South Toledo Bend Texas Directional Boring: Kisatchie Soil, Texas State Highway 255, Sutton Creek
Quick Answer: Texas State Highway 255 is the main route a utility bore may have to get beneath, and Trinity Boring Solutions performs directional boring, also called horizontal directional drilling (HDD), in South Toledo Bend, Texas. The Yukon, Oklahoma main office is 482 road miles from South Toledo Bend near R255, so mobilization enters the plan. Kisatchie soil includes sandy ground that can cave behind a bit, so we support the hole through staged reaming. Along Sutton Creek, the route and water crossing need review before we set pits.
South Toledo Bend bores at a glance
- Unincorporated community in Newton County, Texas. Population 434 (2020 Census count).
- Road distance from our Yukon, Oklahoma main office: 482 miles, about 10 hours of driving.
- Ground: Kisatchie soil is mapped on 21 percent of the area, with bedrock about 40 inches down.
- Rock: bedrock is mapped within 60 inches on 37 percent of the area.
- Highways inside the boundary: Texas State Highway 255 and FM 692. State permit office: TxDOT Beaumont District.
- Railroad track inside the boundary: none mapped.
- Named streams inside the boundary: Sutton Creek.
- Texas811: locate request at least two working days before a bore and no more than 14 days ahead.
- Range: 3/4 inch service lines to 48 inch casing, 10 feet to 5,000 feet.
- Phone answered 24 hours a day: (405) 409-7423
Who does directional boring near Texas State Highway 255 in South Toledo Bend?
Trinity Boring Solutions takes directional boring work in South Toledo Bend, where Texas State Highway 255 is a route a bore may need to pass. Newton County has 434 residents in South Toledo Bend, the 2020 Census count; the Census Bureau does not publish annual estimates for unincorporated places. Water, sewer, gas, electric conduit and fiber can be routed beneath R255, Texas Road or other access roads, depending on the address.
Our main office is in Yukon, Oklahoma, and South Toledo Bend work is done with our own crews and from satellite yards run by partner drilling contractors Trinity has personally vetted. Our family business began in 1965, and we have done directional boring since 1982, accounting for Sutton Creek in route planning. For routes such as Texas Road, we handle lines from 3/4 inch service lines to 48 inch casing and bore lengths from 10 feet to 5,000 feet.

What is Kisatchie soil like to bore in South Toledo Bend?
The USDA soil survey maps Kisatchie soil across 21 percent of South Toledo Bend, with Tehran at 17 percent, Rayburn at 7 percent, Letney at 6 percent and Corrigan at 4 percent. Surface textures include fine sandy loam across 35 percent and loamy sand across 23 percent. At about 40 inches below the surface, the survey maps bedrock across 30 percent, loamy sand across 17 percent, sandy clay loam across 8 percent and clay across 7 percent. Kisatchie, Tehran, Rayburn, and Letney identify mapped soil patterns we use for planning, not test borings. Loamy sand can cave behind the bit, so staged reaming and drilling fluid help keep the hole open.
| USDA soil survey, inside the South Toledo Bend mapped community boundary | What is mapped |
|---|---|
| Soil series mapped | Kisatchie 21 percent, Tehran 17 percent, Rayburn 7 percent, Letney 6 percent and Corrigan 4 percent |
| Texture at the surface | fine sandy loam 35 percent, loamy sand 23 percent and loam 4 percent |
| Texture about 40 inches down | bedrock 30 percent, loamy sand 17 percent and sandy clay loam 8 percent |
| Engineering class about 40 inches down | silty sand (SM) 17 percent, fat clay (CH) 7 percent and clayey sand (SC) 6 percent |
| Average clay content about 40 inches down | 20 percent |
| Bedrock mapped within 60 inches | 37 percent of the area (0 percent hard rock, 37 percent weathered rock) |
| Seasonal water table within 60 inches | 12 percent of the area |
| Flood prone soils | 0 percent of the area |
| High corrosion risk for uncoated steel | 37 percent of the area |
Across South Toledo Bend, the USDA survey maps bedrock within 60 inches on 37 percent of the area; it is mapped as weathered, with no hard bedrock mapped at that depth. A seasonal water table is mapped within 60 inches on 12 percent, so pits may need pumping. We do not map flood prone soils, so fine sandy loam mapping alone cannot establish conditions along a bore route. High steel corrosion risk is mapped on 37 percent, a concern for uncoated steel casing or tracer wire. The map unit named Water covers 38 percent of the area; no age is given for that unit.
How do we bore through bedrock in South Toledo Bend?
At South Toledo Bend, we choose the bore path around Kisatchie soil, mapped bedrock and any road or creek crossing before opening pits. That plan guides the drilling fluid, reaming and pullback.
- On a South Toledo Bend route through loamy sand, we use drilling fluid to support the hole, ream in stages and have the pipe ready before the final pass.
- Where the USDA survey maps bedrock within 60 inches, we plan for slower drilling through weathered material and check the head’s depth and pitch as the bore advances.
- For pits in South Toledo Bend areas with a mapped seasonal water table, we keep excavations small and pump water if needed.
- Before drilling near marked utilities along R255, we hydrovac pothole each line on the path; a surface mark alone does not show its depth.

What does a bore have to cross near R255 in South Toledo Bend?
Texas State Highway 255 and FM 692 are mapped inside the South Toledo Bend community, with 3.9 and 0.6 roadway miles respectively. R255 is the longest named street at 3.91 miles, followed by Texas Road at 3.1 miles and Hickory Hill Drive at 1.63 miles. A route beneath Texas State Highway 255 has to be planned around the roadway and its right of way. A bore along Prv Road 6065 or Quail Drive also needs a route that fits the specific address and existing utilities.
| Crossing | Type | Mapped extent | Who has a say |
|---|---|---|---|
| Texas State Highway 255 | State highway | 3.9 roadway miles inside | State highway office |
| FM 692 | State highway | 0.6 roadway miles inside | State highway office |
| Sutton Creek | Stream | 1.39 channel miles inside | Checked for Corps of Engineers jurisdiction |
| Babel Creek | Stream nearby | 0.4 miles outside | Checked for Corps of Engineers jurisdiction |
| Toledo Bend Reservoir | Stream nearby | 0.4 miles outside | Checked for Corps of Engineers jurisdiction |
| West Prong Indian Creek | Stream nearby | 0.4 miles outside | Checked for Corps of Engineers jurisdiction |
| South Prong Indian Creek | Stream nearby | 0.6 miles outside | Checked for Corps of Engineers jurisdiction |
| Toledo Bend Reservoir | Lake or pond | 39,675 acres, inside | Checked for Corps of Engineers jurisdiction |
| Lake Lenore | Lake or pond | 9 acres, nearby | Checked for Corps of Engineers jurisdiction |
No railroad is mapped inside the South Toledo Bend community or within one mile of its boundary, and no mapped street and rail crossing is recorded there. Sutton Creek runs for 1.39 channel miles inside the community, with one mapped street crossing of a named stream. Toledo Bend Reservoir is also mapped inside the community; Babel Creek is 0.4 miles from the boundary. A planned creek or lake crossing is checked for U.S. Army Corps of Engineers jurisdiction.
Do I need a permit to bore in Newton County near South Toledo Bend?
South Toledo Bend is an unincorporated community with no city government, so streets and permits fall to Newton County or the state, depending on the road. For work in the Texas State Highway 255 right of way, the line owner, not the driller, submits the utility permit application through TxDOT’s RULIS system; the TxDOT Beaumont District reviews it. We give the owner the bore plan and profile and work under its permit. TxDOT requires boring or tunneling beneath existing highway pavement, with encasement and a bore extending beneath all travel lanes on rural highways. Required cover at crossings is 60 inches for electric, communication, water and pressurized sewer lines.
Read the rules for yourself: Texas Utilities Code Chapter 251 on notice to Texas811, the Texas811 questions and answers page, the TxDOT Utility Accommodation Rules, 43 TAC 21.40 and TxDOT utility permits in RULIS.
Which utilities should I check before boring in Newton County near South Toledo Bend?
For a South Toledo Bend address, the water provider has to be confirmed with Newton County or the local water district before a bore is planned. EPA drinking water records do not tie water systems to towns, so a provider could not be matched to this specific community. Electric utilities reporting service in Newton County are Entergy Texas, Deep East Texas Electric Cooperative and Jasper-Newton Electric Cooperative. Before an electric conduit bore near R255, we confirm which utility owns the line at that address.
| Line owner | What it is | Source | Size |
|---|---|---|---|
| Entergy Texas, Deep East Texas Electric Cooperative and Jasper-Newton Electric Cooperative | Electric utilities reporting service in Newton County | EIA Form 861 | Confirm the line owner by address |
The American Community Survey 2019 to 2023 five year estimates put South Toledo Bend’s median housing year at 1986: 4 percent of homes were built before 1960, 77 percent from 1960 to 1999 and 19 percent in 2000 or later. A route near Texas Road could serve a replacement line or a newer service, so we check the actual path instead of guessing what is buried. We hydrovac pothole marked utilities before drilling close to them; paint shows position, not depth.

What is near Hemphill and South Toledo Bend?
South Toledo Bend is an unincorporated community in Newton County, Texas, with 3.25 square miles of land and an elevation of 197 feet. Its ZIP code is 75932. Hemphill is 19.3 miles northwest, Milam is 22.5 miles northwest, and Newton, the county seat, is 23.4 miles southwest. Jasper, the nearest larger city listed, is 28.5 miles southwest. The Yukon, Oklahoma main office is 482 road miles away, a 10.0 hour drive, which affects mobilization for work along Texas State Highway 255 or Sutton Creek.
Places near South Toledo Bend
- Directional boring in Hemphill: 19.3 miles northwest
- Directional boring in Milam: 22.5 miles northwest
- Directional boring in Browndell: 22.5 miles west
- Directional boring in Pineland: 22.7 miles west
- Directional boring in Newton: 23.4 miles southwest
- Directional boring in Jasper: 28.5 miles southwest
What kinds of bores come up on Texas Road in South Toledo Bend?
- Highway crossing: A bore under Texas State Highway 255 needs a route and plan that fit the TxDOT right of way and highway cover rules.
- Water service: A water line near Texas Road needs an address specific check of the provider and the route before pits are placed.
- Fiber drop: A fiber conduit along Prv Road 6065 can be planned around marked lines, with each utility on the bore path exposed first.
- Creek crossing: A route beneath Sutton Creek needs crossing planning and a check for U.S. Army Corps of Engineers jurisdiction.
- Electric conduit: Near FM 692, we confirm the line owner before planning a conduit bore and expose marked utilities along its path.
More on each kind of work: water line boring, electric line boring, fiber optic boring, road, railroad and creek crossings and municipal boring.
What do you need to quote a bore near Sutton Creek in South Toledo Bend?
For a South Toledo Bend quote, send the address or map pin, what is going in the ground, the pipe or conduit size, the footage and any sketch or plans. A route near Sutton Creek needs its crossing shown clearly, since creek access and pit placement can change the bore plan.
The 482 road miles from Yukon shape mobilization for a South Toledo Bend job. Kisatchie soil and the mapped bedrock affect drilling time and reaming; a Texas State Highway 255 crossing brings right of way and cover requirements into the plan. The route’s length, pipe size and utilities to expose also matter. Sutton Creek crossings, pavement, pits, excavator time, sand backfill and emergency scheduling can further change the work required.
Questions people ask about boring in South Toledo Bend
Does Trinity take directional boring work in South Toledo Bend, Newton County, and who staffs it?
Trinity takes directional boring work in South Toledo Bend, Newton County, using our own crews and satellite yards run by drilling partners we have vetted. We work with you from first call through bore log, accounting for FM 692 crossing details regardless of which crew is on site. A route near Texas State Highway 255 can be scoped with the same team.
Can groundwater or flooding affect bore pits near Sutton Creek in South Toledo Bend?
Groundwater can affect pits in South Toledo Bend: the USDA survey maps a seasonal water table within 60 inches on 12 percent of the area. Flood prone soils are not mapped, but a pit near Sutton Creek can still need pumping if water enters. We plan pit size and access around the specific route.
Does Kisatchie soil in South Toledo Bend corrode steel, and what pipe can I use?
The USDA survey maps high steel corrosion risk across 37 percent of South Toledo Bend, so uncoated steel casing and tracer wire deserve material review. Kisatchie is one mapped soil series in the area. HDPE is an option without the steel corrosion exposure; the line owner selects any coating needed for steel.
What ground will a bore pass through in South Toledo Bend near Kisatchie soil?
South Toledo Bend has Kisatchie soil mapped across 21 percent of its area, with fine sandy loam at the surface across 35 percent and loamy sand across 23 percent. At about 40 inches down, the USDA survey maps bedrock across 30 percent and loamy sand across 17 percent. These mapped textures guide planning, but they are not test borings.
How much bedrock is mapped in the top five feet of South Toledo Bend?
The USDA soil survey maps bedrock within 60 inches on 37 percent of South Toledo Bend. It maps that bedrock as weathered, with no hard bedrock mapped within that depth. That pattern helps set expectations for drilling, but it does not describe every bore path or rule out rock deeper down.
Does TxDOT Beaumont District handle Texas State Highway 255 permits in South Toledo Bend?
TxDOT reviews the utility permit for work in the Texas State Highway 255 right of way through its Beaumont District. The utility line owner submits the application in RULIS, while we prepare the bore plan and profile and work under the owner’s permit. Highway cover and installation details depend on the line type.
What bore sizes and lengths can you handle near Prv Road 6065 in South Toledo Bend?
For a job near Prv Road 6065, we handle lines from 3/4 inch service lines up to 48 inch casing, with bore lengths from 10 feet to 5,000 feet. The route, soil and crossings determine the setup. A sketch showing the intended path and nearby utilities helps us review the scope.
How much notice does Texas811 need for a bore along R255 in South Toledo Bend?
For a bore along R255, make the Texas811 locate request at least 48 hours before excavation, excluding Saturdays, Sundays and legal holidays, and no earlier than 14 days ahead. If our start slips more than 14 days past the original notice, we make a new request for work near Hemphill. Before work continues near R255, we have worn or moved marks refreshed through Texas811.
What affects the cost of a directional bore under Texas State Highway 255 in South Toledo Bend?
For a South Toledo Bend bore under Texas State Highway 255, the route length, pipe size, soil and mapped bedrock all affect the work. So do utilities to expose, pavement, creek crossings, pits, excavator time and sand backfill. The 482 road miles from Yukon also affect mobilization; emergency scheduling can change the plan.
Where the South Toledo Bend facts on this page come from
- USDA Natural Resources Conservation Service, Soil Data Access: soil survey map units inside South Toledo Bend
- U.S. Census Bureau, TIGER/Line 2024: South Toledo Bend boundary, roads, rail lines and streams
- U.S. Census Bureau, 2020 Census: South Toledo Bend population count
- U.S. Census Bureau, American Community Survey 2019 to 2023: South Toledo Bend housing units and year built
- Macrostrat geologic map compilation: map units under South Toledo Bend
- U.S. Energy Information Administration, Form EIA 861: electric utilities serving Newton County
- U.S. Geological Survey, Elevation Point Query Service: South Toledo Bend elevation
- OpenStreetMap road network through the OSRM router: road miles from Yukon, Oklahoma to South Toledo Bend
- Texas Utilities Code Chapter 251, Underground Facility Damage Prevention and Safety
- TxDOT Utility Accommodation Rules, 43 Tex. Admin. Code 21.40: underground utilities
- Texas Department of Transportation: Right of Way Utility and Leasing Information System (RULIS) utility permits
Get a Quote for a Bore in South Toledo Bend
Send the address, what is going in, the size and the footage.
Trinity Boring Solutions
9102 NW Expressway, Yukon, OK 73099
(405) 409-7423 | darren@trinityboringsolutions.com
Free Bore Planner
Plan Your Bore in South Toledo Bend, Texas
Type the address of your job in South Toledo Bend. The Bore Planner opens an aerial map at that spot. Drop one pin where the bore starts and one where it ends, tell us what is going in and send the scope to our crew.
Talk to the crew that does the work
Fastest way to a number is a phone call. Tell us where the crossing is and what is going in the ground, and you will get a straight answer on the same call. Bores from 10 feet to 5,000 feet, 3/4 inch service line through 48 inch casing, anywhere in Oklahoma and Texas. We run 24/7 for main breaks and emergency repairs.
Answered by a person, not a call center.
Would rather not call? Send the details and we will come back with a written quote.
County and State Pages for South Toledo Bend
Same county: Deweyville. All counties: Texas county list.