Hebbronville Texas Directional Boring: Delmita Soil, Highway 16 and Noriacitas Creek
Quick Answer: Hebbronville is an unincorporated community in Jim Hogg County, so Galbraith Street is not city owned; we do directional boring, also called horizontal directional drilling (HDD), for crossings of Texas State Highway 16. Our Yukon, Oklahoma main office is 635 road miles from Hebbronville, where CPKC (Kansas City Southern) track is another crossing to plan around. The USDA soil survey maps Delmita fine sandy loam across 43 percent of the area and cemented material at about 40 inches in 77 percent, which can affect reaming and bore depth.
Hebbronville bores at a glance
- County seat of Jim Hogg County, Texas. Population 4,101 (2020 Census count).
- Road distance from our Yukon, Oklahoma main office: 635 miles, about 12.7 hours of driving.
- Ground: Delmita soil is mapped on 47 percent of the area, with cemented material about 40 inches down.
- Rock: no bedrock is mapped in the top 60 inches.
- Highways inside the boundary: Texas State Highway 16, Texas State Highway 359, FM 1017 and Texas State Highway 285. State permit office: TxDOT Pharr District.
- Railroad track inside the boundary: CPKC (Kansas City Southern), with 13 mapped street and rail crossings.
- Named streams inside the boundary: Noriacitas Creek and Mesquite Creek.
- Texas811: locate request at least two working days before a bore and no more than 14 days ahead.
- Range: 3/4 inch service lines to 48 inch casing, 10 feet to 5,000 feet.
- Phone answered 24 hours a day: (405) 409-7423
Who does directional boring under Texas State Highway 16 in Hebbronville?
Hebbronville is an unincorporated community and the county seat, so its streets are not controlled by a city government. The Census Bureau counted 4,101 people here in 2020; it does not publish yearly estimates for unincorporated places. We install water, sewer, gas, electric conduit and fiber lines, including along Smith Avenue or beneath Texas State Highway 16 where a route needs a crossing.
Our main office is in Yukon, Oklahoma, and Hebbronville work is done with our own crews and from satellite yards run by partner drilling contractors Trinity has personally vetted. We handle jobs from 3/4 inch service lines to 48 inch casing, from short connections near Galbraith Street to longer crossings. For directional boring in Hebbronville, our family business started in 1965, and we have done this work since 1982.

How does Delmita soil affect a Hebbronville bore?
The USDA soil survey maps Delmita soil across 47 percent of Hebbronville, with Delmita fine sandy loam mapped across 43 percent. Surface texture is mostly fine sandy loam, with fine sand and loamy fine sand also mapped. At about 40 inches, cemented material is mapped across 77 percent of the area; sandy clay loam is mapped across 22 percent, and average clay content at that depth is 25 percent. In Hebbronville, we distinguish mapped soil patterns from test borings when planning a crossing. The mix means the route and actual ground conditions matter when choosing reaming steps.
| USDA soil survey, inside the Hebbronville mapped community boundary | What is mapped |
|---|---|
| Soil series mapped | Delmita 47 percent, Cuevitas 17 percent, Randado 13 percent, Nueces 13 percent and Brennan 6 percent |
| Texture at the surface | fine sandy loam 80 percent, fine sand 13 percent and loamy fine sand 7 percent |
| Texture about 40 inches down | cemented material 77 percent and sandy clay loam 22 percent |
| Engineering class about 40 inches down | clayey sand (SC) 22 percent |
| Average clay content about 40 inches down | 25 percent |
| Bedrock mapped within 60 inches | None mapped |
| Seasonal water table within 60 inches | 0 percent of the area |
| Flood prone soils | 0 percent of the area |
| High corrosion risk for uncoated steel | 0 percent of the area |
In Hebbronville, we do not see bedrock mapped in the top five feet, though deeper rock remains possible. Seasonal water tables and flood prone soils are not mapped in the USDA survey, which informs pit planning but does not replace checking the site. The survey does not mark areas of high steel corrosion risk. The geologic map shows Holocene sand sheet, about 0.5 to 5 m thick, and Pliocene sedimentary deposits; loose sand can need support to keep a bore open.
What does it take to bore cemented material in Hebbronville?
The USDA soil survey maps cemented material at about 40 inches across much of Hebbronville. We use the planned depth and site checks to choose the approach, rather than treating the mapped layer as a test result.
- On a route through Delmita fine sandy loam, we use staged reaming and have the pipe ready before the final pass so loose ground has less time to fall in.
- Where cemented material is mapped near 40 inches, we check the planned depth and ground conditions before selecting the tooling and pace for a bore.
- Before drilling near Galbraith Street, we hydrovac expose each marked utility on the route because locate paint shows position, not burial depth.
- At Noriacitas Creek, we track the drill head from the surface and log depth and pitch so the crossing profile stays under review.

Where does a line have to go under Noriacitas Creek in Hebbronville?
Texas State Highway 16, Texas State Highway 359, FM 1017 and Texas State Highway 285 run inside the mapped Hebbronville community boundary. Galbraith Street is the longest named street at 2.17 miles; Smith Avenue runs 1.96 miles, and Lucille Street runs 1.52 miles. Oak Avenue is also a long route through the community. A bore beneath pavement avoids cutting across the surface, while the highway owner’s requirements set the crossing plan and cover.
| Crossing | Type | Mapped extent | Who has a say |
|---|---|---|---|
| Texas State Highway 16 | State highway | 7.1 roadway miles inside | State highway office |
| Texas State Highway 359 | State highway | 4.2 roadway miles inside | State highway office |
| FM 1017 | State highway | 1 roadway miles inside | State highway office |
| Texas State Highway 285 | State highway | 1 roadway miles inside | State highway office |
| CPKC (Kansas City Southern) | Railroad | 2.95 track miles inside | The railroad |
| Noriacitas Creek | Stream | 2.88 channel miles inside | Checked for Corps of Engineers jurisdiction |
| Mesquite Creek | Stream | 0.91 channel miles inside | Checked for Corps of Engineers jurisdiction |
CPKC (Kansas City Southern) owns 2.95 track miles inside Hebbronville on its Laredo Subdivision, so a route beneath the line needs railroad coordination. Public records map 13 street and rail crossings. Noriacitas Creek runs 2.88 channel miles inside the community, and Mesquite Creek runs 0.91 miles; 12 street crossings of named streams are mapped. No lakes or ponds are mapped within one mile, but a creek route still needs site and jurisdiction checks.
Who approves a bore in Hebbronville and Jim Hogg County?
Hebbronville has no city government, so a street permit is not issued by a city department; the responsible county or state authority depends on the route. Work in the right of way of Texas State Highway 16 or another state highway needs a TxDOT utility permit. The TxDOT Pharr District reviews it, and the utility that owns the line files through RULIS; we prepare the bore plan and profile for that application. A crossing under CPKC (Kansas City Southern) also needs an agreement with the railroad. Noriacitas Creek is checked for federal jurisdiction during planning.
Read the rules for yourself: Texas Utilities Code Chapter 251 on notice to Texas811, the Texas811 questions and answers page, the TxDOT Utility Accommodation Rules, 43 TAC 21.40 and TxDOT utility permits in RULIS.
Who owns the lines in Hebbronville and Jim Hogg County?
The water provider for a specific Hebbronville address must be confirmed with the county or local water district before a bore is planned; available records do not identify a provider for the community. AEP Texas Central and Medina Electric Cooperative report electric service in Jim Hogg County, but that does not establish which serves a particular address. Before an electric conduit route near Smith Avenue is planned, we confirm the line owner for that location.
| Line owner | What it is | Source | Size |
|---|---|---|---|
| AEP Texas Central and Medina Electric Cooperative | Electric utilities reporting service in Jim Hogg County | EIA Form 861 | Confirm the line owner by address |
The American Community Survey 2019 to 2023 estimates give Hebbronville a median housing year of 1975: 24 percent of units were built before 1960, 62 percent from 1960 to 1999, and 14 percent in 2000 or later. That age range can mean either replacing buried lines or adding a service near Oak Avenue. We hydrovac expose marked utilities along the planned path before drilling near them; paint shows position, not depth.

Do you cover South Fork Estates and Hebbronville?
Hebbronville is the county seat of Jim Hogg County, covers 6.48 square miles and sits at 596 feet in elevation. ZIP code 78361 serves the community. Las Lomitas is 1.7 miles northeast; South Fork Estates is 4.5 miles southwest, and Thompsonville is 7.6 miles southwest. From our Yukon, Oklahoma main office, Hebbronville is 635 road miles away, a 12.7 hour drive for planning. Those distances matter when planning equipment and crew mobilization for a route near Texas State Highway 16.
Places near Hebbronville
- Directional boring in Las Lomitas: 1.7 miles northeast
- Directional boring in South Fork Estates: 4.5 miles southwest
- Directional boring in Thompsonville: 7.6 miles southwest
- Directional boring in Bruni: 11.5 miles northwest
- Directional boring in Realitos: 12.7 miles northeast
What would we bore near Galbraith Street in Hebbronville?
- Highway crossing: A bore beneath Texas State Highway 16 avoids cutting the pavement, with cover and route requirements set through the TxDOT permit.
- Water service: A service near Smith Avenue needs the address specific water provider confirmed before we plan a connection or crossing.
- Fiber conduit: A conduit route along Galbraith Street can use a bore to pass beneath pavement without opening a long surface trench.
- Creek crossing: A route beneath Noriacitas Creek needs depth planning and a check for federal jurisdiction during the crossing review.
- Rail crossing: A bore beneath the CPKC (Kansas City Southern) Laredo Subdivision needs an agreement with the track owner.
- Electric conduit: Before planning near Oak Avenue, we identify which Jim Hogg County electric provider owns the line at that address.
More on each kind of work: water line boring, electric line boring, fiber optic boring, road, railroad and creek crossings and municipal boring.
What drives the price of a Hebbronville bore near CPKC (Kansas City Southern)?
For a route near Galbraith Street, start with its address or map pin. Tell us what goes underground, such as a water line or fiber conduit, then give the pipe or conduit size and footage. A sketch or plans help show whether the route crosses Texas State Highway 16, Noriacitas Creek or a CPKC track.
A short service route along Smith Avenue with clear access is simpler to plan than a long crossing beneath Texas State Highway 16 or CPKC (Kansas City Southern). Price depends on length, pipe size, soil conditions, utilities to expose, pavement, creek crossings, pits and backfill. Delmita soil and cemented material can affect the drilling plan; the 635 road miles from Yukon also affect mobilization. For high profile or emergency boring work in Hebbronville, we plan for added demands.
Questions people ask about boring in Hebbronville
Does Trinity take directional boring jobs in Hebbronville and Jim Hogg County?
Yes. We take directional boring work in Hebbronville, and Trinity stays responsible for the job from the first call through the bore log. The work is staffed with our own crews or crews from partner drilling contractors we have vetted. For a route under Texas State Highway 16, the utility owner still handles its permit application.
How old are buried lines near Smith Avenue in Hebbronville?
Public records do not give the age of individual buried lines. The American Community Survey 2019 to 2023 estimates put the median housing year at 1975, with 24 percent of units built before 1960. A replacement bore near Smith Avenue may need to connect to older infrastructure, so marked lines are exposed before drilling nearby.
What ground will a bore pass through in Hebbronville’s Delmita soil?
The USDA soil survey maps Delmita soil across 47 percent of Hebbronville, mostly as fine sandy loam at the surface. At about 40 inches, cemented material is mapped across 77 percent of the area, with sandy clay loam also present. Those map patterns help with planning, but they are not a substitute for checking the route.
Could a directional bore in Hebbronville hit deeper rock, since bedrock is not mapped in the top five feet?
Bedrock is not mapped in Hebbronville’s top five feet, but that does not rule out deeper rock. The geologic map shows Holocene sand sheet and Pliocene sedimentary deposits. A route near Noriacitas Creek still needs site specific depth planning because mapped geology describes broad units, not conditions at every bore location.
For a crossing beneath Texas State Highway 16 in Hebbronville, who approves the bore?
TxDOT reviews a utility permit for work in the Texas State Highway 16 right of way through its Pharr District. The utility that owns the line submits the application in RULIS, and we prepare the bore plan and profile for it. A crossing under Galbraith Street instead follows the authority responsible for that county road.
What does a bore under CPKC (Kansas City Southern) in Hebbronville need?
A crossing under the CPKC (Kansas City Southern) Laredo Subdivision needs an agreement from the railroad that owns the track. The agreement sets crossing conditions such as casing, depth and flagging. Public records map 2.95 track miles inside Hebbronville, so the proposed alignment needs to be checked against the track location.
What bore sizes and lengths can Trinity handle near Oak Avenue in Hebbronville?
We handle lines from 3/4 inch service size up to 48 inch casing, with bore lengths from 10 feet to 5,000 feet. A service near Oak Avenue and a longer crossing of Texas State Highway 16 can call for different equipment and planning. The route, pipe size and ground conditions help determine the setup.
How much 811 notice is needed for a bore near Galbraith Street in Hebbronville?
Texas811 requires a locate request at least 48 hours before excavation, excluding Saturdays, Sundays and legal holidays, and no earlier than 14 days before it. If our Hebbronville start moves more than 14 days past the original notice, we make a new request. Marks near Galbraith Street that wear off or move must be refreshed through Texas811 before work continues.
What affects the cost of directional boring near Texas State Highway 16 in Hebbronville?
Length, pipe or conduit size, soil, utility crossings, pavement, pits and creek crossings all affect the job scope. Cemented material mapped beneath parts of Hebbronville may change the drilling plan, while a Texas State Highway 16 crossing adds permit and route considerations. Mobilization also reflects the 635 road miles from our Yukon office.
Where the Hebbronville facts on this page come from
- USDA Natural Resources Conservation Service, Soil Data Access: soil survey map units inside Hebbronville
- U.S. Census Bureau, TIGER/Line 2024: Hebbronville boundary, roads, rail lines and streams
- U.S. Census Bureau, 2020 Census: Hebbronville population count
- U.S. Census Bureau, American Community Survey 2019 to 2023: Hebbronville housing units and year built
- Macrostrat geologic map compilation: map units under Hebbronville
- U.S. Department of Transportation, North American Rail Network: track owners in Jim Hogg County
- U.S. Energy Information Administration, Form EIA 861: electric utilities serving Jim Hogg County
- U.S. Geological Survey, Elevation Point Query Service: Hebbronville elevation
- OpenStreetMap road network through the OSRM router: road miles from Yukon, Oklahoma to Hebbronville
- Texas Utilities Code Chapter 251, Underground Facility Damage Prevention and Safety
- TxDOT Utility Accommodation Rules, 43 Tex. Admin. Code 21.40: underground utilities
- Texas Department of Transportation: Right of Way Utility and Leasing Information System (RULIS) utility permits
Get a Quote for a Bore in Hebbronville
Send the address, what is going in, the size and the footage.
Trinity Boring Solutions
9102 NW Expressway, Yukon, OK 73099
(405) 409-7423 | darren@trinityboringsolutions.com
Free Bore Planner
Plan Your Bore in Hebbronville, Texas
Type the address of your job in Hebbronville. The Bore Planner opens an aerial map at that spot. Drop one pin where the bore starts and one where it ends, tell us what is going in and send the scope to our crew.
Talk to the crew that does the work
Fastest way to a number is a phone call. Tell us where the crossing is and what is going in the ground, and you will get a straight answer on the same call. Bores from 10 feet to 5,000 feet, 3/4 inch service line through 48 inch casing, anywhere in Oklahoma and Texas. We run 24/7 for main breaks and emergency repairs.
Answered by a person, not a call center.
Would rather not call? Send the details and we will come back with a written quote.
County and State Pages for Hebbronville
Same county: Guerra. All counties: Texas county list.