trinityboringsolutions.com

Thompsonville Texas Directional Boring: Nueces Soil, FM 3073 And Arroyo De Maqueyes

Quick Answer: Thompsonville is an unincorporated community in Jim Hogg County, so county or state authorities own its streets; we do directional boring, also called horizontal directional drilling (HDD), for routes near Arroyo de Maqueyes. The Yukon main office is 644 road miles away, and Arroyo Lane can help define the access and route. Nueces soil covers 40 percent of the mapped area, and sandy ground can cave behind a drill head. Staged reaming and drilling fluid help keep the hole open for the pipe.

Family Business Since 1965 Boring Since 1982 24 Hour Phone No Utility Strike in 25 Years

Thompsonville bores at a glance

  • Unincorporated community in Jim Hogg County, Texas. Population 26 (2020 Census count).
  • Road distance from our Yukon, Oklahoma main office: 644 miles, about 13 hours of driving.
  • Ground: Nueces soil is mapped on 40 percent of the area, with cemented material about 40 inches down.
  • Rock: no bedrock is mapped in the top 60 inches.
  • Highways inside the boundary: FM 3073. State permit office: TxDOT Pharr District.
  • Railroad track inside the boundary: none mapped.
  • Named streams inside the boundary: Arroyo de Maqueyes and Arroyo del Gato.
  • Texas811: locate request at least two working days before a bore and no more than 14 days ahead.
  • Range: 3/4 inch service lines to 48 inch casing, 10 feet to 5,000 feet.
  • Phone answered 24 hours a day: (405) 409-7423

Which contractor handles directional boring near Arroyo de Maqueyes in Thompsonville?

Thompsonville is an unincorporated community in Jim Hogg County, so its public streets are under county or state authority, not a town government. The Census Bureau counted 26 residents in 2020; it does not publish yearly estimates for unincorporated places. We install water, sewer, gas, electric conduit and fiber lines, including routes along Arroyo Lane or near Arroyo de Maqueyes.

Our main office is in Yukon, Oklahoma, and Thompsonville work is done with our own crews and from satellite yards run by partner drilling contractors Trinity has personally vetted. Our family business began in 1965, with directional boring added in 1982. FM 3073 and Arroyo de Maqueyes crossings are within our range of 3/4 inch service lines through 48 inch casing and bore lengths of 10 feet to 5,000 feet.

Ditch Witch JT922 compact directional drill beside the Trinity Boring Solutions truck at NE 24th Street in Oklahoma City
Our Ditch Witch JT922 compact directional drill beside the Trinity truck on a sleeve bore at NE 24th Street in Oklahoma City. Photos on this page are from our jobs in Oklahoma and Texas.

What kind of ground does Thompsonville have around Nueces soil?

The USDA soil survey maps Nueces series soils across 40 percent of Thompsonville, with Delmita also mapped across 40 percent. Surface textures are fine sand over 40 percent, loamy fine sand over 33 percent and fine sandy loam over 27 percent. At about 40 inches below the surface, the survey maps cemented material over 57 percent of the area and sandy clay loam over 40 percent. Sandy textures account for 43 percent at that depth, while average clay content is 25 percent. These are mapped patterns, not test borings for an Arroyo Lane project.

USDA soil survey, inside the Thompsonville mapped community boundaryWhat is mapped
Soil series mappedNueces 40 percent, Delmita 40 percent, Randado 11 percent, Cuevitas 6 percent and Comitas 3 percent
Texture at the surfacefine sand 40 percent, loamy fine sand 33 percent and fine sandy loam 27 percent
Texture about 40 inches downcemented material 57 percent, sandy clay loam 40 percent and fine sandy loam 3 percent
Engineering class about 40 inches downclayey sand (SC) 40 percent and silty clayey sand (SC SM) 3 percent
Average clay content about 40 inches down25 percent
Bedrock mapped within 60 inchesNone mapped
Seasonal water table within 60 inches0 percent of the area
Flood prone soils0 percent of the area
High corrosion risk for uncoated steel0 percent of the area

Bedrock is not mapped in the top five feet around Arroyo de Maqueyes, though that does not rule out deeper rock. The USDA soil survey maps no seasonal water table within 60 inches and no flood prone soils, so those mapped conditions do not point to wet pits or creek bank flooding. High steel corrosion risk is not mapped, but the line owner should choose casing and tracer wire materials. The geologic map shows a Holocene sand sheet, about 0.5 to 5 m thick in the southeastern map area, and Pliocene sedimentary deposits. Sand can cave behind the bit, so the bore plan needs to account for hole support.

How do crews bore Thompsonville ground with cemented material?

At about 40 inches, the USDA soil survey maps cemented material across much of Thompsonville and sandy clay loam across another large share. We match fluid, reaming and tracking to the route beneath FM 3073 or Arroyo Lane.

  1. Sandy layers cover much of the mapped surface around Arroyo Lane, so we use drilling fluid to support the hole and ream in stages before pulling pipe.
  2. Where cemented material is mapped at about 40 inches near FM 3073, we track the head depth and pitch as the bore advances.
  3. Before drilling near a marked utility on El Maguey Lane, we expose it with hydrovac potholing because surface paint does not show its depth.
  4. At Arroyo de Maqueyes, we plan the profile below the channel and check the crossing for U.S. Army Corps of Engineers jurisdiction.
Trinity Boring Solutions water trailer supplying water for bentonite drilling fluid on a sleeve bore in northeast OKC
Our water trailer feeding the bentonite drilling fluid mix on a sleeve bore in northeast Oklahoma City.

What is in the way of a new line in Thompsonville near Arroyo Lane?

FM 3073 is the state highway inside the mapped community boundary, with 3.5 roadway miles there; no other highway is mapped within 1.5 miles outside the boundary. Arroyo Lane is the longest named street at 1.97 miles. El Maguey Lane runs 0.4 miles, Armstrong Road 0.27 miles and Postman Lane 0.25 miles. A route crossing FM 3073 needs highway planning, while the shorter named roads can shape access and bore entry locations. The mapped community has 17.35 public road centerline miles in all.

CrossingTypeMapped extentWho has a say
FM 3073State highway3.5 roadway miles insideState highway office
Arroyo de MaqueyesStream1.89 channel miles insideChecked for Corps of Engineers jurisdiction
Arroyo del GatoStream0.54 channel miles insideChecked for Corps of Engineers jurisdiction
Magueyas CreekStream nearby0.5 miles outsideChecked for Corps of Engineers jurisdiction
Swipe the table sideways to see every column.

No railroad is mapped inside the Thompsonville boundary or within one mile outside it, so there is no mapped track route to plan around. Arroyo de Maqueyes runs 1.89 channel miles inside the community, and Arroyo del Gato runs 0.54 miles. Three street crossings of named streams are mapped. A route under Arroyo de Maqueyes needs creek crossing review, including a check during planning for U.S. Army Corps of Engineers jurisdiction. We check drainage near Arroyo de Maqueyes and Arroyo del Gato on bore routes; no lakes or ponds are mapped within one mile.

Do I need a permit for a Thompsonville bore in Jim Hogg County?

Thompsonville has no city government, so public street authority belongs to Jim Hogg County or the state, depending on the road. FM 3073 is a state highway, and work in its right of way needs a TxDOT utility permit. The TxDOT Pharr District reviews that application, which the utility owner files through TxDOT’s online RULIS system; we prepare the bore plan and profile for the owner’s application and work under its permit. TxDOT rules require boring or tunneling beneath existing highway pavement. A crossing of Arroyo de Maqueyes is checked for Corps jurisdiction during planning.

Read the rules for yourself: Texas Utilities Code Chapter 251 on notice to Texas811, the Texas811 questions and answers page, the TxDOT Utility Accommodation Rules, 43 TAC 21.40 and TxDOT utility permits in RULIS.

What lines are already in the ground in Thompsonville, Jim Hogg County?

The water provider for an Arroyo Lane address has to be confirmed with the county or the local water district before a bore is planned; a provider could not be matched to Thompsonville. AEP Texas Central and Medina Electric Cooperative report electric service in Jim Hogg County, but that does not establish which one owns a line at a specific address. We confirm the line owner before planning an electric conduit bore near FM 3073.

Line ownerWhat it isSourceSize
AEP Texas Central and Medina Electric CooperativeElectric utilities reporting service in Jim Hogg CountyEIA Form 861Confirm the line owner by address
Swipe the table sideways to see every column.

Housing data is not published for a place as small as Thompsonville, so a home age breakdown is not reliable. For a route along Arroyo Lane or El Maguey Lane, a small community can mean long service runs between the main and an individual connection. Jim Hogg County averages 23.0 inches of precipitation a year, with September the wettest month at 4.5 inches. We hydrovac pothole every marked utility along FM 3073 before drilling nearby; paint shows position, not depth. That check matters where a line crosses a street.

Exposed underground utility line in a hand dug potholing pit before a directional bore in Oklahoma
An existing utility line exposed in a pothole before a directional bore in Oklahoma.

How far is Thompsonville from Hebbronville and the Yukon yard?

Thompsonville is in Jim Hogg County, at an elevation of 666 feet, and covers 3.89 square miles. Its ZIP code is 78361. South Fork Estates is 3.8 miles east, Hebbronville is 7.6 miles northeast, Las Lomitas is 9.2 miles northeast, Bruni is 12.0 miles north and Mirando City is 18.2 miles northwest. Hebbronville is the county seat; Zapata is the nearest larger city, 38.4 miles southwest. From the Yukon, Oklahoma main office, the route is 644 road miles and a 13.0 hour drive, which affects crew mobilization for FM 3073 work.

Places near Thompsonville

What kinds of bores come up in Thompsonville near El Maguey Lane?

  • Highway crossing: A bore beneath FM 3073 needs a route and profile that fit TxDOT’s highway right of way requirements.
  • Water service: A new service along Arroyo Lane needs the address specific water provider confirmed before we plan the connection.
  • Fiber route: A conduit run near El Maguey Lane can connect a property without cutting the street surface.
  • Creek crossing: A line under Arroyo de Maqueyes needs a planned profile and a jurisdiction check during crossing review.
  • Electric conduit: Before planning a route from Armstrong Road, we confirm which electric line owner serves that specific address.
  • Service extension: A longer run near Postman Lane can be scoped from the map pin, footage and pipe or conduit size.

More on each kind of work: water line boring, electric line boring, fiber optic boring, road, railroad and creek crossings and municipal boring.

What drives the price of a Thompsonville bore near FM 3073?

We need a map pin or address first for a bore near Arroyo Lane so we can check the route. The exact spot matters near FM 3073 or Arroyo de Maqueyes because the route can involve a highway or creek crossing. We also need to know what will go underground, the pipe or conduit size and the footage. A sketch or plans help us see pits, access and the proposed path before we prepare a quote.

Ground conditions, crossings and logistics each affect the job. The mapped Nueces and Delmita soils, including cemented material at about 40 inches, can change how we ream and support the hole. A crossing under FM 3073 or Arroyo de Maqueyes calls for route and permit planning. Pipe size, length, exposed utilities, pavement, pits and excavator time also matter. Thompsonville is 644 road miles from Yukon, so mobilization is part of the scope.

Questions people ask about boring in Thompsonville

Does Trinity take directional boring jobs in Thompsonville and Jim Hogg County?

Yes. We take work across Texas, including Thompsonville in Jim Hogg County. The job is handled by our own crews or from a satellite yard operated by a drilling contractor we have vetted. You work with Trinity from the first call through the bore log, including for a route near Arroyo de Maqueyes.

What ground will a Thompsonville bore pass through in Nueces soil?

The USDA soil survey maps Nueces soil across 40 percent of Thompsonville, with fine sand and loamy fine sand common at the surface. At about 40 inches, cemented material is mapped across 57 percent and sandy clay loam across 40 percent. These are survey patterns, not test borings at an Arroyo Lane address.

Will a bore in Thompsonville hit rock near Arroyo del Gato?

Bedrock is not mapped in the top five feet of Thompsonville, but that does not rule out rock deeper down near Arroyo del Gato. The geologic map shows a Holocene sand sheet in the southeastern map area and Pliocene sedimentary deposits. We use the route and site conditions to guide the bore plan.

Who approves a Thompsonville bore under FM 3073?

TxDOT reviews work in the FM 3073 right of way through the Pharr District. The utility owner submits the application in TxDOT’s RULIS system, while we provide the bore plan and profile and work under the owner’s permit. The permit and route plan apply to the specific highway crossing.

Can a line be bored under Arroyo de Maqueyes in Thompsonville?

A line can be planned beneath Arroyo de Maqueyes, which has 1.89 channel miles inside the mapped community. During planning, the creek crossing is checked for U.S. Army Corps of Engineers jurisdiction. The bore profile must account for the channel and the actual site conditions.

Who owns electric lines in Thompsonville, Jim Hogg County, and who checks conduit specs?

AEP Texas Central and Medina Electric Cooperative report service in Jim Hogg County, but the owner at a Thompsonville address must be confirmed. The line owner can confirm conduit specifications before a bore is planned. That step matters for a proposed route along FM 3073 or a local road.

How much 811 notice does a Thompsonville bore near Arroyo Lane need?

Texas811 needs a locate request at least 48 hours before excavation, excluding Saturdays, Sundays and legal holidays, and no earlier than 14 days before. For work near Arroyo Lane, paint shows utility position but not depth. If the start slips more than 14 days after the original notice, make a new request; worn or moved marks must be refreshed through Texas811 before work continues.

Does Thompsonville’s distance from Zapata change a bore from Yukon?

Thompsonville in Jim Hogg County is 644 road miles and a 13.0 hour drive from our Yukon, Oklahoma main office, so we plan travel accordingly. Zapata is 38.4 miles southwest and is the nearest larger city. The distance from Yukon affects mobilization, so we consider it along with the route, footage and access for work near FM 3073.

What affects the cost of directional boring in Thompsonville near FM 3073?

The job scope drives the price: length, pipe or conduit size, ground, utility crossings, pavement, pits and equipment time all matter. Cemented material in the mapped soil at about 40 inches can affect drilling plans. FM 3073 may add highway permit and crossing work, while the 644 road miles from Yukon affect mobilization.

Where the Thompsonville facts on this page come from

Darren Rice in a safety vest at the bore pit beside the Trinity Boring Solutions Ditch Witch directional drill, with drill rods racked, on the airfield at Will Rogers World Airport in Oklahoma City

About Trinity Boring Solutions

Trinity Boring Solutions is a family business in Yukon, Oklahoma, founded by Dean Rice in 1965 and owned today by Darren Rice, who started its directional boring side in 1982. The company bores across Oklahoma and Texas. No bore is too big or too small: 4 foot sidewalk sleeves to roughly 4,100 feet under the Arkansas River in Tulsa. Reach us at (405) 409-7423.

Get a Quote for a Bore in Thompsonville

Send the address, what is going in, the size and the footage.

Trinity Boring Solutions
9102 NW Expressway, Yukon, OK 73099
(405) 409-7423 | darren@trinityboringsolutions.com

Trinity Boring Solutions | 24/7 Available ☎ Call (405) 409-7423 Free Quote

Free Bore Planner

Plan Your Bore in Thompsonville, Texas

Type the address of your job in Thompsonville. The Bore Planner opens an aerial map at that spot. Drop one pin where the bore starts and one where it ends, tell us what is going in and send the scope to our crew.

Talk to the crew that does the work

Fastest way to a number is a phone call. Tell us where the crossing is and what is going in the ground, and you will get a straight answer on the same call. Bores from 10 feet to 5,000 feet, 3/4 inch service line through 48 inch casing, anywhere in Oklahoma and Texas. We run 24/7 for main breaks and emergency repairs.

Call (405) 409-7423

Answered by a person, not a call center.

Would rather not call? Send the details and we will come back with a written quote.

Quick Quote In Page

County and State Pages for Thompsonville

Same county: Guerra. All counties: Texas county list.