Davis Bacon public works boring is ordinary drilling with a heavier paper trail. The rig, the mud and the reamer are the same as on a private job. What changes is the payroll. Federal highway, airport or water money brings a wage determination, a jobsite poster and a certified payroll every week until the last pit is backfilled. Below: who sets the rates in Oklahoma and Texas, what the 2026 wage determinations list for directional drilling, and what we turn in as the boring sub.

Quick summary

  • Davis Bacon public works boring means a directional bore, auger bore or hydrovac job on a public works contract that carries federal money, so every laborer and mechanic on site gets at least the Davis Bacon prevailing wage.
  • We work in Oklahoma and Texas only, from our shop at 9102 Northwest Expy in Yukon.
  • The customer or general contractor pulls permits and sets traffic control. We hand over the bore plan and profile, our method and as built records, and our weekly certified payroll.
  • To get a number, send the plans, the wage determination in your contract and the bore list to our contact page, or call (405) 409-7423.

What Davis Bacon covers on a bore

The Department of Labor applies the Davis Bacon and Related Acts to federally funded or assisted contracts above a small dollar threshold for building, altering or repairing public buildings or public works. A water main, a sewer force main or a casing under a federal aid highway all qualify.

Most bores under these rules are not federal contracts. They are city, rural water or airport jobs where a federal grant or loan paid part of the bill, which brings in the Related Acts. Fact Sheet 66 names the Federal Aid Highway Acts, the Housing and Community Development Act of 1974 and the Federal Water Pollution Control Act as examples.

The rate covers every hour on the site of the work, paid as cash or as cash plus bona fide fringe benefits. It is a floor, not a target.

Trinity Boring Solutions Ditch Witch directional drill loaded with drill rods, with owner Darren Rice and crew on site
Our directional drill loaded with drill rods, with owner Darren Rice and crew on site.

Work we have done that is like this

These are the same kind of public property and street crossings where funding rules come up. We do not list any of them as a Davis Bacon job.

  • FAA conduit at an airport. We bored 840 feet of FAA conduit under runways at Will Rogers World Airport in Oklahoma City.
  • A turnpike crossing. We bored beneath the John Kilpatrick Turnpike in Oklahoma City.
  • A sleeve under a street and a water main. At the Clara Luper Center in Oklahoma City, we bored a 6 inch PVC sleeve under NE 24th Street and a live water main for a general contractor.

Oklahoma and Texas prevailing wage rules are not the same

Oklahoma has no state prevailing wage law in force. The Oklahoma Supreme Court struck down the Minimum Wages on Public Works Act in 1995, and the legislature repealed it effective November 1, 2015, per the notes in Oklahoma Statutes Title 40. A city bore paid with local money has no wage floor unless the owner writes one in. Add a federal grant or revolving fund loan and Davis Bacon applies.

Texas is different. Texas Government Code Chapter 2258 requires prevailing wages on public works for the state and its political subdivisions, with maintenance work excluded. The public body sets the rates, either by its own survey or by adopting the Department of Labor rates, and has to print them in the bid call and the contract. Underpaying brings a daily penalty for each worker shorted. TxDOT calls it a Little Davis Bacon Act.

Who sets the rate and who gets the payroll

This is the table we check before we price a public job. Find the money first, then the rule follows.

Who sets the wage rate and who gets the payroll on a public works bore, by funding source
Funding sourceWage ruleWho sets the ratePayroll goes toSource
Direct federal construction contract (for example a federal agency or base job)Davis Bacon ActU.S. Department of Labor wage determination in the contractTo the federal agency, through the primeDOL Wage and Hour Division
Federal aid highway project let by ODOT or TxDOTFederal Aid Highway Acts, Form FHWA-1273DOL wage determination in the state DOT proposalThrough the prime to ODOT or TxDOTFHWA; ODOT; TxDOT
Airport project with FAA Airport Improvement Program money49 USC 47112(b)DOL wage determination; the clause goes into every construction contract and subcontract with AIP fundingTo the airport sponsorFAA contract provisions
Oklahoma clean water loan (CWSRF, OWRB)Federal Water Pollution Control Act section 513DOL rates obtained 10 days before bid openingPayroll certification letters reviewed with each reimbursement requestOWRB SFY 2027 plan
Oklahoma drinking water loan (DWSRF, DEQ and OWRB)Safe Drinking Water ActLatest DOL rates set before biddingWeekly payroll reports from prime and subs, reviewed by the water system; employee interviewsOklahoma DEQ draft SFY 2027 plan
Texas clean water or drinking water loan (TWDB)Section 513 and SDWA 1452(a)(5)DOL wage determination from SAM.govCertified payroll within 7 days after the regular pay dateTWDB Davis Bacon guidance
Texas state, city, county or district public work with no federal moneyTexas Government Code Chapter 2258The public body, by its own survey or by adopting DOL rates, stated in the bid call and contractRecords of each worker and per diem wages, open to the public bodyTexas Government Code 2258
Oklahoma state or local public work with no federal moneyNone in forceNo state prevailing wage rate applies; the 1995 court ruling struck the act and it was repealed in 2015Only what the owner writes into the contractOklahoma Statutes Title 40
Swipe the table sideways to see every column.

Facts checked November 2026. Tell us if something has changed.

What the 2026 wage determinations list for directional drilling

We pulled the current heavy wage determinations for the counties we work most and read every class. Nine of eleven name no directional drill operator or locator. Only Wichita County and the 20 county decision around San Antonio and Austin do.

Does the 2026 Davis Bacon heavy wage determination list a directional drilling class?
Wage determinationCountiesTypeDirectional drilling class listedClosest listed classes
OK20260026Oklahoma County, OKHeavyNoOperator: Drill; Laborer: Pipelayer
OK20260029Canadian, Cleveland, Grady, Lincoln and McClain Counties, OKHeavyNoOperator: Drill; Laborer: Pipelayer
OK20260028Tulsa County, OKHeavyNoOperator: Drill; Laborer: Pipelayer
OK20260031Payne County, OKHeavyNoPower Equipment Operator Group 6, Rotary Drilling; Laborer: Pipelayer
OK20260036Beckham, Caddo, Cotton, Custer and 9 more counties, OKHeavyNoPower Equipment Operator Group 6, Rotary Drilling; Laborer: Pipelayer
TX20260018Collin, Dallas, Denton, Ellis, Kaufman and Rockwall Counties, TXHeavy, water and sewer linesNoPipelayer; Laborers (Utility); Power Equipment Operators (Backhoe)
TX20260026Johnson, Parker and Tarrant Counties, TXHeavyNoPipelayer; Laborers (Utility)
TX20260019Grayson County, TXHeavy, water and sewer linesNoPipelayer; Laborers (Utility); Power Equipment Operators (Foundation Drill)
TX20260031Harris County, TX (excludes flood control)HeavyNoLaborers (Pipelayer); Power Equipment Operator (Excavator)
TX20260005Wichita County, TXHeavyYes: Power Equipment Operator (Directional Drilling)Listed as is
TX20260007Bexar, Travis, Williamson and 17 more counties, TXHeavyYes: Directional Drilling Operator and Directional Drilling LocatorListed as is
Swipe the table sideways to see every column.

Facts checked November 2026. Tell us if something has changed.

Read from modification 1 of each general decision, published May 18, 2026 on SAM.gov. We list class names only. Rates change with each modification, so always use the decision and modification number written into your contract.

When no listed class fits, the fix is a conformance. Under 29 CFR 5.5(a)(1)(iii), the contracting officer asks the Wage and Hour Division to add a class, using form SF-1444 per the DOL conformance page, and gets an answer within 30 days. Whether a line like Operator: Drill already covers a guided bore is the agency’s call. We raise it before the bid, not after the first payroll.

The DOL definitions put water and sewer lines under heavy, and roads and runways under highway. One contract can carry both, per the DOL FAQ.

Certified payroll for a boring subcontractor

Every week we work on a covered job, we turn in a certified payroll. It goes up the chain. Under 29 CFR 5.5(a)(3)(ii) the prime is responsible for getting every subcontractor payroll to the agency, or to the owner or sponsor when the agency is not a party to the contract.

  • Each worker by an identifying number, such as the last four digits of a Social Security number, not the full number or home address.
  • The class from the wage determination for each worker, with a separate line when someone works two classes in a week.
  • Hours each day, the rate paid, fringe paid as cash or into a plan, deductions and net pay.
  • A signed Statement of Compliance. The WH-347 form is optional; the weekly information is not.

Water loans add their own checks. The TWDB wants certified payroll within seven days after the regular pay date, and the Oklahoma DEQ interviews workers during drinking water jobs.

Payroll records are kept at least three years after all work on the prime contract is complete, and TxDOT asks the same on state jobs.

Who on a bore crew is covered

A Davis Bacon payroll lists laborers and mechanics, which 29 CFR 5.2 defines as workers whose duties are manual or physical. On our crews that is the drill operator, the locator walking the head, the hand mixing mud and the hydrovac operator potholing the crossings. A lead hand who runs the crew is covered for any week he spends more than 20 percent of his time on manual work.

Hauling the rig to and from the site is generally not covered, but on site loading, unloading or waiting time that is more than de minimis is. Apprentices can be paid below the listed rate only when they are individually registered in an approved program, per Fact Sheet 66.

The wage determination and the WH-1321 poster go up where the crew can read them, per 29 CFR 5.5(a)(1). On a long bore with pits far apart, we ask the prime where it hangs.

What we bring to this kind of job

Dean Rice started the company in 1965, we have done underground construction since 1982, and Darren Rice runs it today. These public jobs on our record are the kind where funding rules come up:

  • 840 feet of FAA conduit bored under runways at Will Rogers World Airport in Oklahoma City. See our airport utility work.
  • A bore under the John Kilpatrick Turnpike in Oklahoma City, and a PVC sleeve under NE 24th Street at the Clara Luper Center.
  • A 48 inch HDPE water intake at Fort Cobb Lake.
  • A single shot of 4,100 feet under the Arkansas River.
  • A sandstone bore at Guthrie beneath creeks, a wetland and a dam, and an emergency water line bore in Stillwater.

This list does not say which of those carried a Davis Bacon clause. If your job does, we can quote it and we will run the payroll the way this page lays out. We own our auger boring machines, so a cased crossing for jack and bore stays in house, and our own hydrovac crews pothole the crossings. Jobs within about four hours of Yukon can have a crew the same day. We work under a prime on our general contractor jobs and for cities on municipal boring. On the Clara Luper Center sleeve under NE 24th Street, we worked for the general contractor.

Ditch Witch directional drill rig with a loaded drill rod rack staged at a commercial jobsite
A directional drill rig with a loaded drill rod rack at a commercial jobsite.

What we need from you to quote it

Send this with your bid request and we can price the bore and the payroll work together.

  1. Plans and profiles with pipe size, material and any casing.
  2. The contract wage determination: the general decision number and modification number, and whether it is heavy, highway or both.
  3. The funding source: federal agency, federal aid highway, FAA airport grant, state revolving fund loan, or local money only.
  4. Where certified payroll goes, the deadline and any electronic system.
  5. Permit conditions, and who is pulling permits and handling traffic control.
  6. Soil borings or a geotechnical report.
  7. Utility records and the 811 ticket status for the crossings.
  8. Access for the rig and the pits, staging space and water for the mud.
  9. The schedule, including any work windows, and the bid date.

Send it through our contact page or call (405) 409-7423.

Where to ask about a wage rate

Questions about a rate or a conformance go to the Wage and Hour Division. Its office list shows a district office in Oklahoma City at 215 Dean A McGee Ave and an area office in Tulsa, and district offices in Dallas, Houston, San Antonio and Austin, among others in Texas.

Davis Bacon boring questions we get

Does Davis Bacon apply to directional boring?

Yes, when the bore is part of a federally funded or assisted contract for a public work above the threshold in the Act. A water line, sewer main or conduit under a road is construction. Our drill operator, locator and hands are laborers and mechanics, so they get at least the rate in the contract wage determination.

Does Oklahoma have a prevailing wage law?

No, not for state or local public works. The Oklahoma Supreme Court struck down the Minimum Wages on Public Works Act in 1995, and it was repealed effective November 1, 2015. Federal money still brings Davis Bacon, so a job paid partly by a federal grant, federal aid highway funds or a revolving fund loan carries prevailing wages.

Does Texas have a prevailing wage law for public works?

Yes. Texas Government Code Chapter 2258 requires prevailing wages on public works for the state and its political subdivisions, except maintenance work. The public body sets the rates by its own survey or by adopting Department of Labor rates, and prints them in the bid call and contract.

Does Davis Bacon apply to subcontractors?

Yes. The clauses and wage determination flow down into every subcontract at every tier. The prime contractor is responsible for each sub and for getting every certified payroll to the agency or owner. As the boring sub, we sign our own Statement of Compliance each week and hand our payroll to the prime.

How often is certified payroll due on a Davis Bacon job?

Weekly, for every week covered work is performed. Each payroll shows each worker by an identifying number, the class worked, hours, rates, fringe and deductions, with a signed Statement of Compliance. Form WH-347 is optional; the weekly information is not. TWDB loans add a deadline of seven days after the regular pay date.

Where do I find the wage determination for my county?

On SAM.gov, where the Department of Labor publishes them by county and construction type. Use the decision and modification number written into your contract, not just the newest one. On a sealed bid job, a revision issued at least 10 calendar days before bid opening applies; one issued after bid opening does not.

What if the wage determination has no directional drill operator?

The contracting agency asks the Wage and Hour Division to conform a class, usually on form SF-1444. It is allowed only when no listed class does the work, the class is used in the area, and the rate is reasonably related to listed rates. Our 2026 check found no directional drilling class on nine of eleven heavy decisions.

Is a utility bore heavy or highway construction for Davis Bacon?

Usually heavy. The Department of Labor lists water and sewer lines under heavy construction, while roads, streets, highways and runways fall under highway. One contract can carry more than one wage determination. If a water project bore crosses a highway, ask the agency which schedule covers the boring crew.

Are truck drivers hauling the drill rig covered by Davis Bacon?

Hauling the rig or pipe to and from the site is generally not covered. Time a driver spends on the site loading, unloading or waiting is covered when it is more than de minimis. Hauling between the site and a dedicated support yard next to it can also be covered, so tell us about any staging yard.

Do state revolving fund water loans require Davis Bacon?

Yes. TWDB applies Davis Bacon to clean water treatment works and to any drinking water construction it funds through the revolving funds. In Oklahoma, the OWRB checks wage rates 10 days before bid opening on clean water loans, and DEQ requires weekly payroll reports from the prime and subs on drinking water projects.

Who pulls the permits on a public works bore?

The customer or the general contractor pulls the permits and arranges traffic control. We supply what the permit package needs from the driller: the bore plan and profile, a description of the equipment and method, and as built records. On a Davis Bacon job our weekly certified payroll goes to the prime with that paperwork.

Related pages

Quote a Davis Bacon bore

Send the plans and the wage determination, or call (405) 409-7423.

Talk to the crew that does the work

Fastest way to a number is a phone call. Tell us where the crossing is and what is going in the ground, and you will get a straight answer on the same call. Bores from 10 feet to 4,100 feet in a single shot, with longer runs bored in sections, 3/4 inch service line through 48 inch pipe, anywhere in Oklahoma and Texas. We run 24/7 for main breaks and emergency repairs.