Pineland Texas Directional Boring: Moswell Loam, US 96 and BNSF Railway
Quick Answer: Can you get a line under US 96, the BNSF Railway track or Sandy Creek without cutting it? Yes: Trinity Boring Solutions does directional boring, also called horizontal directional drilling (HDD), in Pineland, Texas, for those crossings. Pineland is 444 road miles from our Yukon, Oklahoma main office, and US 96 runs through the city. Moswell soil and clay at depth call for controlled fluid and staged reaming. We can bore water, sewer, gas, electric conduit and fiber routes along streets such as Temple Avenue.
Pineland bores at a glance
- Incorporated city in Sabine County, Texas. Population 896 (Census Bureau 2024 estimate).
- Road distance from our Yukon, Oklahoma main office: 444 miles, about 8.8 hours of driving.
- Ground: Moswell soil is mapped on 26 percent of the area, with clay about 40 inches down.
- Rock: bedrock is mapped within 60 inches on 58 percent of the area.
- Highways inside the boundary: US 96, FM 2426 and FM 83. State permit office: TxDOT Lufkin District.
- Railroad track inside the boundary: BNSF Railway, with 3 mapped street and rail crossings.
- Named streams inside the boundary: Sandy Creek and Easley Creek.
- Public water: City of Pineland, groundwater wells.
- Texas811: locate request at least two working days before a bore and no more than 14 days ahead.
- Range: 3/4 inch service lines to 48 inch casing, 10 feet to 5,000 feet.
- Phone answered 24 hours a day: (405) 409-7423
Who handles directional boring under US 96 in Pineland?
Trinity Boring Solutions takes directional boring work in Pineland, including routes near US 96 and BNSF Railway. Can you get a line under US 96, a track or Sandy Creek without cutting it? Yes, we bore beneath those obstacles. The Census Bureau Vintage 2024 estimate puts Pineland at 896 people, and we install water, sewer, gas, electric conduit and fiber for routes along streets such as Temple Avenue.
Our main office is in Yukon, Oklahoma, and Pineland work is done with our own crews and from satellite yards run by partner drilling contractors Trinity has personally vetted. For a small service near Maple Street or a larger casing beneath US 96, our work ranges from 3/4 inch service lines to 48 inch casing and from 10 feet to 5,000 feet. We are a family business started in 1965, with directional boring work dating to 1982.

What is Pineland ground like around Moswell soil?
Pineland ground includes Moswell loam, which the USDA soil survey maps across 25% of the area; Moswell is the leading soil series at 26%. Loam is the common surface texture, mapped over 67% of the city. About 40 inches below the surface, clay accounts for 69% of mapped texture, and average clay content at that depth is 48%. These are mapped soil patterns, not test borings, so a route near US 96 still needs site specific planning for sticky clay that can grip the pipe.
| USDA soil survey, inside the Pineland city limits | What is mapped |
|---|---|
| Soil series mapped | Moswell 26 percent, Metcalf 20 percent, Etoile 14 percent, Laneville 11 percent and Penning 9 percent |
| Texture at the surface | loam 67 percent, very fine sandy loam 20 percent and fine sandy loam 8 percent |
| Texture about 40 inches down | clay 69 percent, sandy clay loam 17 percent and silty clay loam 7 percent |
| Engineering class about 40 inches down | fat clay (CH) 69 percent and lean clay (CL) 28 percent |
| Average clay content about 40 inches down | 48 percent |
| Bedrock mapped within 60 inches | 58 percent of the area (0 percent hard rock, 58 percent weathered rock) |
| Seasonal water table within 60 inches | 69 percent of the area |
| Flood prone soils | 11 percent of the area |
| High corrosion risk for uncoated steel | 97 percent of the area |
The USDA soil survey maps weathered bedrock within 60 inches across 58% of Pineland, with typical depth at 54 inches; hard bedrock is not mapped within that depth. A seasonal water table is mapped within 40 inches across 69%, so pits near Sandy Creek may need pumping. Flood prone soils cover 11%. High steel corrosion risk is mapped across 97%, which matters for casing and tracer wire; the line owner selects coatings, while HDPE avoids the soil corrosion concern. The geologic map includes Quartz Sand Decomposition Residuum of Cenozoic age and the Moodys Branch Formation of Priabonian age.
How do we plan a bore through Pineland clay?
Pineland clay can stay open yet stick to the reamer, so we plan fluid and reaming around the mapped Moswell loam and clay at about 40 inches. US 96 and nearby pavement also call for careful fluid control.
- In Pineland’s clay, we use a thinner drilling fluid with polymer and open the hole in stages so sticky cuttings do not build up on the reamer.
- Where heavy clay lies beneath US 96 pavement, we watch fluid returns and pressure so drilling does not lift the surface.
- With a seasonal water table mapped within 40 inches across 69% of Pineland, we keep pits small and pump water when needed.
- Near Sandy Creek, we plan the bore depth beneath the channel, track the head from the surface, and check for Corps jurisdiction during planning.

Where might a Pineland line go under BNSF Railway?
A bore in Pineland can pass beneath US 96, which has 5.2 mapped roadway miles inside the city, or FM 2426 and FM 83. Spur 414 is 0.6 miles outside the limits. For street routes, Temple Avenue is the longest named street at 1.09 miles, followed by Yellowpine Road at 1.03 miles and Maple Street at 0.71 miles. Boring keeps pavement and driveways intact; pits sit on either side of the crossing. The street and road mix helps define the bore path and access plan.
| Crossing | Type | Mapped extent | Who has a say |
|---|---|---|---|
| US 96 | US highway | 5.2 roadway miles inside | State highway office |
| FM 2426 | State highway | 1 roadway miles inside | State highway office |
| FM 83 | State highway | 0.4 roadway miles inside | State highway office |
| Spur 414 | Highway nearby | 0.6 miles outside | State highway office |
| BNSF Railway | Railroad | 2.74 track miles inside | The railroad |
| Sandy Creek | Stream | 1.83 channel miles inside | Checked for Corps of Engineers jurisdiction |
| Easley Creek | Stream | 1.56 channel miles inside | Checked for Corps of Engineers jurisdiction |
| Pomponaugh Creek | Stream nearby | 0.2 miles outside | Checked for Corps of Engineers jurisdiction |
| Rush Branch | Stream nearby | 0.6 miles outside | Checked for Corps of Engineers jurisdiction |
BNSF Railway has 2.74 track miles inside Pineland on its Longview Subdivision, and public records map three street and rail crossings. Sandy Creek runs 1.83 channel miles in the city and Easley Creek 1.56; five mapped street crossings pass over named streams. Pomponaugh Creek lies 0.2 miles outside the limits, and Rush Branch 0.6 miles away. No lakes or ponds are mapped within one mile, and we account for that map context in Pineland bore planning. A creek route needs depth planning below the channel and a check for federal waterway jurisdiction.
Who approves Pineland work in Sabine County?
For a bore on city streets such as Maple Street, the City of Pineland is the local government for those streets; no city department or form is assumed here. Work in the right of way of US 96, FM 2426 or FM 83 needs a TxDOT utility permit, reviewed by the TxDOT Lufkin District. The utility owner files through RULIS, while we prepare the bore plan and profile and work under that owner’s permit. A BNSF Railway crossing needs an agreement with the track owner, and Sandy Creek planning includes a check for U.S. Army Corps of Engineers jurisdiction.
Read the rules for yourself: Texas Utilities Code Chapter 251 on notice to Texas811, the Texas811 questions and answers page, the TxDOT Utility Accommodation Rules, 43 TAC 21.40 and TxDOT utility permits in RULIS.
Who owns the lines near the City of Pineland system?
The City of Pineland public water system uses groundwater wells and lists 619 service connections for 1,043 people. That gives a bore near Temple Avenue a local water system to account for, but the route still needs utility locates. Deep East Texas Electric Cooperative and Jasper-Newton Electric Cooperative report electric service in Sabine County; we confirm the line owner for the specific address before planning an electric conduit bore.
| Line owner | What it is | Source | Size |
|---|---|---|---|
| City of Pineland | Public water system | Groundwater wells | 619 connections, 1,043 people served |
| Deep East Texas Electric Cooperative and Jasper-Newton Electric Cooperative | Electric utilities reporting service in Sabine County | EIA Form 861 | Confirm the line owner by address |
The American Community Survey 2019 to 2023 five year estimates put Pineland’s median housing year at 1977; 18% of homes were built before 1960, 68% from 1960 to 1999 and 14% in 2000 or later. That range can mean replacement work near older homes as well as new service runs. Along Maple Street, hydrovac potholing exposes each marked utility before drilling nearby, because locate paint shows position, not depth.

Where is Pineland in relation to Jasper and Yukon?
Pineland is in Sabine County, Texas, at an elevation of 265 feet, and covers 2.05 square miles of land. Its ZIP code is 75968. Browndell is 8.4 miles south and Hemphill is 9.8 miles northeast; Hemphill is also the county seat. Sam Rayburn is 12.1 miles south, while Jasper, the nearest larger city, is 22.4 miles south. Pineland is 444 road miles and an 8.8 hour drive from our Yukon, Oklahoma main office, a distance that can affect crew mobilization for a US 96 job.
Places near Pineland
- Directional boring in Browndell: 8.4 miles south
- Directional boring in Hemphill: 9.8 miles northeast
- Directional boring in Sam Rayburn: 12.1 miles south
- Directional boring in Milam: 17.8 miles northeast
- Directional boring in Broaddus: 17.9 miles west
- Directional boring in Jasper: 22.4 miles south
What boring work comes up around Pineland and Maple Street?
- Highway crossing: A water or fiber line beneath US 96 can be bored rather than cut through existing highway pavement.
- Street service: A replacement water line along Maple Street can pass beneath driveways while potholing checks marked utilities.
- Rail crossing: A conduit route beneath BNSF Railway needs a crossing agreement from the owner of the Longview Subdivision track.
- Creek crossing: A line beneath Sandy Creek needs a route planned below the channel and a jurisdiction check during planning.
- Water connection: A service near Temple Avenue can be planned around the City of Pineland groundwater well system and its buried lines.
- Airport service: A utility route near Pineland Municipal Airport can use a bore to avoid opening pavement or access surfaces.
More on each kind of work: water line boring, electric line boring, fiber optic boring, road, railroad and creek crossings and municipal boring.
What drives the price of a Pineland bore near Maybell Loop?
For a quote near Maybell Loop, first send the address or map pin. Then tell us what goes in the ground, such as water or fiber, and the pipe or conduit size. Give us the footage, whether the route crosses a street or creek, and a sketch or plans if available. Those details show how the proposed route relates to Pineland’s ground and nearby crossings.
Moswell loam and clay at depth make ground conditions the first pricing question because sticky soil can change fluid use and reaming. Next, the number of marked utilities to expose, pavement, and a crossing of US 96 or BNSF Railway affect the work plan. Pits, excavator time, sand backfill and creek crossings also matter. Mobilization from Yukon is part of the job scope for Pineland, 444 road miles away; high profile or emergency work can add planning demands.
Questions people ask about boring in Pineland
Does Trinity take directional boring jobs in Pineland and Sabine County?
Yes, we take directional boring work in Pineland and across Texas. Our Yukon main office coordinates the work, and our own crews or vetted partner contractor crews may handle the bore. You deal with Trinity from the first call through the bore log, including for routes near US 96 or Sandy Creek.
Does Moswell soil in Pineland corrode steel, and what pipe should I use?
The USDA soil survey maps high steel corrosion risk across 97% of Pineland, so the line owner should consider casing and tracer wire materials. HDPE avoids the soil corrosion concern. Moswell loam is mapped across 25% of the city, but the route and line specifications determine what material is suitable.
What ground does a bore pass through in Pineland near Moswell soil?
The USDA soil survey maps Moswell loam across 25% of Pineland, with loam common at the surface. At about 40 inches down, clay accounts for 69% of mapped texture and average clay content is 48%. Sticky clay can hold an open hole and grip pipe, so a bore near US 96 may need staged reaming.
Could a Pineland bore hit rock near Sandy Creek?
Weathered bedrock is mapped within 60 inches across 58% of Pineland, with typical bedrock depth at 54 inches. Hard bedrock is not mapped within that depth, but the mapping does not rule out rock deeper down. Near Sandy Creek, the route still needs field planning for the actual ground.
Who approves a Pineland bore under US 96?
TxDOT reviews work in the US 96 right of way through the TxDOT Lufkin District. The utility owner submits the application through RULIS, and we prepare the bore plan and profile. For an electric or communication crossing, the usual cover is 60 inches below the lowest crossed grade, subject to the permit.
What does our bore beneath BNSF Railway in Pineland require?
A crossing beneath BNSF Railway needs an agreement from the railroad that owns Pineland’s 2.74 track miles. We use the agreement’s casing, depth and flagging details to plan this crossing. The route and track conditions shape the bore plan, and TxDOT asks for the railroad agreement when a line also occupies highway right of way.
How far is Pineland from Trinity’s Yukon office, and does Jasper affect the job?
Pineland is 444 road miles from our Yukon, Oklahoma main office, an 8.8 hour drive. Jasper is 22.4 miles south of Pineland, but that does not change the Yukon distance. For a bore near Maple Street, the long trip can affect mobilization and how crews are scheduled.
How early should I call 811 for a Pineland bore near Temple Avenue?
For work near Temple Avenue, Texas811 needs a locate request at least 48 hours before excavation, excluding Saturdays, Sundays and legal holidays, and no earlier than 14 days ahead. The ticket’s 20 day life must fit the schedule. If marks wear off or move, have them refreshed through Texas811 before work continues.
What affects the cost of directional boring in Pineland under US 96?
The route and work scope determine the price, with no set amount for a US 96 bore. Pineland’s clay, the pipe or conduit size, footage, pavement, and the utilities that must be exposed all matter. A BNSF Railway or creek crossing can add planning, and mobilization reflects the distance from Yukon.
Where the Pineland facts on this page come from
- USDA Natural Resources Conservation Service, Soil Data Access: soil survey map units inside Pineland
- U.S. Census Bureau, TIGER/Line 2024: Pineland boundary, roads, rail lines and streams
- U.S. Census Bureau, Vintage 2024 population estimates: Pineland
- U.S. Census Bureau, American Community Survey 2019 to 2023: Pineland housing units and year built
- Macrostrat geologic map compilation: map units under Pineland
- U.S. EPA Safe Drinking Water Information System: public water systems serving Pineland
- U.S. Department of Transportation, North American Rail Network: track owners in Sabine County
- U.S. Energy Information Administration, Form EIA 861: electric utilities serving Sabine County
- U.S. Geological Survey, Elevation Point Query Service: Pineland elevation
- OpenStreetMap road network through the OSRM router: road miles from Yukon, Oklahoma to Pineland
- Texas Utilities Code Chapter 251, Underground Facility Damage Prevention and Safety
- TxDOT Utility Accommodation Rules, 43 Tex. Admin. Code 21.40: underground utilities
- Texas Department of Transportation: Right of Way Utility and Leasing Information System (RULIS) utility permits
Get a Quote for a Bore in Pineland
Send the address, what is going in, the size and the footage.
Trinity Boring Solutions
9102 NW Expressway, Yukon, OK 73099
(405) 409-7423 | darren@trinityboringsolutions.com
Free Bore Planner
Plan Your Bore in Pineland, Texas
Type the address of your job in Pineland. The Bore Planner opens an aerial map at that spot. Drop one pin where the bore starts and one where it ends, tell us what is going in and send the scope to our crew.
Talk to the crew that does the work
Fastest way to a number is a phone call. Tell us where the crossing is and what is going in the ground, and you will get a straight answer on the same call. Bores from 10 feet to 5,000 feet, 3/4 inch service line through 48 inch casing, anywhere in Oklahoma and Texas. We run 24/7 for main breaks and emergency repairs.
Answered by a person, not a call center.
Would rather not call? Send the details and we will come back with a written quote.
County and State Pages for Pineland
All counties: Texas county list.
