trinityboringsolutions.com

Hudson Bend Texas Directional Boring: Brackett Soil, RM 620 and Lake Travis

Quick Answer: Along RM 620, Trinity Boring Solutions provides directional boring, also called horizontal directional drilling (HDD), in Hudson Bend, Texas. The Yukon, Oklahoma main office is 402 road miles away, so routes near Hudson Bend Road need mobilization planned around that distance. Brackett soil is mapped across 30 percent of the area and can include very stony ground that slows a bore. With bedrock mapped within 40 inches across 60 percent of the area, the route needs careful depth planning.

Family Business Since 1965 Boring Since 1982 24 Hour Phone No Utility Strike in 25 Years

Hudson Bend bores at a glance

  • Unincorporated community in Travis County, Texas. Population 4,005 (2020 Census count).
  • Road distance from our Yukon, Oklahoma main office: 402 miles, about 7.8 hours of driving.
  • Ground: Brackett soil is mapped on 30 percent of the area, with bedrock about 40 inches down.
  • Rock: bedrock is mapped within 60 inches on 60 percent of the area.
  • Highways inside the boundary: RM 620. State permit office: TxDOT Austin District.
  • Railroad track inside the boundary: none mapped.
  • Texas811: locate request at least two working days before a bore and no more than 14 days ahead.
  • Range: 3/4 inch service lines to 48 inch casing, 10 feet to 5,000 feet.
  • Phone answered 24 hours a day: (405) 409-7423

Who can I call for directional boring near RM 620 in Hudson Bend?

Trinity Boring Solutions takes directional boring work in Hudson Bend, an unincorporated community in Travis County with 4,005 people in the 2020 Census count. Along RM 620 and residential roads such as Eck Lane, our crews can install water, sewer, gas, electric conduit and fiber lines. The route and line type shape the bore plan.

Our main office is in Yukon, Oklahoma, and Hudson Bend work is done with our own crews and from satellite yards run by partner drilling contractors Trinity has personally vetted. Our family business started in 1965, and we have done directional boring since 1982. We handle lines from 3/4 inch service lines through 48 inch casing, a range suited to routes from Eck Lane to RM 620.

Ditch Witch JT922 compact directional drill beside the Trinity Boring Solutions truck at NE 24th Street in Oklahoma City
Our Ditch Witch JT922 compact directional drill beside the Trinity truck on a sleeve bore at NE 24th Street in Oklahoma City. Photos on this page are from our jobs in Oklahoma and Texas.

What is Brackett soil like to bore in Hudson Bend?

The USDA soil survey maps Brackett soil across 30 percent of Hudson Bend and Eckrant across 29 percent. Brackett Rock outcrop complex covers 24 percent of the mapped area, while Eckrant very stony clay covers 21 percent. Those mapped shares describe broad ground patterns, not test borings at a specific address. At about 40 inches below the surface, bedrock is mapped across 60 percent of the area, and the average clay content there is 39 percent. No sandy ground is mapped at that depth, so a bore plan should account for clay and rock rather than assume an easy sand run.

USDA soil survey, inside the Hudson Bend mapped community boundaryWhat is mapped
Soil series mappedBrackett 30 percent and Eckrant 29 percent
Texture at the surfacegravelly clay loam 30 percent and very stony clay 29 percent
Texture about 40 inches downbedrock 60 percent
Average clay content about 40 inches down39 percent
Bedrock mapped within 60 inches60 percent of the area (30 percent hard rock, 30 percent weathered rock)
Seasonal water table within 60 inches0 percent of the area
Flood prone soils0 percent of the area
High corrosion risk for uncoated steel32 percent of the area

Bedrock is mapped within 40 inches across 60 percent of Hudson Bend; the soil survey maps hard and weathered bedrock within 60 inches across 30 percent each. That shallow rock can slow drilling and push the head off line where soil meets rock. Seasonal water table and flood prone soils are not mapped. High steel corrosion risk is mapped across 32 percent, so the line owner should consider steel casing and tracer wire materials. The geology map identifies Cherty Calcareous Clay Solution Residuum of Cenozoic age and Glen Rose Limestone of Albian age, both relevant to changing ground conditions.

What does it take to bore Hudson Bend bedrock?

In Hudson Bend, we plan for Brackett and Eckrant ground that can shift from clay to shallow bedrock along a route. The mapped rock makes steering checks and staged drilling important.

  1. Where Brackett or Eckrant ground turns stony, we track the drill head from the surface and log depth and pitch to hold the planned line.
  2. With bedrock mapped within 40 inches across much of Hudson Bend, we prepare for slower rock drilling and watch the head at soil to rock transitions.
  3. On a proposed route under Eck Lane, we expose every marked utility on the bore path with hydrovac before drilling near it; paint does not show depth.
  4. For a route near Lake Travis or Hurst Creek, we plan the crossing depth and check for federal jurisdiction before setting the bore path.
Rod box on the Vermeer D24x40 S3 Navigator with the bore path heading toward the trees on a rock bore in Guthrie, OK
Rod box on our Vermeer D24x40 with the bore path heading toward the trees on a rock bore in Guthrie, Oklahoma.

What does a bore have to cross in Hudson Bend Road routes?

RM 620 is the state highway mapped inside Hudson Bend, with 6.6 roadway miles in the community. A route beneath its pavement needs a bore rather than an open cut. The longest named local roads include Hudson Bend Road at 2.56 miles, Eck Lane at 1.84 miles and Rocky Ridge Road at 1.72 miles. Mc Cormick Mountain Drive adds another 1.6 miles of mapped roadway. Those streets give route options, but each address still needs its own utility and access review.

CrossingTypeMapped extentWho has a say
RM 620State highway6.6 roadway miles insideState highway office
Hurst CreekStream nearby0.1 miles outsideChecked for Corps of Engineers jurisdiction
Bear CreekStream nearby0.5 miles outsideChecked for Corps of Engineers jurisdiction
Lake TravisLake or pond13,432 acres, insideChecked for Corps of Engineers jurisdiction
Hurst Creek ArmLake or pond256 acres, nearbyChecked for Corps of Engineers jurisdiction
Lake AustinLake or pond67 acres, nearbyChecked for Corps of Engineers jurisdiction
Swipe the table sideways to see every column.

No railroad is mapped inside Hudson Bend or within one mile outside the community boundary, and no street and rail crossings are mapped. No named stream crosses the community; Hurst Creek is 0.1 miles from the boundary and Bear Creek is 0.5 miles away. Unnamed drainage totals 6.79 miles inside the community. Lake Travis lies within the mapped boundary, so a proposed lake or creek crossing needs its own route review and a check for federal jurisdiction during planning.

Whose permission does Hudson Bend work need in Travis County?

Hudson Bend has no city government, so a street bore falls under the county or state rather than a city office. RM 620 is a state highway, and work in its right of way needs a TxDOT utility permit reviewed by the Austin District. The utility owner files through TxDOT’s RULIS system; we prepare the bore plan and profile for that application and work under the owner’s permit. Under RM 620, electric and communication crossings need 60 inches of cover below the lowest crossed grade, and water crossings need 60 inches. TxDOT rules call for boring or tunneling beneath existing highway pavement.

Read the rules for yourself: Texas Utilities Code Chapter 251 on notice to Texas811, the Texas811 questions and answers page, the TxDOT Utility Accommodation Rules, 43 TAC 21.40 and TxDOT utility permits in RULIS.

Who owns the lines serving Hudson Bend in Travis County?

The water provider for a specific Hudson Bend address has to be confirmed with the county or local water district before a bore is planned; available records do not match a provider to this community. In Travis County, Oncor Electric Delivery Company, Austin Energy, Bluebonnet Electric Cooperative and Pedernales Electric Cooperative report electric service. Those reports do not identify the provider at every Eck Lane or RM 620 address, so we confirm the line owner before planning a conduit bore.

Line ownerWhat it isSourceSize
Oncor Electric Delivery Company, Austin Energy, Bluebonnet Electric Cooperative and Pedernales Electric CooperativeElectric utilities reporting service in Travis CountyEIA Form 861Confirm the line owner by address
Swipe the table sideways to see every column.

The American Community Survey 2019 to 2023 five year estimates put Hudson Bend’s median housing year at 1998; 1 percent of homes were built before 1960, 54 percent from 1960 to 1999 and 45 percent in 2000 or later. That mix can mean either replacing an existing line or adding a new service near Hudson Bend Road. Before drilling near a marked utility, we hydrovac pothole it; paint shows position, not depth. For example, a proposed bore under Eck Lane needs marked lines exposed before the drill approaches.

Hydrovac truck and boring equipment staged beside an airport taxiway for utility daylighting in Oklahoma City
Our hydrovac truck and boring equipment beside an airport taxiway in Oklahoma City, set up to expose a utility crossing.

What is near Hudson Bend, including Steiner Ranch?

Hudson Bend is in Travis County, covers 3.99 square miles and sits at an elevation of 780 feet. ZIP code 78734 covers the community. Volente is 2.4 miles northeast, Steiner Ranch is 3.9 miles southeast, Lago Vista is 4.6 miles northwest, Jonestown is 4.6 miles north and Point Venture is 4.7 miles southwest. Steiner Ranch is the nearest larger place listed, while Austin, the county seat, is 13.1 miles southeast. From the Yukon yard, Hudson Bend is 402 road miles and a 7.8 hour drive, a factor when planning work near Lake Travis.

Places near Hudson Bend

What would we bore near Eck Lane in Hudson Bend?

  • Highway crossing: A proposed route beneath RM 620 needs a bore plan that addresses TxDOT cover and pavement requirements.
  • Water service: A service near Eck Lane can be bored to avoid opening a driveway, after the address water provider is confirmed.
  • Fiber conduit: A route along Hudson Bend Road can carry conduit past pavement and marked utilities, with each line exposed before drilling near it.
  • Replacement bore: Where an existing line near Rocky Ridge Road needs replacement, the route can be reviewed for a new bore rather than an open cut.
  • Drainage crossing: A proposed bore near Hurst Creek needs channel depth planning and a jurisdiction check during planning.
  • Lake route: A proposed line near Lake Travis needs a route review for shoreline access and crossing conditions.

More on each kind of work: water line boring, electric line boring, fiber optic boring, road, railroad and creek crossings and municipal boring.

What do you need to quote a Hudson Bend bore near Mc Cormick Mountain Drive?

For a quote near Mc Cormick Mountain Drive, send the address or map pin, what will go underground, the pipe or conduit size and the footage; a sketch or plans help us assess the route. A pin near Hudson Bend Road also helps us see whether RM 620, pavement or drainage sits along the proposed path.

The 402 road miles from Yukon make mobilization part of a Hudson Bend job’s scope. Brackett and Eckrant ground, shallow mapped bedrock and the pipe or conduit size affect the drilling plan. A crossing beneath RM 620 brings highway requirements into the work, while other marked utilities, pavement, drainage, pits and excavator time can change the effort. Access and emergency timing also matter near Lake Travis routes.

Questions people ask about boring in Hudson Bend

Does Trinity Boring Solutions take Hudson Bend jobs in Travis County, and who staffs them?

Yes, we take directional boring jobs in Hudson Bend, Travis County, using our own crews and satellite yards run by vetted drilling contractor partners. You work with Trinity through the job and bore log, whichever crew is at the site. Routes near Eck Lane or RM 620 still get planned for their specific ground and utilities.

Who approves a Hudson Bend bore under RM 620?

TxDOT handles the state highway utility permit for a bore under RM 620, with review by the Austin District. The utility owner submits the application through RULIS, and we prepare the bore plan and profile for it. The permit route and required cover guide the crossing plan beneath the highway.

Can a line be bored beneath Hurst Creek near Hudson Bend?

A line may be planned beneath Hurst Creek, but the route and depth need review before work is set. Hurst Creek is 0.1 miles from the Hudson Bend community boundary, and a creek crossing is checked for U.S. Army Corps of Engineers jurisdiction during planning. Site conditions determine the bore path.

Which electric utilities report service in Travis County near Hudson Bend?

Oncor Electric Delivery Company, Austin Energy, Bluebonnet Electric Cooperative and Pedernales Electric Cooperative report service in Travis County. That does not show which company owns a line at a particular Hudson Bend address. We confirm the line owner and conduit requirements before planning a bore near RM 620 or Eck Lane.

Does Travis County control Rocky Ridge Road in Hudson Bend, and must it be cut?

Hudson Bend is unincorporated, so it has no city government; street work belongs to the county or state depending on the road. A bore along Rocky Ridge Road can pass beneath pavement without cutting across it, with pits placed in dirt on each side where access allows.

How old are buried lines near Eck Lane in Hudson Bend?

Housing data cannot date a buried line at an Eck Lane address, but the American Community Survey estimates a median home year of 1998 in Hudson Bend. That range can mean either a replacement bore or a new service. We expose marked utilities before drilling near them so the route accounts for existing lines.

Can I call Trinity after hours about an urgent Hudson Bend bore near Rocky Ridge Road?

Yes, a person answers Trinity’s phone 24 hours a day for urgent work near Rocky Ridge Road or elsewhere in Hudson Bend. Emergency timing can affect the job plan, and the route still needs utility marks and a review of the ground before drilling begins.

How far ahead should I request 811 marks for Hudson Bend Road?

Request Texas811 locates at least 48 hours before excavation, excluding Saturdays, Sundays and legal holidays; Texas811 describes that as at least two working days. For a bore near Hudson Bend Road, submit the ticket no earlier than 14 days before work. If the start slips beyond that window, make a new request, and refresh worn or moved marks through Texas811 before work continues.

What affects the cost of a Hudson Bend bore under RM 620?

The job scope sets the price for a Hudson Bend bore under RM 620. Factors include footage, pipe or conduit size, Brackett soil and shallow bedrock, utility crossings, pavement, drainage, pits and equipment time. Mobilization from the Yukon yard also matters because the route is 402 road miles from the main office.

Where the Hudson Bend facts on this page come from

Darren Rice in a safety vest at the bore pit beside the Trinity Boring Solutions Ditch Witch directional drill, with drill rods racked, on the airfield at Will Rogers World Airport in Oklahoma City

About Trinity Boring Solutions

Trinity Boring Solutions is a family business in Yukon, Oklahoma, founded by Dean Rice in 1965 and owned today by Darren Rice, who started its directional boring side in 1982. The company bores across Oklahoma and Texas. No bore is too big or too small: 4 foot sidewalk sleeves to roughly 4,100 feet under the Arkansas River in Tulsa. Reach us at (405) 409-7423.

Get a Quote for a Bore in Hudson Bend

Send the address, what is going in, the size and the footage.

Trinity Boring Solutions
9102 NW Expressway, Yukon, OK 73099
(405) 409-7423 | darren@trinityboringsolutions.com

Trinity Boring Solutions | 24/7 Available ☎ Call (405) 409-7423 Free Quote

Free Bore Planner

Plan Your Bore in Hudson Bend, Texas

Type the address of your job in Hudson Bend. The Bore Planner opens an aerial map at that spot. Drop one pin where the bore starts and one where it ends, tell us what is going in and send the scope to our crew.

Talk to the crew that does the work

Fastest way to a number is a phone call. Tell us where the crossing is and what is going in the ground, and you will get a straight answer on the same call. Bores from 10 feet to 5,000 feet, 3/4 inch service line through 48 inch casing, anywhere in Oklahoma and Texas. We run 24/7 for main breaks and emergency repairs.

Call (405) 409-7423

Answered by a person, not a call center.

Would rather not call? Send the details and we will come back with a written quote.

Quick Quote In Page

County and State Pages for Hudson Bend

Same county: Austin · Pflugerville · Manor · Lakeway · Leander · Wells Branch · Bee Cave · Hornsby Bend · Cedar Park · Shady Hollow · West Lake Hills · Barton Creek. All counties: Texas county list.