Addison Texas Directional Boring: Stephen Soil, Hutton Branch Creek and Austin Chalk

Quick Answer: Addison is an incorporated town in Dallas County, so its town streets belong to the town; we take directional boring, also called horizontal directional drilling (HDD), for lines crossing Hutton Branch Creek. Our Yukon, Oklahoma main office is 208 road miles away, and work near Belt Line Road has that distance in its mobilization. Stephen soil is common in the USDA survey, and bedrock mapped near the surface can affect bore depth and pace.

Family Business Since 1965 Boring Since 1982 24 Hour Phone No Utility Strike in 25 Years

Addison bores at a glance

  • Incorporated city in Dallas County, Texas. Population 17,257 (Census Bureau 2024 estimate).
  • Road distance from our Yukon, Oklahoma main office: 208 miles, about 4.1 hours of driving.
  • Ground: Stephen soil is mapped on 42 percent of the area, with bedrock about 40 inches down.
  • Rock: bedrock is mapped within 60 inches on 82 percent of the area.
  • No state or US highway is mapped inside the boundary. Closest: Texas State Highway 289, Interstate 635 and Texas State Highway 190.
  • Railroad track inside the boundary: Dallas, Garland and Northeastern Railroad, with 10 mapped street and rail crossings.
  • Named streams inside the boundary: Hutton Branch Creek and Farmers Branch Creek.
  • Public water: Town of Addison, surface water bought from another system.
  • Texas811: locate request at least two working days before a bore and no more than 14 days ahead.
  • Range: 3/4 inch service lines to 48 inch casing, 10 feet to 5,000 feet.
  • Phone answered 24 hours a day: (405) 409-7423

Who does directional boring near Hutton Branch Creek in Addison?

Addison is an incorporated town in Dallas County; the Census Bureau Vintage 2024 estimate puts its population at 17,257. We install water, sewer, gas, electric conduit and fiber, including service routes along Belt Line Road and connections near Hutton Branch Creek, where access and crossings shape the bore path.

Our main office is in Yukon, Oklahoma, and Addison work is done with our own crews and from satellite yards run by partner drilling contractors Trinity has personally vetted. For Addison work near the Dallas, Garland and Northeastern Railroad, our range runs from 3/4 inch service lines to 48 inch casing and bore lengths of 10 feet to 5,000 feet. We are a family business started in 1965, and we have done directional boring since 1982; the scope near Belt Line Road determines which size fits.

Aerial view of a Trinity Boring Solutions directional drill set up for a gas line bore at a commercial site
Our directional drill set up for a gas line bore at a commercial site, seen from above. Photos on this page are from our jobs in Oklahoma and Texas.

What is Addison ground like to bore through Stephen soil?

The USDA soil survey maps Stephen soil across 42% of Addison, with Dalco at 21% and Houston Black at 14%. Surface texture is mostly silty clay at 55% and clay at 36%. About 40 inches down, the survey maps bedrock in 82% of the area and clay in 15%; it maps no sandy area at that depth. For Addison, we treat mapped soil patterns as planning context, not as test borings for a directional boring route. Stephen silty clay can hold a bore hole, but sticky cuttings can gather on a reamer and clay can grip pipe.

USDA soil survey, inside the Addison city limitsWhat is mapped
Soil series mappedStephen 42 percent, Dalco 21 percent, Houston Black 14 percent, Austin 11 percent and Eddy 8 percent
Texture at the surfacesilty clay 55 percent, clay 36 percent and clay loam 8 percent
Texture about 40 inches downbedrock 82 percent and clay 15 percent
Engineering class about 40 inches downfat clay (CH) 17 percent
Average clay content about 40 inches down53 percent
Bedrock mapped within 60 inches82 percent of the area (0 percent hard rock, 82 percent weathered rock)
Seasonal water table within 60 inches0 percent of the area
Flood prone soils2 percent of the area
High corrosion risk for uncoated steel91 percent of the area

The USDA survey maps bedrock within 60 inches across 82% of Addison, typically at 22 inches; that mapped bedrock is weathered, with no hard bedrock mapped in that depth range. The survey maps no seasonal water table within 60 inches, but flood prone soils cover 2%, so Hutton Branch Creek still needs a depth plan. High steel corrosion risk is mapped across 91%, a factor for steel casing and tracer wire. The mapped Austin chalk is Late Cretaceous; weathered chalk can slow drilling compared with soil.

How do crews handle Addison bedrock and sticky soil?

Stephen soil and shallow, weathered bedrock call for controlled reaming rather than assuming a uniform path. Near Hutton Branch Creek, we set the profile around the channel and check the route as the head advances.

  1. We use a thinner drilling fluid and ream in stages through sticky Stephen soil, then plan to pull pipe the same day the hole is opened.
  2. With bedrock mapped at a typical depth of 22 inches in Addison, we check the profile and allow for slower progress through weathered material.
  3. At Hutton Branch Creek, the bore profile stays below the channel; we also check the crossing for U.S. Army Corps of Engineers jurisdiction during planning.
  4. Before drilling near Belt Line Road, we expose marked utilities with hydrovac; a surface locate shows position, while potholing reveals depth. The head is tracked and its depth and pitch are logged.
Trinity Boring Solutions crew in hard hats at the exit pit with rock tooling on a sandstone bore in Guthrie, OK
Our crew at the exit pit with rock tooling on a sandstone bore in Guthrie, Oklahoma.

What does a bore have to cross near Hutton Branch Creek in Addison?

No state highway is mapped inside Addison, but Texas State Highway 289 is 0.2 miles from the town limits, Interstate 635 is 0.7 miles away and Texas State Highway 190 is 1.3 miles away. Belt Line Road is the longest named street in town at 4.72 miles, followed by Midway Road at 4.15 miles and Quorum Drive at 3.77 miles. Those streets and nearby highways can put pavement and access constraints on a route, so the entry and exit pits need a workable location.

CrossingTypeMapped extentWho has a say
Texas State Highway 289Highway nearby0.2 miles outsideState highway office
Interstate 635Highway nearby0.7 miles outsideState highway office
Texas State Highway 190Highway nearby1.3 miles outsideState highway office
Dallas, Garland and Northeastern RailroadRailroad3.02 track miles insideThe railroad
Hutton Branch CreekStream1.51 channel miles insideChecked for Corps of Engineers jurisdiction
Farmers Branch CreekStream0.35 channel miles insideChecked for Corps of Engineers jurisdiction
White Rock CreekStream nearbyAlong the boundaryChecked for Corps of Engineers jurisdiction
Rawhide CreekStream nearby0.3 miles outsideChecked for Corps of Engineers jurisdiction
Bent Tree CCStream nearby0.4 miles outsideChecked for Corps of Engineers jurisdiction
Mc Kamy BranchStream nearby0.4 miles outsideChecked for Corps of Engineers jurisdiction
Swipe the table sideways to see every column.

The Dallas, Garland and Northeastern Railroad has 3.02 track miles in Addison, and public mapping shows 10 street and rail crossings in town. A bore under its track needs the railroad’s crossing agreement. Hutton Branch Creek runs 1.51 channel miles in town, and Farmers Branch Creek runs 0.35 miles; five mapped street crossings intersect named streams. Within one mile of Addison, we have no mapped lakes or ponds to account for when planning an underground route. A creek route needs depth planning and a check for U.S. Army Corps of Engineers jurisdiction.

Whose permission does Addison work near the Dallas, Garland and Northeastern Railroad need?

Texas State Highway 289 is just outside Addison, and work in its right of way needs a TxDOT utility permit reviewed by the TxDOT Dallas District. The utility that owns the line files through TxDOT’s RULIS system; we provide the bore plan and profile and work under the owner’s permit. If a route crosses the Dallas, Garland and Northeastern Railroad, the railroad’s agreement sets its crossing conditions. Addison’s own streets belong to the town. For Hutton Branch Creek, planning includes checking whether the crossing falls under U.S. Army Corps of Engineers jurisdiction.

Read the rules for yourself: Texas Utilities Code Chapter 251 on notice to Texas811, the Texas811 questions and answers page, the TxDOT Utility Accommodation Rules, 43 TAC 21.40 and TxDOT utility permits in RULIS.

Which utilities serve Addison and Dallas County?

The Town of Addison public water system serves 17,257 people through 12,434 service connections and uses purchased surface water. For electric work, utilities reporting service in Dallas County include Oncor Electric Delivery Company, Texas-New Mexico Power, City of Garland, Farmers Electric Cooperative, HILCO Electric Cooperative and Trinity Valley Electric Cooperative. The line owner needs confirmation before a conduit bore near Belt Line Road. We can hydrovac pothole marked lines before drilling near the water system or electric conduit.

Line ownerWhat it isSourceSize
Town of AddisonPublic water systemSurface water bought from another system12,434 connections, 17,257 people served
Oncor Electric Delivery Company, Texas-New Mexico Power, City of Garland, Farmers Electric Cooperative, HILCO Electric Cooperative and Trinity Valley Electric CooperativeElectric utilities reporting service in Dallas CountyEIA Form 861Confirm the line owner by address
Swipe the table sideways to see every column.

The American Community Survey 2019 to 2023 five year estimates put Addison’s median housing year at 1996; 2% of housing was built before 1960, and 39% was built in 2000 or later. That mix means a Belt Line Road job could involve an older line replacement or a newer service extension. Paint shows a marked utility’s position, not its depth, so we expose marked lines with hydrovac before the drill approaches a crossing.

Reel of yellow polyethylene gas pipe on a trailer staged for a directional bore
A reel of yellow polyethylene gas pipe on a trailer, staged for a directional bore.

Where is Addison in relation to Farmers Branch and Yukon?

Addison is an incorporated town in Dallas County, with 4.35 square miles of land and an elevation of 640 feet. For underground work planning, we use Addison’s ZIP codes 75001 and 75254 to identify the location of boring requests. Farmers Branch is 3.6 miles southwest, and Carrollton is 4.2 miles northwest; Dallas, the county seat, is 12.4 miles south. The Yukon, Oklahoma main office is 208 road miles away, a 4.1 hour drive. That distance is part of planning mobilization for work along Addison’s 67.24 public road centerline miles.

Places near Addison

What would we bore near Belt Line Road in Addison?

  • Water service: A connection to the Town of Addison water system near Belt Line Road can be routed around existing marked lines with potholing first.
  • Fiber conduit: A route along Quorum Drive can avoid cutting pavement by placing entry and exit pits in dirt where access allows.
  • Highway crossing: A bore near Texas State Highway 289 needs a route matched to its right of way and the permit issued to the line owner.
  • Creek crossing: A route beneath Hutton Branch Creek needs a planned profile below the channel and a jurisdiction check during planning.
  • Rail crossing: A bore beneath the Dallas, Garland and Northeastern Railroad needs the railroad agreement and its conditions built into the plan.
  • Electric conduit: Near Midway Road, we identify the electric line owner before planning the conduit route and exposing marked utilities.

More on each kind of work: water line boring, electric line boring, fiber optic boring, road, railroad and creek crossings and municipal boring.

How do I get a quote near Texas State Highway 289 in Addison?

Start with an address or map pin; the exact spot matters near Texas State Highway 289 or Hutton Branch Creek because right of way and crossing conditions change by location. Include what will go in the ground, pipe or conduit size and footage. A sketch or plans help us see the route, nearby marked lines and possible pit locations before we scope the bore.

Price starts with the ground and crossings: Stephen soil can load a reamer, while mapped shallow bedrock can add drilling time. The Dallas, Garland and Northeastern Railroad or Hutton Branch Creek may add crossing and planning work. Pipe or conduit size and footage matter, as do utilities to expose, pavement, pits, excavator time and sand backfill. Mobilization also reflects Addison’s 208 road miles from Yukon. When high profile or emergency boring work arises in Addison, we adjust the scope to match the requested work.

Questions people ask about boring in Addison

Does Trinity take directional boring work in Addison and Dallas County, and who staffs it?

Yes. Trinity takes directional boring work in Addison, and crews may come from the Yukon main office or vetted partner contractor yards. Whether crews change on site, we coordinate with Trinity through the bore log for Addison boring work. For a route in Dallas County, we scope the named street, line and access before work is planned.

What ground should I expect in Addison’s Stephen soil?

The USDA soil survey maps Stephen soil across 42% of Addison, with silty clay making up 55% of surface texture. About 40 inches down, bedrock is mapped across 82% of the area and clay across 15%. Sticky clay can build on the reamer, so the drilling fluid and reaming sequence need attention.

How much of Addison has bedrock within five feet, and is it hard or weathered?

The USDA soil survey maps bedrock within 60 inches across 82% of Addison. The mapped bedrock is weathered, and no hard bedrock is mapped within that depth. Its typical mapped depth is 22 inches, so a route may slow as the drill moves from soil into weathered rock.

Who approves a bore near Texas State Highway 289 in Addison?

TxDOT reviews utility work in the Texas State Highway 289 right of way through the TxDOT Dallas District. The utility owner submits the application in TxDOT’s RULIS system, while we provide the bore plan and profile and work under the issued permit. The exact location near the town limits affects the route and permit scope.

What does a bore under the Dallas, Garland and Northeastern Railroad in Addison require?

A crossing under the Dallas, Garland and Northeastern Railroad needs an agreement with the railroad. Its terms set the crossing conditions, including casing, depth and flagging. The railroad has 3.02 track miles in Addison, so the route and track location need to be identified before the bore plan is finalized.

Can a line be bored under Hutton Branch Creek in Addison?

A bore under Hutton Branch Creek can be planned, with the profile set to pass below the channel. The creek runs 1.51 channel miles in Addison, so the proposed crossing needs a site specific depth plan and a check for U.S. Army Corps of Engineers jurisdiction during planning.

Can I reach Trinity after hours for an urgent bore near Quorum Drive in Addison?

Yes. We tell Addison callers that a person answers Trinity’s phone 24 hours a day at (405) 409-7423. For urgent work near Quorum Drive, have the location and line type ready so we can understand the issue and what response may be needed.

How much notice does Texas811 need for a bore along Belt Line Road in Addison?

Paint marks along Belt Line Road show utility position, not depth. Texas law requires a Texas811 locate request at least 48 hours before excavation, excluding Saturdays, Sundays and legal holidays, and no earlier than 14 days before. If the start slips more than 14 days past the original notice, make a new request; worn or moved marks must be refreshed through Texas811 before work continues.

What affects the cost of directional boring near Texas State Highway 289 in Addison?

The price depends on the job scope, not a fixed rate. Stephen soil and shallow mapped bedrock affect drilling time; crossings near Texas State Highway 289 or the Dallas, Garland and Northeastern Railroad affect planning. Length, pipe size, utility exposure, pavement, pits, excavator time, backfill and mobilization from Yukon also shape the work.

Where the Addison facts on this page come from

Darren Rice in a safety vest at the bore pit beside the Trinity Boring Solutions Ditch Witch directional drill, with drill rods racked, on the airfield at Will Rogers World Airport in Oklahoma City

About Trinity Boring Solutions

Trinity Boring Solutions is a family business in Yukon, Oklahoma, founded by Dean Rice in 1965 and owned today by Darren Rice, who started its directional boring side in 1982. The company bores across Oklahoma and Texas. No bore is too big or too small: 4 foot sidewalk sleeves to roughly 4,100 feet under the Arkansas River in Tulsa. Reach us at (405) 409-7423.

Get a Quote for a Bore in Addison

Send the address, what is going in, the size and the footage.

Trinity Boring Solutions
9102 NW Expressway, Yukon, OK 73099
(405) 409-7423 | darren@trinityboringsolutions.com

Trinity Boring Solutions | 24/7 Available ☎ Call (405) 409-7423 Free Quote

Free Bore Planner

Plan Your Bore in Addison, Texas

Type the address of your job in Addison. The Bore Planner opens an aerial map at that spot. Drop one pin where the bore starts and one where it ends, tell us what is going in and send the scope to our crew.

Talk to the crew that does the work

Fastest way to a number is a phone call. Tell us where the crossing is and what is going in the ground, and you will get a straight answer on the same call. Bores from 10 feet to 5,000 feet, 3/4 inch service line through 48 inch casing, anywhere in Oklahoma and Texas. We run 24/7 for main breaks and emergency repairs.

Call (405) 409-7423

Answered by a person, not a call center.

Would rather not call? Send the details and we will come back with a written quote.