School district and university campus boring

School district and university campus boring starts with two marks on the plan: where we can put the drill and where we can receive the pipe. On an occupied campus, both spots matter as much as what is under the crossing. A bore under the bus drive still needs a place to set up that does not block the buses.

Campus bore at a glance

  • Work: We bore for water, sewer, gas, electric and fiber beneath drives, walks, parking and athletic areas. We also install steel casing by jack and bore.
  • Where: We work in Oklahoma and Texas only, out of 9102 Northwest Expy, Yukon, OK 73099.
  • Size and reach: Our largest pipe was 48 inch HDPE. Our longest single shot was 4,100 feet. Longer runs are bored in sections. What fits your site depends on the ground, the route and available setup room.
  • Permits: The customer or general contractor pulls permits and arranges traffic control. We supply the required bore plan and profile, equipment and method description, and as built records.
  • Quote: Send the site plan with the crossing, pipe size, pit locations and work window. Call (405) 409-7423 if the drawings do not show an access route.

School district and university campus boring: approval reference

A locate ticket, a campus excavation permit and a shutdown approval are different things. Use this table to tell us which documents apply to your crossing. The institutions below publish their own rules or examples. None is presented as a Trinity customer or as a rule for all campuses.

Campus utility crossing approval checklist for Oklahoma and Texas
Where or when What the source says What to put in the bore package
Oklahoma excavation notice The standard notice period is at least 48 hours, excluding the notice date, Saturdays, Sundays and legal holidays (OKIE811 law). Mark the work limits so the locate request covers the setup, pits and full path.
Texas excavation notice A normal ticket requires two working days of notice before work begins, excluding weekends and holidays (Texas811 Excavator Guide). Confirm the ticket area against the current plan, especially if a pit has moved.
Oklahoma State University, Stillwater: breaking ground OSU policy requires an excavation permit in advance for any ground penetration on OSU property. OSU lists the OKIE811 locate request as the first step (OSU excavation policy and procedure). Have the campus contact verify that the drill setup and potholes are inside the permitted work limits.
Oklahoma State University, Stillwater: steam and tunnels OSU lists a campus steam and condensate distribution system (OSU Distribution Systems). OSU design guidelines address steam piping in tunnels and call for utility shutdowns to be identified during design (OSU Engineering Design Guidelines). Ask for the tunnel survey and the campus utility engineer’s crossing detail. Show the structure as well as the pipes on the bore profile.
University of Texas at Austin: boring permit UT Dig Safe requires an excavation permit for drilling on UT property. The permit application requires a valid Texas811 reference and UT Dig Safe ID. UT asks for drawings showing the excavation limits and utility connections (UT Dig Safe). Put the bore path, pits and utility connections on one marked plan. Identify the boring method in the permit request.
University of Texas at Austin: connection outage UT Dig Safe calls for a written outage request to the appropriate Utilities and Energy Management division at least seven working days before the proposed connection date. Some outages can take months to prepare (UT Dig Safe). State which service will be interrupted, the proposed connection date and who can authorize work. Do not count on the excavation permit to clear the outage.
Oklahoma City Public Schools: field restoration window The Taft Stadium board memo proposed replacing turf and the track during summer 2022 and completing the work by August 1, 2022, using school bond funds (OKCPS Taft Stadium memo). Ask for both the field turnover date and the date our pits must be closed so the surface crew can get in.
University of Oklahoma, Norman: summer surface and utility work OU reported that summer 2026 work at Cross Village included sidewalk extensions, drainage and irrigation upgrades, and new sod (OU Campus Operations summer report). Ask facilities which new walks, drains and irrigation lines are already in place. Work from the latest records rather than the old base drawing.
Dallas ISD: bond scope Dallas ISD describes its school bond as paying for capital projects such as renovation and new campuses, not daily operations (Dallas ISD Bond 2026 FAQs). Ask the prime contractor for the actual bid package and drawing revision. Verify who owns the bore, connection and surface work.
Austin public street or sidewalk next to campus Austin inspects public right of way work under excavation and driveway or sidewalk permits (City of Austin Utility Cut Inspections). If the route leaves campus, mark the property line and public work limits. Ask the city about the applicable permit even if the campus permit is in hand.
Swipe the table sideways to see every column.

Facts checked November 2026. Tell us if something has changed.

Sleeve bore jobsite at the future Clara Luper Civil Rights Center with a mini excavator and the Trinity Boring Solutions water trailer
Sleeve bore jobsite at the future Clara Luper Civil Rights Center in Oklahoma City.

Work we have done that is like this

These are the same kind of campus and public site work. We do not list any of them as a school district or university job.

  • A sleeve under a street and a water main. At the Clara Luper Center in Oklahoma City, we bored a 6 inch PVC sleeve under NE 24th Street and a live water main for a general contractor.
  • An emergency water line. We bored an emergency water line for a sorority house in Stillwater, a 3 inch water service brought into the basement, working for the plumbing contractor.
  • A campus irrigation sleeve. We bored a 4 inch irrigation sleeve under Classen Boulevard and a sidewalk on a campus job in Oklahoma City, past major fiber and water lines.

School bond construction, summer windows and athletic fields

Put the reopening date on the plan

“Summer break” is not a work order. If the field contractor needs the area before preseason practice, give us that handoff date, not the first day of school. Mark when our drill and truck can use the gate and where the pipe can sit. During the term we also need to know where buses queue, where students walk and which entrance needs to stay clear for emergency access.

Break the schedule into work that can happen with the building in service and work that needs the campus to isolate a line. A water line crossing may be installed before an approved connection window; it does not follow that the existing main can be shut off the same day. Put the testing, connection and restoration responsibilities in the bid scope before setting a drilling date.

Keep field drainage in the scope

On a sports field job, show the underdrains, irrigation mains, sleeves and the field edge. If the design allows, we prefer to look at pit locations outside the playing surface before accepting a pit in the turf. If we have to open a track, synthetic turf or a drainage base, spell out who reinstates each layer and when the surface crew needs it back. Plot future goals, poles and fence posts too so the designer can check conflicts with the new line.

Quote the drawing, not the bond announcement

On a K12 bond project, a district’s project list might name the school but not show the utility limits. We need the civil sheets and utility details for the package you want us to price. If the general contractor is bidding alternate routes, identify each one and say which connections, casing, testing or restoration belong in each scope. An alternate changes more than footage if it moves the drill across an entrance or changes the pit access.

University utility tunnels, steam and crossings

A line on a utility map is not enough when a bore passes a steam tunnel. Ask facilities for the outside wall and roof elevations, known connections and any clearance restrictions on the structure. Show both steam and condensate routes where they apply. We can review the proposed soil crossing, but we do not assume an existing tunnel can be drilled into, entered or used as a pit. We also do not substitute a standard HDPE water design for an engineered steam or condensate line.

For electric conduit and campus fiber, send the duct count and the distance between pull points, along with the proposed radius and where each end lands. It is better to shift a pit on the drawing than find out in the field that the receiving side has no room for cable pulling or that it puts a crew across the only accessible entrance.

What we bring to a campus crossing

Dean Rice started Trinity in 1965. We have worked underground since 1982, and Darren Rice owns the company today. At the Clara Luper Center in Oklahoma City, we bored a PVC sleeve under NE 24th Street. At Will Rogers World Airport, we bored 840 feet of FAA conduit under runways. Those are examples of work beneath fixed surfaces, not claims that we have worked for any district or university named above. We have also bored an emergency water line for a sorority house in Stillwater, working for the plumbing contractor.

We can review horizontal directional drilling for a steerable bore and auger boring for an approved steel casing. We own the auger machines. We also do hydrovac daylighting to verify marked conflicts where the project allows it. We tell you what we need changed when a plan shows a bore that fits on paper but leaves no practical way to get pipe, spoils or equipment in and out.

Directional drill rig and crew working on a street beside a brick commercial building
A directional drill rig and crew working on a street beside a brick commercial building.

What we need from you to quote it

  • Plans and profile: Give us the latest civil and utility sheets, the length and depth, the connection points and any pit limits. Include the grade for gravity sewer.
  • Product and details: Give us the pipe or duct sizes, materials, wall requirements, casing detail and testing scope from the designer.
  • Ground and utilities: Send any soil logs, groundwater notes and available campus records. Show suspected private lines, steam tunnels and known conflicts. Mark any locations already exposed by potholing.
  • Permit conditions: Share the campus rules and any street crossing approval. Identify the customer or general contractor who files permits and arranges traffic control.
  • Access and schedule: Send gate and haul routes, room for the drill and pipe, hours, bus and pedestrian routes, event dates and the approved shutdown window. Say when surface work must follow us.
  • Closeout: Tell us who connects, tests and restores the work. Send the required format for bore and as built records. Identify anyone who must witness a step before we backfill.

Campus utility boring FAQs

Do I need a campus excavation permit to bore under a school driveway?

Ask the school or campus facilities office before boring under its driveway. Oklahoma State University requires an advance excavation permit on its property, and UT Austin requires a Dig Safe permit. At other campuses, get the owner’s rules in writing. If the drive meets a city street and the route enters the public right of way, check that approval separately.

How far in advance do I call 811 before a campus bore?

The standard notice is at least 48 hours in Oklahoma and two working days for a normal ticket in Texas. Oklahoma excludes the notification date, Saturdays, Sundays and legal holidays. Texas811 excludes weekends and holidays. Start campus review separately and check permit dates and operator responses before committing to mobilization.

Does 811 mark private utility lines on a campus?

Do not assume an 811 ticket covers every campus line. The Texas811 Excavator Guide lists certain lines serving only an owner or its tenant on the owner’s land as outside the state notification chapter. Ask facilities which operators respond through 811 and how the campus wants its own facilities located. Ask for records of irrigation, parking lot lighting, campus fiber and service lines.

What if the locate markings are gone before campus work starts?

Stop work in the affected area and request that the marks be refreshed. Texas811 calls this an Update/Remark request. Tell the campus contact too if its staff marked lines separately. A recent paving or mowing job may have erased marks from only part of the site. Check the entire work area, including where we plan to set the pits.

Is summer break the best time for school utility work?

Summer can be a good time, but only if the actual work and restoration fit around campus use. A district may still run summer classes, meals or athletics. Send the dates the work area can be turned over, what paths stay open and when the pavement or field has to be usable. Plan the shutdown as a separate date.

Can you directional bore under an athletic field or a running track?

We can quote a bore under a field or track if the approved route gives us usable pits and protects the existing drains and utilities. Show the turf or track limits, underdrains and irrigation on the plan. If a pit must disturb the surface, name the restoration contractor and the turnover date before agreeing to that location.

Can directional boring go under a university steam tunnel?

It may be possible if the university approves the crossing profile and the designer confirms the clearance. Give us the verified tunnel dimensions and elevations, including connections and structures near the route. A clearance from a pipe is not a clearance from the outside of its tunnel. Do not assume permission to enter or penetrate the tunnel.

Do I need separate approval to shut off a campus water line?

Yes, get facilities approval before interrupting campus service. UT Austin, for example, requires a written request at least seven working days before the proposed connection date and notes some outages may take months to prepare. Ask who can operate the valve, what facilities will lose service, and when tests and reconnect work must finish.

Can a school bond pay for campus utility work?

It can when the district includes that work in an authorized capital project. Dallas ISD separates capital projects from daily operating costs in its bond FAQ. For a bore quote, use the issued drawing set for the particular school and confirm whether the base bid includes the utility, its connection and the surface restoration.

How deep does a school utility bore have to be?

There is no single campus bore depth. Use the approved profile and requirements from the utility owner and any road authority. A gravity sewer connection can fix the elevations at both ends, while a conduit path may also depend on bends and existing facilities. Flag a mismatch between the drawings and verified field conditions before the bore.

Is jack and bore or directional drilling better under a school drive?

Use the method the approved design and the site can accommodate. We look at directional drilling where the route needs steering and at jack and bore where the design calls for an augered casing. Compare space for pits, drilling equipment and pipe staging. The method that fits below the drive still has to fit above it.

What does campus directional boring cost?

We quote the crossing from the scope, not a campus rate per foot. Send the pipe or conduit size, route and depth, soil records, work hours and where the pits can go. Include casing and whether there is an approved outage window. An occupied campus can change access and restoration even if the bore length stays the same.

Who pulls permits for school district and university campus boring?

The customer or general contractor pulls the permits and arranges traffic control. We provide the bore plan and profile, equipment and method description, and as built records. Confirm who is eligible to submit any campus application. UT Dig Safe, for example, requires a valid Dig Safe ID to apply. Identify the named filer before bid day.

Send us the marked plan

Send the crossing drawings or call (405) 409-7423. If the owner has not approved a shutdown or picked a route, tell us what is still open. We can review the proposed work without assuming those decisions are made.

Talk to the crew that does the work

Fastest way to a number is a phone call. Tell us where the crossing is and what is going in the ground, and you will get a straight answer on the same call. Bores from 10 feet to 4,100 feet in a single shot, with longer runs bored in sections, 3/4 inch service line through 48 inch pipe, anywhere in Oklahoma and Texas. We run 24/7 for main breaks and emergency repairs.