Asherton Texas Directional Boring: Verick Soil, US 83 and El Moro Creek

Quick Answer: US 83 is the main road constraint; we do directional boring, also called horizontal directional drilling (HDD), for lines routed beneath it. From our Yukon, Oklahoma main office, Asherton is 594 road miles away, and access along FM 190 helps shape the mobilization plan. Verick soil covers 46 percent of the mapped area, while cemented bedrock is mapped about 40 inches down in 46 percent. That ground can slow drilling and calls for a bore plan matched to the route.

Family Business Since 1965 Boring Since 1982 24 Hour Phone No Utility Strike in 25 Years

Asherton bores at a glance

  • Incorporated city in Dimmit County, Texas. Population 678 (Census Bureau 2024 estimate).
  • Road distance from our Yukon, Oklahoma main office: 594 miles, about 11.7 hours of driving.
  • Ground: Verick soil is mapped on 46 percent of the area, with cemented bedrock about 40 inches down.
  • Rock: bedrock is mapped within 60 inches on 65 percent of the area.
  • Highways inside the boundary: US 83 and FM 190. State permit office: TxDOT Laredo District.
  • Railroad track inside the boundary: none mapped.
  • Public water: City of Asherton, groundwater wells.
  • Texas811: locate request at least two working days before a bore and no more than 14 days ahead.
  • Range: 3/4 inch service lines to 48 inch casing, 10 feet to 5,000 feet.
  • Phone answered 24 hours a day: (405) 409-7423

Who can I call for directional boring on Carter Street in Asherton?

We take directional boring work in Asherton, in Dimmit County, where the Census Bureau Vintage 2024 estimate puts the population at 678. For a line along Carter Street or another city road, we install water, sewer, gas, electric conduit and fiber by bore, with the route and line type guiding the setup. That keeps the surface route available while the new line goes below it.

Our main office is in Yukon, Oklahoma, and Asherton work is done with our own crews and from satellite yards run by partner drilling contractors Trinity has personally vetted. Since 1982, four decades of directional boring have taught us to plan for changing ground, including the cemented bedrock mapped below parts of Asherton. The family business began in 1965, and that experience shapes how we select equipment and sequence a bore.

Compact Ditch Witch drill rig boring a new utility line across a front yard on a residential street in Edmond, Oklahoma
Our compact Ditch Witch drill boring a new utility line across a front yard on a residential street in Edmond, Oklahoma. Photos on this page are from our jobs in Oklahoma and Texas.

What is Verick soil like to bore in Asherton?

The USDA soil survey maps Verick soil across 46 percent of Asherton, with Brundage mapped across another 34 percent. Fine sandy loam makes up 91 percent of the mapped surface texture. At about 40 inches down, cemented bedrock is mapped in 46 percent of the area, sandy clay loam in 45 percent and clay in 8 percent. Average clay content at that depth is 30 percent. These are mapped soil patterns, not results from test borings, so the exact route still matters.

USDA soil survey, inside the Asherton city limitsWhat is mapped
Soil series mappedVerick 46 percent, Brundage 34 percent, Tonio 12 percent and Maverick 7 percent
Texture at the surfacefine sandy loam 91 percent and clay loam 7 percent
Texture about 40 inches downcemented bedrock 46 percent, sandy clay loam 45 percent and clay 8 percent
Engineering class about 40 inches downclayey sand (SC) 34 percent, lean clay (CL) 13 percent and fat clay (CH) 8 percent
Average clay content about 40 inches down30 percent
Bedrock mapped within 60 inches65 percent of the area (0 percent hard rock, 65 percent weathered rock)
Seasonal water table within 60 inches0 percent of the area
Flood prone soils34 percent of the area
High corrosion risk for uncoated steel43 percent of the area

Bedrock is mapped within 60 inches across 65 percent of Asherton, and it is mapped as weathered bedrock; hard bedrock is not mapped in that depth range. The seasonal water table is not mapped within 60 inches, while flood prone soils cover 34 percent. High steel corrosion risk is mapped in 43 percent, so the line owner should choose any coating for steel casing or tracer wire; HDPE avoids that steel corrosion concern. The Eocene Bigford Formation includes clay, sandstone, shale and lignite, a mix that can make the drill slow as it meets weathered rock.

How do we bore through cemented bedrock in Asherton?

Cemented bedrock is mapped about 40 inches down across part of Asherton, so we match the tooling and bore path to the ground at the crossing. Verick soil and the route surface guide the setup.

  1. With cemented bedrock mapped about 40 inches down in parts of Asherton, we select tooling for the encountered ground and advance carefully where soil meets rock.
  2. Where Verick soil and the mapped fine sandy loam meet a clay or rock layer, we ream in stages and keep drilling fluid suited to the material.
  3. At a Carter Street route, we hydrovac marked utilities on the bore path before drilling near them; surface paint shows location, not burial depth.
  4. For a crossing near El Moro Creek, we plan a path below the channel as needed, check jurisdiction during planning, and track depth and pitch from the surface.
Vermeer D24x40 S3 Navigator and water truck at the entry of a 385 foot sandstone rock bore above the wetland in Guthrie, Oklahoma
Our Vermeer D24x40 and water truck at the entry of a 385 foot sandstone rock bore in Guthrie, Oklahoma.

Could a bore cross El Moro Creek near Asherton?

US 83 has 0.7 mapped roadway miles inside Asherton, and FM 190 has 1.1, so a crossing on either route needs a plan for the highway right of way. Carter Street is the longest named street at 0.9 miles in the city. 3rd Street runs 0.67 miles and 4th Street runs 0.62 miles. Those streets may suit service or conduit routes, but the bore plan must fit the actual address, marked utilities and available pit locations.

CrossingTypeMapped extentWho has a say
US 83US highway0.7 roadway miles insideState highway office
FM 190State highway1.1 roadway miles insideState highway office
El Moro CreekStream nearby0.1 miles outsideChecked for Corps of Engineers jurisdiction
Swipe the table sideways to see every column.

No railroad is mapped inside Asherton or within one mile outside its limits, so there is no mapped local track crossing to plan around. El Moro Creek runs 0.1 miles from the city limits, while 1.36 miles of unnamed drainage are mapped in the city. No street crossing of a named stream is mapped inside the limits, and no lakes or ponds are mapped within one mile. If a proposed route reaches El Moro Creek, its crossing is checked for possible federal jurisdiction during planning.

When we plan a bore under US 83 in Asherton, which office handles the state permit: TxDOT Laredo District?

US 83 and FM 190 are state routes, so work in either right of way needs a TxDOT utility permit reviewed by the Laredo District. The utility owner, not the drilling contractor, submits the application through TxDOT RULIS; we prepare the bore plan and profile and work under the permit issued to that owner. A highway crossing generally sets the depth: electric, communication and water lines need 60 inches of cover, as do pressurized sewer lines. El Moro Creek also needs a jurisdiction check during crossing planning. As we plan work on Carter Street, Asherton’s incorporated city status means we coordinate street access with the city.

Read the rules for yourself: Texas Utilities Code Chapter 251 on notice to Texas811, the Texas811 questions and answers page, the TxDOT Utility Accommodation Rules, 43 TAC 21.40 and TxDOT utility permits in RULIS.

Who owns the lines in Asherton and Dimmit County?

The local government owned City of Asherton water system uses groundwater wells and serves 1,225 people through 452 service connections. For an electric conduit bore near Carter Street, county records list AEP Texas Central, Medina Electric Cooperative and Rio Grande Electric Cooperative as reporting electric service in Dimmit County. We confirm the line owner for the specific route before planning that conduit bore, since the county list does not establish which provider serves every address.

Line ownerWhat it isSourceSize
City of AshertonPublic water systemGroundwater wells452 connections, 1,225 people served
AEP Texas Central, Medina Electric Cooperative and Rio Grande Electric CooperativeElectric utilities reporting service in Dimmit CountyEIA Form 861Confirm the line owner by address
Swipe the table sideways to see every column.

The American Community Survey 2019 to 2023 five year estimates put Asherton’s median housing year at 1991, so we verify utility locations before boring. The survey estimates 8 percent of homes were built before 1960 and 36 percent in 2000 or later. A replacement route along 3rd Street may meet older buried lines, while a newer home may need a new service run. We hydrovac pothole marked utilities on the planned path before drilling near them; paint shows position, not depth.

Trinity Boring Solutions technician hydrovac daylighting along a commercial curbline during utility locating in Oklahoma City
Hydrovac daylighting along a commercial curb line in Oklahoma City to find the utilities before a bore.

How far is Asherton from Carrizo Hill and our Yukon office?

Asherton is an incorporated city in Dimmit County, at an elevation of 532 feet, with 0.82 square miles of land and ZIP code 78827. Carrizo Hill is 5.9 miles northwest, and Carrizo Springs, the county seat, is 8.2 miles northwest. Crystal City is 17.4 miles north. The Yukon, Oklahoma main office is 594 road miles away, or a drive of 11.7 hours. That distance makes the work scope and access plan important when arranging equipment and crew travel to Asherton.

Places near Asherton

What would we bore near 4th Street in Asherton?

  • Highway crossing: A line beneath US 83 needs a bore plan for the highway right of way and cover depth set by line type.
  • Water service: A connection to the City of Asherton groundwater system could follow a 4th Street route, with existing lines exposed before drilling nearby.
  • Fiber conduit: A run along 7th Street can be bored beneath pavement, with the route checked against marked utilities and pit access.
  • Creek crossing: If a route reaches El Moro Creek outside the city limits, plan the channel crossing and check jurisdiction during project planning.
  • Drainage bore: Asherton has 1.36 miles of mapped unnamed drainage, so a route across a drainage feature needs a suitable bore path.
  • Park connection: A conduit route serving Plaza can be placed by bore, with entry and exit pits kept in workable ground.

More on each kind of work: water line boring, electric line boring, fiber optic boring, road, railroad and creek crossings and municipal boring.

How do I get a quote for work near 7th Street in Asherton?

For a quote near 7th Street, send the address or map pin, what is going in the ground, the pipe or conduit size and the footage; a sketch or plans help. Tell us if the route approaches US 83 or a drainage crossing, since those details can change the bore layout and the equipment access we need to price.

Ground conditions are one pricing group: Verick soil and cemented bedrock can change tooling, reaming and time. Crossings are another: a route under US 83, pavement, utilities or drainage may need more planning and exposure work. Logistics include pit space, excavator time, sand backfill and mobilization; Asherton’s 594 road miles from Yukon affect that last part. Pipe size, footage and emergency or high profile work also shape the scope, so the price follows the route and installation details.

Questions people ask about boring in Asherton

Does Trinity Boring Solutions take directional boring work in Asherton and Dimmit County?

Yes. We take directional boring projects in Asherton, Dimmit County, and serve the job through our own crews or partner contractor crews from satellite yards. From the first call through the bore log, we keep one point of contact for work near El Moro Creek, regardless of which crew handles the work. The Yukon, Oklahoma main office is 594 road miles from Asherton.

What do Asherton homes near 3rd Street mean for replacement bores?

Asherton’s median housing year is 1991, according to the American Community Survey 2019 to 2023 five year estimates. A replacement bore near 3rd Street may need to pass existing services, while a newer property may need a new connection. We expose marked utilities along the planned path before the drill approaches them.

Can wet or flood prone ground affect bore pits near El Moro Creek in Asherton?

Flood prone soils are mapped across 34 percent of Asherton, but a seasonal water table is not mapped within 60 inches. El Moro Creek is 0.1 miles from the city limits. We check the specific pit location and route, and plan a creek crossing below the channel where needed.

Can Asherton’s Verick soil corrode steel, and what pipe should I use?

High steel corrosion risk is mapped across 43 percent of Asherton, including areas with Verick soil. In Dimmit County, we confirm the line owner selects any coating for steel casing or tracer wire before installation. HDPE does not have that steel corrosion concern, but the line owner chooses the material and any protection required for the installation.

What ground does a bore pass through in Asherton’s Verick soil?

The USDA soil survey maps Verick soil over 46 percent of Asherton, with fine sandy loam common at the surface. At about 40 inches, cemented bedrock is mapped in 46 percent and sandy clay loam in 45 percent. These mapped patterns help with planning but do not replace checking the actual bore route.

Is rock mapped in Asherton, and how much is within five feet?

Yes. Bedrock is mapped within 60 inches across 65 percent of Asherton, and within 40 inches across 53 percent. The mapped bedrock is weathered; hard bedrock is not mapped within 60 inches. The Bigford Formation includes sandstone and shale, so ground conditions can change along a bore route.

What bore sizes and lengths can you handle for a job near 7th Street in Asherton?

For a job near 7th Street, we handle lines from 3/4 inch service size up to 48 inch casing, with bore lengths from 10 feet to 5,000 feet. The right equipment depends on the line, the mapped ground and the route’s access. A map pin and scope help us assess it.

How much 811 notice do I need for a bore on Carter Street in Asherton?

For a Carter Street start, submit the Texas811 locate request at least 48 hours ahead, excluding Saturdays, Sundays and legal holidays, and no earlier than 14 days before excavation. If our planned FM 190 start slips more than 14 days past the original notice, we submit a new request. Along 4th Street in Asherton, we have worn or moved marks refreshed through Texas811 before work continues.

What affects the cost of a directional bore near US 83 in Asherton?

For a route near US 83, cost factors include length, pipe size, Verick soil or bedrock, pavement, utility crossings, pits, excavator time and backfill. A creek or drainage crossing can also affect the plan. Mobilization matters because Asherton is 594 road miles from the Yukon, Oklahoma main office.

Where the Asherton facts on this page come from

Darren Rice in a safety vest at the bore pit beside the Trinity Boring Solutions Ditch Witch directional drill, with drill rods racked, on the airfield at Will Rogers World Airport in Oklahoma City

About Trinity Boring Solutions

Trinity Boring Solutions is a family business in Yukon, Oklahoma, founded by Dean Rice in 1965 and owned today by Darren Rice, who started its directional boring side in 1982. The company bores across Oklahoma and Texas. No bore is too big or too small: 4 foot sidewalk sleeves to roughly 4,100 feet under the Arkansas River in Tulsa. Reach us at (405) 409-7423.

Get a Quote for a Bore in Asherton

Send the address, what is going in, the size and the footage.

Trinity Boring Solutions
9102 NW Expressway, Yukon, OK 73099
(405) 409-7423 | darren@trinityboringsolutions.com

Trinity Boring Solutions | 24/7 Available ☎ Call (405) 409-7423 Free Quote

Free Bore Planner

Plan Your Bore in Asherton, Texas

Type the address of your job in Asherton. The Bore Planner opens an aerial map at that spot. Drop one pin where the bore starts and one where it ends, tell us what is going in and send the scope to our crew.

Talk to the crew that does the work

Fastest way to a number is a phone call. Tell us where the crossing is and what is going in the ground, and you will get a straight answer on the same call. Bores from 10 feet to 5,000 feet, 3/4 inch service line through 48 inch casing, anywhere in Oklahoma and Texas. We run 24/7 for main breaks and emergency repairs.

Call (405) 409-7423

Answered by a person, not a call center.

Would rather not call? Send the details and we will come back with a written quote.

Quick Quote In Page

County and State Pages for Asherton

All counties: Texas county list.