Street.
- In Houston Black clay, we use thinner drilling fluid with polymer and ream in stages so sticky cuttings are less likely to build up on the tooling.
- Because heavy clay can grip a pipe, we plan to pull the pipe the same day the hole is opened on routes such as Hackberry Street.
- Under Texas State Highway 171 pavement, we keep fluid pressure controlled and track returns so pressure does not lift the roadway.
- Before drilling near a marked line on Live Oak, we hydrovac pothole to expose it; the surface marks show position, not depth.

What is in the way of a new line near Malone and Ash Creek?
Texas State Highway 171, FM 308 and FM 744 run inside Malone. A line crossing Texas State Highway 171 needs a route planned beneath the roadway rather than an open cut through its pavement. Within town, Live Oak is the longest named street at 0.86 miles, followed by Hackberry Street at 0.77 miles and Pecan Street at 0.58 miles. Those roads give a bore planner specific corridors to check for driveways, pavement and marked utilities.
| Crossing | Type | Mapped extent | Who has a say |
|---|---|---|---|
| Texas State Highway 171 | State highway | 0.7 roadway miles inside | State highway office |
| FM 308 | State highway | 0.6 roadway miles inside | State highway office |
| FM 744 | State highway | 0.8 roadway miles inside | State highway office |
| Ash Creek | Stream nearby | 0.1 miles outside | Checked for Corps of Engineers jurisdiction |
| Bynum Creek | Stream nearby | 0.2 miles outside | Checked for Corps of Engineers jurisdiction |
No railroad is mapped inside Malone or within one mile outside the limits, and no street and rail crossing is mapped in town. Ash Creek is 0.1 miles from the town limits and Bynum Creek is 0.2 miles away; neither is mapped inside town. No street crossing of a named stream is mapped within the limits, and no lakes or ponds are mapped within one mile. The town also has 0.19 miles of unnamed drainage, which can affect a route even without a named creek crossing.
Do I need a permit to bore beneath a Malone road in Hill County?
For a crossing under Texas State Highway 171, TxDOT cover depth sets the bore profile: electric and communication lines need 60 inches below the lowest crossed grade, water needs 60 inches, and pressurized sewer needs 60 inches. Along highway right of way, the listed cover is 48 inches for electric and communication, and 36 inches for water. The line owner applies through TxDOT’s RULIS system, and the TxDOT Waco District reviews the request. We prepare the bore plan and profile for the utility owner’s application and work under its permit. Because Malone is an incorporated town, we treat Live Oak as a city street when planning a bore there. Ash Creek crossings are checked for federal jurisdiction during planning.
Read the rules for yourself: Texas Utilities Code Chapter 251 on notice to Texas811, the Texas811 questions and answers page, the TxDOT Utility Accommodation Rules, 43 TAC 21.40 and TxDOT utility permits in RULIS.
Whose lines are already buried near the City of Malone water system?
The City of Malone public water system uses groundwater wells and serves 237 people through 130 service connections. That makes existing water lines a key locate and potholing concern for a new service bore near Live Oak. Utilities reporting electric service in Hill County include Oncor Electric Delivery Company, Texas-New Mexico Power, HILCO Electric Cooperative, Navarro County Electric Cooperative and Navasota Valley Electric Cooperative. We confirm the line owner for the specific address before setting electric conduit specifications.
| Line owner | What it is | Source | Size |
|---|---|---|---|
| City of Malone | Public water system | Groundwater wells | 130 connections, 237 people served |
| Oncor Electric Delivery Company, Texas-New Mexico Power, HILCO Electric Cooperative, Navarro County Electric Cooperative and Navasota Valley Electric Cooperative | Electric utilities reporting service in Hill County | EIA Form 861 | Confirm the line owner by address |
American Community Survey 2019 to 2023 five year estimates put Malone’s median housing year at 1950. The survey estimates 69% of homes were built before 1960, 28% from 1960 to 1999 and 3% in 2000 or later. A replacement route near Hackberry Street may encounter older buried services, but age alone does not establish their location or depth. We use hydrovac potholing to expose each marked utility on the bore path before drilling near it; paint shows position, not depth.

Where is Malone in relation to Hillsboro?
Malone is in Hill County, covers 0.46 square miles and sits at an elevation of 482 feet. ZIP code 76660 serves the town. Penelope is 4.8 miles southwest, Bynum is 7.3 miles northwest, and Hubbard is 7.4 miles southeast. Hillsboro, the county seat and nearest larger city, is 14.4 miles northwest. From our Yukon, Oklahoma main office, Malone is 280 road miles away and a 5.4 hour drive, which affects how we plan mobilization for work near Texas State Highway 171.
Places near Malone
- Directional boring in Penelope: 4.8 miles southwest
- Directional boring in Bynum: 7.3 miles northwest
- Directional boring in Hubbard: 7.4 miles southeast
- Directional boring in Mertens: 9.8 miles north
- Directional boring in Dawson: 10.7 miles east
- Directional boring in Hillsboro: 14.4 miles northwest
What kinds of bores come up near Pecan Street in Malone?
- Water service: A new connection near the City of Malone system needs a route checked against existing groundwater service lines and marked utilities.
- Highway crossing: A bore beneath Texas State Highway 171 keeps the line below the roadway pavement and follows the applicable TxDOT cover profile.
- Street conduit: Electric or fiber conduit beneath Pecan Street can avoid cutting the road surface, with marked lines exposed before drilling nearby.
- Creek crossing: A route approaching Ash Creek needs channel depth and jurisdiction considered during planning, even though the stream is outside town limits.
- Sewer route: A pressurized sewer crossing under FM 308 needs a profile that accounts for the state highway right of way.
- Replacement bore: Near Hackberry Street, potholing helps locate existing services before an older connection is replaced or a new line is pulled.
More on each kind of work: water line boring, electric line boring, fiber optic boring, road, railroad and creek crossings and municipal boring.
What do you need to quote a bore under Texas State Highway 171 in Malone?
For a quote near Texas State Highway 171, send the address or map pin, what is going in the ground, the pipe or conduit size and the footage; a sketch or plans help. Tell us if the route follows a town street such as Live Oak or crosses pavement, because those details change the bore plan.
Houston Black clay is the first price consideration around Malone because heavy clay can cling to the reamer and grip the pipe, affecting the fluid plan and staged reaming. The route’s length and pipe size matter too. A crossing under Texas State Highway 171 adds pavement and permit planning, while a creek or drainage crossing can require added planning. Pits, excavator time, sand backfill and the number of utilities to expose also shape the work. Mobilization from Yukon matters at 280 road miles.
Questions people ask about boring in Malone
Does Trinity take directional boring jobs in Malone and Hill County, and how is the work staffed?
Yes. We take directional boring work across Texas, including Malone and Hill County. Our main office is in Yukon, and work is staffed by our crews or from satellite yards operated by partner drilling contractors we have vetted. The customer works with Trinity through the bore log, including on routes near Live Oak.
Who runs Malone’s public water system in Hill County, and does it get its water from groundwater wells?
The City of Malone owns the public water system, which uses groundwater wells. Public records list 130 service connections serving 237 people. A new water bore near Pecan Street should be planned around the existing system and marked lines, rather than assuming a clear path from the street surface.
Which electric companies report service in Malone and Hill County, and who confirms conduit specs?
Oncor Electric Delivery Company, Texas-New Mexico Power, HILCO Electric Cooperative, Navarro County Electric Cooperative and Navasota Valley Electric Cooperative report service in Hill County. That list does not identify the provider at every Malone address. We confirm the line owner for the route near Live Oak before planning an electric conduit bore.
Who controls Pecan Street in Malone, and does a bore require cutting it?
Malone is incorporated, so Pecan Street is a city street. Directional boring can place a line beneath the road without cutting its pavement, subject to the route and applicable approvals. We check marked utilities along the path and expose them before drilling nearby.
How old are homes and buried lines near Hackberry Street in Malone?
The American Community Survey 2019 to 2023 estimates Malone’s median housing year at 1950, with 69% of homes built before 1960. That age can make replacement work near Hackberry Street more likely to involve existing services, but it does not tell us their exact locations. Along Texas State Highway 171, we pothole marked utilities before drilling near them to verify crossing locations.
Does Houston Black soil in Malone corrode steel, and what pipe should I use?
The USDA soil survey maps high steel corrosion risk throughout Malone, where Houston Black clay is the dominant mapped soil. The line owner should consider casing and tracer wire materials for the site. HDPE is not affected by soil corrosion, but the owner’s material choice should fit the line and project requirements.
Does Trinity cover Penelope and rural sites outside Malone?
Yes. We take work across Texas, including Penelope, 4.8 miles southwest of Malone, and rural sites outside the town limits. For a route near Ash Creek or another drainage, share the location and scope so we can account for access and crossing conditions in the plan.
How much notice does Texas811 need for a bore on Live Oak in Malone?
For a Live Oak excavation, request locates at least 48 hours before the start, excluding Saturdays, Sundays and legal holidays. Submit no earlier than 14 days before work. For a Texas State Highway 171 crossing, if our start slips more than 14 days past the original notice, we submit a new request to TxDOT Waco District. If marks wear off or move, get them refreshed through Texas811 before work continues.
What affects the cost of a bore under Texas State Highway 171 in Malone?
The route length and pipe or conduit size matter, and Houston Black clay can affect the reaming and fluid plan. A Texas State Highway 171 crossing adds pavement and permit planning. Other factors include utilities to expose, pits, excavator time, backfill, drainage crossings and mobilization from Yukon, 280 road miles away. The job details determine the scope.
Where the Malone facts on this page come from
- USDA Natural Resources Conservation Service, Soil Data Access: soil survey map units inside Malone
- U.S. Census Bureau, TIGER/Line 2024: Malone boundary, roads, rail lines and streams
- U.S. Census Bureau, Vintage 2024 population estimates: Malone
- U.S. Census Bureau, American Community Survey 2019 to 2023: Malone housing units and year built
- Macrostrat geologic map compilation: map units under Malone
- U.S. EPA Safe Drinking Water Information System: public water systems serving Malone
- U.S. Energy Information Administration, Form EIA 861: electric utilities serving Hill County
- U.S. Geological Survey, Elevation Point Query Service: Malone elevation
- OpenStreetMap road network through the OSRM router: road miles from Yukon, Oklahoma to Malone
- Texas Utilities Code Chapter 251, Underground Facility Damage Prevention and Safety
- TxDOT Utility Accommodation Rules, 43 Tex. Admin. Code 21.40: underground utilities
- Texas Department of Transportation: Right of Way Utility and Leasing Information System (RULIS) utility permits
Get a Quote for a Bore in Malone
Send the address, what is going in, the size and the footage.
Trinity Boring Solutions
9102 NW Expressway, Yukon, OK 73099
(405) 409-7423 | darren@trinityboringsolutions.com
Free Bore Planner
Plan Your Bore in Malone, Texas
Type the address of your job in Malone. The Bore Planner opens an aerial map at that spot. Drop one pin where the bore starts and one where it ends, tell us what is going in and send the scope to our crew.
Talk to the crew that does the work
Fastest way to a number is a phone call. Tell us where the crossing is and what is going in the ground, and you will get a straight answer on the same call. Bores from 10 feet to 5,000 feet, 3/4 inch service line through 48 inch casing, anywhere in Oklahoma and Texas. We run 24/7 for main breaks and emergency repairs.
Answered by a person, not a call center.
Would rather not call? Send the details and we will come back with a written quote.