Loma Linda East Texas Directional Boring: Opelika Soil, CPKC Track and San Diego Creek
Quick Answer: Wildwood Circle is the only named street; we handle directional boring, also called horizontal directional drilling (HDD), beneath Texas State Highway 44. Loma Linda East is 598 road miles from our Yukon, Oklahoma main office, and CPKC track crossings need their own plan. Opelika fine sandy loam covers 22 percent of mapped ground, while sandy clay loam is mapped under about 40 inches across 84 percent, where sticky soil can grip pipe. San Diego Creek adds a water crossing concern.
Loma Linda East bores at a glance
- Unincorporated community in Jim Wells County, Texas. Population 305 (2020 Census count).
- Road distance from our Yukon, Oklahoma main office: 598 miles, about 11.7 hours of driving.
- Ground: Opelika soil is mapped on 22 percent of the area, with sandy clay loam about 40 inches down.
- Rock: no bedrock is mapped in the top 60 inches.
- Highways inside the boundary: Texas State Highway 44 and Texas State Highway 359. State permit office: TxDOT Corpus Christi District.
- Railroad track inside the boundary: CPKC (Kansas City Southern), with 6 mapped street and rail crossings.
- Named streams inside the boundary: San Diego Creek.
- Texas811: locate request at least two working days before a bore and no more than 14 days ahead.
- Range: 3/4 inch service lines to 48 inch casing, 10 feet to 5,000 feet.
- Phone answered 24 hours a day: (405) 409-7423
Who handles directional boring near Texas State Highway 44 in Loma Linda East?
Wildwood Circle is the only named street in the records, within 20.67 public road centerline miles; Texas State Highway 44 and Texas State Highway 359 also run through the mapped community. Loma Linda East is an unincorporated community in Jim Wells County, with 305 people in the 2020 Census count. We install water, sewer, gas, electric conduit and fiber along routes such as the highways and Wildwood Circle.
For a service along Wildwood Circle, our range starts with a 3/4 inch service line; a larger crossing may call for 48 inch casing. Our main office is in Yukon, Oklahoma, and Loma Linda East work is done with our own crews and from satellite yards run by partner drilling contractors Trinity has personally vetted. We are a family business that started in 1965 and has done directional boring since 1982, with those options suited to local service and crossing work.

What is Loma Linda East ground like to bore in Opelika soil?
The USDA soil survey maps Opelika soil across 22 percent of Loma Linda East, with Runge at 15 percent and Czar at 12 percent. Opelika fine sandy loam is the largest named map unit. Fine sandy loam makes up 72 percent of mapped surface texture, while sandy clay loam is 84 percent of the texture mapped at about 40 inches below the surface. Average clay content at that depth is 29 percent. These are mapped patterns, not test borings, so the route still needs field planning.
| USDA soil survey, inside the Loma Linda East mapped community boundary | What is mapped |
|---|---|
| Soil series mapped | Opelika 22 percent, Runge 15 percent, Czar 12 percent, Pharr 11 percent and Racombes 9 percent |
| Texture at the surface | fine sandy loam 72 percent, sandy clay loam 13 percent and clay 8 percent |
| Texture about 40 inches down | sandy clay loam 84 percent, clay 8 percent and clay loam 5 percent |
| Engineering class about 40 inches down | lean clay (CL) 62 percent, clayey sand (SC) 18 percent and fat clay (CH) 12 percent |
| Average clay content about 40 inches down | 29 percent |
| Bedrock mapped within 60 inches | None mapped |
| Seasonal water table within 60 inches | 27 percent of the area |
| Flood prone soils | 3 percent of the area |
| High corrosion risk for uncoated steel | 30 percent of the area |
For Loma Linda East, we plan bore depth with the mapped bedrock limit in mind: bedrock is not mapped in the top five feet, though deeper rock remains possible. The USDA soil survey maps a seasonal water table within 60 inches across 27 percent of the area, so bore pits may need pumping. Flood prone soils cover 3 percent, including ground where a San Diego Creek crossing needs careful depth planning. Across Loma Linda East, we advise the line owner to consider casing and tracer wire materials where high steel corrosion risk is mapped across 30 percent. The geologic map shows Pleistocene Lissie Formation and Chibanian alluvium; neither establishes conditions at a specific bore.
What does it take to bore Loma Linda East sandy clay loam?
Sandy clay loam is mapped under about 40 inches across much of Loma Linda East. We plan the fluid and reaming around that soil, the seasonal water table, and the route near San Diego Creek.
- In Loma Linda East sandy clay loam, we use a thinner drilling fluid with polymer and open the hole in stages so sticky cuttings do not build up on the reamer.
- Where seasonal water is possible in the mapped ground near San Diego Creek, we keep pits small and pump them as needed to manage water.
- At a Texas State Highway 44 crossing, we track the drill head from the surface and record its depth and pitch as the bore advances.
- Before a bore near Wildwood Circle, we hydrovac expose each marked utility on the path; paint locates position, not depth.

Which roads, tracks or creeks cross Loma Linda East with CPKC (Kansas City Southern)?
Texas State Highway 44 has 8.0 mapped roadway miles inside the Loma Linda East boundary, and Texas State Highway 359 has 4.0. Those state routes may put a bore under pavement or through right of way, so the crossing plan matters. The records name one street, Wildwood Circle, with 0.13 miles inside the community. Across the mapped community there are 20.67 public road centerline miles, but the one named street means route details need to be checked against the project address.
| Crossing | Type | Mapped extent | Who has a say |
|---|---|---|---|
| Texas State Highway 44 | State highway | 8 roadway miles inside | State highway office |
| Texas State Highway 359 | State highway | 4 roadway miles inside | State highway office |
| CPKC (Kansas City Southern) | Railroad | 5.24 track miles inside | The railroad |
| San Diego Creek | Stream | 2.81 channel miles inside | Checked for Corps of Engineers jurisdiction |
| Lattas Creek | Stream nearby | 0.2 miles outside | Checked for Corps of Engineers jurisdiction |
CPKC (Kansas City Southern) has 5.24 track miles inside Loma Linda East, on its Laredo Subdivision. Six mapped street and rail crossings in the community make track location part of route planning. San Diego Creek has 2.81 channel miles inside the boundary, and two mapped street crossings of named streams occur there. Lattas Creek is 0.2 miles from the boundary. A creek bore needs a planned path beneath the channel, not an assumption based on surface appearance.
Who signs off on a Loma Linda East bore in Jim Wells County?
Loma Linda East has no city government, so street authority rests with Jim Wells County or the state, depending on the route. Texas State Highway 44 and Texas State Highway 359 are state highways. At a highway crossing, electric and communication lines need at least 60 inches of cover below the lowest crossed grade; water lines need 60 inches, and pressurized sewer lines need 60 inches. TxDOT requires a utility permit for work in highway right of way. The utility owner files through RULIS, the TxDOT Corpus Christi District reviews it, and we prepare the bore plan and profile for that filing.
Read the rules for yourself: Texas Utilities Code Chapter 251 on notice to Texas811, the Texas811 questions and answers page, the TxDOT Utility Accommodation Rules, 43 TAC 21.40 and TxDOT utility permits in RULIS.
What lines are in the ground in Loma Linda East, Jim Wells County?
The water provider for a specific Loma Linda East address has to be confirmed with the county or the local water district before a bore is planned. Public records do not match a provider to this community. AEP Texas Central, Nueces Electric Cooperative and San Patricio Electric Cooperative report electric service in Jim Wells County, but that does not establish which one serves an address. We identify the line owner before planning an electric conduit bore near Texas State Highway 44.
| Line owner | What it is | Source | Size |
|---|---|---|---|
| AEP Texas Central, Nueces Electric Cooperative and San Patricio Electric Cooperative | Electric utilities reporting service in Jim Wells County | EIA Form 861 | Confirm the line owner by address |
Housing figures are not published for a place this small, so the records do not show whether Wildwood Circle work is an old line replacement or a new service. Long service runs and routes beside Texas State Highway 44 are possibilities to check at the address. Jim Wells County averages 26.1 inches of rain a year, with September averaging 4.4 inches, so wet ground can affect access and pits. We pothole marked utilities before drilling near them because paint shows position, not depth.

Where is Loma Linda East near San Diego?
Loma Linda East is an unincorporated community in Jim Wells County, Texas, at an elevation of 285 feet and covering 5.14 square miles. Its ZIP code is 78332. San Diego is 2.8 miles west, Coyote Acres is 5.2 miles southeast, and Rancho Alegre is 5.9 miles east. Alice, the nearest larger city and county seat, is 7.9 miles east. From our Yukon, Oklahoma main office, the route is 598 road miles and a 11.7 hour drive, which is part of planning mobilization for a job near San Diego Creek.
Places near Loma Linda East
- Directional boring in San Diego: 2.8 miles west
- Directional boring in Coyote Acres: 5.2 miles southeast
- Directional boring in Rancho Alegre: 5.9 miles east
- Directional boring in Alice Acres: 6.5 miles southeast
- Directional boring in Alice: 7.9 miles east
What kinds of bores come up around Wildwood Circle in Loma Linda East?
- Highway crossing: A Texas State Highway 44 bore needs a planned path under pavement and the required cover set by the TxDOT permit.
- Water service: A service near Wildwood Circle can be bored between pits, leaving the street surface uncut.
- Fiber route: A conduit along Texas State Highway 359 needs its route checked against existing marked lines before drilling.
- Creek crossing: A San Diego Creek bore needs depth planning beneath the channel and a check for federal jurisdiction.
- Rail crossing: Work beneath CPKC track in Loma Linda East needs an agreement from the railroad that owns the line.
- Drainage route: Unnamed drainage in Loma Linda East can shape the bore path and pit locations.
More on each kind of work: water line boring, electric line boring, fiber optic boring, road, railroad and creek crossings and municipal boring.
What should I send for a Loma Linda East quote near San Diego Creek?
Start with the address or map pin, such as a route near Wildwood Circle or San Diego Creek. Tell us what goes underground, such as a water line or fiber conduit, then give the pipe or conduit size and the footage. A sketch or plans help us see the path, crossings and work areas before we prepare the quote.
Price follows the work at the specific Loma Linda East site. Soil comes first: sandy clay loam at about 40 inches can affect fluid, reaming and pullback. The number of utilities to expose and the CPKC track or Texas State Highway 44 crossings also shape the plan. Pavement, creek or drainage crossings, pits, excavator time and sand backfill add scope. Mobilization matters because the Yukon main office is 598 road miles away; emergency or high profile work can change planning needs.
Questions people ask about boring in Loma Linda East
Does Trinity take directional boring jobs in Loma Linda East and Jim Wells County?
Yes. We take directional boring work in Loma Linda East and across Texas, accounting for the area’s mapped bedrock and corrosion conditions. Our main office is in Yukon, and work can be staffed by our own crews or by crews from partner drilling contractors we have vetted. We stay involved from the first call through the bore log, whether the job is near Wildwood Circle or Texas State Highway 44.
Who controls streets in Loma Linda East, Jim Wells County, and can a bore avoid cutting them?
Loma Linda East is unincorporated, so it has no city government; street authority is with the county or state according to the road. A directional bore can pass under Wildwood Circle without opening the street surface when the site and design allow. Texas State Highway 44 work also needs its state right of way permit process.
Can groundwater or flooding affect bore pits near San Diego Creek in Loma Linda East?
It can. The USDA soil survey maps a seasonal water table within 60 inches across 27 percent of Loma Linda East, and 3 percent of the area has flood prone soils. Near San Diego Creek, those conditions can mean smaller pits, pumping and a carefully planned route beneath the channel.
Can Loma Linda East Opelika soil corrode steel, and what pipe should we use?
The soil survey maps high steel corrosion risk across 30 percent of Loma Linda East. That risk can matter for steel casing and tracer wire. The line owner selects suitable coatings or materials for the project; HDPE does not have the same soil corrosion concern. The mapped Opelika soil is not a substitute for checking the actual route.
What ground will a bore pass through in Loma Linda East Opelika soil?
The USDA soil survey maps Opelika soil across 22 percent of the community and sandy clay loam under about 40 inches across 84 percent. Average clay content at that depth is 29 percent. Sticky clay can cling to a reamer and grip pipe, so staged reaming and a timely pullback can help manage the ground.
Will our directional bore in Loma Linda East encounter deeper rock, since bedrock is not mapped in the top five feet?
Bedrock is not mapped in the top five feet of Loma Linda East, but deeper rock is not ruled out. The geologic map shows Pleistocene Lissie Formation and Chibanian alluvium. Those map units describe regional materials, not the exact conditions under a route, so the bore plan still accounts for what the drill encounters.
Does Trinity cover San Diego and rural sites outside Loma Linda East?
Yes. We take work across Texas, including routes near San Diego and rural sites beyond the mapped Loma Linda East boundary. San Diego is 2.8 miles west of the community. We review each address and scope to plan travel, access and the crossings along that particular route.
How much Texas811 notice is needed for a bore near Wildwood Circle in Loma Linda East?
Paint near Wildwood Circle shows a marked line’s position, not its depth. Texas law requires a Texas811 locate request at least 48 hours before excavation, excluding Saturdays, Sundays and legal holidays, and no earlier than 14 days ahead. If the start slips more than 14 days past the original notice, request a new ticket; worn or moved marks need refreshing before work continues.
What affects the cost of directional boring near Texas State Highway 44 in Loma Linda East?
The price depends on the route and scope, not just footage. Sandy clay loam, utility exposures, Texas State Highway 44 pavement, CPKC track crossings and San Diego Creek drainage can all change the work. Pipe size, bore length, pits, excavator time, backfill and mobilization from Yukon also matter. We need the address, line type, size and footage to assess the job.
Where the Loma Linda East facts on this page come from
- USDA Natural Resources Conservation Service, Soil Data Access: soil survey map units inside Loma Linda East
- U.S. Census Bureau, TIGER/Line 2024: Loma Linda East boundary, roads, rail lines and streams
- U.S. Census Bureau, 2020 Census: Loma Linda East population count
- Macrostrat geologic map compilation: map units under Loma Linda East
- U.S. Department of Transportation, North American Rail Network: track owners in Jim Wells County
- U.S. Energy Information Administration, Form EIA 861: electric utilities serving Jim Wells County
- U.S. Geological Survey, Elevation Point Query Service: Loma Linda East elevation
- OpenStreetMap road network through the OSRM router: road miles from Yukon, Oklahoma to Loma Linda East
- Texas Utilities Code Chapter 251, Underground Facility Damage Prevention and Safety
- TxDOT Utility Accommodation Rules, 43 Tex. Admin. Code 21.40: underground utilities
- Texas Department of Transportation: Right of Way Utility and Leasing Information System (RULIS) utility permits
Get a Quote for a Bore in Loma Linda East
Send the address, what is going in, the size and the footage.
Trinity Boring Solutions
9102 NW Expressway, Yukon, OK 73099
(405) 409-7423 | darren@trinityboringsolutions.com
Free Bore Planner
Plan Your Bore in Loma Linda East, Texas
Type the address of your job in Loma Linda East. The Bore Planner opens an aerial map at that spot. Drop one pin where the bore starts and one where it ends, tell us what is going in and send the scope to our crew.
Talk to the crew that does the work
Fastest way to a number is a phone call. Tell us where the crossing is and what is going in the ground, and you will get a straight answer on the same call. Bores from 10 feet to 5,000 feet, 3/4 inch service line through 48 inch casing, anywhere in Oklahoma and Texas. We run 24/7 for main breaks and emergency repairs.
Answered by a person, not a call center.
Would rather not call? Send the details and we will come back with a written quote.
County and State Pages for Loma Linda East
Same county: Premont · Orange Grove · Sandia · Westdale · K-Bar Ranch · South La Paloma · Amargosa · Owl Ranch · Alfred · Ben Bolt. All counties: Texas county list.