trinityboringsolutions.com

Valentine Texas Directional Boring: Redona Soil, US 90 And Union Pacific Track

Quick Answer: The USDA soil survey maps sandy clay loam under much of Valentine, where sticky clay can build on a reamer and grip pipe. We take directional boring, also called horizontal directional drilling (HDD), in Valentine, Texas, including routes beneath US 90. Main Street is 651 road miles from our Yukon, Oklahoma main office. Redona soil calls for staged reaming and a planned pull through the open hole.

Family Business Since 1965 Boring Since 1982 24 Hour Phone No Utility Strike in 25 Years

Valentine bores at a glance

  • Incorporated city in Jeff Davis County, Texas. Population 63 (Census Bureau 2024 estimate).
  • Road distance from our Yukon, Oklahoma main office: 651 miles, about 12.3 hours of driving.
  • Ground: Redona soil is mapped on 87 percent of the area, with sandy clay loam about 40 inches down.
  • Rock: no bedrock is mapped in the top 60 inches.
  • Highways inside the boundary: US 90. State permit office: TxDOT El Paso District.
  • Railroad track inside the boundary: Union Pacific, with 3 mapped street and rail crossings.
  • Public water: City of Valentine, groundwater wells.
  • Texas811: locate request at least two working days before a bore and no more than 14 days ahead.
  • Range: 3/4 inch service lines to 48 inch casing, 10 feet to 5,000 feet.
  • Phone answered 24 hours a day: (405) 409-7423

Who handles directional boring near Main Street in Valentine?

We take directional boring work in Valentine, Jeff Davis County. The Census Bureau Vintage 2024 estimate puts the town’s population at 63. Along Main Street, 5th Street or another local route, our crews can install water, sewer, gas, electric conduit or fiber. The line and its path determine the bore plan, especially where a route passes beneath a street.

Our main office is in Yukon, Oklahoma, and Valentine work is done with our own crews and from satellite yards run by partner drilling contractors Trinity has personally vetted. We are a family business that started in 1965, and we have done directional boring since 1982. Our work ranges from small service lines to large casing, a fit for routes through Valentine’s compact street grid.

Ditch Witch JT922 compact directional drill beside the Trinity Boring Solutions truck at NE 24th Street in Oklahoma City
Our Ditch Witch JT922 compact directional drill beside the Trinity truck on a sleeve bore at NE 24th Street in Oklahoma City. Photos on this page are from our jobs in Oklahoma and Texas.

What is Redona soil like to bore in Valentine?

The USDA soil survey maps the Redona association across 87 percent of Valentine, with the Verhalen and Dalby association making up the rest. At about 40 inches below the surface, sandy clay loam is mapped under 87 percent of the town, while clay is mapped under 13 percent. At Valentine, we account for 29 percent average clay content at that depth when planning boring. Valentine soil maps show patterns, not test borings, so we plan crossings without treating them as verified subsurface logs. The sandy clay loam can hold a bore open, but sticky material may gather on the reamer and grip the pipe.

USDA soil survey, inside the Valentine city limitsWhat is mapped
Soil series mappedRedona 87 percent and Verhalen 13 percent
Texture at the surfacesandy loam 87 percent and clay 13 percent
Texture about 40 inches downsandy clay loam 87 percent and clay 13 percent
Engineering class about 40 inches downclayey sand (SC) 87 percent and fat clay (CH) 13 percent
Average clay content about 40 inches down29 percent
Bedrock mapped within 60 inchesNone mapped
Seasonal water table within 60 inches0 percent of the area
Flood prone soils0 percent of the area
High corrosion risk for uncoated steel13 percent of the area

Bedrock is not mapped in the top five feet of Valentine, though the map does not rule out rock below that depth. For Valentine boring plans, seasonal water table and flood prone soils are not mapped, so we account for that information gap. High steel corrosion risk is mapped under 13 percent of the town, so the line owner should consider casing and tracer wire materials there; HDPE is not subject to that soil corrosion concern. The geologic map also shows Holocene Alluvium and Miocene Cenozoic volcanic rocks. Those mapped units help frame planning, but the route still needs to be checked as it is drilled.

How is a bore run through Valentine’s sandy clay loam?

Valentine’s mapped sandy clay loam can hold the hole while clay sticks to the reamer. We plan the bore around the route, expose marked utilities and keep the pipe ready for the pull.

  1. Redona soil is commonly mapped as sandy clay loam at about 40 inches. We use thinner fluid and polymer, then ream in stages to limit sticky buildup.
  2. Clay is mapped under 13 percent of Valentine at about 40 inches. We watch fluid returns so pressure does not lift pavement near a street bore.
  3. Before drilling near a marked line on Main Street, we hydrovac pothole to expose it; paint shows its position, not its depth.
  4. A walkover locator follows the drill head along routes such as 5th Street, while we record depth and pitch as the bore advances.
Trinity Boring Solutions water trailer supplying water for bentonite drilling fluid on a sleeve bore in northeast OKC
Our water trailer feeding the bentonite drilling fluid mix on a sleeve bore in northeast Oklahoma City.

What does a bore have to cross in Valentine near US 90?

US 90 runs through Valentine, with 0.5 mapped roadway miles inside town limits and no other highway listed nearby. A route beneath existing highway pavement is bored or tunneled rather than open cut. Main Street is the longest named street at 1.32 miles in town, followed by California Avenue at 1.08 miles. 5th Street and Bell Avenue are also among the longer routes. Their pavement and the location of marked utilities shape where entry and exit pits can sit.

CrossingTypeMapped extentWho has a say
US 90US highway0.5 roadway miles insideState highway office
Union PacificRailroad1.35 track miles insideThe railroad
Swipe the table sideways to see every column.

Union Pacific track runs 1.35 miles through Valentine on the Union Pacific Valentine Subdivision, and three mapped street and rail crossings are inside town. A crossing beneath that track needs an agreement with Union Pacific. No named streams run through town, and no lakes or ponds are mapped within one mile. With no mapped stream crossings, the route planning here centers on streets, US 90 and the railroad.

Whose permission does a Valentine bore in Jeff Davis County need?

For work on US 90 right of way in Valentine, TxDOT reviews the utility permit through the El Paso District. The utility that owns the line files through TxDOT’s online RULIS system; we prepare the bore plan and profile for that application and work under the owner’s permit. Beneath existing US 90 pavement, the installation is bored or tunneled, with the bore extending under all travel lanes on rural highways. Electric and communication crossings need at least 60 inches of cover below the lowest crossed grade; water crossings need 60 inches, and pressurized sewer crossings need 60 inches. The district can set another depth in its permit.

Read the rules for yourself: Texas Utilities Code Chapter 251 on notice to Texas811, the Texas811 questions and answers page, the TxDOT Utility Accommodation Rules, 43 TAC 21.40 and TxDOT utility permits in RULIS.

Who owns the lines near the City of Valentine water system, and how do we confirm before boring?

The City of Valentine public water system uses groundwater wells and serves 190 people through 81 service connections. A water route along Main Street or another town street needs to account for the existing system and nearby marked lines. AEP Texas North and Rio Grande Electric Cooperative report electric service in Jeff Davis County; we confirm the line owner for the specific address before planning an electric conduit bore.

Line ownerWhat it isSourceSize
City of ValentinePublic water systemGroundwater wells81 connections, 190 people served
AEP Texas North and Rio Grande Electric CooperativeElectric utilities reporting service in Jeff Davis CountyEIA Form 861Confirm the line owner by address
Swipe the table sideways to see every column.

American Community Survey 2019 to 2023 five year estimates put Valentine’s median housing year at 1948. In Valentine, the survey estimates 62 percent of homes were built before 1960, 25 percent from 1960 to 1999 and 13 percent in 2000 or later; we consider that profile when planning underground work. A Main Street project could involve replacement near older housing or a new service. We hydrovac pothole each marked utility on the planned path before drilling nearby, since surface marks show position rather than depth.

Yellow polyethylene gas pipe pulled through a directional bore beside a commercial building
Yellow polyethylene gas pipe pulled through a directional bore beside a commercial building.

Do you cover Valentine and nearby Fort Davis?

Valentine is an incorporated town in Jeff Davis County, at an elevation of 4,435 feet and covering 0.49 square miles. Its ZIP code is 79854. Marfa is 33.9 miles southeast, Fort Davis is 35.7 miles east, and Van Horn is 37.1 miles northwest. Fort Davis is the county seat, 35.7 miles east. From our Yukon, Oklahoma yard, Valentine is 651 road miles away and a 12.3 hour drive. That distance affects how we plan equipment and crew mobilization for a Valentine bore.

Places near Valentine

Which jobs call for a bore near 5th Street in Valentine?

  • Water service: A new connection from the City of Valentine system needs a route planned around existing lines along Main Street.
  • Highway crossing: A utility route beneath US 90 is bored under the pavement, with pits placed beyond the travel lanes.
  • Rail crossing: A bore below the Union Pacific Valentine Subdivision needs an agreement with Union Pacific for the track crossing.
  • Fiber route: A conduit bore along California Avenue can avoid cutting the street while connecting a planned service route.
  • Street service: A sewer or gas line beneath 5th Street can use a bore path that keeps the roadway surface intact.

More on each kind of work: water line boring, electric line boring, fiber optic boring, road, railroad and creek crossings and municipal boring.

What drives the price of a Valentine bore near Bell Avenue?

A map pin matters on Bell Avenue because the exact bore route determines which pavement, utilities or railroad property it approaches. Send the address or pin, what will go underground, the pipe or conduit size and footage. A sketch or plans help us see the proposed path and place the pits.

A short, clear route in Valentine’s sandy clay loam with few exposed utilities is simpler to plan. The scope changes with bore length, pipe size, soil and rock, the number of utilities to cross, pavement, pit work and excavator time. A route under US 90 or Union Pacific track brings crossing requirements into the plan. Mobilization also reflects the 651 road miles from Yukon, and emergency or high profile work can add planning needs.

Questions people ask about boring in Valentine

Does Trinity take directional boring jobs in Valentine, Jeff Davis County?

Yes. We take work in Valentine, Jeff Davis County, and staff it with our own crews or crews from vetted drilling contractor partners. You work with Trinity from the first call through the bore log, including a route beneath US 90 or along Main Street.

What ground does a Valentine bore go through near Redona soil?

The USDA soil survey maps Redona association under 87 percent of Valentine. At about 40 inches, sandy clay loam is mapped under 87 percent and clay under 13 percent. The clay can cling to the reamer, so the mapped ground informs the fluid and reaming plan.

Will a Valentine bore hit rock below Main Street?

Bedrock is not mapped in Valentine’s top five feet, which does not rule out rock deeper down. The geologic map shows Holocene Alluvium and Miocene Cenozoic volcanic rocks. We track the drill head and log depth and pitch as a bore advances near Main Street.

Who approves a Valentine bore under US 90?

TxDOT reviews a US 90 right of way utility permit through its El Paso District. The utility owner files the application in RULIS, and we prepare the bore plan and profile. A route under the existing highway pavement is bored or tunneled.

What must we account for when we plan a Valentine bore under Union Pacific track?

A bore under the 1.35 miles of Union Pacific track in Valentine needs a crossing agreement from Union Pacific. The agreement establishes crossing conditions such as casing, depth and flagging. TxDOT also asks for a copy if the line is on highway right of way.

Who runs Valentine’s public water system, and where do we account for its groundwater wells in our boring plans?

The City of Valentine owns the public water system, which draws from groundwater wells. In Valentine, 190 people receive water through 81 service connections, figures we consider when coordinating underground work near the system. A planned water bore along Main Street needs to account for existing system lines and any other marked utilities on the route.

How far is Valentine from Trinity’s Yukon, Oklahoma main office?

From our Yukon, Oklahoma main office, Valentine is 651 road miles away and a 12.3 hour drive, shaping our mobilization planning. That distance affects mobilization planning for work near California Avenue or US 90. We coordinate the equipment and crew plan around the route and scope.

How early should I request utility marks for a Valentine bore along Main Street?

The person arranging the bore should describe the Main Street path to Texas811 and request a locate at least 48 hours before excavation, excluding weekends and legal holidays. The request cannot be more than 14 days early. If the start slips beyond 14 days, request a new ticket; refresh marks that wear off or move before work continues.

What affects the cost of a Valentine directional bore beneath US 90?

The route length, pipe or conduit size, soil, rock, utility exposures, pavement and pit work all shape the job. A US 90 crossing adds highway planning, while the sandy clay loam affects the drilling approach. We plan mobilization knowing Valentine is 651 road miles from Yukon, which affects how we schedule underground work.

Where the Valentine facts on this page come from

Darren Rice in a safety vest at the bore pit beside the Trinity Boring Solutions Ditch Witch directional drill, with drill rods racked, on the airfield at Will Rogers World Airport in Oklahoma City

About Trinity Boring Solutions

Trinity Boring Solutions is a family business in Yukon, Oklahoma, founded by Dean Rice in 1965 and owned today by Darren Rice, who started its directional boring side in 1982. The company bores across Oklahoma and Texas. No bore is too big or too small: 4 foot sidewalk sleeves to roughly 4,100 feet under the Arkansas River in Tulsa. Reach us at (405) 409-7423.

Get a Quote for a Bore in Valentine

Send the address, what is going in, the size and the footage.

Trinity Boring Solutions
9102 NW Expressway, Yukon, OK 73099
(405) 409-7423 | darren@trinityboringsolutions.com

Trinity Boring Solutions | 24/7 Available ☎ Call (405) 409-7423 Free Quote

Free Bore Planner

Plan Your Bore in Valentine, Texas

Type the address of your job in Valentine. The Bore Planner opens an aerial map at that spot. Drop one pin where the bore starts and one where it ends, tell us what is going in and send the scope to our crew.

Talk to the crew that does the work

Fastest way to a number is a phone call. Tell us where the crossing is and what is going in the ground, and you will get a straight answer on the same call. Bores from 10 feet to 5,000 feet, 3/4 inch service line through 48 inch casing, anywhere in Oklahoma and Texas. We run 24/7 for main breaks and emergency repairs.

Call (405) 409-7423

Answered by a person, not a call center.

Would rather not call? Send the details and we will come back with a written quote.

Quick Quote In Page

County and State Pages for Valentine

All counties: Texas county list.