trinityboringsolutions.com

La Coma Texas Directional Boring: Catarina Clay, Lobo Creek and CPKC Track

Quick Answer: If your first question is whether we can put a line beneath Texas State Highway 359 without cutting it, yes: Trinity Boring Solutions does directional boring, also called horizontal directional drilling (HDD), in La Coma, Texas. La Comma Road and the CPKC (Kansas City Southern) track are other crossings a route may need to clear. La Coma is 649 road miles from our Yukon, Oklahoma main office, and the 0.37 mile Lobo Creek channel can affect alignment. Catarina clay is common here and can cling to the reamer, so we plan fluid and staged reaming around the ground.

Family Business Since 1965 Boring Since 1982 24 Hour Phone No Utility Strike in 25 Years

La Coma bores at a glance

  • Unincorporated community in Webb County, Texas. Population 7 (2020 Census count).
  • Road distance from our Yukon, Oklahoma main office: 649 miles, about 12.6 hours of driving.
  • Ground: Catarina soil is mapped on 47 percent of the area, with clay about 40 inches down.
  • Rock: bedrock is mapped within 60 inches on 38 percent of the area.
  • Highways inside the boundary: Texas State Highway 359. State permit office: TxDOT Laredo District.
  • Railroad track inside the boundary: CPKC (Kansas City Southern), with 2 mapped street and rail crossings.
  • Named streams inside the boundary: Lobo Creek.
  • Texas811: locate request at least two working days before a bore and no more than 14 days ahead.
  • Range: 3/4 inch service lines to 48 inch casing, 10 feet to 5,000 feet.
  • Phone answered 24 hours a day: (405) 409-7423

Who handles directional boring in La Coma by CPKC (Kansas City Southern)?

If your first question is whether we can get a line beneath Texas State Highway 359 without cutting it, we can bore under it in La Coma. We take work in Webb County, where the 2020 Census counted 7 people in this census designated place. A route on La Comma Road or Botello Road can carry water, sewer, gas, electric conduit or fiber, with the bore planned for the line and crossing.

Our main office is in Yukon, Oklahoma, and La Coma work is done with our own crews and from satellite yards run by partner drilling contractors Trinity has personally vetted. We are a family business that started in 1965, and we have bored directionally since 1982. Four decades of work help us plan for the sticky clay mapped along La Comma Road and other La Coma routes.

Trinity Boring Solutions directional boring crew, drill rig and hydrovac trailer staged along an airport service road at Will Rogers World Airport in Oklahoma City
Our boring crew, drill and hydrovac trailer staged along a service road at Will Rogers World Airport in Oklahoma City. Photos on this page are from our jobs in Oklahoma and Texas.

What is La Coma’s Catarina soil like to bore?

Catarina soil is the leading mapped soil series in La Coma, covering 47 percent of the area in the USDA soil survey. The survey maps surface texture as clay across 84 percent, with sandy clay loam across 12 percent and clay loam across 4 percent. At about 40 inches below the surface, clay is mapped across 79 percent, and the average clay content there is 46 percent. Those are mapped patterns, not test borings. The clay can hold an open hole but stick to a reamer and grip the pipe.

USDA soil survey, inside the La Coma mapped community boundaryWhat is mapped
Soil series mappedCatarina 47 percent, Maverick 32 percent, Aguilares 12 percent, Viboras 5 percent and Moglia 4 percent
Texture at the surfaceclay 84 percent, sandy clay loam 12 percent and clay loam 4 percent
Texture about 40 inches downclay 79 percent, sandy clay loam 12 percent and bedrock 6 percent
Engineering class about 40 inches downfat clay (CH) 79 percent and lean clay (CL) 15 percent
Average clay content about 40 inches down46 percent
Bedrock mapped within 60 inches38 percent of the area (0 percent hard rock, 38 percent weathered rock)
Seasonal water table within 60 inches0 percent of the area
Flood prone soils24 percent of the area
High corrosion risk for uncoated steel100 percent of the area

The USDA soil survey maps bedrock within 60 inches across 38 percent of La Coma, with a typical depth of 27 inches; the mapped bedrock is weathered, not hard. Seasonal water table is not mapped, while flood prone soil covers 24 percent, so a route near Lobo Creek needs attention to channel depth and pit placement. High steel corrosion risk is mapped across the area, which matters for casing and tracer wire. The Yegua Formation, of Bartonian age, includes sandstone and clay, so the route may meet changing material.

How do we bore La Coma’s clay ground?

La Coma’s clay calls for control of fluid and reamer buildup, especially where a bore approaches Texas State Highway 359. We plan each pass around the soil map and the actual route.

  1. For La Coma’s heavy clay, we adjust drilling fluid and add polymer to help limit sticky buildup on the reamer and reduce the chance of the clay gripping the pipe.
  2. Catarina clay can swell around a pipe, so we open the hole in stages and have the pipe ready to pull through the same day the final ream is made.
  3. Where a La Coma bore runs beneath Texas State Highway 359, we watch fluid returns and pressure so the clay does not lift pavement.
  4. Before drilling near La Comma Road, we hydrovac expose marked utilities on the route, then track the drill head from the surface and log depth and pitch.
Vermeer D24x40 S3 Navigator and water truck at the entry of a 385 foot sandstone rock bore above the wetland in Guthrie, Oklahoma
Our Vermeer D24x40 and water truck at the entry of a 385 foot sandstone rock bore in Guthrie, Oklahoma.

Where must a La Coma bore pass under Texas State Highway 359?

Texas State Highway 359 runs 0.5 roadway miles inside La Coma’s mapped community boundary, so a crossing there needs a route that passes beneath the pavement. No other highway is mapped within 1.5 miles outside that boundary. La Comma Road is the longest named street, at 1.52 miles inside the community; Botello Road runs 0.35 miles and Milagro Road 0.26 miles. Those streets can define a bore route, and their pavement and access affect where entry and exit pits fit.

CrossingTypeMapped extentWho has a say
Texas State Highway 359State highway0.5 roadway miles insideState highway office
CPKC (Kansas City Southern)Railroad0.67 track miles insideThe railroad
Lobo CreekStream0.37 channel miles insideChecked for Corps of Engineers jurisdiction
Swipe the table sideways to see every column.

The CPKC (Kansas City Southern) Laredo Subdivision has 0.67 track miles inside La Coma. Public records map two street and rail crossings in the community, so a route near the track needs to account for the railroad crossing. Lobo Creek runs 0.37 channel miles here, and no street crossing of a named stream is mapped. No lakes or ponds are mapped within one mile, but a creek route still needs channel and bank planning.

Who approves a La Coma bore in Webb County?

La Coma is an unincorporated community, so it has no city government; streets and permits fall to the county or state according to the road. For a bore beneath Texas State Highway 359, electric and communication lines need at least 60 inches of cover below the lowest crossed grade, as do water lines and pressurized sewer lines at crossings. The utility owner applies through TxDOT’s RULIS system, and the TxDOT Laredo District reviews it. TxDOT requires boring or tunneling beneath existing highway pavement, with crossings encased and rural highway bores extending beneath all travel lanes. A crossing of the CPKC track needs an agreement from its owner. Lobo Creek is checked for federal jurisdiction during planning.

Read the rules for yourself: Texas Utilities Code Chapter 251 on notice to Texas811, the Texas811 questions and answers page, the TxDOT Utility Accommodation Rules, 43 TAC 21.40 and TxDOT utility permits in RULIS.

Which utility lines serve La Coma in Webb County?

The water provider for a specific La Coma address has to be confirmed with Webb County or the local water district before a bore is planned. EPA drinking water records do not tie systems to towns, so a system cannot be matched to this community by name. AEP Texas Central, Medina Electric Cooperative and Rio Grande Electric Cooperative report electric service in Webb County, but that does not identify the provider at each address. We confirm the line owner before planning an electric conduit bore near La Comma Road or another route.

Line ownerWhat it isSourceSize
AEP Texas Central, Medina Electric Cooperative and Rio Grande Electric CooperativeElectric utilities reporting service in Webb CountyEIA Form 861Confirm the line owner by address
Swipe the table sideways to see every column.

Housing figures are not published reliably for a place as small as La Coma, so the age of buried services along Botello Road cannot be inferred from a local housing survey. At this scale, long service runs and lines following named roads can shape the bore path. Webb County averages 21.0 inches of precipitation a year, with September averaging 3.9 inches, so timing and pit conditions matter. Before drilling near marked utilities, we hydrovac pothole each one on the route; paint shows position, not depth.

Large HDPE conduit reels staged on a Rotate A Reel trailer for a fiber and utility installation in Oklahoma
HDPE conduit reels on a reel trailer for a fiber and utility installation in Oklahoma.

Where is La Coma near Pueblo Nuevo?

La Coma is in Webb County, Texas, at an elevation of 575 feet and covers 1.22 square miles. The place uses ZIP code 78043. Pueblo Nuevo is 0.5 miles southwest, while Laredo Ranchettes is 3.5 miles west. Laredo, the nearest larger city and the county seat, is 12.1 miles west. From our Yukon, Oklahoma yard, the drive to La Coma is 649 road miles and 12.6 hours. That distance is part of planning crew and equipment mobilization for a bore near Lobo Creek or Texas State Highway 359.

Places near La Coma

What bore work comes up in La Coma near Botello Road?

  • Highway crossing: A bore beneath Texas State Highway 359 goes under the pavement, with the route planned for the highway lanes and entry pits.
  • Street service: A water or sewer line along La Comma Road can be installed without opening a trench across its pavement.
  • Fiber conduit: A conduit bore near Botello Road can keep the route below the street surface and marked utilities.
  • Creek crossing: A line routed beneath Lobo Creek needs depth planning to stay below the channel and a check for federal jurisdiction.
  • Rail crossing: A utility route beneath the CPKC (Kansas City Southern) track needs the railroad owner’s agreement and crossing conditions.
  • Electric conduit: A route near Milagro Road starts with confirming the electric line owner and exposing marked utilities before drilling nearby.

More on each kind of work: water line boring, electric line boring, fiber optic boring, road, railroad and creek crossings and municipal boring.

What drives the price of a La Coma bore near La Comma Road?

A map pin is the best starting point for a La Coma quote because a pin on La Comma Road or near Lobo Creek fixes the crossing location. What pipe or conduit size and footage should we bore in La Coma? A sketch or plans can show nearby Texas State Highway 359 pavement, tracks or drainage that may shape the route.

Soil and rock conditions matter first in La Coma because Catarina clay can build up on the reamer, while mapped weathered bedrock may change drilling pace. The length and pipe or conduit size set the scale of the work. Crossings of Texas State Highway 359 or CPKC track, marked utilities, pavement, creek drainage, pit space and excavator time also affect the scope. Mobilization matters for a job 649 road miles from Yukon.

Questions people ask about boring in La Coma

Does Trinity Boring Solutions take directional boring work in Webb County near La Coma?

Yes, we take directional boring work in Webb County and serve La Coma from our Yukon main office and vetted partner contractor satellite yards. Our crews do the work, and you deal with Trinity from the first call through the bore log. A route near Texas State Highway 359 can be planned around the pavement and mapped utilities.

Can a line be bored beneath Lobo Creek in La Coma?

A bore beneath Lobo Creek may be possible, depending on the route and site conditions. The mapped channel runs 0.37 miles in La Coma, so the plan must keep the line beneath the channel and consider pit locations on both sides. During planning, the creek crossing is checked for U.S. Army Corps of Engineers jurisdiction.

Which electric company owns the lines at a La Coma address in Webb County?

The specific line owner has to be confirmed for the address before we plan an electric conduit bore. AEP Texas Central, Medina Electric Cooperative and Rio Grande Electric Cooperative report electric service in Webb County, but that does not establish which one serves a property near La Comma Road. We can plan conduit after the owner and its specifications are confirmed.

Who is responsible for Milagro Road in La Coma, and does it have to be cut?

La Coma has no city government, so its streets are under county or state responsibility rather than a city government. A directional bore along or beneath Milagro Road can leave pavement uncut, with pits in dirt on either side of the crossing. The road authority for the specific route should be identified as part of planning.

Could groundwater or flood prone ground near Lobo Creek affect bore pits in La Coma?

Flood prone soils are mapped across 24 percent of La Coma, including ground that may affect a route near Lobo Creek. Seasonal water table is not mapped, but that does not establish conditions at a particular pit. We choose pit locations and plan the bore depth with the creek channel and site conditions in mind.

Does Catarina soil in La Coma corrode steel, and what pipe should I use?

The USDA soil survey maps high steel corrosion risk across La Coma, including areas with Catarina soil. That makes the line owner’s casing and tracer wire material decisions important. HDPE is not affected by soil corrosion, but the appropriate pipe depends on the line and project specifications, which the owner should confirm.

How far is La Coma from Trinity’s Yukon office, and does Laredo affect the job?

Our route to La Coma is 649 road miles, and the 12.6 hour drive from our Yukon, Oklahoma main office shapes travel planning. Laredo is 12.1 miles west of La Coma, but mobilization is planned from Yukon, not from a local office. The distance can affect crew and equipment planning for work near Lobo Creek or Texas State Highway 359.

How much 811 notice do I need for a La Coma bore along La Comma Road?

The excavator or project contact requests a Texas811 locate for the planned bore path along La Comma Road at least 48 hours before excavation, excluding Saturdays, Sundays and legal holidays, and no earlier than 14 days before it. For La Coma work, if the start slips more than 14 days past the original notice, we submit a new request. On La Coma work, we refresh marks that wear off or move through Texas811 before work continues.

What affects the price of a directional bore in La Coma under Texas State Highway 359?

The price depends on the job details, not a standard rate. Catarina clay and any weathered bedrock affect drilling; bore length and pipe size set the work scale. A Texas State Highway 359 crossing, marked utilities, pavement, pits and drainage can add planning or equipment needs. Mobilization also matters because La Coma is 649 road miles from Yukon.

Where the La Coma facts on this page come from

Darren Rice in a safety vest at the bore pit beside the Trinity Boring Solutions Ditch Witch directional drill, with drill rods racked, on the airfield at Will Rogers World Airport in Oklahoma City

About Trinity Boring Solutions

Trinity Boring Solutions is a family business in Yukon, Oklahoma, founded by Dean Rice in 1965 and owned today by Darren Rice, who started its directional boring side in 1982. The company bores across Oklahoma and Texas. No bore is too big or too small: 4 foot sidewalk sleeves to roughly 4,100 feet under the Arkansas River in Tulsa. Reach us at (405) 409-7423.

Get a Quote for a Bore in La Coma

Send the address, what is going in, the size and the footage.

Trinity Boring Solutions
9102 NW Expressway, Yukon, OK 73099
(405) 409-7423 | darren@trinityboringsolutions.com

Trinity Boring Solutions | 24/7 Available ☎ Call (405) 409-7423 Free Quote

Free Bore Planner

Plan Your Bore in La Coma, Texas

Type the address of your job in La Coma. The Bore Planner opens an aerial map at that spot. Drop one pin where the bore starts and one where it ends, tell us what is going in and send the scope to our crew.

Talk to the crew that does the work

Fastest way to a number is a phone call. Tell us where the crossing is and what is going in the ground, and you will get a straight answer on the same call. Bores from 10 feet to 5,000 feet, 3/4 inch service line through 48 inch casing, anywhere in Oklahoma and Texas. We run 24/7 for main breaks and emergency repairs.

Call (405) 409-7423

Answered by a person, not a call center.

Would rather not call? Send the details and we will come back with a written quote.

Quick Quote In Page