trinityboringsolutions.com

Dawson Texas Directional Boring: Crockett Soil, Highway 31 and Larkin Hill Creek

Quick Answer: Dawson is an incorporated town, so its city streets belong to the city; we take directional boring, also called horizontal directional drilling (HDD), for routes involving Larkin Hill Creek. The Yukon, Oklahoma main office is 295 road miles away, and Texas State Highway 31 is one of Dawson’s state routes. Crockett soils cover 94 percent of Dawson, and clay at about 40 inches can stick to a reamer and swell around pipe. Main Street and 3rd Street are among the streets to assess for a route.

Family Business Since 1965 Boring Since 1982 24 Hour Phone No Utility Strike in 25 Years

Dawson bores at a glance

  • Incorporated city in Navarro County, Texas. Population 819 (Census Bureau 2024 estimate).
  • Road distance from our Yukon, Oklahoma main office: 295 miles, about 5.8 hours of driving.
  • Ground: Crockett soil is mapped on 94 percent of the area, with clay about 40 inches down.
  • Rock: bedrock is mapped within 60 inches on 94 percent of the area.
  • Highways inside the boundary: Texas State Highway 31, FM 709 and FM 1838. State permit office: TxDOT Dallas District.
  • Railroad track inside the boundary: none mapped.
  • Named streams inside the boundary: Larkin Hill Creek.
  • Public water: City of Dawson, surface water bought from another system.
  • Texas811: locate request at least two working days before a bore and no more than 14 days ahead.
  • Range: 3/4 inch service lines to 48 inch casing, 10 feet to 5,000 feet.
  • Phone answered 24 hours a day: (405) 409-7423

Which contractor handles bores near Larkin Hill Creek in Dawson?

Dawson is an incorporated town in Navarro County, so city streets belong to the city, and Trinity Boring Solutions takes directional boring work here. The Census Bureau Vintage 2024 estimate puts the town at 819 people. Along Main Street or 3rd Street, our crews can bore routes for water, sewer, gas, electric conduit or fiber, with the path planned around existing lines.

Our main office is in Yukon, Oklahoma, and Dawson work is done with our own crews and from satellite yards run by partner drilling contractors Trinity has personally vetted. Our record is more than 25 years without a utility strike, a consideration near the City of Dawson water system and electric service reported by Oncor Electric Delivery Company and Navarro County Electric Cooperative. At 295 road miles from our Yukon main office, our family business began in 1965 and has done directional boring since 1982.

Trinity Boring Solutions Vermeer D24x40 directional drill set up for a bore
Our Vermeer D24x40 directional drill set up for a bore. Photos on this page are from our jobs in Oklahoma and Texas.

What does the soil survey show about Crockett soil in Dawson?

The USDA soil survey maps Crockett soils across 94 percent of Dawson, chiefly Crockett fine sandy loam. At about 40 inches below the surface, clay is mapped across 96 percent of the area, with an average clay content of 43 percent; sandy texture covers 3 percent there. The surface is mostly fine sandy loam, but that deeper clay changes how a bore behaves. It can stick to a reamer and swell around pipe, so the mud and reaming sequence matter.

USDA soil survey, inside the Dawson city limitsWhat is mapped
Soil series mappedCrockett 94 percent and Gowen 3 percent
Texture at the surfacefine sandy loam 91 percent and loam 6 percent
Texture about 40 inches downclay 96 percent and fine sandy loam 3 percent
Engineering class about 40 inches downfat clay (CH) 95 percent and lean clay (CL) 5 percent
Average clay content about 40 inches down43 percent
Bedrock mapped within 60 inches94 percent of the area (0 percent hard rock, 94 percent weathered rock)
Seasonal water table within 60 inches0 percent of the area
Flood prone soils3 percent of the area
High corrosion risk for uncoated steel96 percent of the area

In Dawson, weathered bedrock is mapped within 60 inches across 94 percent of the area, while the survey does not map bedrock within 40 inches or hard bedrock within 60 inches. A seasonal water table is not mapped within 60 inches, and flood prone soils cover 3 percent. For boring across Dawson’s Crockett and Gowen soils, we advise the line owner to consider casing and tracer wire for the high steel corrosion risk mapped across 96 percent. The Wolfe City Formation is mapped as Phanerozoic sandstone, silt and claystone; weathered material can drill slower than soil, and a soil to rock contact can deflect the head.

How do we bore through clay in Dawson?

For Dawson’s Crockett clay, we manage the fluid and open the hole in stages so sticky cuttings do not build on the reamer or grip the pipe.

  1. Crockett clay can cling to the reamer, so we use a thinner fluid with polymer and open the hole in stages before pulling pipe.
  2. With Dawson’s mapped heavy clay, we watch the fluid returns closely and keep pressure controlled near Main Street pavement to limit lift risk.
  3. At a Larkin Hill Creek crossing, we plan depth below the channel and track the drill head from the surface, logging depth and pitch as it advances.
  4. Before approaching marked lines near the City of Dawson water system or electric routes reported in Navarro County, we hydrovac pothole to verify depth and position.
Vermeer D24x40 S3 Navigator and water truck at the entry of a 385 foot sandstone rock bore above the wetland in Guthrie, Oklahoma
Our Vermeer D24x40 and water truck at the entry of a 385 foot sandstone rock bore in Guthrie, Oklahoma.

Which crossings near Larkin Hill Creek should we plan for in Dawson?

Texas State Highway 31 has 1.5 mapped roadway miles inside Dawson, while FM 709 and FM 1838 each have 1.3. The longest named streets include Main Street at 1.38 miles, 1st Street at 1.31 miles and 3rd Street at 1.26 miles. Because those roads and streets have different owners, we identify the route and right of way before planning a bore. Beneath existing highway pavement, TxDOT rules call for boring or tunneling rather than open trenching.

CrossingTypeMapped extentWho has a say
Texas State Highway 31State highway1.5 roadway miles insideState highway office
FM 709State highway1.3 roadway miles insideState highway office
FM 1838State highway1.3 roadway miles insideState highway office
Larkin Hill CreekStream1.43 channel miles insideChecked for Corps of Engineers jurisdiction
Battle CreekStream nearby0.1 miles outsideChecked for Corps of Engineers jurisdiction
Lake DawsonLake or pond34 acres, nearbyChecked for Corps of Engineers jurisdiction
Swipe the table sideways to see every column.

No railroad is mapped inside Dawson or within one mile, and no street and rail crossing is mapped in town. Larkin Hill Creek runs 1.43 channel miles through Dawson, with two mapped street crossings of named streams. Lake Dawson, a 34 acre lake, is outside the town limits. A creek route needs depth planning beneath the channel, and its jurisdiction is checked during planning; the mapped street crossings also make utility exposure important.

Who has to sign off on Texas State Highway 31 bores in Dawson?

Texas State Highway 31 is a state route in Dawson, so work in its right of way needs a TxDOT utility permit reviewed by the TxDOT Dallas District. The utility that owns the line submits the application through TxDOT’s online RULIS system; we prepare the bore plan and profile and work under the owner’s permit. TxDOT requires a bore or tunnel beneath existing highway pavement, with a casing at crossings and the bore extending beneath all travel lanes on rural highways. Larkin Hill Creek crossings are checked for U.S. Army Corps of Engineers jurisdiction during planning. Dawson has no mapped railroad crossing requiring a track agreement.

Read the rules for yourself: Texas Utilities Code Chapter 251 on notice to Texas811, the Texas811 questions and answers page, the TxDOT Utility Accommodation Rules, 43 TAC 21.40 and TxDOT utility permits in RULIS.

Whose lines are already buried in Navarro County near Dawson?

The City of Dawson public water system uses purchased surface water and reports 574 service connections serving 822 people. Electric service reported in Navarro County includes Oncor Electric Delivery Company and Navarro County Electric Cooperative, but the owner at a specific address must be confirmed before an electric conduit bore. Near a Dawson water main or electric line, we use hydrovac potholing to expose marked utilities before drilling close to them; paint shows position, not depth.

Line ownerWhat it isSourceSize
City of DawsonPublic water systemSurface water bought from another system574 connections, 822 people served
Oncor Electric Delivery Company and Navarro County Electric CooperativeElectric utilities reporting service in Navarro CountyEIA Form 861Confirm the line owner by address
Swipe the table sideways to see every column.

The American Community Survey 2019 to 2023 five year estimates put Dawson’s median housing year at 1965, so we plan Main Street boring around established development. The survey estimates 40 percent of housing was built before 1960, 45 percent from 1960 to 1999 and 15 percent in 2000 or later. That mix can mean a route serves either a replacement or a newer connection. Near Main Street, we expose marked lines before the drill approaches so the bore can be steered with their actual depth in view.

Trinity Boring Solutions technician hydrovac daylighting along a commercial curbline during utility locating in Oklahoma City
Hydrovac daylighting along a commercial curb line in Oklahoma City to find the utilities before a bore.

Where is Dawson in relation to Corsicana and nearby towns?

Dawson is in Navarro County, about 19.5 miles southwest of the county seat and nearest larger city, Corsicana. The town covers 1.79 square miles, sits at an elevation of 484 feet and uses ZIP code 76639. Hubbard is 6.0 miles southwest; Coolidge is 10.5 miles south; Malone is 10.7 miles west; Penelope is 12.8 miles west; and Blooming Grove is 13.7 miles north. The Yukon, Oklahoma main office is 295 road miles away, a drive of 5.8 hours, which affects mobilization for Dawson work.

Places near Dawson

What kinds of bores come up near 3rd Street in Dawson?

  • Highway crossing: A bore beneath Texas State Highway 31 stays under the pavement, with the utility owner handling the TxDOT permit.
  • Water service: A connection near the City of Dawson water system needs a route checked against existing water lines before drilling.
  • Fiber route: A fiber bore along Main Street can avoid open cuts in pavement while marked utilities are exposed along the planned path.
  • Creek crossing: A route beneath Larkin Hill Creek needs depth planning and a check for U.S. Army Corps of Engineers jurisdiction.
  • Electric conduit: Near 3rd Street, we confirm the line owner because Oncor Electric Delivery Company and Navarro County Electric Cooperative report service in the county.
  • Street connection: A service bore near 1st Street can be planned around the mapped Crockett clay and existing underground lines.

More on each kind of work: water line boring, electric line boring, fiber optic boring, road, railroad and creek crossings and municipal boring.

What should I send for a Dawson bore near Main Street?

For a Main Street estimate, give us the address or map pin, what will go in the ground, the pipe or conduit size and footage; a sketch or plans help. Note any crossings of Texas State Highway 31, Larkin Hill Creek or existing utilities, since each affects the route we need to plan.

The Dawson price depends on the route and work involved. Crockett clay can call for staged reaming and careful fluid control, so soil conditions matter early. A crossing of Texas State Highway 31 or Larkin Hill Creek adds planning and crossing work. Length, pipe size, utilities to expose, pavement, pits, excavator time and sand backfill also shape the job. Mobilization reflects the 295 road miles from Yukon, while high profile or emergency work can add demands.

Questions people ask about boring in Dawson

Does Trinity take directional boring work in Dawson and Navarro County?

Yes. Trinity Boring Solutions takes work in Dawson, and Trinity coordinates it from the first call through the bore log. Our own crews and satellite yards operated by partner drilling contractors we have vetted support the work. That service model applies to routes around Navarro County, including streets such as Main Street.

What is Crockett soil like for boring in Dawson?

The USDA soil survey maps Crockett fine sandy loam across much of Dawson, with clay mapped at about 40 inches across 96 percent of the area. The average clay content there is 43 percent. That sticky material can gather on the reamer or swell around pipe, so staged reaming and fluid control matter.

Is there rock within five feet of the surface in Dawson?

Weathered bedrock is mapped within 60 inches across 94 percent of Dawson, but hard bedrock is not mapped at that depth. The survey does not map bedrock within 40 inches. The Wolfe City Formation includes sandstone, silt and claystone, so a bore may slow where it meets weathered rock.

Who approves a bore beneath Texas State Highway 31 in Dawson?

The utility owner applies for a TxDOT utility permit through RULIS for work in the Texas State Highway 31 right of way. The TxDOT Dallas District reviews the application. We supply the bore plan and profile and work under the permit issued to the utility owner, including the crossing conditions for the highway.

Can a line be bored beneath Larkin Hill Creek in Dawson?

A bore can be planned beneath Larkin Hill Creek, which runs 1.43 channel miles in Dawson. We plan depth to stay under the channel and check for U.S. Army Corps of Engineers jurisdiction during planning. The creek’s mapped street crossings also make locating and exposing utilities along the route important.

Who owns Dawson’s water system in Navarro County, and where does its water come from?

The City of Dawson owns its public water system and uses purchased surface water, so we account for utility coordination on 1st Street bores. It reports 574 service connections and 822 people served. For a bore near that system, we identify and expose marked lines before drilling close to them, rather than relying on surface paint to show their depth.

Can I reach Trinity after hours for an urgent bore near 3rd Street in Dawson?

Yes. A person answers Trinity’s phone at (405) 409-7423 24 hours a day, including for urgent work near 3rd Street. Emergency scope can affect the plan, so be ready to describe the location, what line is involved and any nearby feature such as Texas State Highway 31.

How early should I request locates for a bore near Main Street in Dawson?

For a Main Street bore, place the Texas811 locate request at least two working days before excavation, excluding Saturdays, Sundays and legal holidays, and no earlier than 14 days before work. The ticket has a 20 day life; a start more than 14 days past the original notice needs a new request. Before we continue boring along Main Street, we ask that worn or moved marks be refreshed through Texas811.

What affects the cost of a bore beneath Texas State Highway 31 in Dawson?

The Dawson job scope sets the price. Length, pipe or conduit size, Crockett clay, utilities to expose, pavement and pits all affect the work. A Texas State Highway 31 crossing adds permit and crossing planning, while Larkin Hill Creek, backfill, excavator time and the 295 road miles from Yukon can also change the mobilization and job requirements.

Where the Dawson facts on this page come from

Darren Rice in a safety vest at the bore pit beside the Trinity Boring Solutions Ditch Witch directional drill, with drill rods racked, on the airfield at Will Rogers World Airport in Oklahoma City

About Trinity Boring Solutions

Trinity Boring Solutions is a family business in Yukon, Oklahoma, founded by Dean Rice in 1965 and owned today by Darren Rice, who started its directional boring side in 1982. The company bores across Oklahoma and Texas. No bore is too big or too small: 4 foot sidewalk sleeves to roughly 4,100 feet under the Arkansas River in Tulsa. Reach us at (405) 409-7423.

Get a Quote for a Bore in Dawson

Send the address, what is going in, the size and the footage.

Trinity Boring Solutions
9102 NW Expressway, Yukon, OK 73099
(405) 409-7423 | darren@trinityboringsolutions.com

Trinity Boring Solutions | 24/7 Available ☎ Call (405) 409-7423 Free Quote

Free Bore Planner

Plan Your Bore in Dawson, Texas

Type the address of your job in Dawson. The Bore Planner opens an aerial map at that spot. Drop one pin where the bore starts and one where it ends, tell us what is going in and send the scope to our crew.

Talk to the crew that does the work

Fastest way to a number is a phone call. Tell us where the crossing is and what is going in the ground, and you will get a straight answer on the same call. Bores from 10 feet to 5,000 feet, 3/4 inch service line through 48 inch casing, anywhere in Oklahoma and Texas. We run 24/7 for main breaks and emergency repairs.

Call (405) 409-7423

Answered by a person, not a call center.

Would rather not call? Send the details and we will come back with a written quote.

Quick Quote In Page

County and State Pages for Dawson

Same county: Kerens · Rice · Frost · Mildred · Angus · Retreat · Oak Valley · Eureka · Richland · Barry · Navarro · Emhouse. All counties: Texas county list.