trinityboringsolutions.com

Pueblo Nuevo Texas Directional Boring: Copita Soil, Texas State Highway 359 and CPKC Track

Quick Answer: Pueblo Nuevo is an unincorporated community in Webb County; we bore beneath Main Street and Texas State Highway 359 using directional boring, also called horizontal directional drilling (HDD). The Yukon office is 647 road miles away, and CPKC (Kansas City Southern) track crossings affect route planning. USDA maps Copita fine sandy loam over 28 percent of Pueblo Nuevo; clay rich ground can cling to the reamer, so staged passes and controlled fluid matter.

Family Business Since 1965 Boring Since 1982 24 Hour Phone No Utility Strike in 25 Years

Pueblo Nuevo bores at a glance

  • Unincorporated community in Webb County, Texas. Population 432 (2020 Census count).
  • Road distance from our Yukon, Oklahoma main office: 647 miles, about 12.5 hours of driving.
  • Ground: Copita soil is mapped on 28 percent of the area, with sandy clay loam about 40 inches down.
  • Rock: bedrock is mapped within 60 inches on 38 percent of the area.
  • Highways inside the boundary: Texas State Highway 359. State permit office: TxDOT Laredo District.
  • Railroad track inside the boundary: CPKC (Kansas City Southern).
  • Texas811: locate request at least two working days before a bore and no more than 14 days ahead.
  • Range: 3/4 inch service lines to 48 inch casing, 10 feet to 5,000 feet.
  • Phone answered 24 hours a day: (405) 409-7423

Who can I call for directional boring near Main Street in Pueblo Nuevo?

Pueblo Nuevo is an unincorporated community in Webb County, so its public streets, including Main Street and Mier Street, are under county or state authority. The Census Bureau counted 432 residents in 2020; it does not publish yearly estimates for unincorporated places. We bore water, sewer, gas, electric conduit and fiber beneath routes such as Main Street and Texas State Highway 359, with alignment and access set by each job.

Our main office is in Yukon, Oklahoma, and Pueblo Nuevo work is done with our own crews and from satellite yards run by partner drilling contractors Trinity has personally vetted. Our longest bore is roughly 4,100 feet of 48 inch pipe under the Arkansas River in Tulsa, Oklahoma. A Main Street service run is different in scale; our family business began in 1965 and has drilled directionally since 1982.

Ditch Witch JT922 compact directional drill beside the Trinity Boring Solutions truck at NE 24th Street in Oklahoma City
Our Ditch Witch JT922 compact directional drill beside the Trinity truck on a sleeve bore at NE 24th Street in Oklahoma City. Photos on this page are from our jobs in Oklahoma and Texas.

What kind of ground does Pueblo Nuevo have around Copita soil?

The USDA soil survey maps Copita across 28 percent of Pueblo Nuevo, with Copita fine sandy loam on gentle slopes. Moglia clay loam covers 23 percent, Aguilares sandy clay loam 22 percent, and Tela sandy clay loam 13 percent. At the surface, sandy clay loam accounts for 35 percent and fine sandy loam for 28 percent. About 40 inches down, sandy clay loam is mapped across 35 percent, while bedrock is mapped across 28 percent. These are mapped patterns, not test borings; the clay rich layers can hold an open hole and stick to the reamer.

USDA soil survey, inside the Pueblo Nuevo mapped community boundaryWhat is mapped
Soil series mappedCopita 28 percent, Moglia 23 percent, Aguilares 22 percent, Tela 13 percent and Maverick 11 percent
Texture at the surfacesandy clay loam 35 percent, fine sandy loam 28 percent and clay loam 23 percent
Texture about 40 inches downsandy clay loam 35 percent, bedrock 28 percent and loam 23 percent
Engineering class about 40 inches downlean clay (CL) 58 percent and fat clay (CH) 14 percent
Average clay content about 40 inches down29 percent
Bedrock mapped within 60 inches38 percent of the area (0 percent hard rock, 38 percent weathered rock)
Seasonal water table within 60 inches0 percent of the area
Flood prone soils16 percent of the area
High corrosion risk for uncoated steel87 percent of the area

The USDA survey maps bedrock within 60 inches across 38 percent of Pueblo Nuevo, and identifies it as weathered rather than hard bedrock. That can slow a bore compared with soil, but a hard soil bit may handle the mapped weathered material. No seasonal water table is mapped within 60 inches, while flood prone soils cover 16 percent. The Yegua Formation, of Bartonian age, includes sandstone and clay; changing ground at that contact can affect steering. High steel corrosion risk is mapped across 87 percent, so the line owner should consider casing and tracer wire materials; HDPE does not have that steel corrosion concern.

How do crews handle Pueblo Nuevo’s sandy clay loam?

For Pueblo Nuevo’s sandy clay loam and clay loam, we adjust fluid and reaming to the mapped ground rather than treating every section alike. The Copita and Aguilares soils help guide that plan.

  1. With sandy clay loam mapped across 35 percent of Pueblo Nuevo at the surface and CL soil across 58 percent at about 40 inches, we use thinner fluid and staged reaming.
  2. Fine sandy loam covers 28 percent at the surface; for those sections, we keep the pipe ready before the final ream so loose material has less time to cave.
  3. Weathered bedrock is mapped within 60 inches across 38 percent of the community, so we slow the cut where the Yegua Formation changes from soil to sandstone.
  4. High steel corrosion risk is mapped across 87 percent of Pueblo Nuevo; the line owner considers casing and tracer wire materials while we track the bore near Mier Street.
Rod box on the Vermeer D24x40 S3 Navigator with the bore path heading toward the trees on a rock bore in Guthrie, OK
Rod box on our Vermeer D24x40 with the bore path heading toward the trees on a rock bore in Guthrie, Oklahoma.

What is in the way of a new line in Pueblo Nuevo near Texas State Highway 359?

Texas State Highway 359 runs 0.5 mapped roadway miles inside Pueblo Nuevo, making its right of way a likely design constraint for a route that crosses it. No other highway is mapped within 1.5 miles outside the community. Main Street is the longest named street at 0.81 miles, followed by Maria Elena Avenue at 0.52 miles and Mier Street at 0.48 miles. Boring can keep pavement and driveways uncut, but access for the entry and exit pits still has to fit the street and property layout.

CrossingTypeMapped extentWho has a say
Texas State Highway 359State highway0.5 roadway miles insideState highway office
CPKC (Kansas City Southern)Railroad0.54 track miles insideThe railroad
Lobo CreekStream nearby0.6 miles outsideChecked for Corps of Engineers jurisdiction
Swipe the table sideways to see every column.

CPKC (Kansas City Southern) owns 0.54 track miles inside Pueblo Nuevo, on its Laredo Subdivision. No mapped street and rail crossings are shown inside the community, but a proposed route beneath the track still needs railroad coordination. No streams or lakes are mapped inside Pueblo Nuevo, and no street crossings of named streams are mapped there. Lobo Creek is 0.6 miles outside the boundary; a route that reaches the creek needs planning for the channel.

Who has to sign off on a Pueblo Nuevo bore in Webb County?

For a bore beneath Texas State Highway 359 in Pueblo Nuevo, TxDOT reviews the highway permit through its Laredo District. Electric and communication lines crossing the highway need 60 inches of cover below the lowest point of the crossed grade; water lines need 60 inches and pressurized sewer lines need 60 inches. The utility owner, not the drilling contractor, files through TxDOT’s online RULIS system, and we prepare the bore plan and profile for work under the owner’s permit. Pueblo Nuevo has no city government, so street and permit authority rests with the county or state. A CPKC track crossing needs an agreement from the railroad owner, and a possible Lobo Creek crossing is checked for federal waterway jurisdiction during planning.

Read the rules for yourself: Texas Utilities Code Chapter 251 on notice to Texas811, the Texas811 questions and answers page, the TxDOT Utility Accommodation Rules, 43 TAC 21.40 and TxDOT utility permits in RULIS.

What is already in the ground in Pueblo Nuevo, Webb County?

For a specific Pueblo Nuevo address, the water provider must be confirmed with the county or local water district before a bore is planned. EPA drinking water records do not tie a system to this place, so the provider cannot be matched from those records. AEP Texas Central, Medina Electric Cooperative and Rio Grande Electric Cooperative report electric service in Webb County; we confirm the line owner for the address before planning an electric conduit bore.

Line ownerWhat it isSourceSize
AEP Texas Central, Medina Electric Cooperative and Rio Grande Electric CooperativeElectric utilities reporting service in Webb CountyEIA Form 861Confirm the line owner by address
Swipe the table sideways to see every column.

The American Community Survey 2019 to 2023 five year estimates put Pueblo Nuevo’s median housing year at 1979; 8 percent of homes were built before 1960, 70 percent from 1960 to 1999 and 22 percent in 2000 or later. Those ages can mean a route replaces older service pipe or feeds newer construction, so the actual lines need checking. We hydrovac pothole each marked utility on the bore path before drilling near it; paint shows position, not depth. A proposed line beneath Main Street is one local example where confirming depth matters.

Coiled black HDPE conduit fitted with a pulling grip staged on a lawn along a completed bore path
Coiled HDPE conduit fitted with a pulling grip, staged on a lawn along a finished bore path.

What is near Pueblo Nuevo and La Coma?

Pueblo Nuevo is in Webb County, covers 0.58 square miles and sits at an elevation of 601 feet; ZIP code 78043 serves the community. La Coma is 0.5 miles northeast, while Laredo Ranchettes is 3.1 miles west and Ranchitos East is 3.5 miles west. Laredo, the county seat and nearest larger city, is 11.9 miles northwest. The Yukon, Oklahoma yard is 647 road miles away, a 12.5 hour drive, which affects equipment mobilization for Main Street or highway work.

Places near Pueblo Nuevo

What would we bore near Mier Street in Pueblo Nuevo?

  • Highway crossing: A route beneath Texas State Highway 359 needs a bore plan that accounts for highway cover and work within state right of way.
  • Water service: A line toward a Main Street address needs the water provider confirmed before we plan the connection and bore route.
  • Fiber conduit: A route along Mier Street can pass beneath pavement, with marked utilities exposed before the drill approaches them.
  • Rail crossing: A proposed bore under CPKC (Kansas City Southern) track requires railroad coordination for the 0.54 track miles in the community.
  • Creek approach: A route near Lobo Creek needs channel planning and a jurisdiction check before a crossing is laid out.
  • Electric conduit: Along Maria Elena Avenue, the electric line owner for the address must be confirmed before conduit alignment is planned.

More on each kind of work: water line boring, electric line boring, fiber optic boring, road, railroad and creek crossings and municipal boring.

What drives the price of Pueblo Nuevo work near CPKC (Kansas City Southern)?

For a Pueblo Nuevo quote, send the address or map pin, what is going in the ground, the pipe or conduit size and the footage; a sketch or plans help. A route near Main Street or Texas State Highway 359 can show where pavement, utilities or right of way affect the work. Those details let us assess the actual path instead of pricing from a street name alone.

At 647 road miles from Yukon, moving equipment to a Pueblo Nuevo job is part of the quote. Copita and Aguilares soils, plus weathered bedrock mapped within 60 inches in parts of the community, can change drilling time. A crossing of Texas State Highway 359 or CPKC track adds coordination and design work. Length, pipe or conduit size, exposed utilities, pavement, creek or drainage crossings, pits, excavator time and backfill also affect the job. For high profile or emergency boring in Pueblo Nuevo, we add planning time before setting the work schedule.

Questions people ask about boring in Pueblo Nuevo

Does Trinity take directional boring jobs in Pueblo Nuevo, Webb County, and who staffs them?

Yes, we take directional boring jobs in Pueblo Nuevo, Webb County. We use our crews or partner drilling contractors whose work Trinity has vetted, and you deal with Trinity from the first call through the bore log. For a route near Main Street, the crew arrangement does not change who coordinates the work.

What ground should I expect for a Pueblo Nuevo bore near Copita soil?

Copita fine sandy loam is mapped across 28 percent of Pueblo Nuevo, while sandy clay loam covers 35 percent at the surface. At about 40 inches, the survey maps bedrock across 28 percent and sandy clay loam across 35 percent. These are survey patterns, not a site test, so the route near Mier Street still needs project specific planning.

Will a Pueblo Nuevo bore encounter rock near the mapped community boundary?

It may. The USDA survey maps bedrock within 60 inches across 38 percent of Pueblo Nuevo, and classifies it as weathered rather than hard bedrock. That may slow the bore compared with soil, particularly where the Yegua Formation’s sandstone and clay meet. The map does not establish what a particular route will encounter.

Who approves a bore under Texas State Highway 359 in Pueblo Nuevo?

TxDOT’s Laredo District reviews the permit for a bore under Texas State Highway 359 in Pueblo Nuevo. The utility owner files through RULIS, and we supply the bore plan and profile for work under that owner’s permit. Cover requirements depend on the line type and the district’s permit conditions.

What does a Pueblo Nuevo bore under CPKC (Kansas City Southern) track require?

A bore under the CPKC (Kansas City Southern) track in Pueblo Nuevo requires an agreement with the railroad that owns it. On a Pueblo Nuevo crossing, we follow the agreement’s conditions for casing, depth and flagging. The track is part of the Laredo Subdivision, so the proposed route and line type need to be provided for review.

Can a line be bored under Lobo Creek near Pueblo Nuevo?

A line under Lobo Creek can be evaluated as a site specific crossing; the creek lies 0.6 miles outside Pueblo Nuevo’s mapped boundary. As we plan a Pueblo Nuevo crossing, we check whether the US Army Corps of Engineers has jurisdiction. The route, channel conditions and line details determine whether the bore can be designed.

Can I reach Trinity after hours about an urgent bore near Mier Street in Pueblo Nuevo?

Yes, Trinity answers the phone 24 hours a day at (405) 409-7423. For urgent work near Mier Street, share the location and what line is involved so we can understand the request. Emergency response is one of our services, and the route still needs to be assessed.

How early should I request utility marks for a Pueblo Nuevo bore along Main Street?

For a bore along Main Street, Texas law requires the Texas811 locate request at least 48 hours before excavation starts, excluding Saturdays, Sundays and legal holidays, and no earlier than 14 days before. If our Pueblo Nuevo start moves more than 14 days past the original notice, we submit a new request. Before work continues in Pueblo Nuevo, we refresh marks through Texas811 if they wear off or move.

What affects the cost of a Pueblo Nuevo bore under Texas State Highway 359?

The job route and scope determine the price of a bore under Texas State Highway 359 in Pueblo Nuevo. Length, pipe size, the mapped clay and weathered bedrock, pavement, exposed utilities and highway coordination all matter. CPKC track or drainage crossings, pits, backfill, emergency timing and the 647 road miles from Yukon can also affect the estimate.

Where the Pueblo Nuevo facts on this page come from

Darren Rice in a safety vest at the bore pit beside the Trinity Boring Solutions Ditch Witch directional drill, with drill rods racked, on the airfield at Will Rogers World Airport in Oklahoma City

About Trinity Boring Solutions

Trinity Boring Solutions is a family business in Yukon, Oklahoma, founded by Dean Rice in 1965 and owned today by Darren Rice, who started its directional boring side in 1982. The company bores across Oklahoma and Texas. No bore is too big or too small: 4 foot sidewalk sleeves to roughly 4,100 feet under the Arkansas River in Tulsa. Reach us at (405) 409-7423.

Get a Quote for a Bore in Pueblo Nuevo

Send the address, what is going in, the size and the footage.

Trinity Boring Solutions
9102 NW Expressway, Yukon, OK 73099
(405) 409-7423 | darren@trinityboringsolutions.com

Trinity Boring Solutions | 24/7 Available ☎ Call (405) 409-7423 Free Quote

Free Bore Planner

Plan Your Bore in Pueblo Nuevo, Texas

Type the address of your job in Pueblo Nuevo. The Bore Planner opens an aerial map at that spot. Drop one pin where the bore starts and one where it ends, tell us what is going in and send the scope to our crew.

Talk to the crew that does the work

Fastest way to a number is a phone call. Tell us where the crossing is and what is going in the ground, and you will get a straight answer on the same call. Bores from 10 feet to 5,000 feet, 3/4 inch service line through 48 inch casing, anywhere in Oklahoma and Texas. We run 24/7 for main breaks and emergency repairs.

Call (405) 409-7423

Answered by a person, not a call center.

Would rather not call? Send the details and we will come back with a written quote.

Quick Quote In Page

County and State Pages for Pueblo Nuevo

Same county: Rio Bravo · El Cenizo · Ranchos Penitas West · Bruni · Mirando City · Oilton · La Presa · San Carlos I · Colorado Acres · Ranchitos Las Lomas · Tanquecitos South Acres · Los Altos. All counties: Texas county list.