Chico Texas Directional Boring: Windthorst Soil, Union Pacific and Dry Creek

Quick Answer: Windthorst fine sandy loam gives way to clay below, and we take directional boring, also called horizontal directional drilling (HDD), under Chico roads and Union Pacific tracks. Chico is 176 road miles from our Yukon, Oklahoma main office, with FM 1810 among the routes a bore may have to cross. USDA maps sandy clay loam at about 40 inches, where sticky clay can grip pipe. Dry Creek crossings need channel planning. Bridgeport is 6.1 miles south.

Family Business Since 1965 Boring Since 1982 24 Hour Phone No Utility Strike in 25 Years

Chico bores at a glance

  • Incorporated city in Wise County, Texas. Population 1,103 (Census Bureau 2024 estimate).
  • Road distance from our Yukon, Oklahoma main office: 176 miles, about 3.9 hours of driving.
  • Ground: Windthorst soil is mapped on 30 percent of the area, with sandy clay loam about 40 inches down.
  • Rock: bedrock is mapped within 60 inches on 27 percent of the area.
  • Highways inside the boundary: FM 1810, Texas State Highway 101 Business, Texas State Highway 101 and FM 2952. State permit office: TxDOT Fort Worth District.
  • Railroad track inside the boundary: Union Pacific, with 4 mapped street and rail crossings.
  • Named streams inside the boundary: Dry Creek.
  • Public water: City of Chico, groundwater wells.
  • Texas811: locate request at least two working days before a bore and no more than 14 days ahead.
  • Range: 3/4 inch service lines to 48 inch casing, 10 feet to 5,000 feet.
  • Phone answered 24 hours a day: (405) 409-7423

Which contractor handles directional boring on Chico’s Sherman Street?

We take directional boring work in Chico, Wise County, where the Census Bureau Vintage 2024 estimate puts the population at 1,103. Along Sherman Street, Hovey Street or another local route, our crews can install water, sewer, gas, electric conduit and fiber. We size the bore to the line and the crossing, rather than treating every street as the same job.

Our main office is in Yukon, Oklahoma, and Chico work is done with our own crews and from satellite yards run by partner drilling contractors Trinity has personally vetted. With no utility strike in over 25 years, we plan carefully around the City of Chico water system and the electric providers reported in Wise County. Our family business started in 1965, and directional boring has been part of our work since 1982.

Trinity Boring Solutions branded compact directional drilling unit positioned beside a tree on a red dirt jobsite
Our compact directional drill set up beside a tree on a tight site. Photos on this page are from our jobs in Oklahoma and Texas.

What kind of ground does Chico’s Windthorst soil create for boring?

Chico’s Windthorst soil is mainly fine sandy loam near the surface, with clayier ground below. The USDA soil survey maps Windthorst fine sandy loam across 30% of the city and reports sandy clay loam across 56% at about 40 inches below the surface. Sandy clay covers another 27% at that depth, and average clay content is 35%. That mix can make the hole hold its shape, but sticky clay can build on a reamer and grip pipe during a pull.

USDA soil survey, inside the Chico city limitsWhat is mapped
Soil series mappedWindthorst 30 percent, Chaney 27 percent, Selden 22 percent, Balsora 10 percent and Hassee 6 percent
Texture at the surfacefine sandy loam 36 percent, loamy sand 27 percent and loamy fine sand 26 percent
Texture about 40 inches downsandy clay loam 56 percent, sandy clay 27 percent and stratified very fine sandy loam to silty clay loam 10 percent
Engineering class about 40 inches downlean clay (CL) 93 percent and fat clay (CH) 7 percent
Average clay content about 40 inches down35 percent
Bedrock mapped within 60 inches27 percent of the area (0 percent hard rock, 27 percent weathered rock)
Seasonal water table within 60 inches28 percent of the area
Flood prone soils10 percent of the area
High corrosion risk for uncoated steel66 percent of the area

Weathered bedrock is mapped within 60 inches in 27% of Chico, with a typical depth of 52 inches; hard bedrock is not mapped in the top five feet. Seasonal water tables are mapped within 40 inches in 28% of the area, and flood prone soils cover 10%, so Dry Creek pits need water and channel planning. High steel corrosion risk is mapped across 66%, a concern for casing and tracer wire that the line owner should address. The Cenozoic Quartz Sand Decomposition Residuum includes sand, claystone and sandstone, so ground can vary along a bore.

How do crews bore Chico’s sandy clay loam?

In Chico, we adjust the drilling plan to the sandy clay loam mapped below Windthorst soil and to the route’s crossings. That helps control sticky cuttings while keeping the bore on line beneath streets such as Sherman Street.

  1. Because Chico soil maps show 35% average clay at about 40 inches, we use a thinner drilling fluid and staged reaming to limit sticky buildup.
  2. Where Chico’s mapped clay is heavy, we watch fluid returns closely and keep pressure controlled near pavement on Sherman Street.
  3. With Windthorst fine sandy loam over clayier layers, we prepare the pipe before the final ream and pull it while the hole is open.
  4. At Dry Creek or a Chico highway crossing, we track the drill head from the surface and log its depth and pitch as the bore advances.
Trinity Boring Solutions water trailer supplying water for bentonite drilling fluid on a sleeve bore in northeast OKC
Our water trailer feeding the bentonite drilling fluid mix on a sleeve bore in northeast Oklahoma City.

What does a bore have to cross in Chico near Union Pacific?

Chico routes may cross FM 1810, Texas State Highway 101 Business, Texas State Highway 101 or FM 2952, all mapped inside the city limits. Bores beneath highway pavement are planned to avoid cutting the surface. Sherman Street is the longest named street at 1.11 miles, followed by Mount Lane at 0.97 miles and Hovey Street at 0.84 miles. Davis Street adds another possible street route. The alignment and road authority determine the crossing details.

CrossingTypeMapped extentWho has a say
FM 1810State highway2 roadway miles insideState highway office
Texas State Highway 101 BusinessState highway1.5 roadway miles insideState highway office
Texas State Highway 101State highway1.2 roadway miles insideState highway office
FM 2952State highway0.5 roadway miles insideState highway office
Union PacificRailroad2.13 track miles insideThe railroad
Dry CreekStream1.53 channel miles insideChecked for Corps of Engineers jurisdiction
Chicken CreekStream nearby0.7 miles outsideChecked for Corps of Engineers jurisdiction
Village CreekStream nearby0.8 miles outsideChecked for Corps of Engineers jurisdiction
Swipe the table sideways to see every column.

Union Pacific has 2.13 track miles in Chico on the Duncan Subdivision, and public mapping shows four street and rail crossings in the city. A crossing of Union Pacific track needs an agreement from the railroad owner. Dry Creek runs 1.53 channel miles through Chico, where seven mapped street crossings of named streams make channel alignment relevant. Chicken Creek and Village Creek are also nearby, while no lakes or ponds are mapped within one mile.

Whose permission does a Chico bore under FM 1810 need?

The cover depth sets how far a Chico bore must run beneath FM 1810: electric and communication lines need 60 inches at a highway crossing, water needs 60 inches, and pressurized sewer needs 60 inches. TxDOT’s Fort Worth District reviews the state highway utility permit. The utility owner submits the application through TxDOT’s RULIS system; we prepare the bore plan and profile and work under that owner’s permit. Along highway right of way, electric and communication lines need 48 inches of cover and water needs 36 inches. The permit may set another depth.

Read the rules for yourself: Texas Utilities Code Chapter 251 on notice to Texas811, the Texas811 questions and answers page, the TxDOT Utility Accommodation Rules, 43 TAC 21.40 and TxDOT utility permits in RULIS.

Which utilities are already in the ground around the City of Chico?

The City of Chico public water system draws from groundwater wells and reports 463 service connections serving 1,596 people. Electric service reported in Wise County includes Oncor Electric Delivery Company, Cooke County Electric Cooperative Association, Denton County Electric Cooperative, Tri-County Electric Cooperative and Wise Electric Cooperative. Those county reports do not identify the provider at every Chico address, so the line owner is confirmed before a conduit bore near FM 1810 or another route.

Line ownerWhat it isSourceSize
City of ChicoPublic water systemGroundwater wells463 connections, 1,596 people served
Oncor Electric Delivery Company, Cooke County Electric Cooperative Association, Denton County Electric Cooperative, Tri-County Electric Cooperative and Wise Electric CooperativeElectric utilities reporting service in Wise CountyEIA Form 861Confirm the line owner by address
Swipe the table sideways to see every column.

The American Community Survey 2019 to 2023 five year estimates put Chico’s median housing year at 1979; 23% of homes were built before 1960, 58% from 1960 to 1999 and 19% in 2000 or later. A replacement line under Mount Lane may need to meet older buried services, while a newer service can follow a different route. We hydrovac pothole each marked utility along the bore path before drilling near it. On Hovey Street, that means exposing marked lines to learn their depth, since paint only shows position.

Reel of yellow polyethylene gas pipe on a trailer staged for a directional bore
A reel of yellow polyethylene gas pipe on a trailer, staged for a directional bore.

How far is Chico from Bridgeport and our Yukon yard?

Chico is in Wise County, 13.2 miles west of county seat Decatur, and its elevation is 921 feet. The incorporated city covers 1.52 square miles and uses ZIP code 76431. Bridgeport is 6.1 miles south and is the nearest larger city; Lake Bridgeport is 6.4 miles south, and Alvord is 7.3 miles northeast. Our Yukon, Oklahoma main office is 176 road miles away, a 3.9 hour drive. That distance is part of planning mobilization for a bore near FM 1810 or Dry Creek.

Places near Chico

Which jobs call for a bore near Chico’s Hovey Street?

  • Highway crossing: A bore beneath FM 1810 can carry a water line or conduit without cutting through the highway pavement.
  • Water service: A replacement connection near the City of Chico groundwater system can be routed below a street or driveway.
  • Rail crossing: A line beneath the Union Pacific Duncan Subdivision needs an alignment coordinated with the railroad’s crossing agreement.
  • Creek crossing: A Dry Creek bore can pass below the channel, with pit placement and creek jurisdiction checked during planning.
  • Fiber route: Conduit along Hovey Street can be bored beneath pavement and driveways instead of opening the surface.
  • Street service: A bore along Mount Lane can connect a property while keeping the road crossing uncut.

More on each kind of work: water line boring, electric line boring, fiber optic boring, road, railroad and creek crossings and municipal boring.

How do I get a quote for a Chico bore near Dry Creek?

For a Chico quote, give us the address or map pin, what will go underground, the pipe or conduit size and the footage. A route along Sherman Street or a crossing near Dry Creek helps show access and ground conditions. A sketch or plans can clarify the alignment, entry and exit pits, and nearby crossings.

Price depends on the route and work involved. Ground conditions such as Windthorst soil and the clay mapped below it affect drilling and reaming. Crossings of FM 1810, Union Pacific track or Dry Creek can add planning and exposure work. Pipe size, length, pavement, concrete, pits, excavator time and sand backfill also matter. Chico’s 176 road miles from Yukon affect mobilization, while high profile or emergency work can change the scope.

Questions people ask about boring in Chico

Does Trinity take directional boring jobs in Chico, Wise County, and who does the work?

Yes. We take Chico work in Wise County, with our own crews or crews from partner drilling contractors we have vetted. You work with Trinity from the first call through the bore log, including when a crew is working near Sherman Street or FM 1810.

Who owns electric lines in Chico, Wise County, and who confirms conduit specs?

Electric providers reporting service in Wise County include Oncor Electric Delivery Company, Cooke County Electric Cooperative Association, Denton County Electric Cooperative, Tri-County Electric Cooperative and Wise Electric Cooperative. The line owner for the Chico address confirms conduit requirements before a bore is planned; county reporting does not identify the provider at every address.

Does the city control Hovey Street in Chico, and can a bore avoid cutting it?

Chico is incorporated, so Hovey Street and other city streets belong to the city itself. Directional boring can pass beneath the street without opening the pavement. The route still needs to account for marked utilities and the entry and exit pits on either side.

How do Chico’s older homes near Mount Lane affect replacement bores?

The American Community Survey 2019 to 2023 five year estimates put Chico’s median housing year at 1979, with 23% of homes built before 1960. Replacing a line near Mount Lane can mean working around older buried services, so marked utilities along the path are exposed before drilling near them.

Can groundwater or Dry Creek flooding affect Chico bore pits?

It can. USDA mapping shows seasonal water tables within 40 inches in 28% of Chico and flood prone soils across 10%; Dry Creek is a local channel to consider. We plan pit placement and water handling for the route, and creek crossings are checked for U.S. Army Corps of Engineers jurisdiction during planning.

Does Chico’s Windthorst soil corrode steel, and what pipe can a bore use?

The USDA soil survey maps high steel corrosion risk across 66% of Chico, including areas with Windthorst soil. The line owner should consider casing and tracer wire materials or coatings. HDPE is not subject to the mapped soil corrosion concern, and the selected pipe depends on the line design.

What bore sizes and lengths can Trinity handle near Chico’s Davis Street?

For a job near Davis Street, we handle lines from 3/4 inch service lines up to 48 inch casing, with bore lengths from 10 feet to 5,000 feet. The route, ground and crossings in Chico help determine which equipment and bore plan fit the work.

How much 811 notice is needed for a Chico bore along Sherman Street?

For a bore along Sherman Street, Texas law requires a Texas811 locate request at least 48 hours before excavation starts, excluding Saturdays, Sundays and legal holidays, and no earlier than 14 days beforehand. If the start slips more than 14 days past the original notice, submit a new request; worn or moved marks must be refreshed through Texas811 before work resumes.

What affects the cost of a Chico directional bore near FM 1810?

The work scope sets the price for a bore near FM 1810. Length, pipe or conduit size, Windthorst soil, utility crossings, pavement, pits and excavator time all affect the job. Dry Creek crossings may add planning, and mobilization reflects Chico’s 176 road miles from the Yukon yard.

Where the Chico facts on this page come from

Darren Rice in a safety vest at the bore pit beside the Trinity Boring Solutions Ditch Witch directional drill, with drill rods racked, on the airfield at Will Rogers World Airport in Oklahoma City

About Trinity Boring Solutions

Trinity Boring Solutions is a family business in Yukon, Oklahoma, founded by Dean Rice in 1965 and owned today by Darren Rice, who started its directional boring side in 1982. The company bores across Oklahoma and Texas. No bore is too big or too small: 4 foot sidewalk sleeves to roughly 4,100 feet under the Arkansas River in Tulsa. Reach us at (405) 409-7423.

Get a Quote for a Bore in Chico

Send the address, what is going in, the size and the footage.

Trinity Boring Solutions
9102 NW Expressway, Yukon, OK 73099
(405) 409-7423 | darren@trinityboringsolutions.com

Trinity Boring Solutions | 24/7 Available ☎ Call (405) 409-7423 Free Quote

Free Bore Planner

Plan Your Bore in Chico, Texas

Type the address of your job in Chico. The Bore Planner opens an aerial map at that spot. Drop one pin where the bore starts and one where it ends, tell us what is going in and send the scope to our crew.

Talk to the crew that does the work

Fastest way to a number is a phone call. Tell us where the crossing is and what is going in the ground, and you will get a straight answer on the same call. Bores from 10 feet to 5,000 feet, 3/4 inch service line through 48 inch casing, anywhere in Oklahoma and Texas. We run 24/7 for main breaks and emergency repairs.

Call (405) 409-7423

Answered by a person, not a call center.

Would rather not call? Send the details and we will come back with a written quote.