We bore Army Corps of Engineers crossings in Oklahoma and Texas. That means water, sewer, gas, electric and fiber lines under federal levees, floodways, Corps lakes and navigable rivers. These jobs move slower than a county road bore. Two Corps programs can touch the same crossing. Section 408 asks whether the work harms a federal project. The Regulatory Program asks whether the work needs a Section 10 or Section 404 authorization. Our company goes back to 1965, when Dean Rice founded it, and we have done underground construction since 1982. Below are the rules we drill under, who files what, and what we need from you to price the job.

Quick summary

  • We drill utility lines under levees, floodways, Corps lake land and navigable rivers by horizontal directional drilling, or by jack and bore with steel casing.
  • Oklahoma and Texas only, in the Tulsa, Fort Worth and Galveston districts. Our shop is in Yukon.
  • Our longest single shot is 4,100 feet under the Arkansas River. Our largest pipe is a 48 inch HDPE water intake at Fort Cobb Lake. Longer runs go in sections.
  • The owner, the local sponsor or the general contractor files with the Corps. We supply the bore plan and profile, the method and equipment description, and as built records.
  • For a number, call (405) 409-7423 or send plans through our contact page.

This page sits under our utility crossings work and next to our page on federal government directional boring.

Which Corps district covers your levee or river crossing

Three Corps districts cover nearly every crossing we see. The Corps posts a district boundary map if you are near a line. Two Corps programs can apply at once: Section 408 for the federal project, and Section 10 or Section 404 for the water.

Tulsa District

Tulsa covers Oklahoma, the southern half of Kansas and the Red River watershed in north Texas, per its Section 408 program page. Its lakes include Keystone, Eufaula, Fort Gibson and Lake Texoma, and it runs the McClellan-Kerr Arkansas River Navigation System. Its 2026 public notices include an ODOT request to directionally bore utility lines under the Arkansas River on the Robert S. Kerr Lock and Dam reservoir.

Fort Worth District

Fort Worth runs Texas lakes such as Lewisville, Grapevine, Lavon, Ray Roberts and Whitney, per its lakes list. Its Section 408 page says to contact the local sponsor or the Corps lake manager first. It has the most detailed written levee rules we have found, quoted in the table below.

Galveston District

Galveston handles the coast, including the Houston Ship Channel, the Gulf Intracoastal Waterway and the Addicks and Barker Reservoirs, per its project list. In Port Arthur, a Section 408 permission letter covered a 16 inch water line drilled by HDD below Corps jurisdictional water, then run in 24 inch steel casing across the Port Arthur Hurricane Flood Protection Levee.

Directional boring crew staging fusible pipe for a bore crossing at Fort Cobb Lake, Oklahoma
Our crew staging fusible pipe for a bore crossing at Fort Cobb Lake, Oklahoma.

Work we have done that is like this

These are the same kind of crossing a Corps review can reach. We do not list any of them as a Corps permitted job.

  • A long river shot. We bored a single shot of 4,100 feet under the Arkansas River.
  • A lake intake. We installed a 48 inch HDPE water intake line out to the middle of Fort Cobb Lake, and divers changed the reamer at the lake end. Fort Cobb Lake is a Bureau of Reclamation reservoir in Caddo County, part of the Washita Basin Project, not a Corps lake.
  • Rock under creeks, a wetland and a dam. Our Guthrie sandstone bore ran 385 feet through hard sandstone beneath two small creeks, a wetland and a dam for a 4 inch HDPE electrical conduit.

Army Corps of Engineers crossings reference table

We built this table from Corps and state documents we opened and read. Each row links to its source.

Corps rules for boring under levees, lakes and rivers in Oklahoma and Texas
SituationWhat appliesKey numbers and requirementsWho filesSource
Any crossing that alters, occupies or uses a Corps levee, dam or channelSection 408 permissionCorps example: a water main from one side of a levee to the other. Call the district coordinator early.Requester: owner, utility or local sponsorUSACE Section 408
Bore under a Tulsa District leveeSection 408A 2026 notice for a 6 inch HDPE line cited a bore depth of at least two times the levee height beneath the levee foundation, and reviewed boring pressure calculations.RequesterTulsa notice 2025 0011
HDD under a Fort Worth levee or channelFort Worth levee pamphlet, July 2023Under 30 feet below the levee base: engineer sealed calculations, factor of safety 1.5 against hydrofracture. Quality control plan with a maximum drilling pressure. At least 7 feet from encasement to channel bottom.Requester, with the local sponsorFort Worth pamphlet
Jack and bore sleeve through a Fort Worth leveeSame pamphletPit on the landside outside the levee toe. Sleeve past the riverside toe. Annulus pressure grouted with bentonite. Daily plug in the sleeve. Open cut is the least preferred alternative.RequesterFort Worth pamphlet
Fort Worth Section 408 requestSubmittal guide, January 2026Sponsor or lake manager sees it first. Signed Statement of No Objection before review. Plans show staging, laydown and access. As built drawings within 120 days.RequesterFort Worth guide
HDD at a dam or levee under Section 408Drilling and invasive program planSigned by a licensed engineer or geologist. Geotech borings 5 bore diameters or 30 feet below the path, whichever is more. Driller lists two similar trenchless installs in the past five years.Requester, through its engineerUSACE drilling plan guide
Line drilled under a stream or wetland, no fill placedSection 404The drilled line itself does not trigger Section 404. Pits that place fill in waters or wetlands do.Owner, if pits land in watersFederal Register, 2020
Line under a Section 10 navigable waterSection 10NWP 57 lines under Section 10 waters need a Section 10 permit; NWP 58 says they may. Tulsa lists reaches of the Arkansas, Canadian, Red, Verdigris and Washita rivers.OwnerFederal Register, 2026; Tulsa Section 10 list
Utility line general permitsNWP 12 gas and oil, NWP 57 electric and fiber, NWP 58 water and sewerIn force March 15, 2026 to March 15, 2031. Loss limit of one half acre. Preconstruction notice if a Section 10 permit is needed or loss tops one tenth of an acre.Owner or general contractorFederal Register, 2026
General permit work that also needs Section 408General conditions 31 and 32Preconstruction notice required. No authorization until the Section 408 permission and a written verification issue. Corps has 30 days to call a notice complete.Owner or general contractorNWP 58 text, USACE
Oklahoma water quality conditionsOklahoma DEQ; EPA in Indian CountryFuel above the ordinary high water mark. Stockpiles outside the 25 year floodplain. In Indian Country, projects needing a preconstruction notice send EPA Region 6 a plan with baseline photos 30 days ahead.OwnerDEQ conditions; EPA conditions
Texas water quality conditionsTCEQ, November 21, 2025NWP 12, 57 and 58 conditionally certified. Erosion and sediment controls required.OwnerTCEQ letter
Fort Worth lake fee land or flowage easementLicense or easement; written permissionFlowage easement up to elevation 537.0 feet at Lewisville, 572.0 at Grapevine, 509 at Lavon.City, company or landownerLewisville fee land; Lavon real estate
Galveston District levees and federal landRegulatory permit, outgrant, Section 408Section 408 applies if work may interfere with a federal navigation or flood risk project. Regulatory permit comes before the outgrant.Nonfederal entityGalveston land use
Section 408 review clockFederal law, per CRS30 days to call a request complete, then 90 days to decide.Not applicableCRS, April 2026
Swipe the table sideways to see every column.

Facts checked November 2026. Tell us if something has changed.

What we bring to this kind of job

Here is how we fit. The Corps reviews the owner’s request. We are the crew the owner or the general contractor hires to drill it. These are the parts of our record that line up with levee, lake and river work.

  • Long river shots. Our longest single shot is 4,100 feet under the Arkansas River. When a crossing runs longer than one shot, we bore it in sections.
  • Big pipe at a lake. Our largest pipe is a 48 inch HDPE water intake at Fort Cobb Lake.
  • Water, wetland and a dam on one job. At Guthrie we bored through sandstone beneath creeks, a wetland and a dam. Rock under water is the reason our checklist asks for boring logs along the whole path, not just at the pits.
  • Federal review sites. We bored 840 feet of FAA conduit under runways at Will Rogers World Airport in Oklahoma City, and we have bored under the John Kilpatrick Turnpike. See our airport utility work.
  • Steel casing when the plan calls for it. We own auger machines and do jack and bore with steel casing. That is the method the Fort Worth pamphlet lays out for a levee sleeve.
  • Daylighting before we drill. We run hydrovac daylighting and potholing to expose lines near the entry and exit pits.

For drill sizes and pullback ranges, see our HDD drill rig specifications table. For Texas cover depths, see the Texas underground utility depth chart.

Who files the Corps permit and what we hand over

We do not file Corps requests. The customer or the general contractor pulls the permits and arranges traffic control. On a Corps crossing, the requester is usually the owner, the utility or the local sponsor that runs the levee. In Fort Worth, the request goes through the sponsor or the lake manager before the Corps sees it.

We supply what the permit package needs from the driller:

  • A bore plan and profile with entry and exit points, depth under the levee or channel, and borehole and product sizes.
  • A description of the method and equipment we will use, including how we handle drilling fluid.
  • As built records after the pull, so the owner can meet deadlines like Fort Worth’s 120 day rule.

The hydrofracture calculations and the drilling plan get signed by a licensed engineer or geologist. That is your engineer, not us. We give that engineer our method and numbers so the plan on paper matches what we will drill. If you are a city or utility, our pages on boring for municipalities and water line services cover the rest. General contractors can start with boring for general contractors.

Rod box on the Vermeer D24x40 S3 Navigator with the bore path heading toward the trees on a rock bore in Guthrie, OK
The rod box on our rig, with the bore path heading toward the trees on a rock bore in Guthrie.

What we need from you to quote it

Send what you have. Gaps are normal early on. Each item below changes the number.

  • Plans and profile. The crossing location, the levee, channel or lake name, stations, and the design depth.
  • Product. Pipe material, diameter, wall, and whether a steel casing is required.
  • Permit conditions. Any Section 408 conditions, the general permit verification, DEQ or TCEQ conditions, and any lake license terms. Draft versions help.
  • Soil or geotech. Boring logs along the path and below it. Rock, sand and cobble change the tooling and the schedule.
  • Utility records. Existing lines near the pits and along the path, so we can plan potholes.
  • Access. Where the pits, staging and laydown can go, how trucks get in, and where water for drilling comes from. Fort Worth wants these shown on the plans.
  • Schedule. When approval is expected, any low flow window, and the date the line must be in service.
  • Contacts. Who the requester is, and who speaks for the local sponsor or lake office.

Army Corps levee and river crossing FAQs

What is a Section 408 permission?

Section 408 permission is the Corps approval another party needs to alter, occupy or use a Corps civil works project, such as a levee, dam or navigable channel. The Corps checks that the work will not harm the public interest or impair the project. Running a water main from one side of a levee to the other is one example the Corps gives. The requester files it, not the driller.

Do I need a Corps permit to directionally bore under a creek?

Often not for the drilled line itself, but the pits and the setting can still need one. The Corps wrote in 2020 that a line installed below the surface by directional drilling does not trigger Section 404. Entry or exit pits that place fill in waters or wetlands do. A creek on a Section 10 list, or Corps land at the crossing, brings in other approvals. Ask the district before you bid.

Does horizontal directional drilling require a 404 permit?

Not by itself. Section 404 covers discharges of dredged or fill material, and a drilled line under a stream normally places none. A 404 authorization comes in when pits, mats, access roads or cleanup work put fill in waters or wetlands. The 2026 utility general permits also cover cleanup of drilling fluid returns, which is one reason owners often get a general permit verification anyway.

Can you bore under a levee?

Yes, with Section 408 permission and an engineered plan. The Fort Worth District levee pamphlet lists what an HDD submittal must show and calls open cut through a levee the least preferred alternative. A 2026 Tulsa District notice for a 6 inch HDPE line noted a bore depth of at least two times the levee height beneath the levee foundation. Our part is drilling to the approved plan.

How long does a Section 408 review take?

Federal law gives the Corps 30 days to decide whether a request is complete and 90 days after that to make a decision, according to a 2026 Congressional Research Service summary. A complete request saves the most time. In Fort Worth, review does not start until the local sponsor signs a Statement of No Objection. Build the bore schedule around the approval letter, not the submittal date.

What is a preconstruction notification?

A preconstruction notification is the request a project proponent sends the Corps to confirm a general permit covers the work. For utility lines it is required when a Section 10 permit is needed, when the loss of waters tops one tenth of an acre, or when Section 408 permission is also needed. With Section 408 in play, work waits for that permission and a written verification.

What does the driller supply for a Section 408 request?

The driller supplies the bore plan and profile, the method and equipment description, and as built records after the pull. Fort Worth asks for borehole and casing diameters, entry and exit points, annulus grouting and a quality control plan with a maximum drilling pressure. A licensed engineer signs the hydrofracture calculations. We give that engineer our method and numbers so the plan matches the drill.

What happens if drilling mud comes up in a creek?

The crew stops and follows the inadvertent return plan in the permit package. The 2026 general permits cover the temporary work needed to clean up drilling fluid returns in waters. Oklahoma DEQ conditions keep fueling above the ordinary high water mark and stockpiles outside the 25 year floodplain. Under a levee, the district wants written procedures for fluid loss before drilling starts.

Do I need permission to bore on Corps lake land or a flowage easement?

Yes. At Lewisville and Grapevine lakes, the Corps says written permission is needed for any work in the flowage easement, which runs up to elevation 537.0 feet at Lewisville and 572.0 feet at Grapevine. On fee land, cities and companies can request waterline licenses and sewer easements through the lake office. Lavon Lake’s flowage easement goes up to elevation 509 feet. Not every lake is a Corps lake: Fort Cobb Lake, where we installed a 48 inch HDPE water intake, is a Bureau of Reclamation reservoir.

Which Corps district covers my project in Oklahoma or Texas?

In our area it is usually Tulsa, Fort Worth or Galveston. Tulsa covers Oklahoma, the southern half of Kansas and the Red River watershed in north Texas, including Lake Texoma. Fort Worth runs lakes such as Lewisville, Lavon and Whitney. Galveston covers projects such as the Houston Ship Channel, the Gulf Intracoastal Waterway and Addicks and Barker. The Corps posts a boundary map.

Can a levee crossing be done with jack and bore and a steel casing?

Sometimes, and the Fort Worth pamphlet describes how. The bore pit sits on the landside outside the levee toe. The sleeve runs past the riverside toe. The space around the sleeve is pressure grouted with bentonite, and a plug stays in the sleeve at the end of each day. We own auger machines and do jack and bore with steel casing.

Get a number on a Corps crossing

Send the plans, the permit conditions you have and the soil logs. We will tell you how we would drill it and what we still need. Call Darren Rice and the crew at (405) 409-7423, or use our contact page. Our shop is at 9102 Northwest Expy, Yukon, OK 73099. We work in Oklahoma and Texas only, and we run same day crews within about four hours of Yukon for emergency utility work.

Talk to the crew that does the work

Fastest way to a number is a phone call. Tell us where the crossing is and what is going in the ground, and you will get a straight answer on the same call. Bores from 10 feet to 4,100 feet in a single shot, with longer runs bored in sections, 3/4 inch service line through 48 inch pipe, anywhere in Oklahoma and Texas. We run 24/7 for main breaks and emergency repairs.

Call (405) 409-7423

Answered by a person, not a call center.

Would rather not call? Send the details and we will come back with a written quote.