Electra Texas Directional Boring: Tillman Clay Loam, US 287 and BNSF Railway
Quick Answer: Along US 287, Trinity Boring Solutions provides directional boring, also called horizontal directional drilling (HDD), for utility crossings in Electra, Texas. Electra is 153 road miles from our Yukon, Oklahoma main office, and that distance shapes planning for work near Bailey Street. Tillman soil covers 78 percent of the city, and its clay can grip pipe if the open hole sits too long. We stage reaming and plan the pull around that ground, whether the route is near BNSF Railway or a local street.
Electra bores at a glance
- Incorporated city in Wichita County, Texas. Population 2,249 (Census Bureau 2024 estimate).
- Road distance from our Yukon, Oklahoma main office: 153 miles, about 3.1 hours of driving.
- Ground: Tillman soil is mapped on 78 percent of the area, with clay about 40 inches down.
- Rock: bedrock is mapped within 60 inches on 9 percent of the area.
- Highways inside the boundary: US 287, US 287 Business, Texas State Highway 25, FM 1739 and FM 1811. State permit office: TxDOT Wichita Falls District.
- Railroad track inside the boundary: BNSF Railway, with 3 mapped street and rail crossings.
- Public water: City of Electra, surface water bought from another system.
- Electric: City of Electra municipal electric system.
- Texas811: locate request at least two working days before a bore and no more than 14 days ahead.
- Range: 3/4 inch service lines to 48 inch casing, 10 feet to 5,000 feet.
- Phone answered 24 hours a day: (405) 409-7423
Who handles directional boring in Electra and Wichita County?
Trinity Boring Solutions takes directional boring work in Electra, Wichita County, where the Census Bureau Vintage 2024 estimate lists 2,249 residents. A Bailey Street job is 153 road miles from our Yukon yard, so we plan mobilization around the drive and crew arrangement. Along Bailey Street, US 287 and other Electra routes, we bore water, sewer, gas, electric conduit and fiber lines.
Our main office is in Yukon, Oklahoma, and Electra work is done with our own crews and from satellite yards run by partner drilling contractors Trinity has personally vetted. Since 1982, four decades of boring have taught us to stage reaming for Electra’s heavy Tillman clay. Our family business began in 1965, and Trinity stays on the job through the bore log near US 287.

What does Tillman soil mean for boring in Electra?
The USDA soil survey maps Tillman soil across 78 percent of Electra, with Tillman clay loam, 1 to 3 percent slopes covering 76 percent. Clay loam is the surface texture across 84 percent of the mapped area. At about 40 inches, clay is listed across 88 percent of the mapped area, and the survey reports an average of 42 percent clay at that depth. For boring plans in Electra, we treat mapped patterns as planning references, not as test borings. This clay can stick to the reamer and swell around pipe, so timing and staged reaming matter.
| USDA soil survey, inside the Electra city limits | What is mapped |
|---|---|
| Soil series mapped | Tillman 78 percent, Vernon 8 percent, Wheatwood 4 percent, Oil-waste land (miscellaneous area) 4 percent and Frankirk 3 percent |
| Texture at the surface | clay loam 84 percent, loam 5 percent and silt loam 4 percent |
| Texture about 40 inches down | clay 88 percent, silty clay loam 4 percent and variable 4 percent |
| Engineering class about 40 inches down | fat clay (CH) 87 percent and lean clay (CL) 9 percent |
| Average clay content about 40 inches down | 42 percent |
| Bedrock mapped within 60 inches | 9 percent of the area (0 percent hard rock, 9 percent weathered rock) |
| Seasonal water table within 60 inches | 0 percent of the area |
| Flood prone soils | 4 percent of the area |
| High corrosion risk for uncoated steel | 89 percent of the area |
The USDA soil survey maps bedrock within 60 inches across 9 percent of Electra, and the mapped bedrock at that depth is weathered. When we plan Electra work, we do not read the mapped depth as showing hard bedrock within that depth. A seasonal water table is not mapped within 60 inches, while flood prone soils cover 4 percent. High steel corrosion risk is mapped across 89 percent, a reason to discuss casing and tracer wire materials with the line owner. The Waggoner Ranch Formation, of Cisuralian age, includes mudstone, shale, limestone and other rock; its map does not establish conditions at a particular bore.
How do we drill through clay in Electra?
For Electra’s Tillman clay, we use horizontal directional drilling (HDD) with fluid and reaming staged to keep the hole stable and limit pressure beneath pavement on US 287.
- Tillman clay loam covers much of Electra, so we adjust fluid and ream in stages to keep sticky cuttings from loading the reamer.
- Because heavy clay is mapped beneath Electra, we watch fluid returns near Bailey Street and manage pressure to avoid lifting pavement.
- Electra has no sandy area mapped at about 40 inches, but we still have pipe ready before the final ream so the pull can follow promptly.
- The drill head is tracked from the surface as a bore advances beneath US 287, with depth and pitch recorded along the route.

Which roads, tracks or creeks could a bore cross in Electra near Bailey Street?
Electra has 6.3 mapped roadway miles of US 287 inside the city limits, plus 1.8 miles of US 287 Business. Texas State Highway 25 adds 2.8 miles, while FM 1739 and FM 1811 also run inside the limits. Bailey Street is the longest named street at 1.93 miles, followed by Front Avenue at 1.72 miles and Waggoner Street at 1.7 miles. A route beneath one of these roads needs a path that avoids cutting the surface.
| Crossing | Type | Mapped extent | Who has a say |
|---|---|---|---|
| US 287 | US highway | 6.3 roadway miles inside | State highway office |
| US 287 Business | US highway | 1.8 roadway miles inside | State highway office |
| Texas State Highway 25 | State highway | 2.8 roadway miles inside | State highway office |
| FM 1739 | State highway | 1.4 roadway miles inside | State highway office |
| FM 1811 | State highway | 0.2 roadway miles inside | State highway office |
| BNSF Railway | Railroad | 1.87 track miles inside | The railroad |
| South Fork Buffalo Creek | Stream nearby | 0.1 miles outside | Checked for Corps of Engineers jurisdiction |
| East Fork Bluff Creek | Stream nearby | 0.5 miles outside | Checked for Corps of Engineers jurisdiction |
BNSF Railway has 1.87 track miles in Electra, with three mapped street and rail crossings in the city. A crossing plan needs to account for the railroad track and its agreement process. No named streams are mapped inside the limits, but South Fork Buffalo Creek is 0.1 miles from the boundary and East Fork Bluff Creek is 0.5 miles away. Electra also has 0.2 miles of unnamed drainage, and no lakes or ponds are mapped within one mile.
Do I need a permit to bore under US 287 in Electra?
For an Electra crossing of US 287, TxDOT reviews the highway right of way through its Wichita Falls District, while the city handles city streets such as Bailey Street. The utility owner submits the state highway permit application through TxDOT’s RULIS system; we prepare the bore plan and profile for that owner. TxDOT rules require boring or tunneling beneath existing highway pavement, with the bore extending under all travel lanes on rural highways. A BNSF Railway crossing needs an agreement with the track owner. South Fork Buffalo Creek and East Fork Bluff Creek are checked for U.S. Army Corps of Engineers jurisdiction during planning.
Read the rules for yourself: Texas Utilities Code Chapter 251 on notice to Texas811, the Texas811 questions and answers page, the TxDOT Utility Accommodation Rules, 43 TAC 21.40 and TxDOT utility permits in RULIS.
What is already in the ground near the City of Electra system?
Near the City of Electra water system, the local government supplies purchased surface water, and the city owns its municipal electric system. The water system reports 1,402 service connections and 2,559 people served; the EIA reports 1,230 customers for the electric system. Before planning a conduit bore near Bailey Street, we confirm the line owner and expose marked utilities with hydrovac potholing so the drill plan reflects their actual depth.
| Line owner | What it is | Source | Size |
|---|---|---|---|
| City of Electra | Public water system | Surface water bought from another system | 1,402 connections, 2,559 people served |
| City of Electra municipal electric system | City owned electric system | Reports to the U.S. Energy Information Administration | 1,230 customers reported |
| AEP Texas North and Oncor Electric Delivery Company | Electric utilities reporting service in Wichita County | EIA Form 861 | Confirm the line owner by address |
The American Community Survey 2019 to 2023 five year estimates put Electra’s median housing year at 1954, which gives us context for underground work. They estimate 67 percent of homes were built before 1960, 25 percent from 1960 to 1999 and 8 percent in 2000 or later. That age profile makes replacement work along Front Avenue a practical possibility, but it does not establish the age of any buried line. We pothole marked lines before drilling near them, including lines near the City of Electra water and electric systems.

What is near Electra and Iowa Park?
Electra is in Wichita County at an elevation of 1,227 feet and covers 3.09 square miles. We use ZIP code 76360 when identifying the Electra service area for underground boring plans. Harrold is 6.9 miles west, Oklaunion is 14.5 miles northwest, and Iowa Park is 14.5 miles east; Iowa Park is the nearest larger city. Wichita Falls, the county seat, is 24.2 miles east. From our Yukon yard, the drive to Electra is 153 road miles and 3.1 hours, a distance we account for when planning crew and equipment mobilization.
Places near Electra
- Directional boring in Harrold: 6.9 miles west
- Directional boring in Oklaunion: 14.5 miles northwest
- Directional boring in Iowa Park: 14.5 miles east
- Directional boring in Pleasant Valley: 19.6 miles east
- Directional boring in Holliday: 20 miles southeast
What kinds of bores come up in Electra near Front Avenue?
- Water service: A replacement bore near the City of Electra water system can pass beneath Bailey Street without opening the pavement.
- Highway crossing: A utility route beneath US 287 needs a TxDOT plan and a bore that extends under the travel lanes.
- Fiber conduit: A run along Front Avenue can use HDD to avoid cutting the street surface.
- Rail crossing: A route beneath BNSF Railway needs coordination around the track and an agreement with the railroad.
- Drainage crossing: Near South Fork Buffalo Creek, plan depth around the channel and check jurisdiction during design.
- Electric conduit: Confirm the owner of the City of Electra municipal electric system before potholing marked lines along Waggoner Street.
More on each kind of work: water line boring, electric line boring, fiber optic boring, road, railroad and creek crossings and municipal boring.
What do you need to quote a bore near BNSF Railway in Electra?
For a quote near BNSF Railway in Electra, send the address or map pin, what is going underground, the pipe or conduit size and the footage. A sketch or plans help show the route, especially if it approaches US 287, Bailey Street or a marked utility. That gives us a starting scope for the bore.
Electra is 153 road miles from Yukon, so mobilization is part of a quote for work near US 287. Tillman clay can affect drilling and reaming, while a BNSF Railway crossing or pavement adds coordination and protection needs. Length, pipe size, utilities to expose, concrete, drainage crossings, pits, excavator time and backfill also shape the work. High profile or emergency jobs can call for a different plan.
Questions people ask about boring in Electra
Does Trinity take directional boring jobs in Electra and Wichita County?
Yes. Trinity takes directional boring work in Electra, Wichita County. Our own crews and vetted drilling partners staff the work from satellite yards, while you deal with Trinity from the first call through the bore log, including a job along Bailey Street.
How old are homes and buried lines near Front Avenue in Electra?
Electra’s American Community Survey 2019 to 2023 estimates put the median housing year at 1954, with 67 percent built before 1960. Along Front Avenue, that age profile makes it sensible to locate and expose existing lines before planning a replacement bore; it does not establish the age of a particular pipe.
Does Tillman soil in Electra corrode steel, and what pipe can we use?
The USDA soil survey maps high steel corrosion risk across 89 percent of Electra, where Tillman soil dominates. Soil corrosion is a concern for uncoated steel casing or tracer wire. HDPE does not corrode from soil in the way uncoated steel can, and the line owner selects any coatings for steel materials.
What ground will a directional bore pass through in Electra’s Tillman soil?
Tillman clay loam is the dominant mapped soil in Electra, and the USDA survey shows clay across 88 percent of the mapped area at about 40 inches. For soil planning in Electra, we treat soil survey patterns as mapped information, not as test borings. Sticky clay can load a reamer and grip pipe, so we plan the reaming and pull accordingly.
Is rock likely on a bore route in Electra?
Some shallow rock is mapped in Electra: bedrock occurs within 60 inches across 9 percent of the area, and the mapped bedrock is weathered. Hard bedrock is not mapped at that depth. This points to a possibility of slower work in some locations, not a claim about a specific Front Avenue alignment.
Who approves an Electra bore under US 287?
For a bore beneath US 287 in Electra, the utility owner applies through TxDOT’s RULIS system, and TxDOT’s Wichita Falls District reviews the right of way request. We prepare the bore plan and profile for the owner, which works under its permit rather than a contractor filed permit.
How far is Electra from Yukon, and does Iowa Park affect the job?
Electra is 14.5 miles west of Iowa Park and 153 road miles from our Yukon main office. That distance is part of mobilization planning, alongside Tillman clay and the route’s crossings; it does not change the need to fit the crew and equipment to the bore.
How much notice is needed for a bore near Bailey Street in Electra?
For a Bailey Street bore, Texas811 needs a locate request at least 48 hours before excavation, excluding Saturdays, Sundays and legal holidays, and no earlier than 14 days beforehand. If our Electra start slips more than 14 days past the original notice, we make a new request. Before work continues in Electra, we have worn or moved marks refreshed through Texas811.
What affects the cost of directional boring under US 287 in Electra?
The job details set the price for an Electra bore under US 287. Length, pipe size, Tillman clay, pavement, utility crossings and exposure work all affect the scope. BNSF Railway or drainage crossings can add planning, and the 153 road miles from Yukon factor into mobilization.
Where the Electra facts on this page come from
- USDA Natural Resources Conservation Service, Soil Data Access: soil survey map units inside Electra
- U.S. Census Bureau, TIGER/Line 2024: Electra boundary, roads, rail lines and streams
- U.S. Census Bureau, Vintage 2024 population estimates: Electra
- U.S. Census Bureau, American Community Survey 2019 to 2023: Electra housing units and year built
- Macrostrat geologic map compilation: map units under Electra
- U.S. EPA Safe Drinking Water Information System: public water systems serving Electra
- U.S. Department of Transportation, North American Rail Network: track owners in Wichita County
- U.S. Energy Information Administration, Form EIA 861: electric utilities serving Wichita County
- U.S. Geological Survey, Elevation Point Query Service: Electra elevation
- OpenStreetMap road network through the OSRM router: road miles from Yukon, Oklahoma to Electra
- Texas Utilities Code Chapter 251, Underground Facility Damage Prevention and Safety
- TxDOT Utility Accommodation Rules, 43 Tex. Admin. Code 21.40: underground utilities
- Texas Department of Transportation: Right of Way Utility and Leasing Information System (RULIS) utility permits
Get a Quote for a Bore in Electra
Send the address, what is going in, the size and the footage.
Trinity Boring Solutions
9102 NW Expressway, Yukon, OK 73099
(405) 409-7423 | darren@trinityboringsolutions.com
Free Bore Planner
Plan Your Bore in Electra, Texas
Type the address of your job in Electra. The Bore Planner opens an aerial map at that spot. Drop one pin where the bore starts and one where it ends, tell us what is going in and send the scope to our crew.
Talk to the crew that does the work
Fastest way to a number is a phone call. Tell us where the crossing is and what is going in the ground, and you will get a straight answer on the same call. Bores from 10 feet to 5,000 feet, 3/4 inch service line through 48 inch casing, anywhere in Oklahoma and Texas. We run 24/7 for main breaks and emergency repairs.
Answered by a person, not a call center.
Would rather not call? Send the details and we will come back with a written quote.