trinityboringsolutions.com

Home / Services / VA and Federal Facility Utility Boring in Oklahoma and Texas

Government and agency work

VA and Federal Facility Utility Boring in Oklahoma and Texas

VA and federal facility utility boring is not the same job as a city street bore. The soil is the same. The paperwork and the clock are not. A hospital never closes, so every water or power tie in waits for a written outage window. An Air Force base wants a signed dig permit before anyone breaks ground. We built this page from VA specs, FAR clauses and base pages we read ourselves, so a GC can see what the bore sub plans for before bid day.

Quick summary

  • What it is: boring water, sewer, gas, electric and fiber lines under live federal campuses by HDD, auger boring or jack and bore with steel casing.
  • Where: Oklahoma and Texas, including the VA medical centers in Oklahoma City, Muskogee, Dallas, Bonham and Temple, GSA buildings and military bases such as Tinker Air Force Base.
  • Sizes and lengths: small conduit up to 48 inch HDPE. Our longest single shot is 4,100 feet under the Arkansas River, and longer runs are bored in sections.
  • Who files permits: the prime or GC. We supply the bore plan and profile, method description and as built records.
  • How to get a number: send the drawings and the spec book, or call (405) 409-7423.

Dean Rice founded our Yukon company in 1965. We have done underground work since 1982, and Darren Rice runs it now. See also our federal government directional boring page.

Where federal utility work sits in Oklahoma and Texas

GSA’s Region 7 supports customers in Texas, Louisiana, Arkansas, Oklahoma and New Mexico. For work on Army and Air Force ground, see our military base utility contractor page.

Ditch Witch JT922 directional drill rig boring beneath an airport taxiway next to a Trinity Boring Solutions truck at Will Rogers World Airport
A directional drill rig boring beneath an airport taxiway at Will Rogers World Airport.

Work we have done that is like this

These jobs are the same kind of work as a bore on a live federal campus. We do not list any of them as a VA job.

  • FAA conduit at an airport. We bored 840 feet of FAA conduit under runways at Will Rogers World Airport in Oklahoma City.
  • Conduit at an FAA center. We bored two 4 inch conduits at the FAA Mike Monroney Aeronautical Center in Oklahoma City for an electrical contractor, with hydrovac used in the bore process.
  • A hospital campus propane line. We bored a propane line in poly pipe with tracer wire on a hospital campus in Anadarko.

Rules that shape VA and federal facility utility boring

We could not find these in one place, so we built one table. Each row links to the rule we read. VA rows come from the VA master specifications, and your project book can change them.

ItemWhat the rule saysWho handles itSource
VA utility outage requestWritten request to the COR 7 days ahead, 15 calendar days for a major outage. Approved time may fall outside normal hours.Prime or GC submits. We give the tie in duration.VA Master Spec 01 00 00
VA site badges and escortsAll GC and subcontractor employees comply with the VA security program, wear a badge and get VA police permission. One week of notice for escort arrangements.Prime or GC arranges. We send crew names.VA Master Spec 01 00 00
VA as built drawingsTwo sets kept current during work. Delivered as scanned PDF within 15 calendar days after each phase.We supply bore as builts to the GC.VA Master Spec 01 00 00
VA risk assessmentsAt least one PCRA per project. Completed PCRAs and ICRAs go in the solicitation so bidders see risks that affect means, methods, scheduling and pricing.VA prepares. Bidders read them before pricing.VHA Directive 7715
VA utility locatingWhite mark the dig site. Call 811 two business days ahead on local or State lands and public right of way. No digging until all known utilities are marked.GC and driller. We pothole crossings.VA Master Spec 01 35 26
VA hand dig zoneHand dig or use a similar safe method within 3 to 5 feet of identified utilities.Driller. We use hydrovac.VA Master Spec 01 35 26
VA hazard analysisAn AHA is accepted before each activity and submitted at least 15 calendar days before the phase. Competent persons are named in it.Each subcontractor writes its own. Prime submits.VA Master Spec 01 35 26
Air Force dig permitAn AF IMT 103 work clearance must be approved before digging starts.Prime or GC routes it. We mark the route.Tinker AFB civil engineer supplement
AF Form 103 timing, one exampleAbout 3 working days per request, up to 20 people to sign, route marked 5 working days ahead, hand dig 5 feet either side of crossings.Contractor coordinates.Ellsworth AFB solicitation
Base pass at TinkerSponsored contractors with a state photo ID and auto insurance proof can get a pass in as little as 15 to 20 minutes, after a background check.Each worker. Sponsor arranged by the prime.Tinker AFB newcomers page
Oklahoma 811 noticeAt least 48 hours, excluding the notice date, Saturdays, Sundays and legal holidays. Notice expires 14 calendar days from the start date.Excavator.Okie811, the law
Texas 811 noticeNot earlier than the 14th day and not later than the 48th hour before excavation, excluding Saturdays, Sundays and legal holidays.Excavator.Texas Utilities Code 251.151
SAM registrationAn offeror must be registered in SAM when it submits an offer and at award. A subcontractor may choose to get a Unique Entity ID only.Prime registers. Subs follow the contract.FAR SAM clause
Davis Bacon wagesLaborers and mechanics are paid weekly at no less than the wage determination. The determination and poster stay posted at the site.Prime and every subcontractor.FAR construction wage clause
Buy AmericanOnly domestic construction material, except as the clause allows. That includes material a subcontractor brings to the site.Prime and subcontractors.FAR Buy American clause
Swipe the table sideways to see every column.

Facts checked November 2026. Tell us if something has changed.

What a live VA hospital campus changes about a bore

Outage windows set the schedule

The VA General Requirements section says the medical center runs 24 hours a day, 7 days a week. No water, gas, steam, sewer or electric service gets interrupted without approval. So we split the work. We bore and pull the new line in daylight while the old line stays live. Then the tie in happens in the approved window, with the fittings and crew already staged. For water mains, see our water line services.

Campus owned lines may not be on an 811 ticket

The VA safety requirements section says to call 811 two business days ahead on local or State lands and public right of way. Utilities that belong to the hospital itself are another matter. Steam, chilled water, fire loops and campus fiber may have no 811 member behind them. Ask the COR for the campus utility maps and who locates those lines. Then we expose each crossing by utility potholing and hydrovac daylighting.

Patients, entrances and the risk assessments

VHA Directive 7715 requires at least one Pre Construction Risk Assessment for each project. When it finds infection risk, an ICRA follows. Both go into the solicitation so bidders can price means, methods, labor and scheduling. Read them before you place bore pits. A pit by an emergency entrance or air intake may need another spot. HDD helps, since the rig and the exit pit can sit in two parking areas with no trench across the drive. The closest hospital campus work we can point to is a propane line we bored on a hospital campus in Anadarko, and we do not list it as a VA job.

The master spec has no bore section

The VA master specification index lists Division 33 sections for water, sanitary sewer, storm sewer, natural gas and steam distribution. When we checked in November 2026, it listed no section for directional boring or jacking. On many VA jobs, the bore method lives in the drawings or a section the designer adds. We send a written method description early so it can go into the submittals.

Base access and dig permits on military ground

Passes at Tinker AFB need a sponsor and a background check, and visitors need a REAL ID. We check every license on the crew before the first morning.

The Tinker supplement to the Air Force civil engineer instruction says an AF IMT 103, Base Civil Engineer Work Clearance Request, must be approved before work that needs digging. One Air Force solicitation at Ellsworth put coordination at about three working days per request, with as many as twenty people signing. It asked for the route marked five working days ahead. Build a week into the schedule. Runway crossings? See our airport utility contractor page.

Federal contract clauses that reach the bore crew

Most of these land on the prime, and some flow down. The FAR SAM clause requires an offeror to be registered when it submits an offer and at award, and GSA notes some subcontractors get a Unique Entity ID only. The FAR wage clause requires weekly pay at no less than the posted wage determination,, and the Department of Labor puts sub compliance on the prime. The Buy American clause covers material a subcontractor brings to the site, so we ask about HDPE, PVC conduit and steel casing before we order.

What we bring to this kind of job

We do not claim federal contracts here; the airport and FAA center work above was done for contractors on those sites. We bring work done under similar pressure: tight windows, live utilities and records someone else signs.

  • We bored 840 feet of FAA conduit under runways at Will Rogers World Airport.
  • We bored under the John Kilpatrick Turnpike and set a PVC sleeve under NE 24th Street at the Clara Luper Center, both in Oklahoma City. See our road and highway utility work.
  • We put in a 48 inch HDPE water intake at Fort Cobb Lake.
  • We shot 4,100 feet in a single pass under the Arkansas River. Longer runs we bore in sections.
  • We bored Guthrie sandstone beneath creeks, a wetland and a dam, an emergency water line in Stillwater and a propane line at Anadarko.
  • We own our auger machines, so we can quote auger boring and jack and bore with steel casing as well as HDD.
  • We run hydrovac and vacuum excavation for potholing and daylighting, and we install electrical conduit, fiber, water, sewer and gas lines.
  • Same day crews within about four hours of Yukon. For breaks, see our emergency utility contractor page.

On permits, the customer or GC pulls permits and arranges traffic control. Here that includes outage requests, dig permits and base passes. We supply what the package needs from the driller: the bore plan and profile, the equipment and method description and as built records. If you are the GC, our boring for general contractors page shows how we work under you.

Trinity Boring Solutions directional boring crew, drill rig and hydrovac trailer staged along an airport service road at Will Rogers World Airport in Oklahoma City
Our crew, drill rig and hydrovac trailer staged on an airport service road at Will Rogers World Airport.

What we need from you to quote it

  • Plans: utility sheets with the bore line, pipe size and material, and usable entry and exit areas.
  • Spec book: the Division 01 sections plus the PCRA and any ICRA.
  • Permit conditions: outage windows, dig permit terms, base access rules and any road crossing permit.
  • Soil or geotech: boring logs or the geotechnical report. Rock and groundwater change the method.
  • Utility records: campus utility maps, 811 ticket results and facility records for steam, chilled water and fiber.
  • Access: gate, sponsor, escorts, laydown and room for a rig and pipe string.
  • Schedule: bid date, phase dates and how long a tie in may take.

Depth data first? See our underground utility data library.

FAQs on VA hospital and federal building boring

Do subcontractors need to be registered in SAM?

Usually the registration rule falls on the prime. The FAR SAM clause requires an offeror to be registered in SAM when it submits an offer and at award. GSA notes that some entities, such as subcontractors, choose not to register, and those firms cannot bid directly as primes. They can get a Unique Entity ID only. Read your solicitation, because a contract can ask for more.

What is AF Form 103?

AF Form 103 is the Base Civil Engineer Work Clearance Request, the Air Force dig permit. The Tinker supplement to the Air Force civil engineer instruction says it must be approved before digging starts. One Air Force solicitation estimated about three working days per request and as many as twenty people to sign. Plan the bore start date around it.

Do I need a REAL ID to get on Tinker Air Force Base?

Yes, visitors need one. Tinker posted that beginning May 7, 2025, base visitors must have a REAL ID to enter, and that security no longer accepts state identification that does not meet the federal standard. Check every crew member’s license before the job. A REAL ID has a gold star in the upper right corner.

How do contractors get a base pass at Tinker?

Contractors get passes at the Pass and ID office outside the Tinker Gate, near Air Depot Boulevard and Interstate 40. Tinker says sponsored first time contractors with a state photo ID and proof of auto insurance can get a pass in as little as 15 to 20 minutes. Sponsored visitors 18 and older get a background check.

How far ahead does a VA utility outage have to be requested?

The VA master spec calls for a written request 7 days ahead for an ordinary interruption and at least 15 calendar days ahead for a major one. The request states the reason, date, exact time and approximate duration. The prime sends it to the COR. We give the GC our tie in duration so that number holds up.

Can utility work at a VA hospital happen at night or on weekends?

Yes, and often it has to. The VA master spec says the medical center runs 24 hours a day, 7 days a week, and that approved interruption time may fall outside the contractor’s normal working hours. Bore the pipe ahead of time during the day. Save only the tie in for the approved outage window.

Who marks underground utilities on a VA campus?

811 member utilities mark their own lines, and the VA safety spec calls for 811 on local or State land and public right of way. Lines the medical center owns may not show up on any ticket. Ask the COR for campus utility maps and who locates those lines, then pothole every crossing before the bore head gets close.

How close can you dig to a marked utility on a VA job?

The VA safety spec calls for hand digging or a similar safe method within 3 to 5 feet of identified underground utilities. It also says digging does not start until all known utilities are marked. We use hydrovac to daylight crossings, which counts as a safe method on most jobs. Confirm with the project spec.

What is an ICRA, and does it apply to an outdoor bore?

An ICRA is the VHA Infection Control Risk Assessment. VHA Directive 7715 requires one when the PCRA finds infection risk to patients. Most dust rules target interior work, but a bore pit near an entrance or air intake can still be in scope. Completed ICRAs come with the solicitation, so read them before pricing.

Does Davis Bacon apply to subcontractors?

Yes. The Department of Labor says the Davis Bacon Act requires contractors and subcontractors to pay laborers and mechanics on federal construction no less than local prevailing wages and fringe benefits. The FAR wage clause requires weekly pay and a posted wage determination at the site. The prime is responsible for subcontractor compliance at every tier.

Does Buy American apply to pipe a subcontractor brings to the site?

Yes, when the contract includes the FAR Buy American clause for construction materials. It defines construction material as anything the contractor or a subcontractor brings to the site for the work, and it requires domestic construction material unless an exception applies. Material the government buys directly is treated as supplies. Ask about HDPE, PVC and steel casing before ordering.

How far ahead do you call 811 in Oklahoma and Texas?

Call at least 48 hours ahead in both states, not counting weekends and legal holidays. Oklahoma also excludes the day you give notice, and the ticket expires 14 calendar days after the start date. Texas says to call no earlier than the 14th day before work. Base and campus owned lines need their own locate.

Get a number on your federal bore

Send the drawings and the spec book, and we will tell you what the bore needs and what it will take. Call (405) 409-7423 or use our contact page. The shop is at 9102 Northwest Expy, Yukon, OK 73099.

Talk to the crew that does the work

Fastest way to a number is a phone call. Tell us where the crossing is and what is going in the ground, and you will get a straight answer on the same call. Bores from 10 feet to 4,100 feet in a single shot, with longer runs bored in sections, 3/4 inch service line through 48 inch pipe, anywhere in Oklahoma and Texas. We run 24/7 for main breaks and emergency repairs.

Call (405) 409-7423

Answered by a person, not a call center.

Would rather not call? Send the details and we will come back with a written quote.

Quick Quote In Page