trinityboringsolutions.com

Deweyville Texas Directional Boring: Hatliff Soil, Sabine River And CPKC Track

Quick Answer: We do directional boring, or horizontal directional drilling (HDD), in Deweyville, Texas, including routes beneath Sabine River crossings. Ruliffe Road and River Oaks Road are the longest named streets among 36.8 public road miles inside the mapped community boundary, and the Sabine River runs through it. Deweyville is 494 road miles from our Yukon, Oklahoma main office, with Texas State Highway 12 in the community. Hatliff soil and fine sandy loam call for checking how the ground holds a bore open.

Family Business Since 1965 Boring Since 1982 24 Hour Phone No Utility Strike in 25 Years

Deweyville bores at a glance

  • Unincorporated community in Newton County, Texas. Population 571 (2020 Census count).
  • Road distance from our Yukon, Oklahoma main office: 494 miles, about 10.3 hours of driving.
  • Ground: Hatliff soil is mapped on 19 percent of the area, with fine sandy loam about 40 inches down.
  • Rock: no bedrock is mapped in the top 60 inches.
  • Highways inside the boundary: Texas State Highway 12 and Spur 272. State permit office: TxDOT Beaumont District.
  • Railroad track inside the boundary: CPKC (Kansas City Southern), with 1 mapped street and rail crossings.
  • Named streams inside the boundary: Sabine River and Big Cypress Creek.
  • Texas811: locate request at least two working days before a bore and no more than 14 days ahead.
  • Range: 3/4 inch service lines to 48 inch casing, 10 feet to 5,000 feet.
  • Phone answered 24 hours a day: (405) 409-7423

Who does directional boring in Deweyville near the Sabine River?

We take directional boring work in Deweyville, an unincorporated community in Newton County with a 2020 Census count of 571 people. Our crews install water, sewer, gas, electric conduit and fiber along routes such as Ruliffe Road or River Oaks Road, where boring can carry a line beneath pavement without cutting across the street.

Our main office is in Yukon, Oklahoma, and Deweyville work is done with our own crews and from satellite yards run by partner drilling contractors Trinity has personally vetted. We are a family business that started in 1965, with directional boring work dating to 1982; our 3/4 inch service lines through 48 inch casing range fits work from a small service near Cedar Road to larger routes around the Sabine River.

Trinity Boring Solutions directional boring crew, drill rig and hydrovac trailer staged along an airport service road at Will Rogers World Airport in Oklahoma City
Our boring crew, drill and hydrovac trailer staged along a service road at Will Rogers World Airport in Oklahoma City. Photos on this page are from our jobs in Oklahoma and Texas.

What is Deweyville ground like for boring through Hatliff soil?

The USDA soil survey maps Hatliff soil across 19 percent of Deweyville, alongside Kenefick, Belrose and Votaw series. At about 40 inches, fine sandy loam is mapped across 21 percent of the area, while the average clay content at that depth is 24 percent and sandy ground is mapped across 32 percent. Around Deweyville, we treat mapped soil patterns as planning context, not as a substitute for project test borings. A route near a Hatliff-Pluck-Kian complex area may encounter wet, frequently flooded ground, so we plan the bore and work pits for local conditions rather than treating the surface texture as the whole profile.

USDA soil survey, inside the Deweyville mapped community boundaryWhat is mapped
Soil series mappedHatliff 19 percent, Kenefick 18 percent, Belrose 16 percent, Votaw 14 percent and Cowmarsh 7 percent
Texture at the surfacefine sandy loam 22 percent, loam 21 percent and loamy fine sand 16 percent
Texture about 40 inches downfine sandy loam 21 percent, clay 18 percent and sandy clay loam 18 percent
Engineering class about 40 inches downlean clay (CL) 24 percent, silty clayey sand (SC SM) 19 percent and clayey sand (SC) 16 percent
Average clay content about 40 inches down24 percent
Bedrock mapped within 60 inchesNone mapped
Seasonal water table within 60 inches36 percent of the area
Flood prone soils35 percent of the area
High corrosion risk for uncoated steel39 percent of the area

Bedrock is not mapped in the top five feet of Deweyville, but the geologic map shows Alluvial Gravelly Sand of Holocene age, with sand, clay, gravel and silt. Seasonal water tables are mapped within 60 inches across 36 percent of the area, and flood prone soils across 35 percent, so pits near the Sabine River may need water management and channel depth planning. High steel corrosion risk covers 39 percent of the mapped area; the line owner should consider casing and tracer wire materials, while HDPE avoids that steel concern.

How do we bore Deweyville fine sandy loam ground?

We choose the Deweyville bore plan from the soil and route, not the surface alone. Fine sandy loam, mapped seasonal water and the Sabine River each affect how we manage the hole and work pits.

  1. Hatliff and Kenefick soils call for checking how the cut behaves as drilling advances; we adjust fluid and ream in stages if clay starts to cling to the tooling.
  2. Where the USDA survey maps sandy ground near the Sabine River, we plan to support the bore hole and have the product line ready before the final reaming pass.
  3. With seasonal water mapped in Deweyville, we keep pits manageable and pump as needed so water does not stall work along a route near River Oaks Road.
  4. Before a drill approaches a marked utility near Texas State Highway 12, we hydrovac pothole it, then track the head from the surface and log depth and pitch.
Bore pit with a 6 inch PVC sleeve, traffic cones and blue water line flags at NE 24th Street in Oklahoma City
A bore pit with a 6 inch PVC sleeve, traffic cones and blue water line flags at NE 24th Street in Oklahoma City.

Where might a Deweyville bore pass under CPKC (Kansas City Southern)?

Texas State Highway 12 and Spur 272 run inside Deweyville, while Texas State Highway 87 is just outside the mapped community boundary. Ruliffe Road, at 1.32 miles, River Oaks Road, at 1.01 miles, and County Road 4203 are among the longest named streets. A bore beneath a highway or street can keep the surface uncut, but the route, available work area and pavement all shape the setup. Cedar Road is another named street where a proposed crossing would need its own utility checks.

CrossingTypeMapped extentWho has a say
Texas State Highway 12State highway1.8 roadway miles insideState highway office
Spur 272State highway0.8 roadway miles insideState highway office
Texas State Highway 87Highway nearby0.1 miles outsideState highway office
CPKC (Kansas City Southern)Railroad2.57 track miles insideThe railroad
Sabine RiverStream9.06 channel miles insideChecked for Corps of Engineers jurisdiction
Big Cypress CreekStream3.29 channel miles insideChecked for Corps of Engineers jurisdiction
Swipe the table sideways to see every column.

The CPKC (Kansas City Southern) Beaumont (Kcs) Subdivision has 2.57 track miles inside Deweyville, and public mapping shows one street and rail crossing in the community. Any proposed track crossing needs an agreement from the railroad owner. The Sabine River runs 9.06 channel miles through the area, and Big Cypress Creek runs 3.29 channel miles; one street crossing of a named stream is mapped. A water crossing is checked for federal jurisdiction during planning.

Who approves a Deweyville bore in Newton County?

Deweyville has no city government, so public streets fall under county or state authority rather than a local city permit office. For work on Texas State Highway 12 or Spur 272, the line owner, not the driller, applies for a TxDOT utility permit through RULIS, and the TxDOT Beaumont District reviews it; we prepare the bore plan and profile for that filing. TxDOT cover rules set 60 inches below the lowest grade for electric and communication crossings and 60 inches for water crossings, with 48 inches for electric or communication lines running along the right of way. A CPKC track crossing needs the railroad owner’s agreement, and a Sabine River crossing is checked for U.S. Army Corps of Engineers jurisdiction during planning.

Read the rules for yourself: Texas Utilities Code Chapter 251 on notice to Texas811, the Texas811 questions and answers page, the TxDOT Utility Accommodation Rules, 43 TAC 21.40 and TxDOT utility permits in RULIS.

Whose buried lines should we check in Newton County near Deweyville?

The water provider for a Deweyville address must be confirmed with the county or local water district before a bore is planned; available EPA records do not identify a provider for this community. Entergy Texas, Deep East Texas Electric Cooperative and Jasper-Newton Electric Cooperative report electric service in Newton County, but that does not establish which company serves a particular address. We confirm the electric line owner before planning a conduit bore near Texas State Highway 12.

Line ownerWhat it isSourceSize
Entergy Texas, Deep East Texas Electric Cooperative and Jasper-Newton Electric CooperativeElectric utilities reporting service in Newton CountyEIA Form 861Confirm the line owner by address
Swipe the table sideways to see every column.

The American Community Survey 2019 to 2023 five year estimates put Deweyville’s median housing year at 2011: 19 percent of homes were built before 1960, 23 percent from 1960 to 1999, and 58 percent in 2000 or later. That mix can mean a route along Ruliffe Road involves either replacement work or a newer service connection. Before drilling near a marked line, we hydrovac pothole it because paint shows position, not depth; a proposed crossing beneath River Oaks Road would need the same check.

Yellow polyethylene gas pipe pulled through a directional bore beside a commercial building
Yellow polyethylene gas pipe pulled through a directional bore beside a commercial building.

Do you cover Deweyville and nearby Forest Heights?

We serve Deweyville in Newton County, a community at 14 feet elevation with 11.2 square miles of mapped land and ZIP codes 77614 and 77632. Forest Heights is 4.5 miles south, Mauriceville is 7.6 miles southwest, and Little Cypress is 8.5 miles south. Orange, the nearest larger city, is 12.2 miles south; Newton, the county seat, is 38.1 miles north. From our Yukon, Oklahoma main office, Deweyville is 494 road miles away and a 10.3 hour drive, which can affect mobilization for work near Texas State Highway 12.

Places near Deweyville

What could we bore along Deweyville’s River Oaks Road?

  • Highway crossing: A bore beneath Texas State Highway 12 can carry a water line or conduit without cutting through the highway surface.
  • Street service: A water or sewer service beneath Ruliffe Road can avoid an open cut across the named street.
  • Fiber route: Fiber conduit along River Oaks Road can be bored beneath pavement and driveways, with marked utilities exposed before drilling near them.
  • Creek crossing: A proposed line under Big Cypress Creek needs depth planning and a check for U.S. Army Corps of Engineers jurisdiction.
  • Rail crossing: A utility route under CPKC (Kansas City Southern) track needs the railroad owner’s agreement before the crossing is planned.
  • River route: A proposed bore under the Sabine River needs channel planning and a jurisdiction check before the route is set.

More on each kind of work: water line boring, electric line boring, fiber optic boring, road, railroad and creek crossings and municipal boring.

What do you need to quote a Deweyville bore near Cedar Road?

For a Cedar Road quote, send the address or map pin, what will go underground, the pipe or conduit size and footage; a sketch or plans help us read the route. Those details show whether the proposed line follows a street, crosses Texas State Highway 12 or approaches a drainage feature, and help us identify what needs checking before we plan the bore.

A short route through open ground near Cedar Road is simpler to plan than a bore with several marked utilities, pavement or a creek crossing. Length, pipe size, soil, exposed utilities, concrete, access pits, excavator time and sand backfill all affect the work. The Hatliff soil and mapped seasonal water can change pit needs, while a CPKC track or Texas State Highway 12 crossing brings added planning. Deweyville’s 494 road miles from Yukon also matter when we schedule mobilization.

Questions people ask about boring in Deweyville

Does Trinity take directional boring jobs in Deweyville and Newton County?

Yes, we take directional boring work in Deweyville, including routes along Ruliffe Road and near the Sabine River. Our crews work from the Yukon main office and satellite yards operated by partner drilling contractors we have vetted. On Deweyville work, we keep one contact from the first call through the bore log, regardless of which crew is on site.

Will a Deweyville bore hit rock near the Sabine River?

The USDA geologic map does not map bedrock in Deweyville’s top five feet, but that does not rule out deeper rock. It shows Alluvial Gravelly Sand of Holocene age, made up of sand, clay, gravel and silt. A route near the Sabine River still needs site specific planning rather than an assumption based on the map.

Who approves our bore under Texas State Highway 12 in Deweyville?

TxDOT reviews a utility permit for work on Texas State Highway 12 through its Beaumont District. The utility line owner submits the application in RULIS, while we prepare the bore plan and profile. The permit sets project requirements, including cover, so the route and line type need to be established before construction.

What is needed to bore under CPKC (Kansas City Southern) in Deweyville?

The CPKC (Kansas City Southern) railroad owns 2.57 track miles mapped inside Deweyville. A proposed track crossing needs an agreement from the railroad owner, which establishes crossing conditions such as casing, depth and flagging. We plan the route around the track and coordinate the bore plan with the requirements in that agreement.

Can a utility line be bored under the Sabine River in Deweyville?

A bore can be planned beneath the Sabine River, but the route needs channel depth planning and a check for U.S. Army Corps of Engineers jurisdiction. The river runs 9.06 channel miles through Deweyville, where flood prone soils are mapped across 35 percent of the area. Those conditions affect the crossing plan and work pit placement.

Who owns electric lines at a Deweyville address in Newton County?

Entergy Texas, Deep East Texas Electric Cooperative and Jasper-Newton Electric Cooperative report service in Newton County, but that does not identify the provider at every Deweyville address. We confirm the line owner before planning an electric conduit bore near a street such as Cedar Road, then check conduit requirements with that owner.

How much 811 notice is needed for a Deweyville bore on Ruliffe Road?

For a bore on Ruliffe Road, Texas law requires a Texas811 locate request at least 48 hours before excavation, excluding Saturdays, Sundays and legal holidays, and no earlier than 14 days before. For a Deweyville bore under Texas State Highway 12, if the start moves more than 14 days past the original notice, we submit a new request. Before continuing a Deweyville bore, we have worn or moved marks refreshed through Texas811.

How far is Deweyville from Yukon, and does Orange change the job?

Deweyville is 494 road miles and a 10.3 hour drive from our Yukon, Oklahoma main office; Orange is 12.2 miles south and is the nearest larger city. The Yukon distance can affect mobilization for work on Texas State Highway 12, while Orange provides a nearby geographic reference for discussing a job location.

What affects the cost of a Deweyville bore under Texas State Highway 12?

The route length, pipe size, soil, utility crossings, pavement, work pits and equipment needs all affect the price. A Texas State Highway 12 crossing adds permit planning, while Hatliff soil and seasonal water may affect drilling and pit work. A route that also approaches the Sabine River or CPKC track needs additional crossing planning.

Where the Deweyville facts on this page come from

Darren Rice in a safety vest at the bore pit beside the Trinity Boring Solutions Ditch Witch directional drill, with drill rods racked, on the airfield at Will Rogers World Airport in Oklahoma City

About Trinity Boring Solutions

Trinity Boring Solutions is a family business in Yukon, Oklahoma, founded by Dean Rice in 1965 and owned today by Darren Rice, who started its directional boring side in 1982. The company bores across Oklahoma and Texas. No bore is too big or too small: 4 foot sidewalk sleeves to roughly 4,100 feet under the Arkansas River in Tulsa. Reach us at (405) 409-7423.

Get a Quote for a Bore in Deweyville

Send the address, what is going in, the size and the footage.

Trinity Boring Solutions
9102 NW Expressway, Yukon, OK 73099
(405) 409-7423 | darren@trinityboringsolutions.com

Trinity Boring Solutions | 24/7 Available ☎ Call (405) 409-7423 Free Quote

Free Bore Planner

Plan Your Bore in Deweyville, Texas

Type the address of your job in Deweyville. The Bore Planner opens an aerial map at that spot. Drop one pin where the bore starts and one where it ends, tell us what is going in and send the scope to our crew.

Talk to the crew that does the work

Fastest way to a number is a phone call. Tell us where the crossing is and what is going in the ground, and you will get a straight answer on the same call. Bores from 10 feet to 5,000 feet, 3/4 inch service line through 48 inch casing, anywhere in Oklahoma and Texas. We run 24/7 for main breaks and emergency repairs.

Call (405) 409-7423

Answered by a person, not a call center.

Would rather not call? Send the details and we will come back with a written quote.

Quick Quote In Page

County and State Pages for Deweyville

Same county: Newton · South Toledo Bend. All counties: Texas county list.